Based on the hydrodynamic model and the Xinanjiang model, the fiver stage forecasting model has been proposed. But its performance is not satisfactory as applied to estuary areas. River roughness is a sensitive parame...Based on the hydrodynamic model and the Xinanjiang model, the fiver stage forecasting model has been proposed. But its performance is not satisfactory as applied to estuary areas. River roughness is a sensitive parameter in the hydrodynamic model, and its value is related to some substantial uncertainties in the tidal fiver. According to roughness tests, a new method of roughness dynamic correction was developed to improve the performance of the stage model. The method was focused on the usage of observed data for the studied section, and its parameters were analyzed. Nested with the dynamic correction of roughness, the stage model was applied to the tidal reach of the Caoe River. The results demonstrate that the roughness dynamic correction can improve the simulation accuracy of the stage model, and especially has the capacity of reducing the errors at peak stages.展开更多
The present investigation demonstrates the synergistic action of using a sedimentation unit together with Cyperus papyrus(L.)wetland enriched with zeolite mineral in one-year round experiment for treating wastewater.T...The present investigation demonstrates the synergistic action of using a sedimentation unit together with Cyperus papyrus(L.)wetland enriched with zeolite mineral in one-year round experiment for treating wastewater.The system was designed to support a horizontal surface flow pattern and showed satisfactory removal efficiencies for both physicochemical and bacteriological contaminants within 3 days of residence time.The removal efficiencies ranged between 76.3%and 98.8%for total suspended solids,turbidity,iron,biological oxygen demand,and ammonia.The bacterial indicators(total and fecal coliforms,as well as fecal streptococci)and the potential pathogens(Escherichia coli,Staphylococcus aureus,and Pseudomonas aeruginosa)showed removal efficiencies ranged between 96.9%and 99.8%.We expect the system to offer a smart management for every component according to zero waste principle.The treated effluent was reused to irrigate the landscape of pilot area,and the excess sludge was recycled as fertilizer and soil conditioner.The zeolite mineral did not require regeneration for almost 36 weeks of operation,and enhanced the density of shoots(14.11%)and the height of shoots(15.88%).The harvested plant biomass could be a profitable resource for potent antibacterial and antioxidant bioactive compounds.This could certainly offset part of the operation and maintenance costs and optimize the system implementation feasibility.Although the experiment was designed under local conditions,its results could provide insights to upgrade and optimize the performance of other analogous large-scale constructed wetlands.展开更多
基金Project supported by the National Natural Science Foundation of China(Grant No.50679024)the Program"Eleven-Five"for Science and Technology of China(Grant No.2006BAC05B02).
文摘Based on the hydrodynamic model and the Xinanjiang model, the fiver stage forecasting model has been proposed. But its performance is not satisfactory as applied to estuary areas. River roughness is a sensitive parameter in the hydrodynamic model, and its value is related to some substantial uncertainties in the tidal fiver. According to roughness tests, a new method of roughness dynamic correction was developed to improve the performance of the stage model. The method was focused on the usage of observed data for the studied section, and its parameters were analyzed. Nested with the dynamic correction of roughness, the stage model was applied to the tidal reach of the Caoe River. The results demonstrate that the roughness dynamic correction can improve the simulation accuracy of the stage model, and especially has the capacity of reducing the errors at peak stages.
基金The authors wish to express their gratitude to the Microbiology Dep.,Central Laboratory for Environmental Quality Monitoring(CLEQM),National Water Research Center(NWRC)in Egypt for supporting this work.The authors would like also to thank Mr.Kyle Bowman,Head Bioelectrochemical Engineer at Wase-tech,London,UK for his language editing revision of the manuscript.
文摘The present investigation demonstrates the synergistic action of using a sedimentation unit together with Cyperus papyrus(L.)wetland enriched with zeolite mineral in one-year round experiment for treating wastewater.The system was designed to support a horizontal surface flow pattern and showed satisfactory removal efficiencies for both physicochemical and bacteriological contaminants within 3 days of residence time.The removal efficiencies ranged between 76.3%and 98.8%for total suspended solids,turbidity,iron,biological oxygen demand,and ammonia.The bacterial indicators(total and fecal coliforms,as well as fecal streptococci)and the potential pathogens(Escherichia coli,Staphylococcus aureus,and Pseudomonas aeruginosa)showed removal efficiencies ranged between 96.9%and 99.8%.We expect the system to offer a smart management for every component according to zero waste principle.The treated effluent was reused to irrigate the landscape of pilot area,and the excess sludge was recycled as fertilizer and soil conditioner.The zeolite mineral did not require regeneration for almost 36 weeks of operation,and enhanced the density of shoots(14.11%)and the height of shoots(15.88%).The harvested plant biomass could be a profitable resource for potent antibacterial and antioxidant bioactive compounds.This could certainly offset part of the operation and maintenance costs and optimize the system implementation feasibility.Although the experiment was designed under local conditions,its results could provide insights to upgrade and optimize the performance of other analogous large-scale constructed wetlands.