Monitoring the change in horizontal stress from the geophysical data is a tough challenge, and it has a crucial impact on broad practical scenarios which involve reservoir exploration and development, carbon dioxide (...Monitoring the change in horizontal stress from the geophysical data is a tough challenge, and it has a crucial impact on broad practical scenarios which involve reservoir exploration and development, carbon dioxide (CO_(2)) injection and storage, shallow surface prospecting and deep-earth structure description. The change in in-situ stress induced by hydrocarbon production and localized tectonic movements causes the changes in rock mechanic properties (e.g. wave velocities, density and anisotropy) and further causes the changes in seismic amplitudes, phases and travel times. In this study, the nonlinear elasticity theory that regards the rock skeleton (solid phase) and pore fluid as an effective whole is used to characterize the effect of horizontal principal stress on rock overall elastic properties and the stress-dependent anisotropy parameters are therefore formulated. Then the approximate P-wave, SV-wave and SH-wave angle-dependent reflection coefficient equations for the horizontal-stress-induced anisotropic media are proposed. It is shown that, on the different reflectors, the stress-induced relative changes in reflectivities (i.e., relative difference) of elastic parameters (i.e., P- and S-wave velocities and density) are much less than the changes in contrasts of anisotropy parameters. Therefore, the effects of stress change on the reflectivities of three elastic parameters are reasonably neglected to further propose an AVO inversion approach incorporating P-, SH- and SV-wave information to estimate the change in horizontal principal stress from the corresponding time-lapse seismic data. Compared with the existing methods, our method eliminates the need for man-made rock-physical or fitting parameters, providing more stable predictive power. 1D test illustrates that the estimated result from time-lapse P-wave reflection data shows the most reasonable agreement with the real model, while the estimated result from SH-wave reflection data shows the largest bias. 2D test illustrates the feasibility of the proposed inversion method for estimating the change in horizontal stress from P-wave time-lapse seismic data.展开更多
Extreme hydrological events induced by typhoons in reservoir areas have presented severe challenges to the safe operation of hydraulic structures. Based on analysis of the seepage characteristics of an earth rock dam,...Extreme hydrological events induced by typhoons in reservoir areas have presented severe challenges to the safe operation of hydraulic structures. Based on analysis of the seepage characteristics of an earth rock dam, a novel seepage safety monitoring model was constructed in this study. The nonlinear influence processes of the antecedent reservoir water level and rainfall were assumed to follow normal distributions. The particle swarm optimization (PSO) algorithm was used to optimize the model parameters so as to raise the fitting accuracy. In addition, a mutation factor was introduced to simulate the sudden increase in the piezometric level induced by short-duration heavy rainfall and the possible historical extreme reservoir water level during a typhoon. In order to verify the efficacy of this model, the earth rock dam of the Siminghu Reservoir was used as an example. The piezometric level at the SW1-2 measuring point during Typhoon Fitow in 2013 was fitted with the present model, and a corresponding theoretical expression was established. Comparison of fitting results of the piezometric level obtained from the present statistical model and traditional statistical model with monitored values during the typhoon shows that the present model has a higher fitting accuracy and can simulate the uprush feature of the seepage pressure during the typhoon perfectly.展开更多
Affected by external environmental factors and evolution of dam performance, dam seepage behavior shows nonlinear time-varying characteristics. In this study, to predict and evaluate the long-term development trend an...Affected by external environmental factors and evolution of dam performance, dam seepage behavior shows nonlinear time-varying characteristics. In this study, to predict and evaluate the long-term development trend and short-term fluctuation of the dam seepage behavior, two monitoring models were developed, one for the base flow effect and one for daily variation of dam seepage elements. In the first model, to avoid the influence of the time lag effect on the evaluation of seepage variation with the time effect component of seepage elements, the base values of the seepage element and the reservoir water level were extracted using the wavelet multi-resolution analysis method, and the time effect component was separated by the established base flow effect monitoring model. For the development of the daily variation monitoring model for dam seepage elements, all the previous factors, of which the measured time series prior to the dam seepage element monitoring time may have certain influence on the monitored results, were considered. Those factors that were positively correlated with the analyzed seepage element were initially considered to be the support vector machine(SVM) model input factors, and then the SVM kernel function-based sensitivity analysis was performed to optimize the input factor set and establish the optimized daily variation SVM model. The efficiency and rationality of the two models were verified by case studies of the water level of two piezometric tubes buried under the slope of a concrete gravity dam.Sensitivity analysis of the optimized SVM model shows that the influences of the daily variation of the upstream reservoir water level and rainfall on the daily variation of piezometric tube water level are processes subject to normal distribution.展开更多
An automatic monitoring technique of the seepage line, including the monitoring design, the automatic monitoring system and the backfill technique of the measuring probe of pore-water pressure, was used in a tailings ...An automatic monitoring technique of the seepage line, including the monitoring design, the automatic monitoring system and the backfill technique of the measuring probe of pore-water pressure, was used in a tailings dam, and a shallow refractive seismic method was investigated for obtaining the seepage line of those areas outside the monitoring zone. The results show that the automatic monitoring has the error within ±3% relative to piezometric tube method and improves monitoring efficiency greatly, and the shallow refractive seismic method has the error within ±10% but expands the area of monitoring. Both of them can be used for a daily measurement in monitoring the seepage line. The result of the automatic monitoring also shows that not only the design of the survey line and the backfill technique of the measuring probe of pore-water pressure are reasonable and economic but also the reliability and safety of the automatic monitoring system are better. Testing result by the shallow refractive seismic method in tailings reveals that the energy excited by hammering iron sheet-pole is strong enough and safe, and that the character of anti-jamming by the detectors with long tailcone is better.展开更多
