期刊文献+
共找到2,442篇文章
< 1 2 123 >
每页显示 20 50 100
Monitoring the change in horizontal stress with multi-wave time-lapse seismic response based on nonlinear elasticity theory 被引量:2
1
作者 Fu-Bin Chen Zhao-Yun Zong Xing-Yao Yin 《Petroleum Science》 SCIE EI CAS CSCD 2023年第2期815-826,共12页
Monitoring the change in horizontal stress from the geophysical data is a tough challenge, and it has a crucial impact on broad practical scenarios which involve reservoir exploration and development, carbon dioxide (... Monitoring the change in horizontal stress from the geophysical data is a tough challenge, and it has a crucial impact on broad practical scenarios which involve reservoir exploration and development, carbon dioxide (CO_(2)) injection and storage, shallow surface prospecting and deep-earth structure description. The change in in-situ stress induced by hydrocarbon production and localized tectonic movements causes the changes in rock mechanic properties (e.g. wave velocities, density and anisotropy) and further causes the changes in seismic amplitudes, phases and travel times. In this study, the nonlinear elasticity theory that regards the rock skeleton (solid phase) and pore fluid as an effective whole is used to characterize the effect of horizontal principal stress on rock overall elastic properties and the stress-dependent anisotropy parameters are therefore formulated. Then the approximate P-wave, SV-wave and SH-wave angle-dependent reflection coefficient equations for the horizontal-stress-induced anisotropic media are proposed. It is shown that, on the different reflectors, the stress-induced relative changes in reflectivities (i.e., relative difference) of elastic parameters (i.e., P- and S-wave velocities and density) are much less than the changes in contrasts of anisotropy parameters. Therefore, the effects of stress change on the reflectivities of three elastic parameters are reasonably neglected to further propose an AVO inversion approach incorporating P-, SH- and SV-wave information to estimate the change in horizontal principal stress from the corresponding time-lapse seismic data. Compared with the existing methods, our method eliminates the need for man-made rock-physical or fitting parameters, providing more stable predictive power. 1D test illustrates that the estimated result from time-lapse P-wave reflection data shows the most reasonable agreement with the real model, while the estimated result from SH-wave reflection data shows the largest bias. 2D test illustrates the feasibility of the proposed inversion method for estimating the change in horizontal stress from P-wave time-lapse seismic data. 展开更多
关键词 monitoring change in horizontal stress Multi-wave reflection coefficients Nonlinear elasticity theory Time-lapse seismic data
下载PDF
Seepage safety monitoring model for an earth rock dam under influence of high-impact typhoons based on particle swarm optimization algorithm 被引量:8
2
作者 Yan Xiang Shu-yan Fu +2 位作者 Kai Zhu Hui Yuan Zhi-yuan Fang 《Water Science and Engineering》 EI CAS CSCD 2017年第1期70-77,共8页
Extreme hydrological events induced by typhoons in reservoir areas have presented severe challenges to the safe operation of hydraulic structures. Based on analysis of the seepage characteristics of an earth rock dam,... Extreme hydrological events induced by typhoons in reservoir areas have presented severe challenges to the safe operation of hydraulic structures. Based on analysis of the seepage characteristics of an earth rock dam, a novel seepage safety monitoring model was constructed in this study. The nonlinear influence processes of the antecedent reservoir water level and rainfall were assumed to follow normal distributions. The particle swarm optimization (PSO) algorithm was used to optimize the model parameters so as to raise the fitting accuracy. In addition, a mutation factor was introduced to simulate the sudden increase in the piezometric level induced by short-duration heavy rainfall and the possible historical extreme reservoir water level during a typhoon. In order to verify the efficacy of this model, the earth rock dam of the Siminghu Reservoir was used as an example. The piezometric level at the SW1-2 measuring point during Typhoon Fitow in 2013 was fitted with the present model, and a corresponding theoretical expression was established. Comparison of fitting results of the piezometric level obtained from the present statistical model and traditional statistical model with monitored values during the typhoon shows that the present model has a higher fitting accuracy and can simulate the uprush feature of the seepage pressure during the typhoon perfectly. 展开更多
