Traction power systems(TPSs)play a vital role in the operation of electrified railways.The transformation of conventional railway TPSs to novel structures is not only a trend to promote the development of electrified ...Traction power systems(TPSs)play a vital role in the operation of electrified railways.The transformation of conventional railway TPSs to novel structures is not only a trend to promote the development of electrified railways toward high-efficiency and resilience but also an inevitable requirement to achieve carbon neutrality target.On the basis of sorting out the power supply structures of conventional AC and DC modes,this paper first reviews the characteristics of the existing TPSs,such as weak power supply flexibility and low-energy efficiency.Furthermore,the power supply structures of various TPSs for future electrified railways are described in detail,which satisfy longer distance,low-carbon,high-efficiency,high-reliability and high-quality power supply requirements.Meanwhile,the application prospects of different traction modes are discussed from both technical and economic aspects.Eventually,this paper introduces the research progress of mixed-system electrified railways and traction power supply technologies without catenary system,speculates on the future development trends and challenges of TPSs and predicts that TPSs will be based on the continuous power supply mode,employing power electronic equipment and intelligent information technology to construct a railway comprehensive energy system with renewable energy.展开更多
The railways have significantly contributed to the economic development of the city.However,with the evolution of the city and adjustments in the industrial structure,the relocation and rerouting of major railway trun...The railways have significantly contributed to the economic development of the city.However,with the evolution of the city and adjustments in the industrial structure,the relocation and rerouting of major railway trunk lines have resulted in the abandonment of numerous urban railways.The abandoned railways,resulting from inadequate management,have transformed into sites for waste disposal and are particularly vulnerable to environmental issues,including land pollution,degradation of vegetation cover,and a decline in ecological diversity.Abandoned railways in urban centers significantly hinder transportation connectivity and adversely influence the aesthetic appeal of the city.The landscape transformation of these abandoned railways is of paramount importance in the context of urban renewal.These railway sites possess significant potential for stock utilization as specialized,underutilized spaces.Through the processes of re-planning,integration,and renewal,previously underutilized spaces can be revitalized and incorporated into the urban landscape in innovative ways.This approach not only enhances the availability of green leisure areas for residents but also contributes to the realization of sustainable urban development.展开更多
An emerging railway technology called smart railway promises to deliver higher transportation efficiency,enhanced comfort in services,and greater eco-friendliness.The smart railway is expected to integrate fifth-gener...An emerging railway technology called smart railway promises to deliver higher transportation efficiency,enhanced comfort in services,and greater eco-friendliness.The smart railway is expected to integrate fifth-generation mobile communication(5G),Artificial Intelligence(AI),and other technologies,which poses new problems in the construction,operation and maintenance of railway wireless networks.Wireless Digital Twins(DTs),which have recently emerged as a new paradigm for the design of wireless networks,can address these problems and enable the whole lifecycle management of railway wireless networks.However,there are still many scientific issues and challenges for railway-oriented wireless DT.Relevant key technologies to solve these problems are introduced and described,including characterization of materials'physical-EM properties,autonomous reconstruction of Three-dimensional(3D)environment model,AI-empowered environmental cognition,Ray-Tracing(RT),model-based and AIbased RT acceleration,and generation of multi-spectra sensing data.Moreover,this paper presents our research results for each key technology and describes the wireless network planning and optimization system based on highperformance RT developed by our laboratory.This paper outlines the framework for realizing the wireless DT of smart railways,providing the direction for future research.展开更多
Purpose–The purpose of this study is to address the deficiency in safety monitoring technology for 27.5 kV high-voltage cables within the railway traction power supply by analyzing the grounding methods employed in h...Purpose–The purpose of this study is to address the deficiency in safety monitoring technology for 27.5 kV high-voltage cables within the railway traction power supply by analyzing the grounding methods employed in high-speed railways and developing an effective monitoring solution.Design/methodology/approach–Through establishing a mathematical model of induced potential in the cable sheath and analyzing its influencing factors,the principle of grounding current monitoring is proposed.Furthermore,the accuracy of data collection and alarm function of the monitoring equipment were verified through laboratory simulation experiments.Finally,through practical application in the traction substation of the railway bureau on site,a large amount of data were collected to verify the stability and reliability of the monitoring system in actual environments.Findings–The experimental results show that the designed monitoring system can effectively monitor the grounding current of high-voltage cables and respond