期刊文献+
共找到5篇文章
< 1 >
每页显示 20 50 100
Effect of Water and Sediment Regulation on Lower Yellow River 被引量:2
1
作者 徐国宾 司春棣 《Transactions of Tianjin University》 EI CAS 2009年第2期113-120,共8页
According to the results of the water and sediment regulations of the Yellow River in year 2002—2007,the effect of erosion and deposition on the lower reaches,the amount and distribution of erosion and deposition in ... According to the results of the water and sediment regulations of the Yellow River in year 2002—2007,the effect of erosion and deposition on the lower reaches,the amount and distribution of erosion and deposition in the river mouth area,the adjustment of river regime,the effect of river regulation projects and changes of flowing capacity of the channel are analyzed.It is revealed that the water and sediment regulation is efficient to reduce deposition and improve the flowing capacity and the conditions of sediment transport. 展开更多
关键词 Yellow River water and sediment regulation river control sediment transport
下载PDF
Study on the Operation Mechanism and Effect of the Yellow River Water and Sediment Regulation System
2
作者 Yaxi Cai Xiaodong Yang 《Journal of World Architecture》 2022年第5期8-16,共9页
In order to scientifically deal with the problems of less water and more sediment in the Yellow River and the uncoordinated relationship between water and sediment,it is necessary to establish a perfect water and sedi... In order to scientifically deal with the problems of less water and more sediment in the Yellow River and the uncoordinated relationship between water and sediment,it is necessary to establish a perfect water and sediment regulation system.Through the calculation of the sediment transport capacity of the Yellow River and the application of the water and sediment regulation system,it is found that the sediment transport efficiency of the Yellow River will increase with the increase of water flow,and there will be an obvious inflection point near the flat discharge.The joint regulation of the backbone reservoir group can discharge the large discharge close to the minimum flat discharge of the downstream river,which improves the sediment transport capacity of the river and alleviates the problem of sediment deposition.In this paper,through the introduction of the Yellow River water and sediment regulation project system,regulation indicators and mechanisms,the author discusses in detail the Yellow River water and sediment regulation scheme and its operation effect,hoping to provide help promote the improvement of the Yellow River governance effect. 展开更多
关键词 Yellow River Water and sediment regulation Regulatory indicators Regulatory mechanism Operation effect
下载PDF
Understanding the influencing factors and evolving trends of the Yellow River Water-Sediment Regulation System from a system perspective
3
作者 Zhiwei CAO Yuansheng ZHANG +2 位作者 Huanfa CHEN Chaoqun LI Yuan LUO 《Frontiers of Engineering Management》 CSCD 2024年第3期528-541,共14页
Understanding the influencing factors and the evolving trends of the Water-Sediment Regulation System(WSRS)is vital for the protection and management of the Yellow River.Past studies on WSRS have been limited in focus... Understanding the influencing factors and the evolving trends of the Water-Sediment Regulation System(WSRS)is vital for the protection and management of the Yellow River.Past studies on WSRS have been limited in focus and have not fully addressed the complete engineering control system of the basin.This study takes a holistic view,treating sediment management in the Yellow River as a dynamic and ever-evolving complex system.It merges concepts from system science,information theory,and dissipative structure with practical efforts in sediment engineering control.The key findings of this study are as follows:between 1990 and 2019,the average Yellow River Sediment Regulation Index(YSRI)was 55.99,with the lowest being 50.26 in 1990 and the highest being 61.48 in 2019;the result indicates that the WSRS activity decreased,yet it fluctuated,gradually approaching the critical threshold of a dissipative structure. 展开更多
关键词 Yellow River Water-sediment regulation System Yellow River sediment regulation Index system perspective sustainable management.
