期刊文献+
共找到9篇文章
< 1 >
每页显示 20 50 100
Hybrid Flow Shop with Setup Times Scheduling Problem
1
作者 Mahdi Jemmali Lotfi Hidri 《Computer Systems Science & Engineering》 SCIE EI 2023年第1期563-577,共15页
The two-stage hybridflow shop problem under setup times is addressed in this paper.This problem is NP-Hard.on the other hand,the studied problem is modeling different real-life applications especially in manufacturing... The two-stage hybridflow shop problem under setup times is addressed in this paper.This problem is NP-Hard.on the other hand,the studied problem is modeling different real-life applications especially in manufacturing and high performance-computing.Tackling this kind of problem requires the development of adapted algorithms.In this context,a metaheuristic using the genetic algorithm and three heuristics are proposed in this paper.These approximate solutions are using the optimal solution of the parallel machines under release and delivery times.Indeed,these solutions are iterative procedures focusing each time on a particular stage where a parallel machines problem is called to be solved.The general solution is then a concatenation of all the solutions in each stage.In addition,three lower bounds based on the relaxation method are provided.These lower bounds present a means to evaluate the efficiency of the developed algorithms throughout the measurement of the relative gap.An experimental result is discussed to evaluate the performance of the developed algorithms.In total,8960 instances are implemented and tested to show the results given by the proposed lower bounds and heuristics.Several indicators are given to compare between algorithms.The results illustrated in this paper show the performance of the developed algorithms in terms of gap and running time. 展开更多
关键词 Hybridflow shop genetic algorithm setup times HEURISTICS lower bound
下载PDF
A Linear Programming Approach for Parallel Cell Scheduling with Sequence-Dependent Setup Times
2
作者 Tugba Yildiz Besim TurkerOzalp +2 位作者 Ilker Kucukoglu Alkın Yurtkuran Nursel Ozturk 《American Journal of Operations Research》 2014年第3期155-163,共9页
In this study, we consider the problem of scheduling a set of jobs with sequence-dependent setup times on a set of parallel production cells. The objective of this study is to minimize the total completion time. We no... In this study, we consider the problem of scheduling a set of jobs with sequence-dependent setup times on a set of parallel production cells. The objective of this study is to minimize the total completion time. We note that total customer demands for each type should be satisfied, and total required production time in each cell cannot exceed the capacity of the cell. This problem is formulated as an integer programming model and an interface is designed to provide integrity between data and software. Mathematical model is tested by both randomly generated data set and real-world data set from a factory that produce automotive components. As a result of this study, the solution which gives the best alternative production schedule is obtained. 展开更多
关键词 Production Scheduling Total Completion Time Sequence Dependent setup times
下载PDF
A Hybrid Estimation of Distribution Algorithm for Unrelated Parallel Machine Scheduling with Sequence-Dependent Setup Times 被引量:6
3
作者 Ling Wang Shengyao Wang Xiaolong Zheng 《IEEE/CAA Journal of Automatica Sinica》 SCIE EI 2016年第3期235-246,246+236-245,共12页
A hybrid estimation of distribution algorithm(EDA)with iterated greedy(IG) search(EDA-IG) is proposed for solving the unrelated parallel machine scheduling problem with sequence-dependent setup times(UPMSP-SDST). For ... A hybrid estimation of distribution algorithm(EDA)with iterated greedy(IG) search(EDA-IG) is proposed for solving the unrelated parallel machine scheduling problem with sequence-dependent setup times(UPMSP-SDST). For makespan criterion, some properties about neighborhood search operators to avoid invalid search are derived. A probability model based on neighbor relations of jobs is built in the EDA-based exploration phase to generate new solutions by sampling the promising search region. Two types of deconstruction and reconstruction as well as an IG search are designed in the IG-based exploitation phase.Computational complexity of the algorithm is analyzed, and the effect of parameters is investigated by using the Taguchi method of design-of-experiment. Numerical tests on 1640 benchmark instances are carried out. The results and comparisons demonstrate the effectiveness of the EDA-IG. Especially, the bestknown solutions of 531 instances are updated. In addition, the effectiveness of the properties is also demonstrated by numerical comparisons. 展开更多
关键词 Unrelated parallel machine scheduling sequence-dependent setup time(SDST) estimation of distributionalgorithm(EDA) iterated greedy search
