期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Mechanisms of the formation of wind-blown sand hazards and the sand control measures in Gobi areas under extremely strong winds along the Lanzhou-Xinjiang high-speed railway 被引量:2
1
作者 Jianjun QU Tao WANG +5 位作者 Qinghe NIU Benli LIU Lihai TAN Qingjie HAN Yang GAO Jianhua XIAO 《Science China Earth Sciences》 SCIE EI CAS CSCD 2023年第2期292-302,共11页
The Lanzhou-Xinjiang high-speed railway(HSR)traverses areas of the Gobi Desert where extremely strong winds are frequent.These strong winds cause sand/gravel hazards,an unaddressed issue that often seriously compromis... The Lanzhou-Xinjiang high-speed railway(HSR)traverses areas of the Gobi Desert where extremely strong winds are frequent.These strong winds cause sand/gravel hazards,an unaddressed issue that often seriously compromises the safe operation of the HSR.This paper studies the mechanisms leading to wind-blown sand hazards and the outcomes of sand control projects in these areas.The main findings are as follows:(1)Cold northern airflows over the Tian Shan mountain range are accelerated by the wind tunnels and downslope effect as they pass over complex terrain comprising passes,gullies,and proluvial fans.Consequently,the wind intensity often increases two-to threefold,creating frequent high-speed winds that lead to severe sand damage along the HSR.(2)In the Gobi areas with extremely strong winds,sand grains can be lifted as high as 9 m from the ground into the air,far higher than in other areas of the desert.The sand transport rate decreases exponentially with increasing height.Both wind speed and particle size determine saltation height.Coarser particles and stronger winds provide the particles with a higher kinetic energy as they collide with the ground.In the wind zones of Baili and Yandun,the analysed study areas,the saltation layer height of wind-blown sand/gravel exceeds 3 and 2 m,respectively.(3)Based on the above findings,recently emerging sand control materials,suitable for the areas of interest,were screened and developed.Furthermore,under the proposed principle of‘supplementing blocking with trapping’,a comprehensive sand control measure was established,featuring sandblocking belts comprised of multiple rows,and high,vertical sand-trapping installations with a large grids size.The installed system showed a high efficacy,reducing sand transport rate by 87.87%and significantly decreasing the deposition of sand along a trial section of the HSR. 展开更多
关键词 Gobi areas with extremely strong winds Wind-blown sand hazards Complex terrain sand/gravel flow Wind-blown sand control
原文传递
Sand harm in Taklimakan Desert highway and sand control 被引量:14
2
作者 HAN Zhiwen,WANG Tao,SUN Qingwei,DONG Zhibao,WANG Xunming(Laboratory of Blo wn Sand Physics and Desert Environment, Cold and Arid Regions Environm ental and Engineering Research Institute, CAS, Lanzhou 730000, China) 《Journal of Geographical Sciences》 SCIE CSCD 2003年第1期45-53,共9页
Re puted as a wonderful achievement of the world's highway construction h istory, the Taklimakan Desert highway is now facing serious sand drift encroachment problems due to its 447-km-long passage of sand sea con... Re puted as a wonderful achievement of the world's highway construction h istory, the Taklimakan Desert highway is now facing serious sand drift encroachment problems due to its 447-km-long passage of sand sea consist ing of crescent dunes, barchan chains, compound transverse dune ridges and co mplex megadunes. To solve some technical problems in the protection of the highway from sand drift encroachment, desert experts have been conductin g the theoretical and applied studies on sand movement laws; causes, severities and time-space differentiation of sand drift damages; and control ways in cluding mechanical, chemical and biological measures. In this paper the authors give an overall summary on the research contents and recent progress i n the control of sand drift damages in China and hold that the theoretica l research results and practices in the prevention of sand drift encr oachment on the cross-desert highway represent a breakthrough and has an epoch-making significance. Since the construction of protective forest along the cross-desert highway requires large amount of ground water, what will be its environmental consequence and whether it can effectiv ely halt sand drift encroachment on the highway forever are the questions to be studied urgently. 展开更多
关键词 Taklimakan Desert cross-desert highway blown sand hazards control technique
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部