Considering arch rib, lateral brace, suspender, girder, pier and track position, the model for the interaction between long-span tied arch continuous bridge and multiple tracks was established by using steel-concrete ...Considering arch rib, lateral brace, suspender, girder, pier and track position, the model for the interaction between long-span tied arch continuous bridge and multiple tracks was established by using steel-concrete composite section beam element to simulate concrete-filled steel tube(CFST) arch rib, using the beam element with rigid arm to simulate the prestressed concrete girder and using nonlinear bar element to simulate longitudinal constraint between track and bridge. Taking a(77+3×156.8+77) m tied arch continuous bridge with four tracks on the Harbin-Qiqihar Passenger Dedicated Line as an example, the arrangement of continuously welded rail(CWR) was explored. The longitudinal force in CWR on the tied arch continuous bridge, the pier top horizontal force and torque due to the unbalance load case, were analyzed under the action of temperature, vertical live load, train braking and wind load.Studies show that, it can significantly reduce track displacement to set the track expansion devices at main span arch springing on both sides; the track stress due to arch temperature variation can reach 40.8 MPa; the track stress, pier top horizontal force and torque are related to the number of loaded tracks and train running direction, and the bending force applied to unloaded track is close to the loaded track, while the braking force applied to unloaded track is 1/4 to 1/2 of the loaded track; the longitudinal force of track due to the wind load is up to 12.4 MPa, which should be considered.展开更多
Simply-supported tied arch is a zero-thrust arch bridge with clear structural force,large stiffness,low height,beautiful appearance and economic efficiency.In Xuzhou-Shanghai section of Beijing-Shanghai HSR,the simply...Simply-supported tied arch is a zero-thrust arch bridge with clear structural force,large stiffness,low height,beautiful appearance and economic efficiency.In Xuzhou-Shanghai section of Beijing-Shanghai HSR,the simply-supported tied arch is systematically studied and widely applied for the first time.A total of 21 simplysupported tied arch bridges with the spans of 96 m,112 m and 128 m respectively are constructed for the route.The simply-supported tied arch is an external static and internal super-static parallel arch or basket arch of Nielsen system in structure;single-box,threechamber and equal-height prestressed concrete box girder is adopted for the tie beam;dumbbell steel pipe concrete section is adopted for the arch rib;PES(FD)low-stress anticorrosion cable body is adopted for the suspender.The rational structural form is determined by comparative study on the key technical parameters such as the layout form of suspender,rise-span ratio and arch axis alignment.This paper summarizes the optimization of simplysupported tied arch structure and looks forward to the development of bridge structure.展开更多
Bridge construction has received a lot of attention as transportation continues to improve.Reinforced concrete linked arch bridges are a common bridge style in today’s bridge construction.This type of bridge not only...Bridge construction has received a lot of attention as transportation continues to improve.Reinforced concrete linked arch bridges are a common bridge style in today’s bridge construction.This type of bridge not only has a basic and generous shape,but it is also incredibly easy to construct,resulting in significant material and construction cost savings.This article analyzes the construction technology of a reinforced concrete linked arch bridge in order to achieve good construction and application.It is hoped that this analysis can provide a scientific reference for the guarantee of the construction quality and subsequent application effect of this kind of bridge.展开更多
In order to ensure the construction quality and safety of small and medium span basket type steel box tied arch bridge,this paper takes a practical project as an example to analyze the key technologies in its design p...In order to ensure the construction quality and safety of small and medium span basket type steel box tied arch bridge,this paper takes a practical project as an example to analyze the key technologies in its design process.It is hoped that this analysis can provide corresponding reference for the design and construction of this kind of arch bridge.展开更多
Measurement of the vibration frequencies of eight ties set in masonry arches of a church by means of a robotic total station is described.The instrument made continuous recordings(up to ten per second)of the three-dim...Measurement of the vibration frequencies of eight ties set in masonry arches of a church by means of a robotic total station is described.The instrument made continuous recordings(up to ten per second)of the three-dimensional positions of a reflector situated at 1/2 or 1/4 of the length of the tie during vertical oscillation induced by an impulsive load.The recording slips,vibration amplitudes(and their accuracy),hourly diagram and experimental spectra of vibrations,and the corresponding frequencies were calculated.The results were verified by comparing them with the vibration frequencies and indirectly the tension and fixed support constraint calculated from accelerometric measurements.The study provides interesting information on the accuracies of the reflector′s three-dimensional coordinates,but highlighted certain limits in the application of robotized total stations for measuring vibration frequencies of ties in masonry arches.展开更多
