Awareness of the adverse ecological effects of road and other large construction projects has resulted in a rapidly growing demand to quantitatively predict and evaluate the effects on gene flow among plants and anima...Awareness of the adverse ecological effects of road and other large construction projects has resulted in a rapidly growing demand to quantitatively predict and evaluate the effects on gene flow among plants and animals in natural habitats.In this study,we evaluated the effects of different road construction scenarios on animal species movement by using the methods of ecological landscape connectivity in the typical regions of Yunnan Province,China.The results showed landscape connectivity levels(Probability of Connectivity(PC))decreased after road construction and species with lower dispersal abilities were more affected to the subsequent habitat fragmentation.First level roads affected landscape connectivity most significantly.At a distance of 100 m,the PC index decreased more than 50%.Further analysis suggested that the use of landscape connectivity to assess landscape processes revealed the adverse effects on the species movement more effectively compared with the traditional landscape pattern analysis.In addition,we conducted a graph theory and a least-cost modeling discussion,it is obvious that they are powerful tools to represent and analyze landscape networks with respect to related species movement.Network analysis offers a quantitative and simple but effective tool for ecological process assessment and biological conservation on large scales.展开更多
A cost estimate is one of the most important steps in road project management. There are ranges of factors that mostly affect the final project cost. Many approaches were used to estimate project cost, which took into...A cost estimate is one of the most important steps in road project management. There are ranges of factors that mostly affect the final project cost. Many approaches were used to estimate project cost, which took into consideration probable project performance and risks. The aim is to improve the ability of construction managers to predict a parametric cost estimate for road projects using SVM (support vector machine). The work is based on collecting historical road executed cases. The 12 factors were identified to be the most important factors affecting the cost-estimating model. A total of 70 case studies from historical data were divided randomly into three sets: training set includes 60 cases, cross validation set includes three cases and testing set includes seven cases. The built model was successfully able to predict project cost to the AP (accuracy performance) of 95%.展开更多
The need for Optimum Value benefit realization on Road Projects in developing countries has become topical. While the traditional Cost Control project management process only aligns actual costs with budgeted costs, V...The need for Optimum Value benefit realization on Road Projects in developing countries has become topical. While the traditional Cost Control project management process only aligns actual costs with budgeted costs, Value Engineering (VE) is a sustainable and systematic innovative methodology for establishing the best functional balance among desired features of a project. A Value Engineering (VE) study was conducted with the aim of examining the benefits associated with its use on Road Projects in Ghana. This study employed a two-stage research procedure: desk study and field research. The literature review identified the Optimum Value benefits associated with VE road project management technique as increased Confidence Level in Contract Compliance, reliable Implementation Level of Construction Delivery and enhanced Effectiveness Level of Project Sustainability. A quantitative survey research design based on a purposive sampling technique of selecting respondents was adopted. Employing closed-ended questions, 40 sets of questionnaires were issued to professionals in Road Infrastructure and Support Agencies (RISA) under the Ministry of Roads and Highways (MRH) in the Eastern Region of Ghana. At a response rate of 85%, descriptive statistical analysis (Means, Standard Deviations and Variances) and inferential statistical analysis of variance (ANOVA) test were used to process the data and determine whether there was any significant difference between VE benefit parameters and the groups of respondents. The results revealed that road professionals are familiar with the VE process but solely use Cost Control project management technique. Road professionals recognized the high Optimum Value benefits of professionally ethical Contract Compliance, efficient Construction Delivery and functionally viable Project Sustainability on VE road project management process.展开更多
Characteristics of road landscaping were analyzed,as a kind of "linear" landscaping,it could be classified into urban street landscaping,urban ring road and expressway landscaping.Differences between road la...Characteristics of road landscaping were analyzed,as a kind of "linear" landscaping,it could be classified into urban street landscaping,urban ring road and expressway landscaping.Differences between road landscaping projects and other garden landscaping projects or construction projects were analyzed.Landscaping project for the South 3rd Ring Road of Xi'an City(in Yanta District)was taken for an example to summarize construction experience,discuss present conditions and features of garden landscaping supervision in China.The artistic and physiological properties of garden landscaping,as well as the supervision during maintenance period were stressed,but it was also pointed out that garden landscaping supervision in China was actually not given sufficient attention.On this basis,key points in the supervision of road landscaping project were proposed:understanding design ideas,selection of landscape plants,quality control of concealed works,prevention and control of diseases and insects,construction safety management and overall image;only by effectively implementing these key points,a high-quality road landscaping project could be realized to improve the image of a city and beautify its environment.展开更多
