Ground motion duration effect on responses of hydraulic shallow-buried tunnel under SV-waves excitations 被引量:5
1
作者 Sun Benbo Zhang Sherong +1 位作者 Wang Chao Cui Wei 《Earthquake Engineering and Engineering Vibration》 SCIE EI CSCD 2020年第4期887-902,共16页
Although intensive research of the influence of ground motion duration on structural cumulative damage has been carried out, the influence of dynamic responses in underground tunnels remains a heated debate. This stud... Although intensive research of the influence of ground motion duration on structural cumulative damage has been carried out, the influence of dynamic responses in underground tunnels remains a heated debate. This study attempts to highlight the importance of the ground motion duration effect on hydraulic tunnels subjected to deep-focus earthquakes. In the study, a set of 18 recorded accelerograms with a wide-range of durations were employed. A spectrally equivalent method serves to distinguish the effect of duration from other ground motion features, and then the seismic input model was simulated using SV-wave excitation based on a viscous-spring boundary, which was verified by the time-domain waves analysis method. The nonlinear analysis results demonstrate that the risk of collapse of the hydraulic tunnel is higher under long-duration ground motion than that of short-duration ground motion of the same seismic intensity. In a low intensity earthquake, the ground motion duration has little effect on the damage energy consumption of a hydraulic tunnel lining, but in a high intensity earthquake, dissipation of the damage energy and damage index of concrete shows a nonlinear growth trend accompanied by the increase of ground motion duration, which has a great influence on the deformation and stress of hydraulic tunnels, and correlation analysis shows that the correlation coefficient is greater than 0.8. Therefore, the duration of ground motion should be taken into consideration except for its intensity and frequency content in the design of hydraulic tunnel, and evaluation of seismic risk. 展开更多
关键词 hydraulic shallow-buried tunnel SV-waves significant duration energy dissipation damage index
下载PDF
Dynamic Response of Shallow-Buried Tunnels Traversing High Loess Slopes 被引量:1
2
作者 SUN Wen LIANG Qingguo +1 位作者 WANG Lili CAO Xiaoping 《Earthquake Research in China》 CSCD 2020年第4期496-509,共14页
Considering the existence of numerous shallow-buried tunnels traversing high slopes in the loess area in western China and the fact of high seismic intensity there,we investigate the dynamic response rules of a shallo... Considering the existence of numerous shallow-buried tunnels traversing high slopes in the loess area in western China and the fact of high seismic intensity there,we investigate the dynamic response rules of a shallow-buried loess tunnel and its slope under the action of seismic waves with different intensities.Through large-scale shaking table model tests,we successfully analyze the characteristics and process of the destabilization of tunnels and slopes,and propose valuable suggestions regarding the reinforcement parts of a tunnel for reducing seismic damage.The results show that the main seismic damage on a slope include the failure of the sliding surface between the top and foot and the stripping of the soil around the tunnel entrance,while the damage on a tunnel is mainly manifested as the seismic-induced subsidence at the portal section and the cracking deformation at the joint areas.Finally,we propose that the“staggered peak distribution”phenomenon of the maximum acceleration values at the vault and inverted arch area can be considered as a criterion indicating that the tunnel enters into the threshold of dynamic failure. 展开更多
关键词 LOESS High slope shallow-buried tunnel Dynamic response
下载PDF
Research on Construction Control Technology of Large-Span and Small Clear Distance Underpass High-Voltage Line Tunnel
3
作者 Kun Wang Lushi Wang Daoliang Wang 《Journal of World Architecture》 2021年第1期11-16,共6页
Hanping tunnel is a control project of national highway 310 Dahejia to Qingshui highway project.It needs to cross a 330kV high-voltage transmission line under the condition of small clear distance,which requires high ... Hanping tunnel is a control project of national highway 310 Dahejia to Qingshui highway project.It needs to cross a 330kV high-voltage transmission line under the condition of small clear distance,which requires high construction requirements.In view of the difficulties such as shallow buried depth of tunnel and small clear distance between tunnel and tower of high-voltage line,multiple excavation blasting method is adopted,and smooth blasting,charge quantity control and damping hole setting are comprehensively used to reduce the impact on the tower and structure of high-voltage line.In order to ensure the smooth progress of the project,the large-scale finite element analysis software is used to simulate the whole excavation project.The influence of the full-section method and the middle partition wall method(CD method)on the surrounding rock and the high-voltage electric tower is compared.It is found that the CD method can effectively control the displacement of the surrounding rock and the tower on it and the uneven settlement. 展开更多
