期刊文献+
共找到1,174篇文章
< 1 2 59 >
每页显示 20 50 100
A multi-sensor-based distributed real-time measurement system for glacier deformation
1
作者 DONG Han-chuan LIU Shuang +4 位作者 PANG Li-li TAO Zhi-gang FANG Li-de ZHANG Zhong-hua LI Xiao-ting 《Journal of Mountain Science》 SCIE CSCD 2023年第10期2913-2927,共15页
Glacier disasters occur frequently in alpine regions around the world,but the current conventional geological disaster measurement technology cannot be directly used for glacier disaster measurement.Hence,in this stud... Glacier disasters occur frequently in alpine regions around the world,but the current conventional geological disaster measurement technology cannot be directly used for glacier disaster measurement.Hence,in this study,a distributed multi-sensor measurement system for glacier deformation was established by integrating piezoelectric sensing,coded sensing,attitude sensing technology and wireless communication technology.The traditional Modbus protocol was optimized to solve the problem of data identification confusion of different acquisition nodes.Through indoor wireless transmission,adaptive performance analysis,error measurement experiment and landslide simulation experiment,the performance of the measurement system was analyzed and evaluated.Using unmanned aerial vehicle technology,the reliability and effectiveness of the measurement system were verified on the site of Galongla glacier in southeastern Tibet,China.The results show that the mean absolute percentage errors were only 1.13%and 2.09%for the displacement and temperature,respectively.The distributed glacier deformation real-time measurement system provides a new means for the assessment of the development process of glacier disasters and disaster prevention and mitigation. 展开更多
关键词 Glacier disasters Distributed deformation measurement MULTI-SENSOR real-time LoRa Data adaptive.
下载PDF
Development of in-situ Marine Sediment Geo-Acoustic Measurement System with Real-Time and Multi Frequencies (the Second Generation) 被引量:7
2
作者 陶春辉 邓显明 +6 位作者 李红星 周建平 金肖兵 傅顺声 Wlkens R. H 顾春华 何拥华 《China Ocean Engineering》 SCIE EI 2009年第4期769-778,共10页
Compared with the laboratory acoustic measurement of sediment samples, the in-situ acoustic measurement in marine sediment is considered more accurate and rehable, because it covers all of the surrounding environment ... Compared with the laboratory acoustic measurement of sediment samples, the in-situ acoustic measurement in marine sediment is considered more accurate and rehable, because it covers all of the surrounding environment factors and avoids the disturbance during the course of sampling and transporting of sediment samples. A new multi-frequency in-situ geoacoustic measurement system (MFIS^AMS) has been developed. The system can provide acoustic vdocity (compressional wave) and attenuation profiles of the uppermost 4 - 8 m sediment in the seafloor. It consists of 8 channels with 12 frequencies (multi-frequencies) and 0.5 - 2 MHz sampling rates. The data collected can be transmiuted in real-time. Associated with inclinometer and altimeter, it can provide the data for depth emendation. Acoustic velocity and attenuation data have been obtained from two in-situ experiments conducted in the Hangzhou Bay. 展开更多
关键词 marine sediment in-situ acoustic measurement acoustic velocity and attenuation
下载PDF
Vibrations induced by tunnel boring machine in urban areas: In situ measurements and methodology of analysis 被引量:3
3
作者 Antoine Rallu Nicolas Berthoz +1 位作者 Simon Charlemagne Denis Branque 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2023年第1期130-145,共16页
Excavation with tunnel boring machine(TBM)can generate vibrations,causing damages to neighbouring buildings and disturbing the residents or the equipment.This problem is particularly challenging in urban areas,where T... Excavation with tunnel boring machine(TBM)can generate vibrations,causing damages to neighbouring buildings and disturbing the residents or the equipment.This problem is particularly challenging in urban areas,where TBMs are increasingly large in diameter and shallow in depth.In response to this problem,four experimental campaigns were carried out in different geotechnical contexts in France.The vibration measurements were acquired on the surface and inside the TBMs.These measurements are also complemented by few data in the literature.An original methodology of signal processing is pro-posed to characterize the amplitude of the particle velocities,as well as the frequency content of the signals to highlight the most energetic bands.The levels of vibrations are also compared with the thresholds existing in various European regulations concerning the impact on neighbouring structures and the disturbance to local residents. 展开更多
关键词 Ground-borne vibrations Tunnel boring machine(TBM) In situ measurement Dynamic characterization Vibration levels Site spectrum