promptly to changes in cable insulation status.The system performs excellently in terms of data collection accuracy,real-time performance and reliability of alarm functions.In addition,the on-site trial results further confirm the accuracy and reliability of the monitoring system in practical applications,providing strong technical support for the safe operation of highspeed railway traction power supply systems.Originality/value–This study innovatively develops a 27.5kV high-voltage cable grounding current monitoring system,which provides a new technical means for evaluating the insulation status of cables by accurately measuring the grounding current.The design,experimental verification and application of this system in high-speed railway traction power supply systems have demonstrated significant academic value and practical significance,contributing innovative solutions to the field of railway power supply safety monitoring.展开更多
During the operation of sandy railways, the challenge posed by wind-blown sand is a persistent issue. An in-depth study on the influence of wind-blown sand content on the macroscopic and microscopic mechanical propert...During the operation of sandy railways, the challenge posed by wind-blown sand is a persistent issue. An in-depth study on the influence of wind-blown sand content on the macroscopic and microscopic mechanical properties of the ballast bed is of great significance for understanding the potential problems of sandy railways and proposing reasonable and adequate maintenance and repair strategies. Building upon existing research, this study proposes a new assessment indicator for sand content. Utilizing the discrete element method(DEM) and fully considering the complex interactions between ballast and sand particles, three-dimensional(3D) multi-scale analysis models of sandy ballast beds with different wind-blown sand contents are established and validated through field experiments. The effects of varying wind-blown sand content on the microscopic contact distribution and macroscopic mechanical behavior(such as resistance and support stiffness) of ballast beds are carefully analyzed. The results show that with the increase in sand content, the average contact force and coordination number between ballast particles gradually decrease, and the disparity in contact forces between different layers of the ballast bed diminishes. The longitudinal and lateral resistance of the ballast bed initially decreases and then increases, with a critical point at 10% sand content. At 15% sand content, the lateral resistance is mainly shared by the ballast shoulder. The longitudinal resistance sharing ratio is always the largest on the sleeper side, followed by that at the sleeper bottom, and the smallest on the ballast shoulder. When the sand content exceeds 10%, the contribution of sand particles to stiffness significantly increases, leading to an accelerated growth rate of the overall support stiffness of the ballast bed, which is highly detrimental to the long-term service performance of the ballast bed. In conclusion, it is recommended that maintenance and repair operations should be promptly conducted when the sand content of the ballast bed reaches or exceeds 10%.展开更多
As the unique power entrance,the pantograph-catenary electrical contact system maintains the efficiency and reliability of power transmission for the high-speed train.Along with the fast development of high-speed rail...As the unique power entrance,the pantograph-catenary electrical contact system maintains the efficiency and reliability of power transmission for the high-speed train.Along with the fast development of high-speed railways all over the world,some commercialized lines are built for covering the remote places under harsh environment,especially in China;these environmental elements including wind,sand,rain,thunder,ice and snow need to be considered during the design of the pantograph-catenary system.The pantograph-catenary system includes the pantograph,the contact wire and the interface—pantograph slide.As the key component,this pantograph slide plays a critical role in reliable power transmission under dynamic condition.The fundamental material characteristics of the pantograph slide and contact wire such as electrical conductivity,impact resistance,wear resistance,etc.,directly determine the sliding electrical contact performance of the pantograph-catenary system;meanwhile,different detection methods of the pantograph-catenary system are crucial for the reliability of service and maintenance.In addition,the challenges brought from extreme operational conditions are discussed,taking the Sichuan-Tibet Railway currently under construction as a special example with the high-altitude climate.The outlook for developing the ultra-high-speed train equipped with the novel pantograph-catenary system which can address the harsher operational environment is also involved.This paper has provided a comprehensive review of the high-speed railway pantograph-catenary systems,including its progress,challenges,outlooks in the history and future.展开更多
