This paper analyzed the deformation mechanism in lateral roof roadway of the Ding Wu-3 roadway which was disturbed by repeated mining of close coal seams Wu-8 and Wu-10 in Pingdingshan No. 1 Mine. To determine the str...This paper analyzed the deformation mechanism in lateral roof roadway of the Ding Wu-3 roadway which was disturbed by repeated mining of close coal seams Wu-8 and Wu-10 in Pingdingshan No. 1 Mine. To determine the strata disturbance scope, the strata displacement angle was used to calculate the protection pillar width. A numerical model was built considering the field geological conditions. In simulation, the mining stress borderline was defined as the contour where the induced stress is 1.5 times of the original stress. Simulation results show the mining stress borderline of the lateral roadway extended 91.7 m outward after repeated mining. Then the original stress increased, deforming the road- way of interest. This deformation agreed with the in situ observations. Moreover, the strata displacement angle changed due to repeated mining. Therefore, reselection of the displacement angle was required to design the protective pillar width. Since a constant strata displacement angle was used in traditional design, the orooosed method was beneficial in field cases.展开更多
Deep beam anchorage structures based on spatial distribution analysis of the cable prestressed field have been proposed for roadway roof support, Stability and other factors that influence deep beam structures are stu...Deep beam anchorage structures based on spatial distribution analysis of the cable prestressed field have been proposed for roadway roof support, Stability and other factors that influence deep beam structures are studied in this paper using mechanical calculations, numerical analysis and field measurements, A mechanical model of deep beam structure subjected to multiple loading is established, including analysis of roof support in the return airway of S1203 working face in the Yuwu coal mine, China, The expression of maximum shear stress in the deep beam structure is deduced according to the stress superposition criterion, It is found that the primary factors affecting deep beam structure stability are deep beam thickness, cable pre-tension and cable spacing, The variation of maximum shear stress distribution and prestressed field diffusion effects according to various factors are analyzed using Matlah and FLAC3DTM software, and practical support parameters of the S1203 return airway roof are determined, According to the observations of rock pressure, there is no evidence of roof separation, and the maximum values of roof subsidence and convergence of wall rock are 72 and 48 mm, respectively, The results show that the proposed roof support design with a deep beam structure is feasible and achieves effective control of the roadway roof,展开更多
A reasonable unsupported roof distance(URD) when advancing underground coal mine roadways can contribute greatly to safe and rapid roadway development.A mechanical model of the roof,using the relationship between the ...A reasonable unsupported roof distance(URD) when advancing underground coal mine roadways can contribute greatly to safe and rapid roadway development.A mechanical model of the roof,using the relationship between the roof stress distribution and URD,obtained by the difference method,and roof stability according to the in-situ roof stress and rock mass strength was developed.We subsequently designed a proper range of URD,developed a testing method of URD with the function of mining protection,evaluated roof stability through analyzing the test data and then determined a reasonable URD.Considering the factors of the geological conditions,the immediate roof stability and the efficiency of the labor arrangement system,the URD of the advancing roadway of 9802 working face in Zhangshuanglou coal mine was determined to be 6 m using the proposed method.The results show that,when a 2 m length of roadway was reinforced by temporary support and high pre-stressed bolt support after the roadway advancement of 6 m per cycle,the speed and the security of the roadway development can be achieved and the advance rate can reach more than 400 m per month.展开更多
We investigated the deformation failure mechanism of surrounding rock from the aspect of engineering support for a roadway in seams with soft roofs and soft floors and observed the large displacement of the roadway in...We investigated the deformation failure mechanism of surrounding rock from the aspect of engineering support for a roadway in seams with soft roofs and soft floors and observed the large displacement of the roadway in these soft seams.The result shows that the deformation area is quite large,and settlement of the roof is evident and displacement of the side walls is also obvious.We considered rock bolt-cable coupling for roadway support in seams with soft roofs and floors,in which the cable should be fixed at key positions.As well,we designed an optimal scheme to support a roadway in soft seams of the Shizuishan Second Mine in Ningxia,China.Field monitoring results show that bolt-cable coupling support has achieved the aims of roadway stability control and minimizes deformation.展开更多
Automated installation of primary roof support material can potentially increase productivity and operator safety in the roadway development process within underground coal mining. Although the broader manufacturing s...Automated installation of primary roof support material can potentially increase productivity and operator safety in the roadway development process within underground coal mining. Although the broader manufacturing sector has benefited from automation, several challenges exist within the Australian underground coal industry which makes it difficult to fully exploit these technologies. At the University of Wollongong a series of reprogrammable electromechanical manipulators have been designed to overcome these challenges and automatically handle the installation of roof and rib containment consumables on a continuous miner. The automated manipulation removes personnel from hazards in the immediate face area, particularly those associated with working in a confined and unstable working environment in close proximity to rotating and moving equipment. In a series of above ground trials the automated system was successfully demonstrated without human intervention and proven to be capable of achieving cycle times at a rate of 10 m per operating hour, consistent with that required to support high capacity longwall mines. The trials also identified a number of refinements which could further improve both cycle times and system reliability when considering the technology for underground use. The results have concluded that conventional manual handling practices on a continuous miner can be eliminated, and that the prototypes have significantly reduced the technical risk in proceeding to a full underground trial.展开更多