下载PDF
Measured dynamic load distribution within the in situ axlebox bearing of high-speed trains under polygonal wheel–rail excitation
4
作者 Yu Hou Xi Wang +4 位作者 Jiaqi Wei Menghua Zhao Wei Zhao Huailong Shi Chengyu Sha 《Railway Engineering Science》 EI 2024年第4期444-460,共17页
The dynamic load distribution within in-service axlebox bearings of high-speed trains is crucial for the fatigue reliability assessment and forward design of axlebox bearings. This paper presents an in situ measuremen... The dynamic load distribution within in-service axlebox bearings of high-speed trains is crucial for the fatigue reliability assessment and forward design of axlebox bearings. This paper presents an in situ measurement of the dynamic load distribution in the four rows of two axlebox bearings on a bogie wheelset of a high-speed train under polygonal wheel–rail excitation. The measurement employed an improved strain-based method to measure the dynamic radial load distribution of roller bearings. The four rows of two axlebox bearings on a wheelset exhibited different ranges of loaded zones and different means of distributed loads. Besides, the mean value and standard deviation of measured roller–raceway contact loads showed non-monotonic variations with the frequency of wheel–rail excitation. The fatigue life of the four bearing rows under polygonal wheel–rail excitation was quantitatively predicted by compiling the measured roller–raceway contact load spectra of the most loaded position and considering the load spectra as input. 展开更多
关键词 High-speed train Axlebox bearing Dynamic load distribution In situ measurement Polygonal wheel–rail excitation
下载PDF
Real-time reliability evaluation based on damaged measurement degradation data 被引量:16
5
作者 王小林 蒋平 +1 位作者 郭波 程志君 《Journal of Central South University》 SCIE EI CAS 2012年第11期3162-3169,共8页
A method was proposed to evaluate the real-time reliability for a single product based on damaged measurement degradation data.Most researches on degradation analysis often assumed that the measurement process did not... A method was proposed to evaluate the real-time reliability for a single product based on damaged measurement degradation data.Most researches on degradation analysis often assumed that the measurement process did not have any impact on the product's performance.However,in some cases,the measurement process may exert extra stress on products being measured.To obtain trustful results in such a situation,a new degradation model was derived.Then,by fusing the prior information of product and its own on-line degradation data,the real-time reliability was evaluated on the basis of Bayesian formula.To make the proposed method more practical,a procedure based on expectation maximization (EM) algorithm was presented to estimate the unknown parameters.Finally,the performance of the proposed method was illustrated by a simulation study.The results show that ignoring the influence of the damaged measurement process can lead to biased evaluation results,if the damaged measurement process is involved. 展开更多
关键词 degradation analysis damaged measurement real-time reliability expectation maximization algorithm
下载PDF
Micro-failure process and failure mechanism of brittle rock under uniaxial compression using continuous real-time wave velocity measurement 被引量:3
6
作者 WU Zhi-jun WANG Zhi-yang +2 位作者 FAN Li-feng WENG Lei LIU Quan-sheng 《Journal of Central South University》 SCIE EI CAS CSCD 2021年第2期556-571,共16页
In this study,the micro-failure process and failure mechanism of a typical brittle rock under uniaxial compression are investigated via continuous real-time measurement of wave velocities.The experimental results indi... In this study,the micro-failure process and failure mechanism of a typical brittle rock under uniaxial compression are investigated via continuous real-time measurement of wave velocities.The experimental results indicate that the evolutions of wave velocities became progressively anisotropic under uniaxial loading due to the direction-dependent development of micro-damage.A wave velocity model considering the inner anisotropic crack evolution is proposed to accurately describe the variations of wave velocities during uniaxial compression testing.Based on which,the effective elastic parameters are inferred by a transverse isotropic constitutive model,and the evolutions of the crack density are inversed using a self-consistent damage model.It is found that the propagation of axial cracks dominates the failure process of brittle rock under uniaxial loading and oblique shear cracks develop with the appearance of macrocrack. 展开更多
关键词 elastic wave velocity brittle rock failure uniaxial compression test continuous real-time measurement anisotropic damage evolution theory and modelling
下载PDF