Piled embankments,which offer many advantages,are increasingly popular in construction of high-speed railways in China.Although the performance of piled embankment under static loading is well-known,the behavior under...Piled embankments,which offer many advantages,are increasingly popular in construction of high-speed railways in China.Although the performance of piled embankment under static loading is well-known,the behavior under the dynamic train load of a high-speed railway is not yet understood.In light of this,a heavily instrumented piled embankment model was set up,and a model test was carried out,in which a servo-hydraulic actuator outputting M-shaped waves was adopted to simulate the process of a running train.Earth pressure,settlement,strain in the geogrid and pile and excess pore water pressure were measured.The results show that the soil arching height under the dynamic train load of a high-speed railway is shorter than under static loading.The growth trend for accumulated settlement slowed down after long-term vibration although there was still a tendency for it to increase.Accumulated geogrid strain has an increasing tendency after long-term vibration.The closer the embankment edge,the greater the geogrid strain over the subsoil.Strains in the pile were smaller under dynamic train loads,and their distribution was different from that under static loading.At the same elevation,excess pore water pressure under the track slab was greater than that under the embankment shoulder.展开更多
Based on the annual production data collected by the Statistic Center of the Ministry of Railways of the People's Republic of China, we calculated the energy saving and direct emission reductions of CO2, soot, SO2, C...Based on the annual production data collected by the Statistic Center of the Ministry of Railways of the People's Republic of China, we calculated the energy saving and direct emission reductions of CO2, soot, SO2, CO, NOx and CnHm of electrified railways, and analyzed their dynamic characteristics during the period of 1975 2007. The results show that during this period, the annual mean values of energy saving is 1.23×10^6 tce, and direct emission reduction of CO2, soot, SO2, CO, NOx and CnHm are 4.267×10^6 t, 20.5×10^3 t, 3.0×10^3 t, 9.6×10^3 t, 67.9×10^3 t, and 6.9×10^3 t per year, respectively. The annual average increasing rates of energy saving is 139×10^3 tce, and direct emission reduction of CO2, soot, SO2, CO, NOx and CnHm are 483×10^3 t, 2.3×10^3 t, 0.34×10^3 t, 1.1×10^3 t, 7.7 ×10^3 t and 0.78×10^3 t per year, respectively. The electrified railways have played an important role in decreasing the energy consumption and air pollutant emissions of China's railway system. The results of this study could provide some reference knowledge for future reductions of energy consumption and waste gas emission in China's railway transportation.展开更多
The high dynamic power requirements present in modern railway transportation systems raise research challenges for an optimal operation of railway electrification. This paper presents a Monte Carlo analysis on the app...The high dynamic power requirements present in modern railway transportation systems raise research challenges for an optimal operation of railway electrification. This paper presents a Monte Carlo analysis on the application of a power transfer device installed in the neutral zone and exchanging active power between two sections. The main analyzed parameters are the active power balance in the two neighbor traction power substations and the system power losses. A simulation framework is presented to comprise the desired analysis and a universe of randomly distributed scenarios are tested to evaluate the effectiveness of the power transfer device system. The results show that the density of trains and the relative branch length of a traction power substation should be considered in the evaluation phase of the best place to install a power transfer device, towards the reduction of the operational power losses, while maintaining the two substations balanced in terms of active power.展开更多
High Speed Railway (HSR) provides its customers not only safety, security, comfort and on-time commuting, but also a fast transportation alternative to air travel or regular passenger rail services. Providing these be...High Speed Railway (HSR) provides its customers not only safety, security, comfort and on-time commuting, but also a fast transportation alternative to air travel or regular passenger rail services. Providing these benefits would not be possible without the tremendous growth and prevalence of wireless communication technologies. Due to advances in wireless communication systems, both trains and passengers are connected through high speed wireless networks to the Internet, data centers and railroad control centers. Railroad communities, academia, related industries and standards bodies, even the European Space Agency, are involved in advancing developments of HSR for highly connected train communication systems. The goal of these efforts is to provide the capabilities for uninterrupted high-speed fault-tolerant communication networks for all possible geographic, structural and weather conditions. This survey provides an overview of the current state-of-the-art and future trends for wireless technologies aiming to realize the concept of HSR communication services. Our goal is to highlight the challenges for these technologies, including GSM-R, Wi-Fi, WIMAX, LTE-R, RoF, LCX & Cognitive Radio, the offered solutions, their performance, and other related issues. Currently, providing HSR services is the goal of many countries across the globe. Europe, Japan & Taiwan, China, as well as North & South America have increased their efforts to advance HSR technologies to monitor and control not only the operations but also to deliver extensive broadband solutions to passengers. This survey determined a trend of the industry to transition control plane operations towards narrowband frequencies, i.e. LTE400/700, and to utilize concurrently other technologies for broadband access for passengers such that services of both user and train control systems are supported. With traditional technologies, a tradeoff was required and often favored train control services over passenger amenities. However, with the advances in communication systems, such as LTE-R and cognitive radios, it is becoming possible for system designers to offer rich services to passengers while also providing support for enhanced train control operations such as Positive Train Control.展开更多