The stability of a backfill wall is critical to implement gob-side entry driving technology in which a small coal pillar is substituted by a waste backfill wall. Based on features of surrounding rock structures in the...The stability of a backfill wall is critical to implement gob-side entry driving technology in which a small coal pillar is substituted by a waste backfill wall. Based on features of surrounding rock structures in the backfill wall, we propose a mechanical model on the structural effect of a soft-hard backfill wall using theory analysis, physical experiments and a numerical simulation. The results show thatChe deformation of the structure of the soft-hard backfill wall is coordinated with the roof and floor. The soft structure on the top of the backfill wall can absorb the energy in the roof by its large deformation and adapt to the given deformation caused by the rotation and subsidence of a key rock block. The hard structure at the bottom of the backfill wall can absorb the strong supporting resistance from the top surrounding rock. The soft structure on the top protecting the hard bottom structure by its large deformation contributes to the stability of the entire backfill wall. An application indicated that the stress in the backfill wall effec- tively decreased and its deformation was significantly reduced after the top coal remained. This ensured the stability of the backfill wall.展开更多
Deep large span cut holes are difficult to stabilize. The 7801 cut hole in the Lu'an Wuyang Mine was used as this project's background. The main factors affecting large span cut hole stability are analyzed. Pr...Deep large span cut holes are difficult to stabilize. The 7801 cut hole in the Lu'an Wuyang Mine was used as this project's background. The main factors affecting large span cut hole stability are analyzed. Pre- stressed bolting theory was used to design a roof control method for a large span roadway. By reducing the span and applying equal strength coordinated supports the rock could be stabilized. The control prin- ciples and methods are given herein along with the analysis. A double micro arch cross section roadway is defined and its use in solving the current problem is described. Beam arch theory was used to build a model of the double micro arch cross section roadway. A support reverse force model for the arch foot intersection was also derived. A support method based upon reducing the width of the large span in the cut hole is presented. These results show that the reduced span of the roadway roof plus the use of cable anchors and single supports gives an effective way to control the large span cut hole. On site monitoring showed that the reduced span support from the double micro arch cross section roadway design had a significant effect. The roadway surface displacement was small and harmful deformation of the cut hole was effectively controlled. This will ensure its long term stability.展开更多
基金Financial supports from the National Natural Science Foundation of China (No. 51204160)the Priority Academic Program Development of Jiangsu Higher Education Institutions of China(No.SZBF2011-6-B35)+1 种基金the National Science and Technology Support Program of China(No.2012BAK04B06)the Project Funded by State Key Laboratory of Coal Resources and Safe Mining of China(No.SKLCRSM11X03)
文摘This paper analyzed the deformation mechanism in lateral roof roadway of the Ding Wu-3 roadway which was disturbed by repeated mining of close coal seams Wu-8 and Wu-10 in Pingdingshan No. 1 Mine. To determine the strata disturbance scope, the strata displacement angle was used to calculate the protection pillar width. A numerical model was built considering the field geological conditions. In simulation, the mining stress borderline was defined as the contour where the induced stress is 1.5 times of the original stress. Simulation results show the mining stress borderline of the lateral roadway extended 91.7 m outward after repeated mining. Then the original stress increased, deforming the road- way of interest. This deformation agreed with the in situ observations. Moreover, the strata displacement angle changed due to repeated mining. Therefore, reselection of the displacement angle was required to design the protective pillar width. Since a constant strata displacement angle was used in traditional design, the orooosed method was beneficial in field cases.
基金provided by the National Natural Science Foundation of China (Nos. 51504259 and 51234005)the Fundamental Research Funds for the Central Universities (No. 2010QZ06)
文摘Deep beam anchorage structures based on spatial distribution analysis of the cable prestressed field have been proposed for roadway roof support, Stability and other factors that influence deep beam structures are studied in this paper using mechanical calculations, numerical analysis and field measurements, A mechanical model of deep beam structure subjected to multiple loading is established, including analysis of roof support in the return airway of S1203 working face in the Yuwu coal mine, China, The expression of maximum shear stress in the deep beam structure is deduced according to the stress superposition criterion, It is found that the primary factors affecting deep beam structure stability are deep beam thickness, cable pre-tension and cable spacing, The variation of maximum shear stress distribution and prestressed field diffusion effects according to various factors are analyzed using Matlah and FLAC3DTM software, and practical support parameters of the S1203 return airway roof are determined, According to the observations of rock pressure, there is no evidence of roof separation, and the maximum values of roof subsidence and convergence of wall rock are 72 and 48 mm, respectively, The results show that the proposed roof support design with a deep beam structure is feasible and achieves effective control of the roadway roof,
基金supported by the State Key Laboratory of Coal Resources and Sate Mining,China University of Mining and Technology (No.SKLCRSM13X07)the National Natural Science Foundation of China (No.51174195)+1 种基金Chinese National Programs for Fundamental Research and Development (No.2013CB227900)the Fundamental Research Funds for the Central Universities (No.2014XT01)
文摘A reasonable unsupported roof distance(URD) when advancing underground coal mine roadways can contribute greatly to safe and rapid roadway development.A mechanical model of the roof,using the relationship between the roof stress distribution and URD,obtained by the difference method,and roof stability according to the in-situ roof stress and rock mass strength was developed.We subsequently designed a proper range of URD,developed a testing method of URD with the function of mining protection,evaluated roof stability through analyzing the test data and then determined a reasonable URD.Considering the factors of the geological conditions,the immediate roof stability and the efficiency of the labor arrangement system,the URD of the advancing roadway of 9802 working face in Zhangshuanglou coal mine was determined to be 6 m using the proposed method.The results show that,when a 2 m length of roadway was reinforced by temporary support and high pre-stressed bolt support after the roadway advancement of 6 m per cycle,the speed and the security of the roadway development can be achieved and the advance rate can reach more than 400 m per month.
