As an essential infrastructure,the rural power grid is vital in promoting agricultural and rural carbon sequestration and improving rural energy electrification.It is necessary to carry out in-depth research on its co...As an essential infrastructure,the rural power grid is vital in promoting agricultural and rural carbon sequestration and improving rural energy electrification.It is necessary to carry out in-depth research on its comprehensive efficiency.Based on the requirements of“double carbon”and rural revitalization strategy for the rural Power Grid,this paper focuses on the modernization and low-carbon transformation of the rural Power Grid.It constructs an input-output index system for the investment efficiency of the rural Power Grid in China under the new situation.It uses the primary data of the rural Power Grid of 30 prefecture-level cities in China from 2019 to 2021 to evaluate the investment efficiency of the rural Power Grid in China through a three-stage DEA model.The empirical results show that:considering the regional differences,the comprehensive efficiency of the rural Power Grid in backward areas is significantly improved;that is,the three-stage DEA method can more objectively evaluate the comprehensive efficiency of the rural Power Grid.In the context of the continued promotion of the rural revitalization strategy,to improve the comprehensive efficiency of the rural Power Grid,it is necessary to improve the technical level of the rural Power Grid further and appropriately expand the scale of investment in the rural Power Grid.展开更多
With the acceleration of agricultural electrification,a lot of nonlinear and shock loads appear in the rural power grid,and the resulting harmonic and reactive currents pollute the rural power grid more and more serio...With the acceleration of agricultural electrification,a lot of nonlinear and shock loads appear in the rural power grid,and the resulting harmonic and reactive currents pollute the rural power grid more and more seriously.To solve the above problem,three-level neutral point clamped(NPC)inverters have been widely used,but their development is greatly restricted by the defect of neutral point voltage imbalance.In this paper,an improved virtual space vector pulse width modulation(VSVPWM)was proposed.Firstly,the mathematical models of various space vectors were established,and the influence of various space vectors on neutral point voltage was analyzed.The sum of the vector current at the neutral point was zero and the voltage control at the neutral point was completed by.introducing the time offset into different switching times of the redundant small vector.This method was simple in design and avoided the redundant calculation of the traditional VSVPWM method and tedious switch sequence design.This balancing control strategy could greatly reduce the influence of virtual vectors on neutral point voltage and effectively control the low-frequency oscillation of neutral point voltage.The validity of the method was verified by establishing a matlab simulation model.展开更多
In consideration of high investment, large scope, longperiod and arduous tasks of rural power garid construction andretrofit, this paper analyzes the present state of China’s ruralpower grids and the difficulties on ...In consideration of high investment, large scope, longperiod and arduous tasks of rural power garid construction andretrofit, this paper analyzes the present state of China’s ruralpower grids and the difficulties on the construction and retrofit,for which some technical proposals are put forward.展开更多
For a long time, because of the lack of investment capital and enough attentions, the overall constructions of rural power grid were far behind than the urban power grid in Chongqing Jiangbei Power Company. The low vo...For a long time, because of the lack of investment capital and enough attentions, the overall constructions of rural power grid were far behind than the urban power grid in Chongqing Jiangbei Power Company. The low voltage problems were highlighted in the rural power grid due to the characteristics of rural power grid. Using the distribution network flow calculation method, we evaluated the low voltage problems of the rural power grid which belongs to Chongqing Jiangbei Power Company. In addition, we collected the data of distribution transformers in electricity consumption peak period. Some practical management strategies were proposed by the analysis and evaluation of potential and appeared low voltage problems.展开更多
With the reform of rural network enterprise system,the speed of transfer property rights in rural power enterprises is accelerated.The evaluation of the operation and development status of rural power enterprises is d...With the reform of rural network enterprise system,the speed of transfer property rights in rural power enterprises is accelerated.The evaluation of the operation and development status of rural power enterprises is directly related to the future development and investment direction of rural power enterprises.At present,the evaluation of the production and operation of rural network enterprises and the development status of power network only relies on the experience of the evaluation personnel,sets the reference index,and forms the evaluation results through artificial scoring.Due to the strong subjective consciousness of the evaluation results,the practical guiding significance is weak.Therefore,distributed data mining method in rural power enterprises status evaluation was proposed which had been applied in many fields,such as food science,economy or chemical industry.The distributed mathematical model was established by using principal component analysis(PCA)and regression analysis.By screening various technical indicators and determining their relevance,the reference value of evaluation results was improved.Combined with statistical program for social sciences(SPSS)data analysis software,the operation status of rural network enterprises was evaluated,and the rationality,effectiveness and economy of the evaluation was verified through comparison with current evaluation results and calculation examples of actual grid operation data.展开更多
农村地区之间存在着显著的地区差异,为了指导农村电网投资,提出一种基于组合赋权和多属性边界逼近区域比较法(multi-attributive border approximation area comparison,MABAC)的差异化农网综合效益评价模型。首先,综合考虑农村地区差...农村地区之间存在着显著的地区差异,为了指导农村电网投资,提出一种基于组合赋权和多属性边界逼近区域比较法(multi-attributive border approximation area comparison,MABAC)的差异化农网综合效益评价模型。首先,综合考虑农村地区差异及乡村振兴战略对农网发展的要求,从农网投资经济效益、供电能力、基础设施情况、地区发展带动、生产生活质量、清洁低碳发展等6个方面构建农网综合效益评价指标体系;其次,基于最小化主客观权重异质性原则构建基于图模型—熵权法的组合赋权模型,并引入MABAC方法用于解决农网综合效益评价问题;最后,通过算例分析验证了所提出模型的有效性。展开更多
基金supported by the State Grid Science and Technology Project (1300-202157362A-0-0-00).