关键词 monitoring model Particle swarm optimization algorithm Earth rock dam Lagging effect TYPHOON seepage pressure Mutation factor Piezometric level
下载PDF
Monitoring models for base flow effect and daily variation of dam seepage elements considering time lag effect 被引量:11
3
作者 Shao-wei Wang Ying-li Xu +1 位作者 Chong-shi Gu Teng-fei Bao 《Water Science and Engineering》 EI CAS CSCD 2018年第4期344-354,共11页
Affected by external environmental factors and evolution of dam performance, dam seepage behavior shows nonlinear time-varying characteristics. In this study, to predict and evaluate the long-term development trend an... Affected by external environmental factors and evolution of dam performance, dam seepage behavior shows nonlinear time-varying characteristics. In this study, to predict and evaluate the long-term development trend and short-term fluctuation of the dam seepage behavior, two monitoring models were developed, one for the base flow effect and one for daily variation of dam seepage elements. In the first model, to avoid the influence of the time lag effect on the evaluation of seepage variation with the time effect component of seepage elements, the base values of the seepage element and the reservoir water level were extracted using the wavelet multi-resolution analysis method, and the time effect component was separated by the established base flow effect monitoring model. For the development of the daily variation monitoring model for dam seepage elements, all the previous factors, of which the measured time series prior to the dam seepage element monitoring time may have certain influence on the monitored results, were considered. Those factors that were positively correlated with the analyzed seepage element were initially considered to be the support vector machine(SVM) model input factors, and then the SVM kernel function-based sensitivity analysis was performed to optimize the input factor set and establish the optimized daily variation SVM model. The efficiency and rationality of the two models were verified by case studies of the water level of two piezometric tubes buried under the slope of a concrete gravity dam.Sensitivity analysis of the optimized SVM model shows that the influences of the daily variation of the upstream reservoir water level and rainfall on the daily variation of piezometric tube water level are processes subject to normal distribution. 展开更多
关键词 Dam seepage monitoring model Time lag effect Support vector machine(SVM) Sensitivity analysis Base flow Daily variation Piezometric tube water level
下载PDF
Monitoring technique for seepage line of tailings dam 被引量:2
4
作者 李夕兵 蒋卫东 《Journal of Central South University of Technology》 2003年第2期130-133,共4页
An automatic monitoring technique of the seepage line, including the monitoring design, the automatic monitoring system and the backfill technique of the measuring probe of pore-water pressure, was used in a tailings ... An automatic monitoring technique of the seepage line, including the monitoring design, the automatic monitoring system and the backfill technique of the measuring probe of pore-water pressure, was used in a tailings dam, and a shallow refractive seismic method was investigated for obtaining the seepage line of those areas outside the monitoring zone. The results show that the automatic monitoring has the error within ±3% relative to piezometric tube method and improves monitoring efficiency greatly, and the shallow refractive seismic method has the error within ±10% but expands the area of monitoring. Both of them can be used for a daily measurement in monitoring the seepage line. The result of the automatic monitoring also shows that not only the design of the survey line and the backfill technique of the measuring probe of pore-water pressure are reasonable and economic but also the reliability and safety of the automatic monitoring system are better. Testing result by the shallow refractive seismic method in tailings reveals that the energy excited by hammering iron sheet-pole is strong enough and safe, and that the character of anti-jamming by the detectors with long tailcone is better. 展开更多
关键词 TAILINGS DAM seepage LINE automatic monitoring SHALLOW refractive SEISMIC
下载PDF
Test Research of Seepage Monitoring Based on Distributed Optical Fiber 被引量:1
5
作者 Zhao Xinming Gao Yifei +4 位作者 Wang Qianwen Gao Junqi Zhou Yong Wu Gang Yao Jian 《Transactions of Nanjing University of Aeronautics and Astronautics》 EI CSCD 2018年第2期300-308,共9页