Real-time forward modeling and inversion of logging-while-drilling electromagnetic measurements in horizontal wells 被引量:2
7
作者 WANG Lei LIU Yingming +2 位作者 WANG Caizhi FAN Yiren WU Zhenguan 《Petroleum Exploration and Development》 CSCD 2021年第1期159-168,共10页
Based on the pseudo-analytical equation of electromagnetic log for layered formation,an optimal boundary match method is proposed to adaptively truncate the encountered formation structures.An efficient integral metho... Based on the pseudo-analytical equation of electromagnetic log for layered formation,an optimal boundary match method is proposed to adaptively truncate the encountered formation structures.An efficient integral method is put forward to significantly accelerate the convergence of Sommerfeld integral.By asymptotically approximating and subtracting the first reflection/transmission waves from the scattered field,the new Sommerfeld integral method has addressed difficulties encountered by the traditional digital filtering method,such as low computational precision and limited operating range,and realized the acceleration of the computation speed of logging-while-drilling electromagnetic measurements(LWD EM).By making use of the priori information from the offset/pilot wells and interactively adjusting the formation model,the optimum initial guesses of the inversion model is determined in order to predict the nearby formation boundaries.The gradient optimization algorithm is developed and an interactive inversion system for the LWD EM data from the horizontal wells is established.The inverted results of field data demonstrated that the real-time interactive inversion method is capable of providing the accurate boundaries of layers around the wellbore from the LWD EM,and it will benefit the wellbore trajectory optimization and reservoir interpretation. 展开更多
关键词 logging-while-drilling electromagnetic measurement horizontal well real-time forward modeling interactive inversion bed boundary
下载PDF
Real-Time Black Carbon Emissions from Light-Duty Passenger Vehicles Using a Portable Emissions Measurement System 被引量:1
8
作者 Xuan Zheng Liqiang He +4 位作者 Xiaoyi He Shaojun Zhang Yihuan Cao Jiming Hao Ye Wu 《Engineering》 SCIE EI CAS 2022年第9期73-81,共9页
Black carbon(BC)is considered the second largest anthropogenic climate forcer,but the radiative effects of BC are highly correlated with its combustion sources.On-road vehicles are an important source of anthropogenic... Black carbon(BC)is considered the second largest anthropogenic climate forcer,but the radiative effects of BC are highly correlated with its combustion sources.On-road vehicles are an important source of anthropogenic BC.However,there are major uncertainties in the estimates of the BC emissions from on-road light-duty passenger vehicles(LDPVs),and results obtained with the portable emissions measurement system(PEMS)method are particularly lacking.We developed a PEMS platform and evaluated the on-road BC emissions from ten in-use LDPVs.We demonstrated that the BC emission factors(EFs)of gasoline direction injection(GDI)engine vehicles range from 1.10 to 1.56 mg.km^(-1),which are higher than the EFs of port fuel injection(PFI)engine vehicles(0.10–0.17 mg.km^(-1))by a factor of 11.The BC emissions during the cold-start phase contributed 2%–33%to the total emissions.A strong correlation(R^(2)=0.70)was observed between the relative BC EFs and average vehicle speed,indicating that traffic congestion alleviation could effectively mitigate BC emissions.Moreover,BC and particle number(PN)emissions were linearly correlated(R^(2)=0.90),and compared to PFI engine vehicles,the instantaneous PN-to-BC emission rates of GDI engine vehicles were less sensitive to vehicle specific power-to-velocity(VSPV)increase in all speed ranges. 展开更多
关键词 Black carbon Light-duty gasoline vehicles Portable emissions measurement system real-time emissions
下载PDF
Research on Collaboration Theory of Distributed Measurement System and Real-Time of Communication Platform
9
作者 SHENYan 《Journal of Electronic Science and Technology of China》 2005年第1期95-95,共1页
关键词 distributed measurement system agent technology swarm intellgence Particle Swarm Optimization algorithm Collaboration model Switched Ethernet real-time Scheduling AEROENGINE
下载PDF
Establishment of continuous cooling transformation diagrams of aluminum alloys using in situ voltage measurement 被引量:1
10
作者 李红英 宾杰 +1 位作者 赵延阔 王晓峰 《Transactions of Nonferrous Metals Society of China》 SCIE EI CAS CSCD 2011年第9期1944-1949,共6页