A number of studies conducted in Kenya </span><span style="font-family:Verdana;">and </span><span style="font-family:Verdana;">internationally indicate</span>...A number of studies conducted in Kenya </span><span style="font-family:Verdana;">and </span><span style="font-family:Verdana;">internationally indicate</span><span style="font-family:Verdana;">d</span><span style="font-family:""><span style="font-family:Verdana;"> that most of the construction firms and contractors do not seem to strictly observe safety administration in construction industry, hence compromised performance at implementation stage of projects and even later in the post implementation or post-delivery stage. The study aimed to examine the influence of contractors’ safety record on road performance. This is to create better understanding of how the safety record of contractors could either positively or negatively influence performance of roads during post-delivery stage. The study used both descriptive survey research design and correlation design based on a pragmatic mixed method approach. Through stratified sampling and proportionate sampling, a sample of 210 was drawn from a population of 460 comprising of registered contractors and Public Service Vehicles (PSV) drivers within Nairobi County in Kenya. Questionnaires were distributed using simple random sampling. The questionnaires returned were 153 in total representing 72.8% of all questionnaires distributed to the respondents. Data was descriptively analyzed using percentages, frequencies, means and standard deviations for measuring central tendency and variability. Inferential analysis was done by use of correlation and regression. The descriptive analysis revealed that safety policy management system, insurance policy, and adequacy of standards in addressing safety outcome are to some extent practiced and adhered to. However, compliance behavior to safety procedures is still weak and requires improvement. The null hypothesis was tested and the results obtained from a simple linear regression indicated that, R = 0.657, R</span><sup><span style="font-size:12px;font-family:Verdana;">2</span></sup><span style="font-family:Verdana;"> = 0.431, B = 0.359, t = 10.703, F (1,151) = 114.558, p = 0.000 < 0.05. This means that contractors’ safety record has a strong positive and significant relationship with road performance and that 43.1% of variation in performance is explained by safety record. This study recommends that contractors’ safety record should be part</span></span><span style="font-family:Verdana;">,</span><span style="font-family:Verdana;"> and parcel of the evaluation criteria used in selection of a suitable road contractor to ensure road performance is achieved even after construction is completed. The study is significant in that it contributes to the body of knowledge by providing empirical data on the need for safety procedures in urban road construction and beyond.展开更多
随着信息技术的快速发展,建筑信息模型(Building Information Modeling,BIM)在建筑行业中的应用日益广泛。本论文针对路桥项目的特殊性,以解决实际问题为目标,探讨了BIM在路桥项目管理与协调中的应用[1]。通过对实际项目的案例研究,提...随着信息技术的快速发展,建筑信息模型(Building Information Modeling,BIM)在建筑行业中的应用日益广泛。本论文针对路桥项目的特殊性,以解决实际问题为目标,探讨了BIM在路桥项目管理与协调中的应用[1]。通过对实际项目的案例研究,提出了一套基于BIM的路桥项目管理与协调的方法和工具,以优化项目的生命周期管理和提高项目的整体效率。本研究为路桥项目的实际应用提供了有益的参考和指导。展开更多
基金Under the auspices of Nonprofit Environment Protection Specific Project of China(No.201209029-4)
文摘Awareness of the adverse ecological effects of road and other large construction projects has resulted in a rapidly growing demand to quantitatively predict and evaluate the effects on gene flow among plants and animals in natural habitats.In this study,we evaluated the effects of different road construction scenarios on animal species movement by using the methods of ecological landscape connectivity in the typical regions of Yunnan Province,China.The results showed landscape connectivity levels(Probability of Connectivity(PC))decreased after road construction and species with lower dispersal abilities were more affected to the subsequent habitat fragmentation.First level roads affected landscape connectivity most significantly.At a distance of 100 m,the PC index decreased more than 50%.Further analysis suggested that the use of landscape connectivity to assess landscape processes revealed the adverse effects on the species movement more effectively compared with the traditional landscape pattern analysis.In addition,we conducted a graph theory and a least-cost modeling discussion,it is obvious that they are powerful tools to represent and analyze landscape networks with respect to related species movement.Network analysis offers a quantitative and simple but effective tool for ecological process assessment and biological conservation on large scales.
文摘A cost estimate is one of the most important steps in road project management. There are ranges of factors that mostly affect the final project cost. Many approaches were used to estimate project cost, which took into consideration probable project performance and risks. The aim is to improve the ability of construction managers to predict a parametric cost estimate for road projects using SVM (support vector machine). The work is based on collecting historical road executed cases. The 12 factors were identified to be the most important factors affecting the cost-estimating model. A total of 70 case studies from historical data were divided randomly into three sets: training set includes 60 cases, cross validation set includes three cases and testing set includes seven cases. The built model was successfully able to predict project cost to the AP (accuracy performance) of 95%.