原文传递
Response of the distributary channel of the Huanghe River estuary to water and sediment discharge regulation in 2007
4
作者 马妍妍 李广雪 +6 位作者 叶思源 张志恒 赵广明 李景阳 周春艳 丁文洁 杨欣 《Chinese Journal of Oceanology and Limnology》 SCIE CAS CSCD 2010年第6期1362-1370,共9页
The water and sediment discharge regulation (WSDR) project, which has been performed since 2002 before flood season every year, is of great significance to the river management in China. Until 2007, six experiments ... The water and sediment discharge regulation (WSDR) project, which has been performed since 2002 before flood season every year, is of great significance to the river management in China. Until 2007, six experiments have been fulfilled to evaluate the effect of the project on the natural environment. To fill the gap of investigations, a study on flood and suspended sediment transportation and channel changing along the distributary channel of the Huanghe (Yellow) River was conducted during the WSDR project period in 2007. The lower channel was scoured rapidly and the channel became unobstructed gradually several days after the flood peak water was discharged from the Xiaolangdi Reservoir. Within four days after the flood peak at 3 000 m3/s entered the distributary, the channel in the river mouth area was eroded quickly. Both the mean values of area and depth of the main channel were tripled, and the maximum flood carrying capacity increased to 5 500 m3/s or more. Then, the river channel was silted anew in a very short time after completion of the WSDR. Favored by the WSDR project, the fiver status in April 2008 became better than that of the year before. The adjustment ranges of main channel parameters were about 30%, 10%, and 10% at sections C2, Q4, and Q7, respectively. The process of rapid erosion-deposition was more active 15 km away in the channel from the fiver mouth due to the marine influence. It is reasonable for discharging sediment at concentration peak from Xiaolangdi Reservoir at the end of the flood peak. As a result, the sediment peak reached the river mouth about two days later than that of the water current. In addition, the WSDR project has improved the development of the estuarine wetland. Wetland vegetation planted along the river banks restrained the water flow as a strainer and improved the main channel stability. It is suggested to draw water at mean rate of 150 m3/s from the Huanghe River during flood periods, because at the rate the water in the wetland would be stored and replenished in balance. Moreover, we believe that cropland on the river shoal of the lower Huanghe River should be replaced by wetland. These activities should achieve the Huanghe River management strategy of "To concentrate flow to scour sediment, stabilize the main channel, and regulate water and sediment". 展开更多
关键词 Huanghe (Yellow) River estuary water and sediment regulation river channel adjustment wetland.
下载PDF
Using Rn-222 to Study Human-Regulated River Water-Sediment Input Event in the Estuary
5
作者 XU Yuezhi XIAO Liu +5 位作者 GAO Maosheng YANG Disong ZHAO Shibin XU Haowei WANG Lisha ZHANG Xiaojie 《Journal of Ocean University of China》 SCIE CAS CSCD 2023年第6期1464-1472,共9页
The implementation of the water sediment regulation scheme(WSRS)is a typical example of artificially controlling land-source input.During WSRS,the water discharge of the Yellow River will increase significantly,and so... The implementation of the water sediment regulation scheme(WSRS)is a typical example of artificially controlling land-source input.During WSRS,the water discharge of the Yellow River will increase significantly,and so will the input of terri-genous materials.In this study,we used a natural geochemical tracer 222Rn to quantify terrestrial inputs under the influence of the 2014 WSRS in the Yellow River Estuary.The results indicated that during WSRS the concentration of 222Rn in the estuary increased by about four times than in the period before WSRS.The high-level 222Rn plume disappeared quickly after WSRS,indicating that 222Rn has a very short‘memory effect’in the estuary.Based on the investigation conducted from 2015 to 2016,the concentration of 222Rn tended to be stable in the lower reaches of the Yellow River.During WSRS,the concentrations of 222Rn in the river water in-creased sharply at about 3–5 times greater than in the non-WSRS period.Based on the 222Rn mass balance model,the fluxes of 222Rn caused by submarine groundwater discharge(SGD)were estimated to be(3.5±1.7)×10^(3),(11±3.9)×10^(3),and(5.2±1.9)×10^(3)dpm m^(-2)d^(-1)in the periods before,during,and after WSRS,respectively.This finding indicated that SGD was the major source of 222Rn in the Yellow River Estuary,which can be significantly increased during WSRS.Furthermore,the SGD-associated nutrient fluxes were estimated to be 9.8×10^(3),2.5×102,and 1.1×10^(4)μmolm^(-2)d^(-1)for dissolved inorganic nitrogen,phosphorus,and silicon,respectively,during WSRS or about 2–40 times greater than during the non-WSRS period. 展开更多
关键词 222Rn submarine groundwater discharge water sediment regulation scheme NUTRIENT Yellow River
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部