An effective method was proposed to establish the continuous cooling transformation(CCT) diagrams of aluminum alloys using in situ voltage measurement.The voltage change of samples with predefined dimension was reco... An effective method was proposed to establish the continuous cooling transformation(CCT) diagrams of aluminum alloys using in situ voltage measurement.The voltage change of samples with predefined dimension was recorded under the constant current state during continuous cooling.Solutionizing time,together with starting and finishing temperatures of phase transformation of the alloy can be obtained from relationships of voltage vs time and temperature.A critical cooling rate without detectable phase transition during continuous cooling can be determined.Continuous cooling transformation diagrams of tested samples can be established conveniently based on these results.Microstructure observation and differential scanning calorimetry(DSC) testing were applied to verify the reliability of continuous cooling transformation diagram. 展开更多
关键词 aluminum alloys in situ voltage measurement phase transformation CCT diagram MICROSTRUCTURE
下载PDF
IN SITU MEASUREMENT OF BREEDING-FIRE OF SULPHIDE ORE DUMPS 被引量:3
11
作者 Wu, Chao Wang, Pinglong Meng, Jingrang 《中国有色金属学会会刊:英文版》 EI CSCD 1997年第1期34-38,共5页
INSITUMEASUREMENTOFBREEDINGFIREOFSULPHIDEOREDUMPS①WuChao,WangPinglong,MengTingrangDepartmentofResourcesExpl... INSITUMEASUREMENTOFBREEDINGFIREOFSULPHIDEOREDUMPS①WuChao,WangPinglong,MengTingrangDepartmentofResourcesExploitationEnginerin... 展开更多
关键词 SULPHIDE ORE dumps breeding FIRE behaviour in situ measurement
下载PDF
Measurements of in situ stress and mining-induced stress in Beiminghe Iron Mine of China 被引量:8
12
作者 欧阳振华 李长洪 +1 位作者 徐万才 李昊洁 《Journal of Central South University》 SCIE EI CAS 2009年第1期85-90,共6页
In order to obtain the distribution rules of in situ stress and mining-induced stress of Beiminghe Iron Mine, the stress relief method by overcoring was used to measure the in situ stress, and the MC type bore-hole st... In order to obtain the distribution rules of in situ stress and mining-induced stress of Beiminghe Iron Mine, the stress relief method by overcoring was used to measure the in situ stress, and the MC type bore-hole stress gauge was adopted to measure the mining-induced stress. In the in situ stress measuring, the technique of improved hollow inclusion cells was adopted, which can realize complete temperature compensation. Based on the measuring results, the distribution model of in situ stress was established and analyzed. The in situ stress measuring result shows that the maximum horizontal stress is 1.75-2.45 times of vertical stress and almost 1.83 times of the minimum horizontal stress in this mineral field. And the mining-induced stress measuring result shows that, according to the magnitude of front abutment pressure the stress region can be separated into stress-relaxed area, stress- concentrated area and initial stress area. At the -50 m mining level of this mine, the range of stress-relaxed area is 0-3 m before mining face; the range of stress-concentrated area is 3-55 m before mining face, and the maximum mining-induced stress is 16.5-17.5 MPa, which is 15-20 m from the mining face. The coefficient of stress concentration is 1.85. 展开更多
关键词 in situ stress mining-induced stress Beiminghe Iron Mine stress measurment
下载PDF
Self-contained in situ sediment acoustic measurement system based on hydraulic driving penetration 被引量:9
13
作者 Kan Guangming Liu Baohua +2 位作者 Zhao Yuexia Li Guanbao Pei Yanliang 《High Technology Letters》 EI CAS 2011年第3期311-316,共6页
A novel self-contained in situ sediment acoustic measurement system based on hydraulic driving penetration is proposed to solve the problem of large disturbances to sediments of the in situ equipments already in exist... A novel self-contained in situ sediment acoustic measurement system based on hydraulic driving penetration is proposed to solve the problem of large disturbances to sediments of the in situ equipments already in existence. By using a hydraulic driving device, the system drives four acoustic probes into sediments at an even speed, and this decreases disturbances to sediments introduced by the penetration of acoustic probes. By means of the special design of the central control unit, the system can work full-automatically and the data are stored self-containedly, and this avoids the requirement of real-time remote controlling from the ship. Its operating water depth, measuring depth and measuring frequency is 500m, 1.0m and 30kHz respectively. A set of in situ sound speeds and attenuation coefficients of sediments are obtained at 40 stations using the system. The results confirm that the data obtained by the in situ sediment acoustic system are accurate and credible. 展开更多
关键词 acoustic properties sound speed sound attenuation in situ measurement system
下载PDF
A real-time measuring technology for studying distortion of hydraulic turbine blade castings during heat treatment process 被引量:1
14
作者 Yu Hailiang Kang Jinwu +3 位作者 Nie Gang Long Haimin Hao Xiaokun Huang Tianyou 《China Foundry》 SCIE CAS 2011年第3期300-304,共5页
