期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
Composite active control system of roof and side truss cable for large section coal roadway in fold coal pillar area 被引量:5
1
作者 Sheng-Rong XIE Er-Peng LI Fu-Lian HE Shou-Bao ZHANG Guang-Chao ZHANG Mao-Yu PANG 《Journal of Coal Science & Engineering(China)》 2013年第2期126-132,共7页
In order to solve the surrounding rock control problem of large section gangue replacement roadway under complicated conditions, this paper analyzed the impact to the roadway controlling produced by the geological con... In order to solve the surrounding rock control problem of large section gangue replacement roadway under complicated conditions, this paper analyzed the impact to the roadway controlling produced by the geological conditions such as high ground stress, folded structure tilted roof asymmetry and soft wall rock, and built the tilt layered roof structural mechanics model to clarify the increase span mechanism of the weak coal instability. Then, we proposed the combined control system including roof inclined truss cable, coal-side cable-channel steel and intensive bolt support. And then by building the structural mechanics model of roof inclined truss cable system, the support principle was described. Besides, according to this model, we deduced the calculation formula of cable anchoring force and its tensile stress. Finally surrounding rock control technology of large section roadway in fold coal pillar area was formed. Field practice shows that the greatest roof convergence of gangue replacement roadway is 158 mm and coal-side deformation is 243 mm. Roadway deformation is controlled effectively and technical support is provided for replacement mining. 展开更多
关键词 fold coal pillar area increase span mechanism roof inclined truss cable system coal-side cable-channel steel structural mechanics model
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部