文摘We investigated the deformation failure mechanism of surrounding rock from the aspect of engineering support for a roadway in seams with soft roofs and soft floors and observed the large displacement of the roadway in these soft seams.The result shows that the deformation area is quite large,and settlement of the roof is evident and displacement of the side walls is also obvious.We considered rock bolt-cable coupling for roadway support in seams with soft roofs and floors,in which the cable should be fixed at key positions.As well,we designed an optimal scheme to support a roadway in soft seams of the Shizuishan Second Mine in Ningxia,China.Field monitoring results show that bolt-cable coupling support has achieved the aims of roadway stability control and minimizes deformation.
基金the Australian Coal Association Research Programthe Roadway Development Task Group for their ongoing support with funding and review
文摘Automated installation of primary roof support material can potentially increase productivity and operator safety in the roadway development process within underground coal mining. Although the broader manufacturing sector has benefited from automation, several challenges exist within the Australian underground coal industry which makes it difficult to fully exploit these technologies. At the University of Wollongong a series of reprogrammable electromechanical manipulators have been designed to overcome these challenges and automatically handle the installation of roof and rib containment consumables on a continuous miner. The automated manipulation removes personnel from hazards in the immediate face area, particularly those associated with working in a confined and unstable working environment in close proximity to rotating and moving equipment. In a series of above ground trials the automated system was successfully demonstrated without human intervention and proven to be capable of achieving cycle times at a rate of 10 m per operating hour, consistent with that required to support high capacity longwall mines. The trials also identified a number of refinements which could further improve both cycle times and system reliability when considering the technology for underground use. The results have concluded that conventional manual handling practices on a continuous miner can be eliminated, and that the prototypes have significantly reduced the technical risk in proceeding to a full underground trial.
基金Financial supports for this work, provided by the New Century Excellent Talents in University (No.NCET-05-0480)the Research Fund of the State Key Laboratory of Coal Resources and Mine Safety of CUMT (No.09KF06)the Scientific Research Fund of CUMT (No.OA090239)
文摘The stability of a backfill wall is critical to implement gob-side entry driving technology in which a small coal pillar is substituted by a waste backfill wall. Based on features of surrounding rock structures in the backfill wall, we propose a mechanical model on the structural effect of a soft-hard backfill wall using theory analysis, physical experiments and a numerical simulation. The results show thatChe deformation of the structure of the soft-hard backfill wall is coordinated with the roof and floor. The soft structure on the top of the backfill wall can absorb the energy in the roof by its large deformation and adapt to the given deformation caused by the rotation and subsidence of a key rock block. The hard structure at the bottom of the backfill wall can absorb the strong supporting resistance from the top surrounding rock. The soft structure on the top protecting the hard bottom structure by its large deformation contributes to the stability of the entire backfill wall. An application indicated that the stress in the backfill wall effec- tively decreased and its deformation was significantly reduced after the top coal remained. This ensured the stability of the backfill wall.
基金Financial supports are from the National Natural Science Foundation of China (No. 50874104)the Scientific Research Industrialization Project of Jiangsu Universities (No. JH07-023)
文摘Deep large span cut holes are difficult to stabilize. The 7801 cut hole in the Lu'an Wuyang Mine was used as this project's background. The main factors affecting large span cut hole stability are analyzed. Pre- stressed bolting theory was used to design a roof control method for a large span roadway. By reducing the span and applying equal strength coordinated supports the rock could be stabilized. The control prin- ciples and methods are given herein along with the analysis. A double micro arch cross section roadway is defined and its use in solving the current problem is described. Beam arch theory was used to build a model of the double micro arch cross section roadway. A support reverse force model for the arch foot intersection was also derived. A support method based upon reducing the width of the large span in the cut hole is presented. These results show that the reduced span of the roadway roof plus the use of cable anchors and single supports gives an effective way to control the large span cut hole. On site monitoring showed that the reduced span support from the double micro arch cross section roadway design had a significant effect. The roadway surface displacement was small and harmful deformation of the cut hole was effectively controlled. This will ensure its long term stability.