Seasonally cold climate and resulting frost action set great demands to railway track substructure in order to maintain Irack geomelry. Chal- lenges culminate on high-speed lines, where the tolerances for roughness ar...Seasonally cold climate and resulting frost action set great demands to railway track substructure in order to maintain Irack geomelry. Chal- lenges culminate on high-speed lines, where the tolerances for roughness are the tightest. Problems may result in highly increased Irack maintenance and need for temporary speed reslrictions. The causes of frost action can be associated with subsoil, subballast or ballast. The major concern in frost protection is to avoid the freezing of frost susceptible subsoil by using sufficient thickness of subballast and relying on non-fi'ost-susctible subballast material. This paper provides an overview of the main research findings on the role of ballast, subballast and subsoil in frost acedon. In new comlruclion the material specificalions, design procedures and construction methods have been developed to ensure adequate performance of Irack subscatt, but special challenges exist in managing existing Wacks that were not designed for modem requirements. In order to perform cost-effective and sustainable track maintenance, it is necessary to recognize the problem areas and define the root-causes of problems. For locating the problem sections and defining the causes of defects, a sophisticated analysis based on integration of track geometry and ground penetrating radar (GPR) data has been developed and is summarized in this paper,展开更多
Railway seat inventory control strategies play a crucial role in the growth of profit and train load factor. The railway passenger seat inventory control problem in China was addressed. Chinese passenger railway opera...Railway seat inventory control strategies play a crucial role in the growth of profit and train load factor. The railway passenger seat inventory control problem in China was addressed. Chinese passenger railway operation features and seat inventory control practice were analyzed firstly. A dynamic demand forecasting method was introduced to forecast the coming demand in a ticket booking period. By clustering, passengers' historical ticket bookings were used to forecast the demand to come in a ticket booking period with least squares support vector machine. Three seat inventory control methods: non-nested booking limits, nested booking limits and bid-price control, were modeled under a single-fare class. Different seat inventory control methods were compared with the same demand based on ticket booking data of Train T15 from Beijing West to Guangzhou. The result shows that the dynamic non-nested booking limits control method performs the best, which gives railway operators evidence to adjust the remaining capacity in a ticket booking period.展开更多
Motivated by the huge practical engineering demand for the fundamental understanding of mechanical characteristics of high-speed railway infrastructure,a fullscale multi-functional test platform for high-speed railway...Motivated by the huge practical engineering demand for the fundamental understanding of mechanical characteristics of high-speed railway infrastructure,a fullscale multi-functional test platform for high-speed railway track–subgrade system is developed in this paper,and its main functions for investigating the mechanical performance of track–subgrade systems are elaborated with three typical experimental examples.Comprising the full-scale subgrade structure and all the five types of track structures adopted in Chinese high-speed railways,namely the CRTS I,the CRTS II and the CRTS III ballastless tracks,the double-block ballastless track and the ballasted track,the test platform is established strictly according to the construction standard of Chinese high-speed railways.Three kinds of effective loading methods are employed,including the real bogie loading,multi-point loading and the impact loading.Various types of sensors are adopted in different components of the five types of track–subgrade systems to measure the displacement,acceleration,pressure,structural strain and deformation,etc.Utilizing this test platform,both dynamic characteristics and long-term performance evolution of high-speed railway track–subgrade systems can be investigated,being able to satisfy the actual demand for large-scale operation of Chinese high-speed railways.As examples,three typical experimental studies are presented to elucidate the comprehensive functionalities of the full-scale multi-functional test platform for exploring the dynamic performance and its long-term evolution of ballastless track systems and for studying the long-term accumulative settlement of the ballasted track–subgrade system in high-speed railways.Some interesting phenomena and meaningful results are captured by the developed test platform,which provide a useful guidance for the scientific operation and maintenance of high-speed railway infrastructure.展开更多
The GIS is a tool that allows us to study the logic of the distribution of phenomena that occur on the Earth’s surface. In this article, we propose exploring its potential for historical research over long periods. H...The GIS is a tool that allows us to study the logic of the distribution of phenomena that occur on the Earth’s surface. In this article, we propose exploring its potential for historical research over long periods. Here, we present a Historical GIS (HGIS) of the railways of Europe for the period 1830-2010. This is a response to the need to carry out spatialtemporal analyses in order to evaluate the territorial impact of the railway and its influence on the distribution of population. The main objectives of this work are: to publicise the existence of this spatial database;to explain the approach followed in order to produce it;and to highlight some of the results that have already been achieved by using it. To date, the possibilities offered by HGIS have hardly been explored in research into the territorial impact of the railway. Similarly, until now, little work has been done in this area at the European scale. The most innovative aspects of this HGIS therefore lie in the methodology used and the subject treated.展开更多