In this paper,a theoretical model of temperature and velocity of a fiber is derived.A test model simulating seepage indoor is designed.The optical fiber heating temperatures under different compaction degree and seepa...In this paper,a theoretical model of temperature and velocity of a fiber is derived.A test model simulating seepage indoor is designed.The optical fiber heating temperatures under different compaction degree and seepage velocities are measured through applying AC voltage on the optical fiber.The analyzing results show that the optical fiber heating temperature and seepage velocity are related in quadratic function.The quantitative relations of optical fiber temperature and seepage velocity under different soil types and compaction degree are fitted.Analysis on how the compaction degree influences the relation of optical fiber temperature and seepage velocity shows that with the increase of compaction degree,optical fiber heating temperature will gradually decline.The influence of soil type on fiber heating temperature is very complex.In practice,according to the characteristics of the soil,determining quantitative relationship and implementing quantitative monitoring of the seepage velocity are needed.展开更多
The study on developing the reasonable safety monitoring indexes plays a most importantly role in the health monitoring of high core rockfill dams. However, researches on this topic are relatively scarce both at home ...The study on developing the reasonable safety monitoring indexes plays a most importantly role in the health monitoring of high core rockfill dams. However, researches on this topic are relatively scarce both at home and abroad. In this paper, the characteristics and failure modes of seepage in high core rockfill dam are analyzed firstly. Then, a safety monitoring index based on seepage quantity, which reflects the overall seepage behavior, is developed, using the real-time monitoring data and its safety monitoring model. Moreover, another safety monitoring index based on seepage gradient, reflecting the local seepage behavior, is proposed, combining the spatial layout of osmo- meters and local failure mechanisms of core wall. Additionally, one more safety monitoring index based on permeability coefficient, which considers the overall and local seepage behaviors, is developed, on the basis of establishing the finite element analysis model and real-time seepage coefficient inversion analysis model of high core rockfill dam. A case study on these indexes of Nuozhadu high core rockfill dam is developed, which improves the reliability of seepage safety evaluation of the dam.展开更多
The relative change of in-situ stress is an inevitable outcome of differential movement among the crust plates. Conversely, changes of in-situ stress can also lead to deformation and instability of crustal rock mass, ...The relative change of in-situ stress is an inevitable outcome of differential movement among the crust plates. Conversely, changes of in-situ stress can also lead to deformation and instability of crustal rock mass, trigger activity of faults, and induce earthquakes. Hence, monitoring real-time change of in-situ stress is of great significance. Piezomagnetic in-situ stress monitoring has good and longtime applications in large engineering constructions and geoscience study fields in China. In this paper, the new piezomagnetic in-situ stress monitoring system is introduced and it not only has overall improvements in measuring cell's structure and property, stressing and orienting way, but also enhances integration and intelligence of control and data transmission system, in general, which greatly promotes installing efficiency of measuring probe and quality of monitoring data. This paper also discusses the responses of new piezomagnetic system in large earthquake events of in-situ stress monitoring station at Qiaoqi of Baoxing and Wenxian of Gansu. The monitoring data reflect adjustments and changes of tectonic stress field at the southwestern segment of and the northern area near the Longmenshan fault zone, which shows that the new system has a good performance and application prospect in the geoscience field. Data of the Qiaoqi stress-monitoring station manifest that the Lushan Earthquake did not release stress of the southwestern segment of the Longmenshan fault zone adequately and there still probably exists seismic risk in this region in the future. Combined with absolute in-situ stress measurement, carrying out long-term in-situ stress monitoring in typical tectonic position of important regions is of great importance for researchers to assess and study regional crust stability.展开更多
A method based on solution of the inverse heat conduction problem was presented for online stress monitoring and fatigue life analysis of boiler drums. The mathematical model of the drum temperature distribution is ba...A method based on solution of the inverse heat conduction problem was presented for online stress monitoring and fatigue life analysis of boiler drums. The mathematical model of the drum temperature distribution is based on the assumptions that the difference of temperature along the longitudinal axis of the boiler drum is negligible with changes only in the radial direction and the circumferential direction, and that the outer surface of drum is thermaUy insulated. Combining this model with the control-volume method provides temperatures at different points on a cross-section of the drum. With the temperature data, the stresses and the life expectancy of the boiler drum are derived according to the ASME code. Applying this method to the cold start-up process of a 300 MW boiler demonstrated the absence of errors caused by the boundary condition assumptions on the inner surface of the drum and testified that the method is an applicable technique for the online stress monitoring and fatigue life analysis of boiler drums.展开更多
This paper proposed an online monitoring and early-warning system of dynamic stress of crane metal structure, and designed this system’s hardware,including sensor unit,data gathering unit,and controlling & proces...This paper proposed an online monitoring and early-warning system of dynamic stress of crane metal structure, and designed this system’s hardware,including sensor unit,data gathering unit,and controlling & processing unit of this sys- tem,and discussed the waterproof protection for resistance strain wafer and scheme of data gathering and transmission of dynamic strain gauge,moreover developed system software of real-time and online monitoring dynamic stress,including data gathering by DLL and data display & processing based on Visual C++.The system applies the dynamic strain gauge to gather the data of the stress,and communicates between PLC control system of crane and upper industrial computer,so that realize the real-time online monitoring and early-warning for crane’s metal structure stress.The test results show this system carry on real time and online monitoring to dynamic stress of loud-bearing metal structure longly and stability,and can give an alarm and overload protection on time.So the system has good practice value.展开更多
Background: Psychological stress and recovery monitoring is a key issue for increasing athletes' health, well-being, and performance. This multistudy report examined changes and the doseàresponse relationship...Background: Psychological stress and recovery monitoring is a key issue for increasing athletes' health, well-being, and performance. This multistudy report examined changes and the doseàresponse relationships between recoveryàstress psychological states, training load(TL), heart rate(HR), heart rate recovery(HRR), and heart rate variability(HRV) while providing evidence for the factorial validity of a short French version of the RecoveryàStress Questionnaire for Athletes(RESTQ-36-R-Sport).Methods: Four hundred and seventy-three university athletes(Study 1), 72 full expert swimmers(Study 2), and 11 national to international swimmers(Study 3) participated in the study. Data were analyzed through confirmatory factor analyses(Study 1), repeated ANOVAs and correlational analyses(Study 2), t tests and correlational analyses(Study 3).Results: Multiple-group confirmatory factor analyses showed that the RESTQ-36-R-Sport scores were partially invariant across gender, type of sport, and practice level(Study 1). A doseàresponse relationship was performed between TL and RESTQ-36-R-Sport scores during an ecological training program(Study 2). Finally, relationships were found between physiological(HRR) and psychological(RESTQ-36-R-Sport) states during an ecological tapering period leading to a national championship(Study 3).Conclusion: As a whole, these findings provided evidence for the usefulness of the short version of the RESTQ-36-R-Sport for regular monitoring to prevent potential maladaptation due to intensive competitive sport practice.展开更多