文摘As an essential infrastructure,the rural power grid is vital in promoting agricultural and rural carbon sequestration and improving rural energy electrification.It is necessary to carry out in-depth research on its comprehensive efficiency.Based on the requirements of“double carbon”and rural revitalization strategy for the rural Power Grid,this paper focuses on the modernization and low-carbon transformation of the rural Power Grid.It constructs an input-output index system for the investment efficiency of the rural Power Grid in China under the new situation.It uses the primary data of the rural Power Grid of 30 prefecture-level cities in China from 2019 to 2021 to evaluate the investment efficiency of the rural Power Grid in China through a three-stage DEA model.The empirical results show that:considering the regional differences,the comprehensive efficiency of the rural Power Grid in backward areas is significantly improved;that is,the three-stage DEA method can more objectively evaluate the comprehensive efficiency of the rural Power Grid.In the context of the continued promotion of the rural revitalization strategy,to improve the comprehensive efficiency of the rural Power Grid,it is necessary to improve the technical level of the rural Power Grid further and appropriately expand the scale of investment in the rural Power Grid.
基金Supported by Application Technology Research and Development of Harbin City(2017RAXXJ075)。
文摘With the acceleration of agricultural electrification,a lot of nonlinear and shock loads appear in the rural power grid,and the resulting harmonic and reactive currents pollute the rural power grid more and more seriously.To solve the above problem,three-level neutral point clamped(NPC)inverters have been widely used,but their development is greatly restricted by the defect of neutral point voltage imbalance.In this paper,an improved virtual space vector pulse width modulation(VSVPWM)was proposed.Firstly,the mathematical models of various space vectors were established,and the influence of various space vectors on neutral point voltage was analyzed.The sum of the vector current at the neutral point was zero and the voltage control at the neutral point was completed by.introducing the time offset into different switching times of the redundant small vector.This method was simple in design and avoided the redundant calculation of the traditional VSVPWM method and tedious switch sequence design.This balancing control strategy could greatly reduce the influence of virtual vectors on neutral point voltage and effectively control the low-frequency oscillation of neutral point voltage.The validity of the method was verified by establishing a matlab simulation model.
文摘In consideration of high investment, large scope, longperiod and arduous tasks of rural power garid construction andretrofit, this paper analyzes the present state of China’s ruralpower grids and the difficulties on the construction and retrofit,for which some technical proposals are put forward.
文摘For a long time, because of the lack of investment capital and enough attentions, the overall constructions of rural power grid were far behind than the urban power grid in Chongqing Jiangbei Power Company. The low voltage problems were highlighted in the rural power grid due to the characteristics of rural power grid. Using the distribution network flow calculation method, we evaluated the low voltage problems of the rural power grid which belongs to Chongqing Jiangbei Power Company. In addition, we collected the data of distribution transformers in electricity consumption peak period. Some practical management strategies were proposed by the analysis and evaluation of potential and appeared low voltage problems.
基金Supported by Funding(2017RAXXJ075)from Harbin Applied Technology Research and Development Project
文摘With the reform of rural network enterprise system,the speed of transfer property rights in rural power enterprises is accelerated.The evaluation of the operation and development status of rural power enterprises is directly related to the future development and investment direction of rural power enterprises.At present,the evaluation of the production and operation of rural network enterprises and the development status of power network only relies on the experience of the evaluation personnel,sets the reference index,and forms the evaluation results through artificial scoring.Due to the strong subjective consciousness of the evaluation results,the practical guiding significance is weak.Therefore,distributed data mining method in rural power enterprises status evaluation was proposed which had been applied in many fields,such as food science,economy or chemical industry.The distributed mathematical model was established by using principal component analysis(PCA)and regression analysis.By screening various technical indicators and determining their relevance,the reference value of evaluation results was improved.Combined with statistical program for social sciences(SPSS)data analysis software,the operation status of rural network enterprises was evaluated,and the rationality,effectiveness and economy of the evaluation was verified through comparison with current evaluation results and calculation examples of actual grid operation data.
文摘农村地区之间存在着显著的地区差异,为了指导农村电网投资,提出一种基于组合赋权和多属性边界逼近区域比较法(multi-attributive border approximation area comparison,MABAC)的差异化农网综合效益评价模型。首先,综合考虑农村地区差异及乡村振兴战略对农网发展的要求,从农网投资经济效益、供电能力、基础设施情况、地区发展带动、生产生活质量、清洁低碳发展等6个方面构建农网综合效益评价指标体系;其次,基于最小化主客观权重异质性原则构建基于图模型—熵权法的组合赋权模型,并引入MABAC方法用于解决农网综合效益评价问题;最后,通过算例分析验证了所提出模型的有效性。