Increasing railway traffic and energy utilization issues prompt electrified railway systems to be more economical,efficient and sustainable.As regenerative braking energy in railway systems has huge potential for opti...Increasing railway traffic and energy utilization issues prompt electrified railway systems to be more economical,efficient and sustainable.As regenerative braking energy in railway systems has huge potential for optimized utilization,a lot of research has been focusing on how to use the energy efficiently and gain sustainable benefits.The energy storage system is an alternative because it not only deals with regenerative braking energy but also smooths drastic fluctuation of load power profile and optimizes energy management.In this work,we propose a co-phase traction power supply system with super capacitor(CSS_SC)for the purpose of realizing the function of energy management and power quality management in electrified railways.Besides,the coordinated control strategy is presented to match four working modes,including traction,regenerative braking,peak shaving and valley filling.A corresponding simulation model is built in MATLAB/Simulink to verify the feasibility of the proposed system under dynamic working conditions.The results demonstrate that CSS_SC is flexible to deal with four different working conditions and can realize energy saving within the allowable voltage unbalance of 0.008%in simulation in contrast to 1.3%of the standard limit.With such a control strategy,the performance of super capacitor is controlled to comply with efficiency and safety constraints.Finally,a case study demonstrates the improvement in power fluctuation with the valley-to-peak ratio reduced by 20.3%and the daily load factor increased by 17.9%.展开更多
The internet of things(IoT)has been widely considered to be integrated with high-speed railways to improve safety and service.It is important to achieve reliable communication in IoT for railways(IoT-R)under high mobi...The internet of things(IoT)has been widely considered to be integrated with high-speed railways to improve safety and service.It is important to achieve reliable communication in IoT for railways(IoT-R)under high mobility scenarios and strict energy constraints.Orthogonal time frequency space(OTFS)modulation is a two-dimensional modulation technique that has the potential to overcome the challenges in high Doppler environments.In addition,OTFS can have lower peak-to-average power ratio(PAPR)compared to orthogonal frequency division multiplexing,which is especially important for the application of IoT-R.Therefore,OTFS modulation for IoT-R is investigated in this paper.In order to decrease PAPR of OTFS and promote the application of OTFS modulation in IoT-R,the peak windowing technique is used in this paper.This technique can reduce the PAPR of OTFS by reducing the peak power and does not require multiple iterations.The impacts of different window functions,window sizes and clipping levels on PAPR and bit error rate of OTFS are simulated and discussed.The simulation results show that the peak windowing technique can efficiently reduce the PAPR of OTFS for IoT-R.展开更多
The paper introduces some findings about a sensitivity analysis conducted on every geometrical and mechanical parameters which characterize the use of a railway superstructure at the high velocity. This analysis was c...The paper introduces some findings about a sensitivity analysis conducted on every geometrical and mechanical parameters which characterize the use of a railway superstructure at the high velocity. This analysis was carried out by implementing a forecast model that is derived from the simplified Gazetas and Dobry one. This model turns out to be particularly appropriate in the explication of problems connected to high velocity, since it evaluates both inertial and viscous effects activated by the moving load speed. The model implementation requires the transfer function determination that represents the action occurred by the bed surfaces on the railway and it therefore contains information concerning the geometrical and the mechanical characteristics of the embankment, of the ballast and of the sub-ballast. The transfer function H has been evaluated with the finite elements method and particularly, by resorting the ANSYS code with a harmonic structural analysis in the frequencies field. The authors, from the critic examination of the system's dynamics response in its entirety, glean a series of observations both of a general and a specific character, finally attaining a propose of a design modification of the standard railway superstructure at the high velocity of train operation adopted today especially in Italy.展开更多