For a semi-submersible platform in repair, the eight old main brackets which connect columns with pontoons need to be replaced by new ones. In order to ensure the safety of the cutting operation of the old main bracke...For a semi-submersible platform in repair, the eight old main brackets which connect columns with pontoons need to be replaced by new ones. In order to ensure the safety of the cutting operation of the old main bracket and calculate the initial stress condition of new main bracket, the structural stress monitoring of eight key spots is carried out, and then the calibrated finite element model is established according to the field monitoring results. Before cutting the main bracket and all associated structures, eight rectangular rosettes were installed, and a tailored cutting scheme was proposed to release the initial stress, in which the main bracket and associated column and pontoon plates were partly cut. During the cutting procedure, the strains of the monitoring spots were measured, and then the structural stress of the monitored spots were obtained. The stress variation characteristics at different spots during the initial cutting operation were shown and the initial stress condition of the monitored spots was figured out. The loading and support conditions of the semi-submersible platform were calibrated based on the measured initial stress condition, which made the finite element model more credible. The stress condition with the main bracket and associated structures being entirely cut out is analyzed by the Finite Element Method (FEM), which demonstrates the cutting operation to be safe and feasible. In addition, the calibrated finite element model can be used to calculate the initial stress condition of the new main bracket, which will be very helpful for the long-term stress monitoring on the main bracket.展开更多
Initial residual stress is the main reason causing machining deformation of the workpiece,which has been deemed as one of the most important aspects of machining quality issues.The inference of the distribution of ini...Initial residual stress is the main reason causing machining deformation of the workpiece,which has been deemed as one of the most important aspects of machining quality issues.The inference of the distribution of initial residual stress inside the blank has significant meaning for machining deformation control.Due to the principle error of existing residual stress detection methods,there are still challenges in practical applications.Aiming at the detection problem of the initial residual stress field,an initial residual stress inference method by incorporating monitoring data and mechanism model is proposed in this paper.Monitoring data during machining process is used to represent the macroscopic characterization of the unbalanced residual stress,and the finite element numerical model is used as the mechanism model so as to solve the problem that the analytic mechanism model is difficult to establish;the policy gradient approach is introduced to solve the gradient descent problem of the combination of learning model and mechanism model.Finally,the initial residual stress field is obtained through iterative calculation based on the fusing method of monitoring data and mechanism model.Verification results show that the proposed inference method of initial residual stress field can accurately and effectively reflect the machining deformation in the actual machining process.展开更多
Brought forward the conception of conventional MS monitoring, and described the different monitoring ranges of frequencies and magnitude about earthquake and conventional MS monitoring and MS monitoring in detail. The...Brought forward the conception of conventional MS monitoring, and described the different monitoring ranges of frequencies and magnitude about earthquake and conventional MS monitoring and MS monitoring in detail. The monitoring results received by the Polish ARAMIS M/E monitoring system and the monitodng instrument designed by the author's research group in the same colliery show that the events amount received by conventional MS monitoring instrument which is only about 1/20 of the MS monitoring events, and it can only describe violent activity in larger range and be only applied to monitor hard and thick surrounding rock under mine. Meanwhile the small scale and high precision MS monitoring instrument can receive a lot of low rock fracturing signals, which can actualize the rock movement inversion and precisely descdbe 4-D changes of stress fields, and depend on the observed results we can determine the upper limits of mining and describe S-shaped strata spatial structure and high stress field in Iongwall face surrounded by two sides mined areas.展开更多
In this paper, we describe a new silicon-die thermal monitoring approach using spatiotemporal signal processing technique for Wafer-Scale IC thermome- chanical stress monitoring. It is proposed in the context of a waf...In this paper, we describe a new silicon-die thermal monitoring approach using spatiotemporal signal processing technique for Wafer-Scale IC thermome- chanical stress monitoring. It is proposed in the context of a wafer-scale-based (WaferICTM) rapid prototyping platform for electronic systems. This technique will be embedded into the structure of the WaferIC, and will be used as a preventive measure to protect the wafer from possible damages that can be caused by excessive thermomechanical stress. The paper also presents spatial and spatiotemporal algorithms and the experimental results from an IR images collection campaign conducted using an IR camera.展开更多
A landslide monitoring application is presented by using a high-resolution distributed fiber optic stress sensor. The sensor is used to monitor the intra-stress distribution and variations in landslide bodies, and can...A landslide monitoring application is presented by using a high-resolution distributed fiber optic stress sensor. The sensor is used to monitor the intra-stress distribution and variations in landslide bodies, and can be used for the early warning of the occurrence of the landslides. The principle of distributed fiber optic stress sensing and the intra-stress monitoring method for landslides are described in detail. By measuring the distributed polarization mode coupling in the polarization-maintaining fiber, the distributed fiber stress sensor with stress measuring range 0 to 15 MPa, spatial resolution 10 cm and measuring range 0.5 km, is designed. The warning system is also investigated experimentally in the field trial.展开更多