In this paper,a theoretical model of temperature and velocity of a fiber is derived.A test model simulating seepage indoor is designed.The optical fiber heating temperatures under different compaction degree and seepa... In this paper,a theoretical model of temperature and velocity of a fiber is derived.A test model simulating seepage indoor is designed.The optical fiber heating temperatures under different compaction degree and seepage velocities are measured through applying AC voltage on the optical fiber.The analyzing results show that the optical fiber heating temperature and seepage velocity are related in quadratic function.The quantitative relations of optical fiber temperature and seepage velocity under different soil types and compaction degree are fitted.Analysis on how the compaction degree influences the relation of optical fiber temperature and seepage velocity shows that with the increase of compaction degree,optical fiber heating temperature will gradually decline.The influence of soil type on fiber heating temperature is very complex.In practice,according to the characteristics of the soil,determining quantitative relationship and implementing quantitative monitoring of the seepage velocity are needed. 展开更多
关键词 THEORETICAL model seepage VELOCITY QUANTITATIVE monitoring COMPACTION DEGREE soil type
下载PDF
Research on the Seepage Safety Monitoring Indexes of the High Core Rockfill Dam 被引量:1
6
作者 Bo Chen Li Zhang +2 位作者 Qiupei Qian Yanhong Dou Zhuohao Ji 《World Journal of Engineering and Technology》 2017年第3期42-53,共12页
The study on developing the reasonable safety monitoring indexes plays a most importantly role in the health monitoring of high core rockfill dams. However, researches on this topic are relatively scarce both at home ... The study on developing the reasonable safety monitoring indexes plays a most importantly role in the health monitoring of high core rockfill dams. However, researches on this topic are relatively scarce both at home and abroad. In this paper, the characteristics and failure modes of seepage in high core rockfill dam are analyzed firstly. Then, a safety monitoring index based on seepage quantity, which reflects the overall seepage behavior, is developed, using the real-time monitoring data and its safety monitoring model. Moreover, another safety monitoring index based on seepage gradient, reflecting the local seepage behavior, is proposed, combining the spatial layout of osmo- meters and local failure mechanisms of core wall. Additionally, one more safety monitoring index based on permeability coefficient, which considers the overall and local seepage behaviors, is developed, on the basis of establishing the finite element analysis model and real-time seepage coefficient inversion analysis model of high core rockfill dam. A case study on these indexes of Nuozhadu high core rockfill dam is developed, which improves the reliability of seepage safety evaluation of the dam. 展开更多
关键词 HIGH Core ROCKFILL DAM Structural Health monitoring Safety monitoring Index seepage Quantity PERMEABILITY Gradient PERMEABILITY Coefficient
下载PDF
Piezomagnetic In-situ Stress Monitoring and its Application in the Longmenshan Fault Zone 被引量:4
7
作者 ZHANG Chongyuan WU Manlu +1 位作者 CHEN Qunce LIAO Chunting 《Acta Geologica Sinica(English Edition)》 SCIE CAS CSCD 2014年第5期1592-1602,共11页
The relative change of in-situ stress is an inevitable outcome of differential movement among the crust plates. Conversely, changes of in-situ stress can also lead to deformation and instability of crustal rock mass, ... The relative change of in-situ stress is an inevitable outcome of differential movement among the crust plates. Conversely, changes of in-situ stress can also lead to deformation and instability of crustal rock mass, trigger activity of faults, and induce earthquakes. Hence, monitoring real-time change of in-situ stress is of great significance. Piezomagnetic in-situ stress monitoring has good and longtime applications in large engineering constructions and geoscience study fields in China. In this paper, the new piezomagnetic in-situ stress monitoring system is introduced and it not only has overall improvements in measuring cell's structure and property, stressing and orienting way, but also enhances integration and intelligence of control and data transmission system, in general, which greatly promotes installing efficiency of measuring probe and quality of monitoring data. This paper also discusses the responses of new piezomagnetic system in large earthquake events of in-situ stress monitoring station at Qiaoqi of Baoxing and Wenxian of Gansu. The monitoring data reflect adjustments and changes of tectonic stress field at the southwestern segment of and the northern area near the Longmenshan fault zone, which shows that the new system has a good performance and application prospect in the geoscience field. Data of the Qiaoqi stress-monitoring station manifest that the Lushan Earthquake did not release stress of the southwestern segment of the Longmenshan fault zone adequately and there still probably exists seismic risk in this region in the future. Combined with absolute in-situ stress measurement, carrying out long-term in-situ stress monitoring in typical tectonic position of important regions is of great importance for researchers to assess and study regional crust stability. 展开更多