关键词 large-span tunnel High-voltage tower Construction control
下载PDF
Distribution characteristics and the evolution law of excavation damage zone in the large-span transition section of high-speed railway tunnel based on microseismic monitoring
4
作者 Ao Li Dingli Zhang +2 位作者 Zhenyu Sun Jun Huang Fei Dong 《Railway Sciences》 2022年第1期56-75,共20页
Purpose–The microseismic monitoring technique has great advantages on identifying the location,extent and the mechanism of damage process occurring in rock mass.This study aims to analyze distribution characteristics... Purpose–The microseismic monitoring technique has great advantages on identifying the location,extent and the mechanism of damage process occurring in rock mass.This study aims to analyze distribution characteristics and the evolution law of excavation damage zone of surrounding rock based on microseismic monitoring data.Design/methodology/approach–In situ test using microseismic monitoring technique is carried out in the large-span transition tunnel of Badaling Great Wall Station of Beijing-Zhangjiakou high-speed railway.An intelligent microseismic monitoring system is built with symmetry monitoring point layout both on the mountain surface and inside the tunnel to achieve three-dimensional and all-round monitoring results.Findings–Microseismic events can be divided into high density area,medium density area and low density area according to the density distribution of microseismic events.The positions where the cumulative distribution frequencies of microseismic events are 60 and 80%are identified as the boundaries between high and medium density areas and between medium and low density areas,respectively.The high density area of microseismic events is regarded as the high excavation damage zone of surrounding rock,which is affected by the grade of surrounding rock and the span of tunnel.The prediction formulas for the depth of high excavation damage zone of surrounding rock at different tunnel positions are given considering these two parameters.The scale of the average moment magnitude parameters of microseismic events is adopted to describe the damage degree of surrounding rock.The strong positive correlation and multistage characteristics between the depth of excavation damage zone and deformation of surrounding rock are revealed.Based on the depth of high excavation damage zone of surrounding rock,the prestressed anchor cable(rod)is designed,and the safety of anchor cable(rod)design parameters is verified by the deformation results of surrounding rock.Originality/value–The research provides a new method to predict the surrounding rock damage zone of large-span tunnel and also provides a reference basis for design parameters of prestressed anchor cable(rod). 展开更多
关键词 High-speed railway large-span tunnel Excavation damage zone Microseismic monitoring
下载PDF
Blast responses of shallow-buried prefabricated modular concrete tunnels reinforced by BFRP-steel bars 被引量:4
5
作者 Chengjie Zhao Zexun Tang +6 位作者 Peng Wang Jiang Feng Jiannan Zhou Xinli Kong Hansheng Geng Fengnian Jin Hualin Fan 《Underground Space》 SCIE EI 2022年第2期184-198,共15页
This paper reports the anti-blast performance of shallow-buried prefabricated modular tunnel reinforced by basalt fiber-reinforced polymer(BFRP)-steel bars.Three concrete arch members with steel bars and three concret... This paper reports the anti-blast performance of shallow-buried prefabricated modular tunnel reinforced by basalt fiber-reinforced polymer(BFRP)-steel bars.Three concrete arch members with steel bars and three concrete arch members with BFRP-steel bars were fabricated,with the other arch parameters kept constant.The three identical arches were assembled into an integral structure and then buried in soil for field anti-blast experiments.Through the experiment,the pressure on the vault,the displacement and acceleration of the vault,the strain in the reinforcement bars and the macroscopic damage of the arches under the blast load were determined.To evaluate the damage of the arch tunnel,a residual load-bearing capacity test was conducted on the arch members after the explosion experiment.The experimental results showed that the BFRP-steel bars reinforced concrete arch exhibited a higher load-bearing capacity and more safety redundancy than the steel bars reinforced concrete arch,and that the BFRP-steel bars could inhibit the occurrence of concrete cracks to a certain extent.A comparison between the arches assembled at different positions showed that the prefabricated modular tun-nel can be simplified directly as a two-dimensional arch structure under the blast load for analysis and calculation. 展开更多
关键词 BFRP-steel bars Concrete arch shallow-buried protective tunnel Anti-blast performance
原文传递