As one of the dynamic disasters of coal mines,rockburst seriously affects underground safe coal mining.Based on the laboratory test,field test,and theoretical analysis,this study proposed the principle of the rock bur...As one of the dynamic disasters of coal mines,rockburst seriously affects underground safe coal mining.Based on the laboratory test,field test,and theoretical analysis,this study proposed the principle of the rock burst induced by the combination of dynamic and static stresses and divided such rock burst into three types,including induced by primary dynamic stress,mainly induced by dynamic stress,and by dynamic stress in low critical stress state.The expressions of the static stress induced by coal mining and dynamic stress induced by mining tremors were obtained.Moreover,theories and technologies at home and abroad were summarized concerning the monitoring,forecasting,and preventing of rockburst.These mainly include the zoning and leveling forecasting method,electromagnetic radiation technology,elastic wave and seismic wave computed tomography technologies in aspect of rockburst monitoring,as well as the intensity weakening theory,the strong-soft-strong structure effect,the directional hydraulic fracturing technology,the roadway support system in regards of rockburst prevention.The prospect of rockburst development suggested that researches concerning the rockburst mechanism should be quantitatively developed around the roadway and coalface surrounding coal-rock mass.It should be focused on the rockburst mechanism and prevention technology of mining with over 1,000 km deep and mining in large tectonic zone.In addition,the monitoring and prevention of rockburst should be based on rockburst mechanism.展开更多
A recent research campaign at a Canadian nickel-copper mine involved instrumenting a hard rock sill drift pillar with an array of multi-point rod extensometers,distributed optical fibre strain sensors,and borehole pre...A recent research campaign at a Canadian nickel-copper mine involved instrumenting a hard rock sill drift pillar with an array of multi-point rod extensometers,distributed optical fibre strain sensors,and borehole pressure cells(BHPCs).The instrumentation spanned across a 15.24 m lengthwise segment of the relatively massive granitic pillar situated at a depth of 2.44 km within the mine.Between May 2016 and March 2017,the pillar’s displacement and pressure response were measured and correlated with mining activities on the same level as the pillar,including:(1)mine-by of the pillar,(2)footwall drift development,and(3)ore body stoping operations.Regarding displacements of the pillar,the extensometers provided high temporal resolution(logged hourly)and the optical fibre strain sensors provide high spatial resolution(measured every 0.65 mm along the length of each sensor).The combination of sensing techniques allowed centimetre-scale rock mass bulking near the pillar sidewalls to be distinguished from microstrain-scale fracturing towards the core of the pillar.Additionally,the influence and extent of a mine-scale schistose shear zone transecting the pillar was identified.By converting measured rock mass displacement to velocity,a process was demonstrated which allowed mining activities inducing displacements to be categorised by time-duration and cumulative displacement.In over half of the analysed mining activities,displacements were determined to prolong for over an hour,predominately resulting in submillimetre cumulative displacements,but in some cases multi-centimetre cumulative displacements were observed.This time-dependent behaviour was more pronounced within the vicinity of the plumb shear zone.Displacement measurements were also used to assess selected support member load and elongation mobilisation per mining activity.It was found that a combined static load and elongation capacity of reinforcing members was essential to maintaining excavation stability,while permitting gradual shedding of stress through controlled pillar sidewall displacements.展开更多
In order to study pillar and overburden response to retreat mining, a ground control program was conducted at a Central Appalachian Mine. The program consisted of several monitoring methods including a seismic monitor...In order to study pillar and overburden response to retreat mining, a ground control program was conducted at a Central Appalachian Mine. The program consisted of several monitoring methods including a seismic monitoring system, borehole pressure cells in the pillars, and time-lapse photogrammetry of the pillar ribs. Two parallel geophone arrays were installed, one on each side of the panel with the sensors mounted 3 m into the roof. A total of fourteen geophones recorded more than 5000 events during the panel retreat. A MIDAS datalogger was used to record pressure from borehole pressure cells(BPCs)located in two adjacent pillars that were not mined during retreat. A series of photographs were taken of the pillars that had the BPCs as the face approached so that deformation of the entire rib could be monitored using photogrammetry. Results showed that pillar stability and cave development were as expected. The BPCs showed an increase in loading when the face was 115 m inby and a clear onset of the forward abutment at 30 m. The photogrammetry results displayed pillar deformation corresponding to the increased loading. The microseismic monitoring results showed the overburden caving inby the face, again as expected. The significance of these results lies in two points,(1) we can quantify the safe manner in which this mine is conducting retreating operations, and(2) we can use volumetric technologies(photogrammetry and microseismic) to monitor entire volumes of the mine in addition to the traditional point-location geotechnical measurements(BPCs).展开更多
Reinforcement quality evaluation at the abutment is an important research direction. Prototype monitoring and theoretical derivation were integrated to study the replacement reinforcement quality in abutment contact z...Reinforcement quality evaluation at the abutment is an important research direction. Prototype monitoring and theoretical derivation were integrated to study the replacement reinforcement quality in abutment contact zones of the Xiaowan ultra-high arch dam. The principles of monitoring layout and design are introduced in detail. Prototype monitoring shows that the increment of the interfacial compressive stress is much larger in the impoundment stage than in the regulating stage. The water pressure and time-effect are two main factors affeeting the interfacial stress. The time-effect is the key factor in the initial impoundment stage, and the water pressure is the key factor after impoundment. The contact properties are significantly improved by grouting. This study shows that there are three typical stages in the joint opening hydrographs, namely the compression stage, opening stage, and stable stage. There is a nonlinear relationship between the joint opening and temperature, which can be well described by the S-function. In conclusion, the reinforcement effect is satisfying, and the abutment is safe.展开更多
CSIRO has recently developed a real-time roof monitoring system for under-groundcoal mines and successfully tried the system in gate roads at Ulan Mine.The systemintegrated displacement monitoring,stress monitoring an...CSIRO has recently developed a real-time roof monitoring system for under-groundcoal mines and successfully tried the system in gate roads at Ulan Mine.The systemintegrated displacement monitoring,stress monitoring and seismic monitoring in onepackage.It included GEL multianchor extensometers,vibrating wire uniaxial stress meters,ESG seismic monitoring system with microseismic sensors and high-frequency AE sensors.The monitoring system automated and the data can be automatically collected by acentral computer located in an underground nonhazardous area.The data are then transferredto the surface via an optical fiber cable.The real-time data were accessed at anylocation with an Internet connection.The trials of the system in two tailgates at Ulan Minedemonstrate that the system is effective for monitoring the behavior and stability of roadwaysduring Iongwall mining.The continuous roof displacement/stress data show clearprecursors of roof falls.The seismic data (event count and locations) provide insights intothe roof failure process during roof fall.展开更多
基金National Natural Science Foundation of China(42174139,41974119,42030103)Laoshan Laboratory Science and Technology Innovation Program(LSKJ202203406)Science Foundation from Innovation and Technology Support Program for Young Scientists in Colleges of Shandong Province and Ministry of Science and Technology of China(2019RA2136).