下载PDF
Identical Machine Scheduling Problem with Sequence-Dependent Setup Times: MILP Formulations Computational Study
4
作者 Farouk Yalaoui Nhan Quy Nguyen 《American Journal of Operations Research》 2021年第1期15-34,共20页
This work aims to give a systematic construction of the two families of mixed-integer-linear-programming (MILP) formulations, which are graph-<span style="font-family:;" "=""> </span&... This work aims to give a systematic construction of the two families of mixed-integer-linear-programming (MILP) formulations, which are graph-<span style="font-family:;" "=""> </span><span style="font-family:Verdana;">based and sequence-based, of the well-known scheduling problem<img src="Edit_41010f25-7ca5-482c-89be-790fad4616e1.png" alt="" /></span><span style="font-family:Verdana;text-align:justify;">. Two upper bounds of job completion times are introduced. A numerical test result analysis is conducted with a two-fold objective 1) testing the performance of each solving methods, and 2) identifying and analyzing the tractability of an instance according to the instance structure in terms of the number of machines, of the jobs setup time lengths and of the jobs release date distribution over the scheduling horizon.</span> <div> <span style="font-family:Verdana;text-align:justify;"><br /> </span> </div> 展开更多
关键词 Identical Machine Scheduling Problem Release Date Sequence Dependent setup Time
下载PDF
AN IMPROVED BRANCH-AND-BOUND ALGORITHM TO MINIMIZE THE WEIGHTED FLOWTIME ON IDENTICAL PARALLEL MACHINES WITH FAMILY SETUP TIMES
5
作者 Belgacem BETTAYEB Imed KACEM Kondo H.ADJALLAH 《Journal of Systems Science and Systems Engineering》 SCIE EI CSCD 2008年第4期446-459,共14页
This article investigates identical parallel machines scheduling with family setup times. The objective function being the weighted sum of completion times, the problem is known to be strongly NP-hard. We propose a co... This article investigates identical parallel machines scheduling with family setup times. The objective function being the weighted sum of completion times, the problem is known to be strongly NP-hard. We propose a constructive heuristic algorithm and three complementary lower bounds. Two of these bounds proceed by elimination of setup times or by distributing each of them to jobs of the corresponding family, while the third one is based on a lagrangian relaxation. The bounds and the heuristic are incorporated into a branch-and-bound algorithm. Experimental results obtained outperform those of the methods presented in previous works, in term of size of solved problems. 展开更多
关键词 SCHEDULING HEURISTIC lower bound branch-and-bound algorithm identical parallel machines family setup times
原文传递
On a BMAP/G/1 G-queue with Setup Times and Multiple Vacations
6
作者 Yi PENG Xiang-qun YANG 《Acta Mathematicae Applicatae Sinica》 SCIE CSCD 2011年第4期625-638,共14页
In this paper, we consider a BMAP/G/1 G-queue with setup times and multiple vacations. Arrivals of positive customers and negative customers follow a batch Markovian arrival process (BMAP) and Markovian arrival proc... In this paper, we consider a BMAP/G/1 G-queue with setup times and multiple vacations. Arrivals of positive customers and negative customers follow a batch Markovian arrival process (BMAP) and Markovian arrival process (MAP) respectively. The arrival of a negative customer removes all the customers in the system when the server is working. The server leaves for a vacation as soon as the system empties and is allowed to take repeated (multiple) vacations. By using the supplementary variables method and the censoring technique, we obtain the queue length distributions. We also obtain the mean of the busy period based on the renewal theory. 展开更多
关键词 G-queues batch Markovian arrival process (BMAP) setup times multiple vacations censoring technique Markov chains
原文传递
Performance Assessment and Configuration Analysis in the Study of SCADA System (Supervisory Control and Data Acquisition)
7
作者 R.Vanalakshmi S.Maragathasundari +2 位作者 M.Kameswari B.Balamurugan C.Swedheetha 《Intelligent Automation & Soft Computing》 SCIE 2023年第8期1399-1419,共21页