During heat treatment process, the distortion behavior inevitably appears in hydraulic turbine blade castings. In this research, a technology was developed for real-time measurement of the distortion in hydraulic turb... During heat treatment process, the distortion behavior inevitably appears in hydraulic turbine blade castings. In this research, a technology was developed for real-time measurement of the distortion in hydraulic turbine blade castings at the still air cooling and forced air cooling stages during heat treatment process. The method was used to measure the distortion behavior at the cooling stages in both normalizing and tempering processes. At the normalization, the distortion at the blade comer near outlet side undergoes four stages with alternating bending along positive and negative directions. At the tempering stage, the distortion could be divided into two steps. The temperature difference between the two surfaces of blade casting was employed to analyze the distortion mechanism. The measured results could be applied to guide the production, and the machining allowance could be reduced by controlling the distortion behavior. 展开更多
关键词 real-time measuring DISTORTION hydraulic turbine blade casting heat treatment
下载PDF
In Situ Measurement of the Undisturbed Ground Temperature for Ground Source Heat Pump System 被引量:1
15
作者 周亚素 《Journal of Donghua University(English Edition)》 EI CAS 2008年第1期73-77,共5页
The undisturbed ground temperatures are important for design of the ground heat exchangers in ground source heat pump (GSHP) systems. In this paper, the undisturbed ground temperatures measured in two different me... The undisturbed ground temperatures are important for design of the ground heat exchangers in ground source heat pump (GSHP) systems. In this paper, the undisturbed ground temperatures measured in two different methods are presented. The investigation was carried out in two cases. The temperature measured with the direct method is assumed to give the correct undisturbed ground temperature profile. The temperature measured with indirect method overestimates the undisturbed ground temperature by 2.1℃ and 1.7~C. This difference is mainly caused by the circulation pump and ambient air to the fluid. Therefore, the results that are decreased about 2℃ as compared with the indirect measured are recommended to estimate the undisturbed ground temperature in situ measuring. A smaller pump or deeper borehole or mild weather would result in a more correct temperature. Because the undisturbed ground temperature is affected by many factors. Whether or not these conclusions are correct to other areas, this would need further investigation. 展开更多
关键词 in situ measurement the undisturbed ground temperature indirect measurement method
下载PDF
Methane seepages in the northern South China Sea: evidence from in situ measurements 被引量:1
16
作者 QIU Zhongyan HAN Xiqiu WANG Yejian 《Journal of Oceanology and Limnology》 SCIE CAS CSCD 2018年第5期1556-1561,共6页
Continental margins in world oceans contain large amounts of marine gas hydrates. Changes in the temperature and pressure of sediment may destabilize the methane hydrate, leading to its release and seepage into the se... Continental margins in world oceans contain large amounts of marine gas hydrates. Changes in the temperature and pressure of sediment may destabilize the methane hydrate, leading to its release and seepage into the sea. This process would increase the dissolved methane in the ambient seawater. In this study, a methane sensor was used to detect methane anomalies in the water column in southwestern Dongsha and Shenhu, northern slope of the South China Sea. Methane plumes were detected at stations SCS001 and T001 in the southwestern Dongsha area, and station SCS002 in the Shenhu area, respectively. The maximum methane concentrations were 8.8 nmol/L in southwestern Dongsha and 10.1 nmol/L in Shenhu, which are about 4–5 times higher than the background methane concentration. This indicates that there are active methane seepages present in both the southwestern Dongsha and Shenhu areas, which are likely related to a methane hydrate reservoir beneath the seafloor. A methane sensor with a low detection limit is a practical instrument with which to detect methane plumes in oceanic environments and to monitor methane leakage from the seafloor. 展开更多
关键词 northern slope of the South China Sea methane leakage in situ measurement methane sensor
下载PDF
Advance of in-situ stress measurement in China 被引量:10
17
作者 Meifeng Cai Hua Peng 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE 2011年第4期373-384,共12页