文摘Monitoring the change in horizontal stress from the geophysical data is a tough challenge, and it has a crucial impact on broad practical scenarios which involve reservoir exploration and development, carbon dioxide (CO_(2)) injection and storage, shallow surface prospecting and deep-earth structure description. The change in in-situ stress induced by hydrocarbon production and localized tectonic movements causes the changes in rock mechanic properties (e.g. wave velocities, density and anisotropy) and further causes the changes in seismic amplitudes, phases and travel times. In this study, the nonlinear elasticity theory that regards the rock skeleton (solid phase) and pore fluid as an effective whole is used to characterize the effect of horizontal principal stress on rock overall elastic properties and the stress-dependent anisotropy parameters are therefore formulated. Then the approximate P-wave, SV-wave and SH-wave angle-dependent reflection coefficient equations for the horizontal-stress-induced anisotropic media are proposed. It is shown that, on the different reflectors, the stress-induced relative changes in reflectivities (i.e., relative difference) of elastic parameters (i.e., P- and S-wave velocities and density) are much less than the changes in contrasts of anisotropy parameters. Therefore, the effects of stress change on the reflectivities of three elastic parameters are reasonably neglected to further propose an AVO inversion approach incorporating P-, SH- and SV-wave information to estimate the change in horizontal principal stress from the corresponding time-lapse seismic data. Compared with the existing methods, our method eliminates the need for man-made rock-physical or fitting parameters, providing more stable predictive power. 1D test illustrates that the estimated result from time-lapse P-wave reflection data shows the most reasonable agreement with the real model, while the estimated result from SH-wave reflection data shows the largest bias. 2D test illustrates the feasibility of the proposed inversion method for estimating the change in horizontal stress from P-wave time-lapse seismic data.
基金supported by the National Natural Science Foundation of China(Grants No.51179108 and 51679151)the Special Fund for the Public Welfare Industry of the Ministry of Water Resources of China(Grant No.201501033)+1 种基金the National Key Research and Development Program(Grant No.2016YFC0401603)the Program Sponsored for Scientific Innovation Research of College Graduates in Jiangsu Province(Grant No.KYZZ15_0140)
文摘Extreme hydrological events induced by typhoons in reservoir areas have presented severe challenges to the safe operation of hydraulic structures. Based on analysis of the seepage characteristics of an earth rock dam, a novel seepage safety monitoring model was constructed in this study. The nonlinear influence processes of the antecedent reservoir water level and rainfall were assumed to follow normal distributions. The particle swarm optimization (PSO) algorithm was used to optimize the model parameters so as to raise the fitting accuracy. In addition, a mutation factor was introduced to simulate the sudden increase in the piezometric level induced by short-duration heavy rainfall and the possible historical extreme reservoir water level during a typhoon. In order to verify the efficacy of this model, the earth rock dam of the Siminghu Reservoir was used as an example. The piezometric level at the SW1-2 measuring point during Typhoon Fitow in 2013 was fitted with the present model, and a corresponding theoretical expression was established. Comparison of fitting results of the piezometric level obtained from the present statistical model and traditional statistical model with monitored values during the typhoon shows that the present model has a higher fitting accuracy and can simulate the uprush feature of the seepage pressure during the typhoon perfectly.
基金supported by the National Natural Science Foundation of China(Grant No.51709021)the Open Foundation of the State Key Laboratory of Hydrology-Water Resources and Hydraulic Engineering(Grant No.2016491111)
文摘Affected by external environmental factors and evolution of dam performance, dam seepage behavior shows nonlinear time-varying characteristics. In this study, to predict and evaluate the long-term development trend and short-term fluctuation of the dam seepage behavior, two monitoring models were developed, one for the base flow effect and one for daily variation of dam seepage elements. In the first model, to avoid the influence of the time lag effect on the evaluation of seepage variation with the time effect component of seepage elements, the base values of the seepage element and the reservoir water level were extracted using the wavelet multi-resolution analysis method, and the time effect component was separated by the established base flow effect monitoring model. For the development of the daily variation monitoring model for dam seepage elements, all the previous factors, of which the measured time series prior to the dam seepage element monitoring time may have certain influence on the monitored results, were considered. Those factors that were positively correlated with the analyzed seepage element were initially considered to be the support vector machine(SVM) model input factors, and then the SVM kernel function-based sensitivity analysis was performed to optimize the input factor set and establish the optimized daily variation SVM model. The efficiency and rationality of the two models were verified by case studies of the water level of two piezometric tubes buried under the slope of a concrete gravity dam.Sensitivity analysis of the optimized SVM model shows that the influences of the daily variation of the upstream reservoir water level and rainfall on the daily variation of piezometric tube water level are processes subject to normal distribution.
文摘An automatic monitoring technique of the seepage line, including the monitoring design, the automatic monitoring system and the backfill technique of the measuring probe of pore-water pressure, was used in a tailings dam, and a shallow refractive seismic method was investigated for obtaining the seepage line of those areas outside the monitoring zone. The results show that the automatic monitoring has the error within ±3% relative to piezometric tube method and improves monitoring efficiency greatly, and the shallow refractive seismic method has the error within ±10% but expands the area of monitoring. Both of them can be used for a daily measurement in monitoring the seepage line. The result of the automatic monitoring also shows that not only the design of the survey line and the backfill technique of the measuring probe of pore-water pressure are reasonable and economic but also the reliability and safety of the automatic monitoring system are better. Testing result by the shallow refractive seismic method in tailings reveals that the energy excited by hammering iron sheet-pole is strong enough and safe, and that the character of anti-jamming by the detectors with long tailcone is better.