Queuing models are used to assess the functionality and aesthetics of SCADA systems for supervisory control and data collection.Here,the main emphasis is on how the queuing theory can be used in the system’s design a... Queuing models are used to assess the functionality and aesthetics of SCADA systems for supervisory control and data collection.Here,the main emphasis is on how the queuing theory can be used in the system’s design and analysis.The analysis’s findings indicate that by using queuing models,cost-performance ratios close to the ideal might be attained.This article discusses a novel methodology for evaluating the service-oriented survivability of SCADA systems.In order to evaluate the state of service performance and the system’s overall resilience,the framework applies queuing theory to an analytical model.As a result,the SCADA process is translated using the M^(X)/G/1 queuing model,and the queueing theory is used to evaluate this design’s strategy.The supplemental variable technique solves the queuing problem that comes with the subsequent results.The queue size,server idle time,utilization,and probabilistic generating factors of the distinct operating strategies are estimated.Notable examples were examined via numerical analysis using mathematical software.Because it is used frequently and uses a statistical demarcation method,this tactic is completely acceptable.The graphical representation of this perspective offers a thorough analysis of the alleged limits. 展开更多
关键词 SCADA system queuing model compulsory vacation setup time stage feedback service supplementary variable technique
下载PDF
Neighborhood Combination Search for Single-Machine Scheduling with Sequence-Dependent Setup Time
8
作者 刘晓路 徐宏云 +3 位作者 陈嘉铭 苏宙行 吕志鹏 丁俊文 《Journal of Computer Science & Technology》 SCIE EI CSCD 2024年第3期737-752,共16页
In a local search algorithm,one of its most important features is the definition of its neighborhood which is crucial to the algorithm's performance.In this paper,we present an analysis of neighborhood combination... In a local search algorithm,one of its most important features is the definition of its neighborhood which is crucial to the algorithm's performance.In this paper,we present an analysis of neighborhood combination search for solv-ing the single-machine scheduling problem with sequence-dependent setup time with the objective of minimizing total weighted tardiness(SMSWT).First,We propose a new neighborhood structure named Block Swap(B1)which can be con-sidered as an extension of the previously widely used Block Move(B2)neighborhood,and a fast incremental evaluation technique to enhance its evaluation efficiency.Second,based on the Block Swap and Block Move neighborhoods,we present two kinds of neighborhood structures:neighborhood union(denoted by B1UB2)and token-ring search(denoted by B1→B2),both of which are combinations of B1 and B2.Third,we incorporate the neighborhood union and token-ring search into two representative metaheuristic algorithms:the Iterated Local Search Algorithm(ILSnew)and the Hybrid Evolutionary Algorithm(HEA_(new))to investigate the performance of the neighborhood union and token-ring search.Exten-sive experiments show the competitiveness of the token-ring search combination mechanism of the two neighborhoods.Tested on the 120 public benchmark instances,our HEA_(new)has a highly competitive performance in solution quality and computational time compared with both the exact algorithms and recent metaheuristics.We have also tested the HEA,new algorithm with the selected neighborhood combination search to deal with the 64 public benchmark instances of the single-machine scheduling problem with sequence-dependent setup time.HEAnew is able to match the optimal or the best known results for all the 64 instances.In particular,the computational time for reaching the best well-known results for five chal-lenging instances is reduced by at least 61.25%. 展开更多
关键词 single-machine scheduling sequence-dependent setup time neighborhood combination search token-ring search hybrid evolutionary algorithm
原文传递
Modeling and Scheduling Optimization for Bulk Ore Blending Process 被引量:1
9
作者 SONG Chun-yue , HU Kai-lin , LI Ping ( State Key Laboratory of Industrial Control Technology , Zhejiang University , Hangzhou 310027 , Zhejiang , China ) 《Journal of Iron and Steel Research(International)》 SCIE EI CAS CSCD 2012年第9期20-28,共9页
A new scheduling model for the bulk ore blending process in iron-making industry is presented , by converting the process into an assembly flow shop scheduling problem with sequence-depended setup time and limited int... A new scheduling model for the bulk ore blending process in iron-making industry is presented , by converting the process into an assembly flow shop scheduling problem with sequence-depended setup time and limited intermediate buffer , and it facilitates the scheduling optimization for this process.To find out the optimal solution of the scheduling problem , an improved genetic algorithm hybridized with problem knowledge-based heuristics is also proposed , which provides high-quality initial solutions and fast searching speed.The efficiency of the algorithm is verified by the computational experiments. 展开更多
关键词 bulk ore blending assembly flow shop sequence-depended setup time limited intermediate buffer genetic algorithm
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部