基金Project(51378503)supported by the National Natural Science Foundation of ChinaProject(2014M552158)supported by China Postdoctoral Science Foundation
文摘Considering arch rib, lateral brace, suspender, girder, pier and track position, the model for the interaction between long-span tied arch continuous bridge and multiple tracks was established by using steel-concrete composite section beam element to simulate concrete-filled steel tube(CFST) arch rib, using the beam element with rigid arm to simulate the prestressed concrete girder and using nonlinear bar element to simulate longitudinal constraint between track and bridge. Taking a(77+3×156.8+77) m tied arch continuous bridge with four tracks on the Harbin-Qiqihar Passenger Dedicated Line as an example, the arrangement of continuously welded rail(CWR) was explored. The longitudinal force in CWR on the tied arch continuous bridge, the pier top horizontal force and torque due to the unbalance load case, were analyzed under the action of temperature, vertical live load, train braking and wind load.Studies show that, it can significantly reduce track displacement to set the track expansion devices at main span arch springing on both sides; the track stress due to arch temperature variation can reach 40.8 MPa; the track stress, pier top horizontal force and torque are related to the number of loaded tracks and train running direction, and the bending force applied to unloaded track is close to the loaded track, while the braking force applied to unloaded track is 1/4 to 1/2 of the loaded track; the longitudinal force of track due to the wind load is up to 12.4 MPa, which should be considered.
文摘Simply-supported tied arch is a zero-thrust arch bridge with clear structural force,large stiffness,low height,beautiful appearance and economic efficiency.In Xuzhou-Shanghai section of Beijing-Shanghai HSR,the simply-supported tied arch is systematically studied and widely applied for the first time.A total of 21 simplysupported tied arch bridges with the spans of 96 m,112 m and 128 m respectively are constructed for the route.The simply-supported tied arch is an external static and internal super-static parallel arch or basket arch of Nielsen system in structure;single-box,threechamber and equal-height prestressed concrete box girder is adopted for the tie beam;dumbbell steel pipe concrete section is adopted for the arch rib;PES(FD)low-stress anticorrosion cable body is adopted for the suspender.The rational structural form is determined by comparative study on the key technical parameters such as the layout form of suspender,rise-span ratio and arch axis alignment.This paper summarizes the optimization of simplysupported tied arch structure and looks forward to the development of bridge structure.
文摘Bridge construction has received a lot of attention as transportation continues to improve.Reinforced concrete linked arch bridges are a common bridge style in today’s bridge construction.This type of bridge not only has a basic and generous shape,but it is also incredibly easy to construct,resulting in significant material and construction cost savings.This article analyzes the construction technology of a reinforced concrete linked arch bridge in order to achieve good construction and application.It is hoped that this analysis can provide a scientific reference for the guarantee of the construction quality and subsequent application effect of this kind of bridge.
文摘In order to ensure the construction quality and safety of small and medium span basket type steel box tied arch bridge,this paper takes a practical project as an example to analyze the key technologies in its design process.It is hoped that this analysis can provide corresponding reference for the design and construction of this kind of arch bridge.
文摘Measurement of the vibration frequencies of eight ties set in masonry arches of a church by means of a robotic total station is described.The instrument made continuous recordings(up to ten per second)of the three-dimensional positions of a reflector situated at 1/2 or 1/4 of the length of the tie during vertical oscillation induced by an impulsive load.The recording slips,vibration amplitudes(and their accuracy),hourly diagram and experimental spectra of vibrations,and the corresponding frequencies were calculated.The results were verified by comparing them with the vibration frequencies and indirectly the tension and fixed support constraint calculated from accelerometric measurements.The study provides interesting information on the accuracies of the reflector′s three-dimensional coordinates,but highlighted certain limits in the application of robotized total stations for measuring vibration frequencies of ties in masonry arches.