基金supported by the Water Conservancy Science and Technology Project of Jiangsu Province(Nos. 2012088,2013093)
文摘In this paper,a theoretical model of temperature and velocity of a fiber is derived.A test model simulating seepage indoor is designed.The optical fiber heating temperatures under different compaction degree and seepage velocities are measured through applying AC voltage on the optical fiber.The analyzing results show that the optical fiber heating temperature and seepage velocity are related in quadratic function.The quantitative relations of optical fiber temperature and seepage velocity under different soil types and compaction degree are fitted.Analysis on how the compaction degree influences the relation of optical fiber temperature and seepage velocity shows that with the increase of compaction degree,optical fiber heating temperature will gradually decline.The influence of soil type on fiber heating temperature is very complex.In practice,according to the characteristics of the soil,determining quantitative relationship and implementing quantitative monitoring of the seepage velocity are needed.
文摘The study on developing the reasonable safety monitoring indexes plays a most importantly role in the health monitoring of high core rockfill dams. However, researches on this topic are relatively scarce both at home and abroad. In this paper, the characteristics and failure modes of seepage in high core rockfill dam are analyzed firstly. Then, a safety monitoring index based on seepage quantity, which reflects the overall seepage behavior, is developed, using the real-time monitoring data and its safety monitoring model. Moreover, another safety monitoring index based on seepage gradient, reflecting the local seepage behavior, is proposed, combining the spatial layout of osmo- meters and local failure mechanisms of core wall. Additionally, one more safety monitoring index based on permeability coefficient, which considers the overall and local seepage behaviors, is developed, on the basis of establishing the finite element analysis model and real-time seepage coefficient inversion analysis model of high core rockfill dam. A case study on these indexes of Nuozhadu high core rockfill dam is developed, which improves the reliability of seepage safety evaluation of the dam.
基金finically supported by the Sino Probe-06-01,Special Fund Research in the Public Interest (Grant No. 201211076)National Key Basic Project (973) (Grant No. 2008CB425702)
文摘The relative change of in-situ stress is an inevitable outcome of differential movement among the crust plates. Conversely, changes of in-situ stress can also lead to deformation and instability of crustal rock mass, trigger activity of faults, and induce earthquakes. Hence, monitoring real-time change of in-situ stress is of great significance. Piezomagnetic in-situ stress monitoring has good and longtime applications in large engineering constructions and geoscience study fields in China. In this paper, the new piezomagnetic in-situ stress monitoring system is introduced and it not only has overall improvements in measuring cell's structure and property, stressing and orienting way, but also enhances integration and intelligence of control and data transmission system, in general, which greatly promotes installing efficiency of measuring probe and quality of monitoring data. This paper also discusses the responses of new piezomagnetic system in large earthquake events of in-situ stress monitoring station at Qiaoqi of Baoxing and Wenxian of Gansu. The monitoring data reflect adjustments and changes of tectonic stress field at the southwestern segment of and the northern area near the Longmenshan fault zone, which shows that the new system has a good performance and application prospect in the geoscience field. Data of the Qiaoqi stress-monitoring station manifest that the Lushan Earthquake did not release stress of the southwestern segment of the Longmenshan fault zone adequately and there still probably exists seismic risk in this region in the future. Combined with absolute in-situ stress measurement, carrying out long-term in-situ stress monitoring in typical tectonic position of important regions is of great importance for researchers to assess and study regional crust stability.
基金Funded by the National Science and Technology Support Project of China (No. 2006BAA03B02-03)
文摘A method based on solution of the inverse heat conduction problem was presented for online stress monitoring and fatigue life analysis of boiler drums. The mathematical model of the drum temperature distribution is based on the assumptions that the difference of temperature along the longitudinal axis of the boiler drum is negligible with changes only in the radial direction and the circumferential direction, and that the outer surface of drum is thermaUy insulated. Combining this model with the control-volume method provides temperatures at different points on a cross-section of the drum. With the temperature data, the stresses and the life expectancy of the boiler drum are derived according to the ASME code. Applying this method to the cold start-up process of a 300 MW boiler demonstrated the absence of errors caused by the boundary condition assumptions on the inner surface of the drum and testified that the method is an applicable technique for the online stress monitoring and fatigue life analysis of boiler drums.
基金Funded by the National Natural Science Fund grants 60574012
文摘This paper proposed an online monitoring and early-warning system of dynamic stress of crane metal structure, and designed this system’s hardware,including sensor unit,data gathering unit,and controlling & processing unit of this sys- tem,and discussed the waterproof protection for resistance strain wafer and scheme of data gathering and transmission of dynamic strain gauge,moreover developed system software of real-time and online monitoring dynamic stress,including data gathering by DLL and data display & processing based on Visual C++.The system applies the dynamic strain gauge to gather the data of the stress,and communicates between PLC control system of crane and upper industrial computer,so that realize the real-time online monitoring and early-warning for crane’s metal structure stress.The test results show this system carry on real time and online monitoring to dynamic stress of loud-bearing metal structure longly and stability,and can give an alarm and overload protection on time.So the system has good practice value.
基金supported by the Conseil Régional de Bourgogne, the club of Alliance Dijon Natationthe Comité Régional de Natation Bourgogne under Grant number 2013-9201AAO048S02835
文摘Background: Psychological stress and recovery monitoring is a key issue for increasing athletes' health, well-being, and performance. This multistudy report examined changes and the doseàresponse relationships between recoveryàstress psychological states, training load(TL), heart rate(HR), heart rate recovery(HRR), and heart rate variability(HRV) while providing evidence for the factorial validity of a short French version of the RecoveryàStress Questionnaire for Athletes(RESTQ-36-R-Sport).Methods: Four hundred and seventy-three university athletes(Study 1), 72 full expert swimmers(Study 2), and 11 national to international swimmers(Study 3) participated in the study. Data were analyzed through confirmatory factor analyses(Study 1), repeated ANOVAs and correlational analyses(Study 2), t tests and correlational analyses(Study 3).Results: Multiple-group confirmatory factor analyses showed that the RESTQ-36-R-Sport scores were partially invariant across gender, type of sport, and practice level(Study 1). A doseàresponse relationship was performed between TL and RESTQ-36-R-Sport scores during an ecological training program(Study 2). Finally, relationships were found between physiological(HRR) and psychological(RESTQ-36-R-Sport) states during an ecological tapering period leading to a national championship(Study 3).Conclusion: As a whole, these findings provided evidence for the usefulness of the short version of the RESTQ-36-R-Sport for regular monitoring to prevent potential maladaptation due to intensive competitive sport practice.
