期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Variable scheduling interval task scheduling for phased array radar 被引量:4
1
作者 ZHANG Haowei XIE Junwei +2 位作者 ZHANG Zhaojian SHAO Lei CHEN Tangjun 《Journal of Systems Engineering and Electronics》 SCIE EI CSCD 2018年第5期937-946,共10页
A scheduling algorithm is presented aiming at the task scheduling problem in the phased array radar. Rather than assuming the scheduling interval(SI) time, which is the update interval of the radar invoking the schedu... A scheduling algorithm is presented aiming at the task scheduling problem in the phased array radar. Rather than assuming the scheduling interval(SI) time, which is the update interval of the radar invoking the scheduling algorithm, to be a fixed value,it is modeled as a fuzzy set to improve the scheduling flexibility.The scheduling algorithm exploits the fuzzy set model in order to intelligently adjust the SI time. The idle time in other SIs is provided for SIs which will be overload. Thereby more request tasks can be accommodated. The simulation results show that the proposed algorithm improves the successful scheduling ratio by 16%,the threat ratio of execution by 16% and the time utilization ratio by 15% compared with the highest task mode priority first(HPF)algorithm. 展开更多
关键词 phased array radar task scheduling variable scheduling interval(SI) fuzzy set
下载PDF
DYNAMIC ADVANCED PLANNING AND SCHEDULING WITH FROZEN INTERVAL FOR NEW ORDERS 被引量:2
2
作者 CHEN Kejia JI Ping 《Chinese Journal of Mechanical Engineering》 SCIE EI CAS CSCD 2007年第4期117-119,共3页
A dynamic advanced planning and scheduling (DAPS) problem is addressed where new orders arrive on a continuous basis. A periodic policy with frozen interval is adopted to increase stability on the shop floor. A gene... A dynamic advanced planning and scheduling (DAPS) problem is addressed where new orders arrive on a continuous basis. A periodic policy with frozen interval is adopted to increase stability on the shop floor. A genetic algorithm is developed to find a schedule at each rescheduling point for both original orders and new orders that both production idle time and penalties on tardiness and earliness of orders are minimized. The proposed methodology is tested on a small example to illustrate the effect of the frozen interval. The results indicate that the suggested approach can improve the schedule stability while retaining efficiency. 展开更多
关键词 Dynamic advanced planning and scheduling Genetic algorithm Frozen interval
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部