关键词 in-situ stress monitoring new piezomagnetic in-situ stress monitoring system theLongmenshan fault zone regional stress field dynamic changes
下载PDF
An inverse method for online stress monitoring and fatigue life analysis of boiler drums 被引量:5
8
作者 胡文森 李斌 《Journal of Chongqing University》 CAS 2009年第2期89-96,共8页
A method based on solution of the inverse heat conduction problem was presented for online stress monitoring and fatigue life analysis of boiler drums. The mathematical model of the drum temperature distribution is ba... A method based on solution of the inverse heat conduction problem was presented for online stress monitoring and fatigue life analysis of boiler drums. The mathematical model of the drum temperature distribution is based on the assumptions that the difference of temperature along the longitudinal axis of the boiler drum is negligible with changes only in the radial direction and the circumferential direction, and that the outer surface of drum is thermaUy insulated. Combining this model with the control-volume method provides temperatures at different points on a cross-section of the drum. With the temperature data, the stresses and the life expectancy of the boiler drum are derived according to the ASME code. Applying this method to the cold start-up process of a 300 MW boiler demonstrated the absence of errors caused by the boundary condition assumptions on the inner surface of the drum and testified that the method is an applicable technique for the online stress monitoring and fatigue life analysis of boiler drums. 展开更多
关键词 boiler drum fatigue life temperature distribution online stress monitoring
下载PDF
Design and Develop Online Monitoring and Early-warning System of Crane Structural Stress 被引量:1
9
作者 XU Huping~1 LIN Weiguo~2 XU Changsheng~2 1.School of Automation,Wuhan University of Technology,Wuhan 430070,China 2.School of Material Engineering,Wuhan University of Tedmology,Wuhan 430070 ,China 《武汉理工大学学报》 CAS CSCD 北大核心 2006年第S2期724-727,共4页
This paper proposed an online monitoring and early-warning system of dynamic stress of crane metal structure, and designed this system’s hardware,including sensor unit,data gathering unit,and controlling & proces... This paper proposed an online monitoring and early-warning system of dynamic stress of crane metal structure, and designed this system’s hardware,including sensor unit,data gathering unit,and controlling & processing unit of this sys- tem,and discussed the waterproof protection for resistance strain wafer and scheme of data gathering and transmission of dynamic strain gauge,moreover developed system software of real-time and online monitoring dynamic stress,including data gathering by DLL and data display & processing based on Visual C++.The system applies the dynamic strain gauge to gather the data of the stress,and communicates between PLC control system of crane and upper industrial computer,so that realize the real-time online monitoring and early-warning for crane’s metal structure stress.The test results show this system carry on real time and online monitoring to dynamic stress of loud-bearing metal structure longly and stability,and can give an alarm and overload protection on time.So the system has good practice value. 展开更多
关键词 CRANE METAL structure stress DETECT ONLINE monitor
下载PDF
Monitoring stress and recovery states: Structural and external stages of the short version of the RESTQ sport in elite swimmers before championships 被引量:1
10
作者 Michel Nicolas Philippe Vacher +1 位作者 Guillaume Martinent Laurent Mourot 《Journal of Sport and Health Science》 SCIE 2019年第1期77-88,共12页
Background: Psychological stress and recovery monitoring is a key issue for increasing athletes' health, well-being, and performance. This multistudy report examined changes and the doseàresponse relationship... Background: Psychological stress and recovery monitoring is a key issue for increasing athletes' health, well-being, and performance. This multistudy report examined changes and the doseàresponse relationships between recoveryàstress psychological states, training load(TL), heart rate(HR), heart rate recovery(HRR), and heart rate variability(HRV) while providing evidence for the factorial validity of a short French version of the RecoveryàStress Questionnaire for Athletes(RESTQ-36-R-Sport).Methods: Four hundred and seventy-three university