基金financially supported by the National Natural Science Foundation of China(Grant Nos.51709170 and 51979167)the Ministry of Industry and Information Technology of China(Project No.[2016] 546)+1 种基金the Shanghai Sailing Program(Grant No.17YF1409700)the Open Foundation of State Key Laboratory of Ocean Engineering(Grant No.1716)
文摘For a semi-submersible platform in repair, the eight old main brackets which connect columns with pontoons need to be replaced by new ones. In order to ensure the safety of the cutting operation of the old main bracket and calculate the initial stress condition of new main bracket, the structural stress monitoring of eight key spots is carried out, and then the calibrated finite element model is established according to the field monitoring results. Before cutting the main bracket and all associated structures, eight rectangular rosettes were installed, and a tailored cutting scheme was proposed to release the initial stress, in which the main bracket and associated column and pontoon plates were partly cut. During the cutting procedure, the strains of the monitoring spots were measured, and then the structural stress of the monitored spots were obtained. The stress variation characteristics at different spots during the initial cutting operation were shown and the initial stress condition of the monitored spots was figured out. The loading and support conditions of the semi-submersible platform were calibrated based on the measured initial stress condition, which made the finite element model more credible. The stress condition with the main bracket and associated structures being entirely cut out is analyzed by the Finite Element Method (FEM), which demonstrates the cutting operation to be safe and feasible. In addition, the calibrated finite element model can be used to calculate the initial stress condition of the new main bracket, which will be very helpful for the long-term stress monitoring on the main bracket.
基金National Natural Science Foundation of China(Grant No.51775278)National Science Fund of China for Distinguished Young Scholars(Grant No.51925505).
文摘Initial residual stress is the main reason causing machining deformation of the workpiece,which has been deemed as one of the most important aspects of machining quality issues.The inference of the distribution of initial residual stress inside the blank has significant meaning for machining deformation control.Due to the principle error of existing residual stress detection methods,there are still challenges in practical applications.Aiming at the detection problem of the initial residual stress field,an initial residual stress inference method by incorporating monitoring data and mechanism model is proposed in this paper.Monitoring data during machining process is used to represent the macroscopic characterization of the unbalanced residual stress,and the finite element numerical model is used as the mechanism model so as to solve the problem that the analytic mechanism model is difficult to establish;the policy gradient approach is introduced to solve the gradient descent problem of the combination of learning model and mechanism model.Finally,the initial residual stress field is obtained through iterative calculation based on the fusing method of monitoring data and mechanism model.Verification results show that the proposed inference method of initial residual stress field can accurately and effectively reflect the machining deformation in the actual machining process.
基金Supported by the National Natural Science Foundation of China and Project(2007-04) 0pen Fund of State Key Laboratory of Coal Resources and Safe Mining (40674017, 50534080)
文摘Brought forward the conception of conventional MS monitoring, and described the different monitoring ranges of frequencies and magnitude about earthquake and conventional MS monitoring and MS monitoring in detail. The monitoring results received by the Polish ARAMIS M/E monitoring system and the monitodng instrument designed by the author's research group in the same colliery show that the events amount received by conventional MS monitoring instrument which is only about 1/20 of the MS monitoring events, and it can only describe violent activity in larger range and be only applied to monitor hard and thick surrounding rock under mine. Meanwhile the small scale and high precision MS monitoring instrument can receive a lot of low rock fracturing signals, which can actualize the rock movement inversion and precisely descdbe 4-D changes of stress fields, and depend on the observed results we can determine the upper limits of mining and describe S-shaped strata spatial structure and high stress field in Iongwall face surrounded by two sides mined areas.
文摘In this paper, we describe a new silicon-die thermal monitoring approach using spatiotemporal signal processing technique for Wafer-Scale IC thermome- chanical stress monitoring. It is proposed in the context of a wafer-scale-based (WaferICTM) rapid prototyping platform for electronic systems. This technique will be embedded into the structure of the WaferIC, and will be used as a preventive measure to protect the wafer from possible damages that can be caused by excessive thermomechanical stress. The paper also presents spatial and spatiotemporal algorithms and the experimental results from an IR images collection campaign conducted using an IR camera.
基金supported by the National Natural Science Foundation of China under Grant No. 60377021partially supported by Program for New Century Excellent Talents in University under Grant. No. NCET-07-0152Sichuan Scientific Funds for Young Researchers under Grant No. 08ZQ026-012.
文摘A landslide monitoring application is presented by using a high-resolution distributed fiber optic stress sensor. The sensor is used to monitor the intra-stress distribution and variations in landslide bodies, and can be used for the early warning of the occurrence of the landslides. The principle of distributed fiber optic stress sensing and the intra-stress monitoring method for landslides are described in detail. By measuring the distributed polarization mode coupling in the polarization-maintaining fiber, the distributed fiber stress sensor with stress measuring range 0 to 15 MPa, spatial resolution 10 cm and measuring range 0.5 km, is designed. The warning system is also investigated experimentally in the field trial.
基金supported by the National Natural Science Foundation of China(51174285,51104150)the Research and Innovation Project for College Graduates of Jiangsu Province(CXZZ12_0949)the National Twelfth-Five Year Research Program of China(2012BAK09B01).
