期刊文献+
共找到5篇文章
< 1 >
每页显示 20 50 100
Construction Schedule of Generating Units Actually Realized in 1996 (as of Aug. 8,1996) 被引量:2
1
《Electricity》 1996年第4期53-53,共1页
关键词 as of Aug Construction schedule of Generating Units Actually Realized in 1996
下载PDF
Construction Schedule of Generating Units to be Commissioned in 1998 (as of Dec 11, 1998)
2
《Electricity》 1999年第2期50-50,共1页
关键词 as of Dec 11 Construction schedule of Generating Units to be Commissioned in 1998
下载PDF
Joint Dynamic Clustering and User Scheduling for Downlink Cloud Radio Access Network with Limited Feedback 被引量:2
3
作者 XU Dongyang REN Pinyi +1 位作者 DU Qinghe SUN Li 《China Communications》 SCIE CSCD 2015年第12期147-159,共13页
In limited feedback-based CloudRAN(C-RAN) systems,the inter-cluster and intra-cluster interference together with the quantification error can seriously deteriorates the system spectral efficiency.We,in this paper,prop... In limited feedback-based CloudRAN(C-RAN) systems,the inter-cluster and intra-cluster interference together with the quantification error can seriously deteriorates the system spectral efficiency.We,in this paper,propose an efficient three-phase framework and corresponding algorithms for dealing with this problem.Firstly,a greedy scheduling algorithm based on the lower bound of the ergodic rate is performed for generating an elementary cluster in the first phase.And then the elementary cluster is divided into many small clusters according to the following proposed algorithms based on the short term instantaneous information in the second phase.In the end,based on the limited feedback two zero-forcing(ZF) precoding strategies are adopted for reducing the intra-cluster interference in the third phase.The provided Monte Carlo simulations show the effectiveness of our proposed algorithms in the respect of system spectral efficiency and average user rate. 展开更多
关键词 Scheduling seriously clustering elementary scheduling Feedback generating greedy dealing fading
下载PDF
Generalized multiple time windows model based parallel machine scheduling for TDRSS 被引量:1
4
作者 LIN Peng KUANG Lin-ling +3 位作者 CHEN Xiang YAN Jian LU Jian-hua WANG Xiao-juan 《Journal of Beijing Institute of Technology》 EI CAS 2016年第3期382-391,共10页
The scheduling efficiency of the tracking and data relay satellite system(TDRSS)is strictly limited by the scheduling degrees of freedom(DoF),including time DoF defined by jobs' flexible time windows and spatial ... The scheduling efficiency of the tracking and data relay satellite system(TDRSS)is strictly limited by the scheduling degrees of freedom(DoF),including time DoF defined by jobs' flexible time windows and spatial DoF brought by multiple servable tracking and data relay satellites(TDRSs).In this paper,ageneralized multiple time windows(GMTW)model is proposed to fully exploit the time and spatial DoF.Then,the improvements of service capability and job-completion probability based on the GMTW are theoretically proved.Further,an asymmetric path-relinking(APR)based heuristic job scheduling framework is presented to maximize the usage of DoF provided by the GMTW.Simulation results show that by using our proposal 11%improvement of average jobcompletion probability can be obtained.Meanwhile,the computing time of the time-to-target can be shorten to 1/9 of the GRASP. 展开更多
关键词 parallel machine scheduling problem with generalized multiple time windows (PMGMTW) positive/negative adaptive subsequence adjustment (p/n-ASA) evolutionary asymmetric key-path-relinking (EvAKPR)
下载PDF
New Maintenance Strategies for Generating Companies in Power Market
5
作者 贾德香 程浩忠 +2 位作者 严健勇 陈明 韩净 《Journal of Shanghai Jiaotong university(Science)》 EI 2007年第2期263-270,282,共9页
A new approach to maintenance scheduling of generating units(MSU)in competitive electricity markets was presented,which was formulated as a noncooperative game with complete information.The payoff of each generating c... A new approach to maintenance scheduling of generating units(MSU)in competitive electricity markets was presented,which was formulated as a noncooperative game with complete information.The payoff of each generating company(Genco)was defined as the profit from the energy auction market minus maintenance cost and risk loss.The compensation fee of interruptible load was a part of the maintenance cost when the permitted maintenance capacity in the system was insufficient.Hourly energy auction was incorporated in the computation of both revenues from energy market and risk loss of maintenance strategy as a nested game.A new heuristic search algorithm for the calculation of the game equilibrium of MSU was presented,which coordinates the solutions of non-equilibrium,unique equilibrium and multiple equilibria.Numerical results for a two-Genco system and a realistic system were used to demonstrate the basic ideas and the applicability of the proposed method,as well as its computational efficiency. 展开更多
关键词 maintenance scheduling of generating unit (MSU) maintenance cost interruptible load risk loss power market noncooperative game coordination of equilibria
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部