A case of Qinghuayuan tunnel excavation below the existing Beijing Subway Line 10 is presented.The new Qinghuayuan tunnel,part of the Beijing-Zhangjiakou High-speed Railway,was excavated by a shield machine with an ou...A case of Qinghuayuan tunnel excavation below the existing Beijing Subway Line 10 is presented.The new Qinghuayuan tunnel,part of the Beijing-Zhangjiakou High-speed Railway,was excavated by a shield machine with an outer diameter of 12.2 m.The existing subway was excavated by shallow tunnelling method.The project layout,geological conditions,reinforcement measures,operational parameters of shield machine and monitoring results of the project are introduced.During the Qinghuayuan tunnel excavation below the existing subway,total thrust,shield driving speed,cutterhead rotation speed and torque were manually controlled below the average values obtained from the previous monitoring of this project,which could effectively reduce the disturbance of the surrounding soil induced by shield excavation.The Gaussian fitting function can appropriately fit both the ground and the existing subway settlements.The trough width is influenced not only by the excavation overburden depth,but also by the forepoling reinforcement and tail void grouting measures.展开更多
Field tests on settlement characteristics were carried out on the cement fly-ash gravel (CFG) pile-plate composite foundation on Beijing-Xuzhou section of Beijing-Shanghai high-speed railway. The settlements of the ...Field tests on settlement characteristics were carried out on the cement fly-ash gravel (CFG) pile-plate composite foundation on Beijing-Xuzhou section of Beijing-Shanghai high-speed railway. The settlements of the piles and the soil between pries were measured and analyzed. The results show that the settlement-time dependency experienced three phases: rapid development phase, stable development phase and stable phase. Therefore, surcharge preloading was necessary to reduce the settlement after construction. The finite element software Plaxis was used to calculate the deformations of the pile top and the soil between piles at the embankment center, as well as the settlements of CFG pile reinforcement area and the underlying stratum under surcharge preloading. The calculation results and the field test results were compared and analyzed. Both the results show that the settlement of the composite foundation mainly occured in underlying stratum. The settlement characteristics of pile-plate composite foundation under high embankment are also concluded.展开更多
The transport mechanism and settlement characteristics of suspended sediments are analyzed in this article on the basis of measured data. Results indicate that the concentration and flux of suspended sediments decreas...The transport mechanism and settlement characteristics of suspended sediments are analyzed in this article on the basis of measured data. Results indicate that the concentration and flux of suspended sediments decrease sharply from Hangzhou Bay to the offshore area. Suspended sediment transport is mainly controlled by advection transport and gravitational circulation transport. The settling velocity of suspended sediments gradually decreases from Hangzhou Bay to the offshore area. The settlement of suspended sediments mainly takes place during the turning phase of the tidal currents.展开更多
The effects of excavation unloading, construction reloading and underground water on basal heave of excavation projects were presented and analyzed based on the measurement results of an underground urban complex whic...The effects of excavation unloading, construction reloading and underground water on basal heave of excavation projects were presented and analyzed based on the measurement results of an underground urban complex which was located in Shanghai. The effects on water pressure and building settlements were analyzed as well. The numerical analyses by finite element method (FEM) were conducted. It showed that the soil under the excavation base continued to heave during the following certain construction stage. It also found that the bearing capacity of uplift piles which supported the buildings affected the structure quality significantly. The conclusions can be applied in future projects.展开更多
基金Project(U1934210)supported by the Key Project of High-speed Rail Joint Fund of National Natural Science Foundation of ChinaProject(8202037)supported by the Natural Science Foundation of Beijing,China。
文摘A case of Qinghuayuan tunnel excavation below the existing Beijing Subway Line 10 is presented.The new Qinghuayuan tunnel,part of the Beijing-Zhangjiakou High-speed Railway,was excavated by a shield machine with an outer diameter of 12.2 m.The existing subway was excavated by shallow tunnelling method.The project layout,geological conditions,reinforcement measures,operational parameters of shield machine and monitoring results of the project are introduced.During the Qinghuayuan tunnel excavation below the existing subway,total thrust,shield driving speed,cutterhead rotation speed and torque were manually controlled below the average values obtained from the previous monitoring of this project,which could effectively reduce the disturbance of the surrounding soil induced by shield excavation.The Gaussian fitting function can appropriately fit both the ground and the existing subway settlements.The trough width is influenced not only by the excavation overburden depth,but also by the forepoling reinforcement and tail void grouting measures.
文摘Field tests on settlement characteristics were carried out on the cement fly-ash gravel (CFG) pile-plate composite foundation on Beijing-Xuzhou section of Beijing-Shanghai high-speed railway. The settlements of the piles and the soil between pries were measured and analyzed. The results show that the settlement-time dependency experienced three phases: rapid development phase, stable development phase and stable phase. Therefore, surcharge preloading was necessary to reduce the settlement after construction. The finite element software Plaxis was used to calculate the deformations of the pile top and the soil between piles at the embankment center, as well as the settlements of CFG pile reinforcement area and the underlying stratum under surcharge preloading. The calculation results and the field test results were compared and analyzed. Both the results show that the settlement of the composite foundation mainly occured in underlying stratum. The settlement characteristics of pile-plate composite foundation under high embankment are also concluded.
文摘The transport mechanism and settlement characteristics of suspended sediments are analyzed in this article on the basis of measured data. Results indicate that the concentration and flux of suspended sediments decrease sharply from Hangzhou Bay to the offshore area. Suspended sediment transport is mainly controlled by advection transport and gravitational circulation transport. The settling velocity of suspended sediments gradually decreases from Hangzhou Bay to the offshore area. The settlement of suspended sediments mainly takes place during the turning phase of the tidal currents.
基金the National Natural Science Foundation of China (No. 50679041)
文摘The effects of excavation unloading, construction reloading and underground water on basal heave of excavation projects were presented and analyzed based on the measurement results of an underground urban complex which was located in Shanghai. The effects on water pressure and building settlements were analyzed as well. The numerical analyses by finite element method (FEM) were conducted. It showed that the soil under the excavation base continued to heave during the following certain construction stage. It also found that the bearing capacity of uplift piles which supported the buildings affected the structure quality significantly. The conclusions can be applied in future projects.