In-situ stress is an essential parameter for design and construction of most engineering projects that involve excavation in rocks. Progress in in-situ stress measurement from the 1950s in China is briefly introduced.... In-situ stress is an essential parameter for design and construction of most engineering projects that involve excavation in rocks. Progress in in-situ stress measurement from the 1950s in China is briefly introduced. Stress relief by overcoring technique and hydraulic fracturing: technique are the two main techniques for in-situ stress measurement in China at present. To make them suitable for application at great depth and to increase their measuring reliability and accuracy, a series of techniques have been developed. Applications and achievements of in-situ stress measurement in Chinese rock engineering, including mining, geotechnical and hydropower engineering, and earthquake prediction, are introduced. Suggestions for further development of in-situ stress measurement are also proposed. 展开更多
关键词 in-situ stress measurement new development of techniques engineering application
下载PDF
Preliminary Results of In-situ Stress Measurements along the Longmenshan Fault Zone after the Wenchuan M_s 8.0 Earthquake 被引量:32
18
作者 WU Manlu ZHANG Yueqiao +5 位作者 LIAO Chunting CHEN Qunce MA Yinsheng WU Jinsheng YAN Junfeng OU Mingyi 《Acta Geologica Sinica(English Edition)》 SCIE CAS CSCD 2009年第4期746-753,共8页
Four months after the Wenchuan Ms 8 earthquake in western Sichuan, China, in situ stress measurements were carried out along the Longmenshan fault zone with the purpose of obtaining stress parameters for earthquake ha... Four months after the Wenchuan Ms 8 earthquake in western Sichuan, China, in situ stress measurements were carried out along the Longmenshan fault zone with the purpose of obtaining stress parameters for earthquake hazard assessment. In-situ stresses were measured in three new boreholes by using overcoring with the piezomagnetic stress gauges for shallow depths and hydraulic fracturing for lower depths. The maximum horizontal stress in shallow depths (-20 m) is about 4.3 MPa, oriented N19°E, in the epicenter area at Yingxiu Town, about 9.7 MPa, oriented N51°W, at Baoxing County in the southwestern Longmenshan range, and about 2.6 MPa, oriented N39°E, near Kangding in the southernmost zone of the Longmenshan range. Hydraulic fracturing at borehole depths from 100 to 400 m shows a tendency towards increasing stress with depth. A comparison with the results measured before the Wenchuan earthquake along the Longmenshan zone and in the Tibetan Plateau demonstrates that the stress level remains relatively high in the southwestern segment of the Longmenshan range, and is still moderate in the epicenter zone. These results provide a key appraisal for future assessment of earthquake hazards of the Longmenshan fault zone and the aftershock occurrences of the Wenchuan earthquake. 展开更多
关键词 Wenchuan Ms 8.0 earthquake in-situ stress measurement overcoring hydraulic fracturing Longmenshan fault belt
下载PDF
A COMBINED MEASUREMENT SYSTEM FOR UV/V IN SITU SPECTROELECTROCHEMICAL STUDY 被引量:1
19
作者 Jin LUO Zhong Hua LIN Zhao Wu TIAN (State Key Laboratory for Physical Chemistry of the Solid Surface,Xiamen University,Xiamen,361005) 《Chinese Chemical Letters》 SCIE CAS CSCD 1991年第4期309-312,共4页
A microcomputer-based UV/V in situ spectroelectrochemical measurement system has been developed.This paper presents a description of the experimental details regarding the methods and equipment.
关键词 UV A COMBINED measurement SYSTEM FOR UV/V IN situ SPECTROELECTROCHEMICAL STUDY
下载PDF
New development of hydraulic fracturing technique for in-situ stress measurement at great depth of mines 被引量:3
20
作者 Meifeng Cai Hua Peng Hongguang Ji 《Journal of University of Science and Technology Beijing》 CSCD 2008年第6期665-670,共6页
In-situ stress measurement using the hydraulic fracturing technique was made at Wanfu Coal Mine in Shandong Province, China. To solve problems caused by great measuring depth and extra thick overburden soil layers in ... In-situ stress measurement using the hydraulic fracturing technique was made at Wanfu Coal Mine in Shandong Province, China. To solve problems caused by great measuring depth and extra thick overburden soil layers in the mine, a series of improved techniques were developed for the traditional hydraulic fracturing technique and equipment to increase their pressure-enduring ability and to ensure safe and flexible removal of the sealing packers with other experimental apparatus. Successful in-situ stress measurement at 37 points within 7 boreholes, which were mostly over 1000 m deep, was completed. Through the measurement, detailed information of in-situ stress state has been provided for mining design of the mine. The improved hydraulic fracturing technique and equipment also provide reliable tools for in-situ stress measurement at great depth of other mines. 展开更多
关键词 hydraulic fracturing in-situ stress measurement coal mine measuring depth
下载PDF
上一页 1 2 59 下一页 到第
使用帮助 返回顶部