According to the measured data after impoundment and operation of the Three Gorges Reservoir,the reservoir sediment deposition and downstream river channel scouring are described briefly and compared with the research...According to the measured data after impoundment and operation of the Three Gorges Reservoir,the reservoir sediment deposition and downstream river channel scouring are described briefly and compared with the research results achieved in the demonstration stage.It is indicated through analysis that the reservoir sediment deposition and downstream river channel scouring during 8-year impoundment and operation are still within the original forecast,so the original forecasting results are feasible.The further observation and comparison should be conducted because the comparison between the observed data and the original forecast is not so sufficient in time and the prototype observation and related research work should be strengthened in the future.展开更多
Gezhouba hydroproject was impounded and put into operation in 1981. In order to analyse the impact on the downstream river course, Jingjiang Hydrologic and Water Resources Survey Bureau of Changjiang Water Resources C...Gezhouba hydroproject was impounded and put into operation in 1981. In order to analyse the impact on the downstream river course, Jingjiang Hydrologic and Water Resources Survey Bureau of Changjiang Water Resources Commission has conducted prototype observation on the Yichang-Chenglingji river stretch. On basis of the observed data, the change in river regime and scour-sedimentation evolution and water surface profile below the dam are analysed systematically. The results show that the scouring of downstream river course mainly stretches from Yichang to Ouchikou, mainly occurring in 1980~1987; the scourring mainly takes place in the river channel and the water surface profile drops significantly in dry season,but not quite in high flood season.展开更多
Flood disaster has been a serious hidden danger since the ancient time. The essential cause for the fact that floods have not been eliminated for hundreds of years is that time honored strategies do not suit the case...Flood disaster has been a serious hidden danger since the ancient time. The essential cause for the fact that floods have not been eliminated for hundreds of years is that time honored strategies do not suit the cases of flood prevention. In the view of geological environmental analyses of flood formation and from the synthesis of experiences gained in flood control in the past hundreds of years, sluggish draining of flood, silt sedimentation in channel and building levee blindly constitute the main cause of intractable flood for a long time in the middle reach of the Yangtze River. Draining away silt and water is the only way to stamping out flood disaster. Opening up artificial waterways for flood diversion, draining away the silt of channel into the polders, and storing the flood water are important engineering measures for the flood control and damage reduction.展开更多
针对目前胜利油田海堤防护工程有27.7 km 的临海海堤存在非常严重的安全隐患,根据历史资料分析、数值模拟以及实测资料推算,研究了黄河三角洲地区桩西至黄河海港海域25 a,50 a 一遇渡流共同作用下冲淤变化,得出研究区海域冲淤演化特征...针对目前胜利油田海堤防护工程有27.7 km 的临海海堤存在非常严重的安全隐患,根据历史资料分析、数值模拟以及实测资料推算,研究了黄河三角洲地区桩西至黄河海港海域25 a,50 a 一遇渡流共同作用下冲淤变化,得出研究区海域冲淤演化特征。为该海岸段海岸防护工程加固方案的设计、施工以及工程的灾害预测,提供了可借鉴的科学依据。展开更多
基金support from the Technology Pillar Program during the"Eleventh Five-year Plan"Period (No.2006BAB05B02No.2006BAB05B03) are acknowledged
文摘According to the measured data after impoundment and operation of the Three Gorges Reservoir,the reservoir sediment deposition and downstream river channel scouring are described briefly and compared with the research results achieved in the demonstration stage.It is indicated through analysis that the reservoir sediment deposition and downstream river channel scouring during 8-year impoundment and operation are still within the original forecast,so the original forecasting results are feasible.The further observation and comparison should be conducted because the comparison between the observed data and the original forecast is not so sufficient in time and the prototype observation and related research work should be strengthened in the future.
文摘Gezhouba hydroproject was impounded and put into operation in 1981. In order to analyse the impact on the downstream river course, Jingjiang Hydrologic and Water Resources Survey Bureau of Changjiang Water Resources Commission has conducted prototype observation on the Yichang-Chenglingji river stretch. On basis of the observed data, the change in river regime and scour-sedimentation evolution and water surface profile below the dam are analysed systematically. The results show that the scouring of downstream river course mainly stretches from Yichang to Ouchikou, mainly occurring in 1980~1987; the scourring mainly takes place in the river channel and the water surface profile drops significantly in dry season,but not quite in high flood season.
基金The research is supported by the National Natural Science F ounda-tion of China( No.49972 0 5 7) and the China Geological Surv
文摘Flood disaster has been a serious hidden danger since the ancient time. The essential cause for the fact that floods have not been eliminated for hundreds of years is that time honored strategies do not suit the cases of flood prevention. In the view of geological environmental analyses of flood formation and from the synthesis of experiences gained in flood control in the past hundreds of years, sluggish draining of flood, silt sedimentation in channel and building levee blindly constitute the main cause of intractable flood for a long time in the middle reach of the Yangtze River. Draining away silt and water is the only way to stamping out flood disaster. Opening up artificial waterways for flood diversion, draining away the silt of channel into the polders, and storing the flood water are important engineering measures for the flood control and damage reduction.
文摘针对目前胜利油田海堤防护工程有27.7 km 的临海海堤存在非常严重的安全隐患,根据历史资料分析、数值模拟以及实测资料推算,研究了黄河三角洲地区桩西至黄河海港海域25 a,50 a 一遇渡流共同作用下冲淤变化,得出研究区海域冲淤演化特征。为该海岸段海岸防护工程加固方案的设计、施工以及工程的灾害预测,提供了可借鉴的科学依据。