文摘As one of the dynamic disasters of coal mines,rockburst seriously affects underground safe coal mining.Based on the laboratory test,field test,and theoretical analysis,this study proposed the principle of the rock burst induced by the combination of dynamic and static stresses and divided such rock burst into three types,including induced by primary dynamic stress,mainly induced by dynamic stress,and by dynamic stress in low critical stress state.The expressions of the static stress induced by coal mining and dynamic stress induced by mining tremors were obtained.Moreover,theories and technologies at home and abroad were summarized concerning the monitoring,forecasting,and preventing of rockburst.These mainly include the zoning and leveling forecasting method,electromagnetic radiation technology,elastic wave and seismic wave computed tomography technologies in aspect of rockburst monitoring,as well as the intensity weakening theory,the strong-soft-strong structure effect,the directional hydraulic fracturing technology,the roadway support system in regards of rockburst prevention.The prospect of rockburst development suggested that researches concerning the rockburst mechanism should be quantitatively developed around the roadway and coalface surrounding coal-rock mass.It should be focused on the rockburst mechanism and prevention technology of mining with over 1,000 km deep and mining in large tectonic zone.In addition,the monitoring and prevention of rockburst should be based on rockburst mechanism.
文摘A recent research campaign at a Canadian nickel-copper mine involved instrumenting a hard rock sill drift pillar with an array of multi-point rod extensometers,distributed optical fibre strain sensors,and borehole pressure cells(BHPCs).The instrumentation spanned across a 15.24 m lengthwise segment of the relatively massive granitic pillar situated at a depth of 2.44 km within the mine.Between May 2016 and March 2017,the pillar’s displacement and pressure response were measured and correlated with mining activities on the same level as the pillar,including:(1)mine-by of the pillar,(2)footwall drift development,and(3)ore body stoping operations.Regarding displacements of the pillar,the extensometers provided high temporal resolution(logged hourly)and the optical fibre strain sensors provide high spatial resolution(measured every 0.65 mm along the length of each sensor).The combination of sensing techniques allowed centimetre-scale rock mass bulking near the pillar sidewalls to be distinguished from microstrain-scale fracturing towards the core of the pillar.Additionally,the influence and extent of a mine-scale schistose shear zone transecting the pillar was identified.By converting measured rock mass displacement to velocity,a process was demonstrated which allowed mining activities inducing displacements to be categorised by time-duration and cumulative displacement.In over half of the analysed mining activities,displacements were determined to prolong for over an hour,predominately resulting in submillimetre cumulative displacements,but in some cases multi-centimetre cumulative displacements were observed.This time-dependent behaviour was more pronounced within the vicinity of the plumb shear zone.Displacement measurements were also used to assess selected support member load and elongation mobilisation per mining activity.It was found that a combined static load and elongation capacity of reinforcing members was essential to maintaining excavation stability,while permitting gradual shedding of stress through controlled pillar sidewall displacements.
基金supported by a NIOSH Ground Control Capacity Building grant
文摘In order to study pillar and overburden response to retreat mining, a ground control program was conducted at a Central Appalachian Mine. The program consisted of several monitoring methods including a seismic monitoring system, borehole pressure cells in the pillars, and time-lapse photogrammetry of the pillar ribs. Two parallel geophone arrays were installed, one on each side of the panel with the sensors mounted 3 m into the roof. A total of fourteen geophones recorded more than 5000 events during the panel retreat. A MIDAS datalogger was used to record pressure from borehole pressure cells(BPCs)located in two adjacent pillars that were not mined during retreat. A series of photographs were taken of the pillars that had the BPCs as the face approached so that deformation of the entire rib could be monitored using photogrammetry. Results showed that pillar stability and cave development were as expected. The BPCs showed an increase in loading when the face was 115 m inby and a clear onset of the forward abutment at 30 m. The photogrammetry results displayed pillar deformation corresponding to the increased loading. The microseismic monitoring results showed the overburden caving inby the face, again as expected. The significance of these results lies in two points,(1) we can quantify the safe manner in which this mine is conducting retreating operations, and(2) we can use volumetric technologies(photogrammetry and microseismic) to monitor entire volumes of the mine in addition to the traditional point-location geotechnical measurements(BPCs).
基金supported by the National Natural Science Foundation of China(Grant No51139001)the Natural Science Foundation of Jiangsu Province(Grant NoBK2009479)+2 种基金the Scientific Research Foundation of the State Human Resource Ministry for Returned Chinese Scholars(Grant No2009003)the Scientific Research Foundation for Doctors in Jiangsu Enterprises(Grant No2011-33)the Jiangsu Provincial Postdoctoral Sustentation Fund(Grant No1101049C)
文摘Reinforcement quality evaluation at the abutment is an important research direction. Prototype monitoring and theoretical derivation were integrated to study the replacement reinforcement quality in abutment contact zones of the Xiaowan ultra-high arch dam. The principles of monitoring layout and design are introduced in detail. Prototype monitoring shows that the increment of the interfacial compressive stress is much larger in the impoundment stage than in the regulating stage. The water pressure and time-effect are two main factors affeeting the interfacial stress. The time-effect is the key factor in the initial impoundment stage, and the water pressure is the key factor after impoundment. The contact properties are significantly improved by grouting. This study shows that there are three typical stages in the joint opening hydrographs, namely the compression stage, opening stage, and stable stage. There is a nonlinear relationship between the joint opening and temperature, which can be well described by the S-function. In conclusion, the reinforcement effect is satisfying, and the abutment is safe.
文摘CSIRO has recently developed a real-time roof monitoring system for under-groundcoal mines and successfully tried the system in gate roads at Ulan Mine.The systemintegrated displacement monitoring,stress monitoring and seismic monitoring in onepackage.It included GEL multianchor extensometers,vibrating wire uniaxial stress meters,ESG seismic monitoring system with microseismic sensors and high-frequency AE sensors.The monitoring system automated and the data can be automatically collected by acentral computer located in an underground nonhazardous area.The data are then transferredto the surface via an optical fiber cable.The real-time data were accessed at anylocation with an Internet connection.The trials of the system in two tailgates at Ulan Minedemonstrate that the system is effective for monitoring the behavior and stability of roadwaysduring Iongwall mining.The continuous roof displacement/stress data show clearprecursors of roof falls.The seismic data (event count and locations) provide insights intothe roof failure process during roof fall.