athletes(Study 1), 72 full expert swimmers(Study 2), and 11 national to international swimmers(Study 3) participated in the study. Data were analyzed through confirmatory factor analyses(Study 1), repeated ANOVAs and correlational analyses(Study 2), t tests and correlational analyses(Study 3).Results: Multiple-group confirmatory factor analyses showed that the RESTQ-36-R-Sport scores were partially invariant across gender, type of sport, and practice level(Study 1). A doseàresponse relationship was performed between TL and RESTQ-36-R-Sport scores during an ecological training program(Study 2). Finally, relationships were found between physiological(HRR) and psychological(RESTQ-36-R-Sport) states during an ecological tapering period leading to a national championship(Study 3).Conclusion: As a whole, these findings provided evidence for the usefulness of the short version of the RESTQ-36-R-Sport for regular monitoring to prevent potential maladaptation due to intensive competitive sport practice. 展开更多
关键词 Adaptation Confirmatory factor analysis Heart rate variability monitoring RECOVERY stress
下载PDF
Structural Stress Monitoring and FEM Analysis of the Cutting Operation of the Main Bracket of A Semi-Submersible Platform 被引量:1
11
作者 KOU Yu-feng YANG Jian-min +3 位作者 XU Sheng-wen PENG Tao LIU Jun WU Zhuo-wei 《China Ocean Engineering》 SCIE EI CSCD 2019年第6期649-659,共11页
For a semi-submersible platform in repair, the eight old main brackets which connect columns with pontoons need to be replaced by new ones. In order to ensure the safety of the cutting operation of the old main bracke... For a semi-submersible platform in repair, the eight old main brackets which connect columns with pontoons need to be replaced by new ones. In order to ensure the safety of the cutting operation of the old main bracket and calculate the initial stress condition of new main bracket, the structural stress monitoring of eight key spots is carried out, and then the calibrated finite element model is established according to the field monitoring results. Before cutting the main bracket and all associated structures, eight rectangular rosettes were installed, and a tailored cutting scheme was proposed to release the initial stress, in which the main bracket and associated column and pontoon plates were partly cut. During the cutting procedure, the strains of the monitoring spots were measured, and then the structural stress of the monitored spots were obtained. The stress variation characteristics at different spots during the initial cutting operation were shown and the initial stress condition of the monitored spots was figured out. The loading and support conditions of the semi-submersible platform were calibrated based on the measured initial stress condition, which made the finite element model more credible. The stress condition with the main bracket and associated structures being entirely cut out is analyzed by the Finite Element Method (FEM), which demonstrates the cutting operation to be safe and feasible. In addition, the calibrated finite element model can be used to calculate the initial stress condition of the new main bracket, which will be very helpful for the long-term stress monitoring on the main bracket. 展开更多
关键词 semi-submersible platform main bracket cutting operation field stress monitoring FEM analysis
下载PDF
An Initial Residual Stress Inference Method by Incorporating Monitoring Data and Mechanism Model
12
作者 Shuguo Wang Yingguang Li +1 位作者 Changqing Liu Zhiwei Zhao 《Chinese Journal of Mechanical Engineering》 SCIE EI CAS CSCD 2022年第5期47-65,共19页
Initial residual stress is the main reason causing machining deformation of the workpiece,which has been deemed as one of the most important aspects of machining quality issues.The inference of the distribution of ini... Initial residual stress is the main reason causing machining deformation of the workpiece,which has been deemed as one of the most important aspects of machining quality issues.The inference of the distribution of initial residual stress inside the blank has significant meaning for machining deformation control.Due to the principle error of existing residual stress detection methods,there are still challenges in practical applications.Aiming at the detection problem of the initial residual stress field,an initial residual stress inference method by incorporating monitoring data and mechanism model is proposed in this paper.Monitoring data during machining process is used to represent the macroscopic characterization of the unbalanced residual stress,and the finite element numerical model is used as the mechanism model so as to solve the problem that the analytic mechanism model is difficult to establish;the policy gradient approach is introduced to solve the gradient descent problem of the combination of learning model and mechanism model.Finally,the initial residual stress field is obtained through iterative calculation based on the fusing method of monitoring data and mechanism model.Verification results show that the proposed inference method of initial residual stress field can accurately and effectively reflect the machining deformation in the actual machining process. 展开更多
