Assume that the Tonglu Canal would be widened and deepened in which a water lock is constructed atthe river side, and made open to the sea side. The canal's planned control dimensions are determined, and the erosi...Assume that the Tonglu Canal would be widened and deepened in which a water lock is constructed atthe river side, and made open to the sea side. The canal's planned control dimensions are determined, and the erosionand siltation characteristics along the river (totally 81. 8 km) are analyzed by the numerical calculation of one-dimen-sional unsteady flow and the relative standards. According to the data of the evolution, hydrology and sediment inthe Xiaomiaohong Waterway, it is found reasonable to select the channel near the Xingang Gate as the second sea-entering approach. This paper is helpful in planning and designing the approach.展开更多
文摘Assume that the Tonglu Canal would be widened and deepened in which a water lock is constructed atthe river side, and made open to the sea side. The canal's planned control dimensions are determined, and the erosionand siltation characteristics along the river (totally 81. 8 km) are analyzed by the numerical calculation of one-dimen-sional unsteady flow and the relative standards. According to the data of the evolution, hydrology and sediment inthe Xiaomiaohong Waterway, it is found reasonable to select the channel near the Xingang Gate as the second sea-entering approach. This paper is helpful in planning and designing the approach.