In limited feedback-based CloudRAN(C-RAN) systems,the inter-cluster and intra-cluster interference together with the quantification error can seriously deteriorates the system spectral efficiency.We,in this paper,prop...In limited feedback-based CloudRAN(C-RAN) systems,the inter-cluster and intra-cluster interference together with the quantification error can seriously deteriorates the system spectral efficiency.We,in this paper,propose an efficient three-phase framework and corresponding algorithms for dealing with this problem.Firstly,a greedy scheduling algorithm based on the lower bound of the ergodic rate is performed for generating an elementary cluster in the first phase.And then the elementary cluster is divided into many small clusters according to the following proposed algorithms based on the short term instantaneous information in the second phase.In the end,based on the limited feedback two zero-forcing(ZF) precoding strategies are adopted for reducing the intra-cluster interference in the third phase.The provided Monte Carlo simulations show the effectiveness of our proposed algorithms in the respect of system spectral efficiency and average user rate.展开更多
The scheduling efficiency of the tracking and data relay satellite system(TDRSS)is strictly limited by the scheduling degrees of freedom(DoF),including time DoF defined by jobs' flexible time windows and spatial ...The scheduling efficiency of the tracking and data relay satellite system(TDRSS)is strictly limited by the scheduling degrees of freedom(DoF),including time DoF defined by jobs' flexible time windows and spatial DoF brought by multiple servable tracking and data relay satellites(TDRSs).In this paper,ageneralized multiple time windows(GMTW)model is proposed to fully exploit the time and spatial DoF.Then,the improvements of service capability and job-completion probability based on the GMTW are theoretically proved.Further,an asymmetric path-relinking(APR)based heuristic job scheduling framework is presented to maximize the usage of DoF provided by the GMTW.Simulation results show that by using our proposal 11%improvement of average jobcompletion probability can be obtained.Meanwhile,the computing time of the time-to-target can be shorten to 1/9 of the GRASP.展开更多
A new approach to maintenance scheduling of generating units(MSU)in competitive electricity markets was presented,which was formulated as a noncooperative game with complete information.The payoff of each generating c...A new approach to maintenance scheduling of generating units(MSU)in competitive electricity markets was presented,which was formulated as a noncooperative game with complete information.The payoff of each generating company(Genco)was defined as the profit from the energy auction market minus maintenance cost and risk loss.The compensation fee of interruptible load was a part of the maintenance cost when the permitted maintenance capacity in the system was insufficient.Hourly energy auction was incorporated in the computation of both revenues from energy market and risk loss of maintenance strategy as a nested game.A new heuristic search algorithm for the calculation of the game equilibrium of MSU was presented,which coordinates the solutions of non-equilibrium,unique equilibrium and multiple equilibria.Numerical results for a two-Genco system and a realistic system were used to demonstrate the basic ideas and the applicability of the proposed method,as well as its computational efficiency.展开更多
基金supported by the National Natural Science Foundation of China(NSFC) under Grant(No. 61461136001)
文摘In limited feedback-based CloudRAN(C-RAN) systems,the inter-cluster and intra-cluster interference together with the quantification error can seriously deteriorates the system spectral efficiency.We,in this paper,propose an efficient three-phase framework and corresponding algorithms for dealing with this problem.Firstly,a greedy scheduling algorithm based on the lower bound of the ergodic rate is performed for generating an elementary cluster in the first phase.And then the elementary cluster is divided into many small clusters according to the following proposed algorithms based on the short term instantaneous information in the second phase.In the end,based on the limited feedback two zero-forcing(ZF) precoding strategies are adopted for reducing the intra-cluster interference in the third phase.The provided Monte Carlo simulations show the effectiveness of our proposed algorithms in the respect of system spectral efficiency and average user rate.
基金Supported by the National Natural Science Foundation of China(91338101,91338108,61132002,6132106)Research Fund of Tsinghua University(2011Z05117)Co-innovation Laboratory of Aerospace Broadband Network Technology
文摘The scheduling efficiency of the tracking and data relay satellite system(TDRSS)is strictly limited by the scheduling degrees of freedom(DoF),including time DoF defined by jobs' flexible time windows and spatial DoF brought by multiple servable tracking and data relay satellites(TDRSs).In this paper,ageneralized multiple time windows(GMTW)model is proposed to fully exploit the time and spatial DoF.Then,the improvements of service capability and job-completion probability based on the GMTW are theoretically proved.Further,an asymmetric path-relinking(APR)based heuristic job scheduling framework is presented to maximize the usage of DoF provided by the GMTW.Simulation results show that by using our proposal 11%improvement of average jobcompletion probability can be obtained.Meanwhile,the computing time of the time-to-target can be shorten to 1/9 of the GRASP.
基金The National High Technology Research and Development Program of China(863Program)(No.2005AA505101-621)Important Science and Technology Research Project of Shanghai(No.041612012)
文摘A new approach to maintenance scheduling of generating units(MSU)in competitive electricity markets was presented,which was formulated as a noncooperative game with complete information.The payoff of each generating company(Genco)was defined as the profit from the energy auction market minus maintenance cost and risk loss.The compensation fee of interruptible load was a part of the maintenance cost when the permitted maintenance capacity in the system was insufficient.Hourly energy auction was incorporated in the computation of both revenues from energy market and risk loss of maintenance strategy as a nested game.A new heuristic search algorithm for the calculation of the game equilibrium of MSU was presented,which coordinates the solutions of non-equilibrium,unique equilibrium and multiple equilibria.Numerical results for a two-Genco system and a realistic system were used to demonstrate the basic ideas and the applicability of the proposed method,as well as its computational efficiency.