关键词 Initial residual stress INFERENCE monitoring data Mechanism model Policy gradient
下载PDF
Research on application of rockmass breaking and inversion stress distribution by MS monitoring in Iongwall face
13
作者 成云海 姜福兴 张兴民 《Journal of Coal Science & Engineering(China)》 2007年第4期520-523,共4页
Brought forward the conception of conventional MS monitoring, and described the different monitoring ranges of frequencies and magnitude about earthquake and conventional MS monitoring and MS monitoring in detail. The... Brought forward the conception of conventional MS monitoring, and described the different monitoring ranges of frequencies and magnitude about earthquake and conventional MS monitoring and MS monitoring in detail. The monitoring results received by the Polish ARAMIS M/E monitoring system and the monitodng instrument designed by the author's research group in the same colliery show that the events amount received by conventional MS monitoring instrument which is only about 1/20 of the MS monitoring events, and it can only describe violent activity in larger range and be only applied to monitor hard and thick surrounding rock under mine. Meanwhile the small scale and high precision MS monitoring instrument can receive a lot of low rock fracturing signals, which can actualize the rock movement inversion and precisely descdbe 4-D changes of stress fields, and depend on the observed results we can determine the upper limits of mining and describe S-shaped strata spatial structure and high stress field in Iongwall face surrounded by two sides mined areas. 展开更多
关键词 mining field MS monitoring conventional MS monitoring rock strata movement mining stress field
下载PDF
A spatiotemporal signal processing technique for wafer-scale IC thermomechanical stress monitoring by an infrared camera
14
作者 Michel Saydé Ahmed Lakhssassi +1 位作者 Emmanuel Kengne Roman Palenichka 《Journal of Biosciences and Medicines》 2013年第2期1-5,共5页
In this paper, we describe a new silicon-die thermal monitoring approach using spatiotemporal signal processing technique for Wafer-Scale IC thermome- chanical stress monitoring. It is proposed in the context of a waf... In this paper, we describe a new silicon-die thermal monitoring approach using spatiotemporal signal processing technique for Wafer-Scale IC thermome- chanical stress monitoring. It is proposed in the context of a wafer-scale-based (WaferICTM) rapid prototyping platform for electronic systems. This technique will be embedded into the structure of the WaferIC, and will be used as a preventive measure to protect the wafer from possible damages that can be caused by excessive thermomechanical stress. The paper also presents spatial and spatiotemporal algorithms and the experimental results from an IR images collection campaign conducted using an IR camera. 展开更多
关键词 THERMAL monitoring Ring Oscillator (RO) Spatial SPATIOTEMPORAL THERMO-MECHANICAL stress Temperature Sensor THERMAL Analysis WaferIC Wafer-Scale System
下载PDF
Landslide Monitoring Based on High-Resolution Distributed Fiber Optic Stress Sensor
15
作者 Zhi-Yong Dai Yong Liu +3 位作者 Li-Xun Zhang Zhong-Hua Ou Ce Zhou Yong-Zhi Liu 《Journal of Electronic Science and Technology of China》 2008年第4期416-419,共4页
A landslide monitoring application is presented by using a high-resolution distributed fiber optic stress sensor. The sensor is used to monitor the intra-stress distribution and variations in landslide bodies, and can... A landslide monitoring application is presented by using a high-resolution distributed fiber optic stress sensor. The sensor is used to monitor the intra-stress distribution and variations in landslide bodies, and can be used for the early warning of the occurrence of the landslides. The principle of distributed fiber optic stress sensing and the intra-stress monitoring method for landslides are described in detail. By measuring the distributed polarization mode coupling in the polarization-maintaining fiber, the distributed fiber stress sensor with stress measuring range 0 to 15 MPa, spatial resolution 10 cm and measuring range 0.5 km, is designed. The warning system is also investigated experimentally in the field trial. 展开更多
关键词 Distributed fiber optic stress sensor landslides warning monitoring system.
