The extreme large miter gates of TGP permanent shiplock are of great difficulty in erection,in view of the stringent requirement of precision control and the complicated components.The major erection problems,such as ...The extreme large miter gates of TGP permanent shiplock are of great difficulty in erection,in view of the stringent requirement of precision control and the complicated components.The major erection problems,such as the erection measurement control, the selection of erection position of gate leaf,welding and deformation manipulation,the erection of back tie rods,the installation of apex pintle and prestressing anchorages,etc., had been carefully deliberated, and the optimized approaches were adopted.The erection practice of the miter gate at No.1 lock head shows that the adopted erection technology is safe,reliable and effective, and it may be used for reference for similar miter gates.展开更多
The Three Gorges Project is one of the essential key projects for flood controlling and water resources regulation in the Yangtze River. The project includes a river-crossing dam, underground powerhouses, and navigati...The Three Gorges Project is one of the essential key projects for flood controlling and water resources regulation in the Yangtze River. The project includes a river-crossing dam, underground powerhouses, and navigation structures. Because of the huge size and complicated construction technologies, the project faced a series of challenging engineering issues. In terms of rock mechanics, there are many key technical issues, including the sliding resistance and stability of the dam section along the foundations of powerhouses No.l-5, the ,,;lope stability of the double-line five-stage shiplock, excavation of large-scale underground powerhouses, and curtain grouting under the dam. With decades of scientific research and 16 years of practical construction experiences and reservoir operations, these key technical issues in construction of the Three Gorges Project are successfully resolved, which will attribute to the development of hydropower technology. On the basis of the monitoring data during construction and normal operation periods of the Three Gorges Project, this paper presents a systematic analysis of these key rock mechanical issues in terms of behaviors, solutions, dynamic controlling, monitoring arrangement and integrated assessment.展开更多
With high rock slope in shiplock area, thin reinforced concrete lining walls are constructed for the shiplock system. The construction technology involves much complicated structures in formwork, frequent interference...With high rock slope in shiplock area, thin reinforced concrete lining walls are constructed for the shiplock system. The construction technology involves much complicated structures in formwork, frequent interference due to crossover working procedures, tight time schedule, high quality of reinforced concrete and showcase appearance requirements, hidden troubles affecting construction safety. With above-mentioned factors in consideration, a single-side-separated sliding formwork technology advanced from past sliding formwork experiences has been developed and applied successfully. This new technology is beneficial in quick and safe operation, capable to assure best quality and appearance of shiplock concrete works, and has filled up the gap in terms of construction sliding formwork in our country.展开更多
文摘The extreme large miter gates of TGP permanent shiplock are of great difficulty in erection,in view of the stringent requirement of precision control and the complicated components.The major erection problems,such as the erection measurement control, the selection of erection position of gate leaf,welding and deformation manipulation,the erection of back tie rods,the installation of apex pintle and prestressing anchorages,etc., had been carefully deliberated, and the optimized approaches were adopted.The erection practice of the miter gate at No.1 lock head shows that the adopted erection technology is safe,reliable and effective, and it may be used for reference for similar miter gates.
文摘The Three Gorges Project is one of the essential key projects for flood controlling and water resources regulation in the Yangtze River. The project includes a river-crossing dam, underground powerhouses, and navigation structures. Because of the huge size and complicated construction technologies, the project faced a series of challenging engineering issues. In terms of rock mechanics, there are many key technical issues, including the sliding resistance and stability of the dam section along the foundations of powerhouses No.l-5, the ,,;lope stability of the double-line five-stage shiplock, excavation of large-scale underground powerhouses, and curtain grouting under the dam. With decades of scientific research and 16 years of practical construction experiences and reservoir operations, these key technical issues in construction of the Three Gorges Project are successfully resolved, which will attribute to the development of hydropower technology. On the basis of the monitoring data during construction and normal operation periods of the Three Gorges Project, this paper presents a systematic analysis of these key rock mechanical issues in terms of behaviors, solutions, dynamic controlling, monitoring arrangement and integrated assessment.
文摘With high rock slope in shiplock area, thin reinforced concrete lining walls are constructed for the shiplock system. The construction technology involves much complicated structures in formwork, frequent interference due to crossover working procedures, tight time schedule, high quality of reinforced concrete and showcase appearance requirements, hidden troubles affecting construction safety. With above-mentioned factors in consideration, a single-side-separated sliding formwork technology advanced from past sliding formwork experiences has been developed and applied successfully. This new technology is beneficial in quick and safe operation, capable to assure best quality and appearance of shiplock concrete works, and has filled up the gap in terms of construction sliding formwork in our country.