文摘The need for Optimum Value benefit realization on Road Projects in developing countries has become topical. While the traditional Cost Control project management process only aligns actual costs with budgeted costs, Value Engineering (VE) is a sustainable and systematic innovative methodology for establishing the best functional balance among desired features of a project. A Value Engineering (VE) study was conducted with the aim of examining the benefits associated with its use on Road Projects in Ghana. This study employed a two-stage research procedure: desk study and field research. The literature review identified the Optimum Value benefits associated with VE road project management technique as increased Confidence Level in Contract Compliance, reliable Implementation Level of Construction Delivery and enhanced Effectiveness Level of Project Sustainability. A quantitative survey research design based on a purposive sampling technique of selecting respondents was adopted. Employing closed-ended questions, 40 sets of questionnaires were issued to professionals in Road Infrastructure and Support Agencies (RISA) under the Ministry of Roads and Highways (MRH) in the Eastern Region of Ghana. At a response rate of 85%, descriptive statistical analysis (Means, Standard Deviations and Variances) and inferential statistical analysis of variance (ANOVA) test were used to process the data and determine whether there was any significant difference between VE benefit parameters and the groups of respondents. The results revealed that road professionals are familiar with the VE process but solely use Cost Control project management technique. Road professionals recognized the high Optimum Value benefits of professionally ethical Contract Compliance, efficient Construction Delivery and functionally viable Project Sustainability on VE road project management process.
文摘Characteristics of road landscaping were analyzed,as a kind of "linear" landscaping,it could be classified into urban street landscaping,urban ring road and expressway landscaping.Differences between road landscaping projects and other garden landscaping projects or construction projects were analyzed.Landscaping project for the South 3rd Ring Road of Xi'an City(in Yanta District)was taken for an example to summarize construction experience,discuss present conditions and features of garden landscaping supervision in China.The artistic and physiological properties of garden landscaping,as well as the supervision during maintenance period were stressed,but it was also pointed out that garden landscaping supervision in China was actually not given sufficient attention.On this basis,key points in the supervision of road landscaping project were proposed:understanding design ideas,selection of landscape plants,quality control of concealed works,prevention and control of diseases and insects,construction safety management and overall image;only by effectively implementing these key points,a high-quality road landscaping project could be realized to improve the image of a city and beautify its environment.
文摘A number of studies conducted in Kenya </span><span style="font-family:Verdana;">and </span><span style="font-family:Verdana;">internationally indicate</span><span style="font-family:Verdana;">d</span><span style="font-family:""><span style="font-family:Verdana;"> that most of the construction firms and contractors do not seem to strictly observe safety administration in construction industry, hence compromised performance at implementation stage of projects and even later in the post implementation or post-delivery stage. The study aimed to examine the influence of contractors’ safety record on road performance. This is to create better understanding of how the safety record of contractors could either positively or negatively influence performance of roads during post-delivery stage. The study used both descriptive survey research design and correlation design based on a pragmatic mixed method approach. Through stratified sampling and proportionate sampling, a sample of 210 was drawn from a population of 460 comprising of registered contractors and Public Service Vehicles (PSV) drivers within Nairobi County in Kenya. Questionnaires were distributed using simple random sampling. The questionnaires returned were 153 in total representing 72.8% of all questionnaires distributed to the respondents. Data was descriptively analyzed using percentages, frequencies, means and standard deviations for measuring central tendency and variability. Inferential analysis was done by use of correlation and regression. The descriptive analysis revealed that safety policy management system, insurance policy, and adequacy of standards in addressing safety outcome are to some extent practiced and adhered to. However, compliance behavior to safety procedures is still weak and requires improvement. The null hypothesis was tested and the results obtained from a simple linear regression indicated that, R = 0.657, R</span><sup><span style="font-size:12px;font-family:Verdana;">2</span></sup><span style="font-family:Verdana;"> = 0.431, B = 0.359, t = 10.703, F (1,151) = 114.558, p = 0.000 < 0.05. This means that contractors’ safety record has a strong positive and significant relationship with road performance and that 43.1% of variation in performance is explained by safety record. This study recommends that contractors’ safety record should be part</span></span><span style="font-family:Verdana;">,</span><span style="font-family:Verdana;"> and parcel of the evaluation criteria used in selection of a suitable road contractor to ensure road performance is achieved even after construction is completed. The study is significant in that it contributes to the body of knowledge by providing empirical data on the need for safety procedures in urban road construction and beyond.
文摘随着信息技术的快速发展,建筑信息模型(Building Information Modeling,BIM)在建筑行业中的应用日益广泛。本论文针对路桥项目的特殊性,以解决实际问题为目标,探讨了BIM在路桥项目管理与协调中的应用[1]。通过对实际项目的案例研究,提出了一套基于BIM的路桥项目管理与协调的方法和工具,以优化项目的生命周期管理和提高项目的整体效率。本研究为路桥项目的实际应用提供了有益的参考和指导。