下载PDF
Research progress of monitoring, forecasting, and prevention of rockburst in underground coal mining in China 被引量:68
16
作者 Linming Dou Zonglong Mu +2 位作者 Zhenlei Li Anye Cao Siyuan Gong 《International Journal of Coal Science & Technology》 EI CAS 2014年第3期278-288,共11页
As one of the dynamic disasters of coal mines,rockburst seriously affects underground safe coal mining.Based on the laboratory test,field test,and theoretical analysis,this study proposed the principle of the rock bur... As one of the dynamic disasters of coal mines,rockburst seriously affects underground safe coal mining.Based on the laboratory test,field test,and theoretical analysis,this study proposed the principle of the rock burst induced by the combination of dynamic and static stresses and divided such rock burst into three types,including induced by primary dynamic stress,mainly induced by dynamic stress,and by dynamic stress in low critical stress state.The expressions of the static stress induced by coal mining and dynamic stress induced by mining tremors were obtained.Moreover,theories and technologies at home and abroad were summarized concerning the monitoring,forecasting,and preventing of rockburst.These mainly include the zoning and leveling forecasting method,electromagnetic radiation technology,elastic wave and seismic wave computed tomography technologies in aspect of rockburst monitoring,as well as the intensity weakening theory,the strong-soft-strong structure effect,the directional hydraulic fracturing technology,the roadway support system in regards of rockburst prevention.The prospect of rockburst development suggested that researches concerning the rockburst mechanism should be quantitatively developed around the roadway and coalface surrounding coal-rock mass.It should be focused on the rockburst mechanism and prevention technology of mining with over 1,000 km deep and mining in large tectonic zone.In addition,the monitoring and prevention of rockburst should be based on rockburst mechanism. 展开更多
关键词 ROCKBURST Dynamic stress Static stress Mining tremor monitoring and forecasting PREVENTION
下载PDF
An in situ monitoring campaign of a hard rock pillar at great depth within a Canadian mine 被引量:6
17
作者 Bradley Forbes Nicholas Vlachopoulos +2 位作者 Mark S.Diederichs Andrew J.Hyett Allan Punkkinen 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2020年第3期427-448,共22页
A recent research campaign at a Canadian nickel-copper mine involved instrumenting a hard rock sill drift pillar with an array of multi-point rod extensometers,distributed optical fibre strain sensors,and borehole pre... A recent research campaign at a Canadian nickel-copper mine involved instrumenting a hard rock sill drift pillar with an array of multi-point rod extensometers,distributed optical fibre strain sensors,and borehole pressure cells(BHPCs).The instrumentation spanned across a 15.24 m lengthwise segment of the relatively massive granitic pillar situated at a depth of 2.44 km within the mine.Between May 2016 and March 2017,the pillar’s displacement and pressure response were measured and correlated with mining activities on the same level as the pillar,including:(1)mine-by of the pillar,(2)footwall drift development,and(3)ore body stoping operations.Regarding displacements of the pillar,the extensometers provided high temporal resolution(logged hourly)and the optical fibre strain sensors provide high spatial resolution(measured every 0.65 mm along the length of each sensor).The combination of sensing techniques allowed centimetre-scale rock mass bulking near the pillar sidewalls to be distinguished from microstrain-scale fracturing towards the core of the pillar.Additionally,the influence and extent of a mine-scale schistose shear zone transecting the pillar was identified.By converting measured rock mass displacement to velocity,a process was demonstrated which allowed mining activities inducing displacements to be categorised by time-duration and cumulative displacement.In over half of the analysed mining activities,displacements were determined to prolong for over an hour,predominately resulting in submillimetre cumulative displacements,but in some cases multi-centimetre cumulative displacements were observed.This time-dependent behaviour was more pronounced within the vicinity of the plumb shear zone.Displacement measurements were also used to assess selected support member load and elongation mobilisation per mining activity.It was found that a combined static load and elongation capacity of reinforcing members was essential to maintaining excavation stability,while permitting gradual shedding of stress through controlled pillar sidewall displacements. 展开更多
关键词 Hard rock pillar ROCKBURST Rock mass bulking Distributed optical fibre strain sensing EXTENSOMETER In situ monitoring High stress Dynamic support
下载PDF
Ground control monitoring of retreat room–and–pillar mine in Central Appalachia 被引量:2
18
作者 Erik C.Westman Ryan J.Molka William J.Conrad 《International Journal of Mining Science and Technology》 SCIE EI CSCD 2017年第1期65-69,共5页
