Three-dimensional experimental study of loose top-coal drawing law for longwall top-coal caving mining technology 被引量:12
1
作者 Jiachen Wang Jinwang Zhang +1 位作者 Zhengyang Song Zhaolong Li 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2015年第3期318-326,共9页
Based on the loose medium flow field theory, the loose top-coal drawing law of longwall top-coal caving(LTCC) mining technology is studied by using self-developed three-dimensional(3D) test device. The loose top-c... Based on the loose medium flow field theory, the loose top-coal drawing law of longwall top-coal caving(LTCC) mining technology is studied by using self-developed three-dimensional(3D) test device. The loose top-coal drawing test with shields and the controlled test without shields are performed in the condition without any boundary effect. Test results show that shields will cause reduction in drawing volume of coal in the LTCC mining. The deflection phenomenon of drawing body is also observed in the controlled test, which is verified that the deflection of drawing body is caused by shield. It is found that the deflection angle decreases with increasing caving height, with the maximum value of atailand the minimum value of 0. In addition, the formula to calculate the drawing volume is proposed subsequently.The deflection of drawing body is numerically simulated using particle flow code PFC3 Dand the proposed formula to calculate drawing volume in LTCC is also verified. 展开更多
关键词 Longwall top-coal caving(LTCC) Caving shield Three-dimensional(3D) physical model test Deflection of drawing body PFC3D
下载PDF
Study on Ground Deformation during Shield Tunnel Construction
2
作者 Zhongkun Zhang 《Journal of Construction Research》 2021年第2期19-26,共8页
Through the systematic analysis of the ground settlement generated by the process of shield tunneling,the relationships between ground deformation and construction parameters are studied in this paper.Based on the ass... Through the systematic analysis of the ground settlement generated by the process of shield tunneling,the relationships between ground deformation and construction parameters are studied in this paper.Based on the assumption of linear small deformation,a mathematical model of the relationship between ground deformation and construction parameters is set up.The principle and method of optimization for estimating ground deformation is studied.The actual measured data are compared with the results of theoretical analysis in a case.Considering different ground formations in different construction sites with different adverse effects on surface and underground structures,the ground surface deformations caused by shield tunneling is an aimed topic in this paper.The contributions and research implications are the revealed relationships between the ground deformation and the shield tunneling parameters during construction. 展开更多
关键词 Shield tunnel Ground settlement Construction parameters Mathematical model Maximum estimation Shield tunnel Ground settlement Construction parameters Mathematical model Maximum estimation