In order to study pillar and overburden response to retreat mining, a ground control program was conducted at a Central Appalachian Mine. The program consisted of several monitoring methods including a seismic monitor... In order to study pillar and overburden response to retreat mining, a ground control program was conducted at a Central Appalachian Mine. The program consisted of several monitoring methods including a seismic monitoring system, borehole pressure cells in the pillars, and time-lapse photogrammetry of the pillar ribs. Two parallel geophone arrays were installed, one on each side of the panel with the sensors mounted 3 m into the roof. A total of fourteen geophones recorded more than 5000 events during the panel retreat. A MIDAS datalogger was used to record pressure from borehole pressure cells(BPCs)located in two adjacent pillars that were not mined during retreat. A series of photographs were taken of the pillars that had the BPCs as the face approached so that deformation of the entire rib could be monitored using photogrammetry. Results showed that pillar stability and cave development were as expected. The BPCs showed an increase in loading when the face was 115 m inby and a clear onset of the forward abutment at 30 m. The photogrammetry results displayed pillar deformation corresponding to the increased loading. The microseismic monitoring results showed the overburden caving inby the face, again as expected. The significance of these results lies in two points,(1) we can quantify the safe manner in which this mine is conducting retreating operations, and(2) we can use volumetric technologies(photogrammetry and microseismic) to monitor entire volumes of the mine in addition to the traditional point-location geotechnical measurements(BPCs). 展开更多
关键词 Retreat mining stress measurement Microseismic monitoring Pillar stability
下载PDF
Safety evaluation of replacement reinforcement quality in abutment contact zones of ultra-high arch dam in first impoundment period based on prototype monitoring 被引量:2
19
作者 Bo HU Zhong-ru WU +2 位作者 Guan-biao LIU Bin ZHAO Bo XU 《Water Science and Engineering》 EI CAS 2012年第2期210-218,共9页
Reinforcement quality evaluation at the abutment is an important research direction. Prototype monitoring and theoretical derivation were integrated to study the replacement reinforcement quality in abutment contact z... Reinforcement quality evaluation at the abutment is an important research direction. Prototype monitoring and theoretical derivation were integrated to study the replacement reinforcement quality in abutment contact zones of the Xiaowan ultra-high arch dam. The principles of monitoring layout and design are introduced in detail. Prototype monitoring shows that the increment of the interfacial compressive stress is much larger in the impoundment stage than in the regulating stage. The water pressure and time-effect are two main factors affeeting the interfacial stress. The time-effect is the key factor in the initial impoundment stage, and the water pressure is the key factor after impoundment. The contact properties are significantly improved by grouting. This study shows that there are three typical stages in the joint opening hydrographs, namely the compression stage, opening stage, and stable stage. There is a nonlinear relationship between the joint opening and temperature, which can be well described by the S-function. In conclusion, the reinforcement effect is satisfying, and the abutment is safe. 展开更多
关键词 ultra-high arch dam prototype monitoring compressive stress joint opening safety evaluation
下载PDF
Integrated real-time roof monitoring 被引量:1
20
作者 SHEN Bao-tang GUO Hua KING Andrew 《Journal of Coal Science & Engineering(China)》 2009年第3期313-317,共5页
CSIRO has recently developed a real-time roof monitoring system for under-groundcoal mines and successfully tried the system in gate roads at Ulan Mine.The systemintegrated displacement monitoring,stress monitoring an... CSIRO has recently developed a real-time roof monitoring system for under-groundcoal mines and successfully tried the system in gate roads at Ulan Mine.The systemintegrated displacement monitoring,stress monitoring and seismic monitoring in onepackage.It included GEL multianchor extensometers,vibrating wire uniaxial stress meters,ESG seismic monitoring system with microseismic sensors and high-frequency AE sensors.The monitoring system automated and the data can be automatically collected by acentral computer located in an underground nonhazardous area.The data are then transferredto the surface via an optical fiber cable.The real-time data were accessed at anylocation with an Internet connection.The trials of the system in two tailgates at Ulan Minedemonstrate that the system is effective for monitoring the behavior and stability of roadwaysduring Iongwall mining.The continuous roof displacement/stress data show clearprecursors of roof falls.The seismic data (event count and locations) provide insights intothe roof failure process during roof fall. 展开更多
关键词 roof fall real-time monitoring DISPLACEMENT stress SEISMICITY
下载PDF
上一页 1 2 123 下一页 到第
使用帮助 返回顶部