In order to analyze the characteristics of wheel-rail vibration of the vertical section in a high-speed railway, a vehicle-line dynamics model is established using the dynamics software SIMPACK. Through this model, th...In order to analyze the characteristics of wheel-rail vibration of the vertical section in a high-speed railway, a vehicle-line dynamics model is established using the dynamics software SIMPACK. Through this model, the paper analyzes the influence of vertical section parameters, including vertical section slope and vertical curve radius, on wheel-rail dynamics interaction and the acting region of wheel-rail vibration. In addition, the characteristics of wheel- rail vibration of the vertical section under different velocities are investigated. The results show that the variation of wheel load is not sensitive to the vertical section slope but is greatly affected by the vertical curve radius. It was also observed that the smaller the vertical curve radius is, the more severe the interaction between the wheel and rail be- comes. Furthermore, the acting region of wheel-rail vibration expands with the vertical curve radius increasing. On another note, it is necessary to match the slope and vertical curve radius reasonably, on account of the influence of operation speed on the characteristics of wheel-rail vibration. This is especially important at the design stage of vertical sec- tions for lines of different grades.展开更多
This paper systematically analyzes and proves the favorable factors of utilizing the ports and the railways in Northeast China for the Asia-Europe land bridge transportation. It will be more beneficial to Dalian Port ...This paper systematically analyzes and proves the favorable factors of utilizing the ports and the railways in Northeast China for the Asia-Europe land bridge transportation. It will be more beneficial to Dalian Port and HaDa (Harbin-Dalian) and Binzhou (Harbin-Manzhouli) railways in Northeast China to the Siberia railway in Russia than 1) to other ports and the corresponding railways in China, 2) to the Nakhodka Port in Russia and the corresponding railways and 3) to the Chongjin Port in North Korea and the corresponding railways. This paper also puts forward the reform measures to adopt the ports and the railways in the northeast region in China for the land bridge transportation and the problems in transportation policies and management systems.展开更多
Purpose–This research aims to improve the performance of rail fastener defect inspection method for multi railways,to effectively ensure the safety of railway operation.Design/methodology/approach–Firstly,a fastener...Purpose–This research aims to improve the performance of rail fastener defect inspection method for multi railways,to effectively ensure the safety of railway operation.Design/methodology/approach–Firstly,a fastener region location method based on online learning strategy was proposed,which can locate fastener regions according to the prior knowledge of track image and template matching method.Online learning strategy is used to update the template library dynamically,so that the method not only can locate fastener regions in the track images of multi railways,but also can automatically collect and annotate fastener samples.Secondly,a fastener defect recognition method based on deep convolutional neural network was proposed.The structure of recognition network was designed according to the smaller size and the relatively single content of the fastener region.The data augmentation method based on the sample random sorting strategy is adopted to reduce the impact of the imbalance of sample size on recognition performance.Findings–Test verification of the proposed method is conducted based on the rail fastener datasets of multi railways.Specifically,fastener location module has achieved an average detection rate of 99.36%,and fastener defect recognition module has achieved an average precision of 96.82%.Originality/value–The proposed method can accurately locate fastener regions and identify fastener defect in the track images of different railways,which has high reliability and strong adaptability to multi railways.展开更多
基金supported in part by the Scientific Foundation for Outstanding Young Scientists of Sichuan under Grant No.2021JDJQ0032in part by the National Natural Science Foundation of China under Grant No.52107128in part by the Natural Science Foundation of Sichuan Province under Grant No.2022NSFSC0436.
文摘Traction power systems(TPSs)play a vital role in the operation of electrified railways.The transformation of conventional railway TPSs to novel structures is not only a trend to promote the development of electrified railways toward high-efficiency and resilience but also an inevitable requirement to achieve carbon neutrality target.On the basis of sorting out the power supply structures of conventional AC and DC modes,this paper first reviews the characteristics of the existing TPSs,such as weak power supply flexibility and low-energy efficiency.Furthermore,the power supply structures of various TPSs for future electrified railways are described in detail,which satisfy longer distance,low-carbon,high-efficiency,high-reliability and high-quality power supply requirements.Meanwhile,the application prospects of different traction modes are discussed from both technical and economic aspects.Eventually,this paper introduces the research progress of mixed-system electrified railways and traction power supply technologies without catenary system,speculates on the future development trends and challenges of TPSs and predicts that TPSs will be based on the continuous power supply mode,employing power electronic equipment and intelligent information technology to construct a railway comprehensive energy system with renewable energy.
基金Sponsored by Basic Ability Enhancement Program for Young and Middle-aged Teachers in Colleges and Universities in Guangxi(2024KY0683).
文摘The railways have significantly contributed to the economic development of the city.However,with the evolution of the city and adjustments in the industrial structure,the relocation and rerouting of major railway trunk lines have resulted in the abandonment of numerous urban railways.The abandoned railways,resulting from inadequate management,have transformed into sites for waste disposal and are particularly vulnerable to environmental issues,including land pollution,degradation of vegetation cover,and a decline in ecological diversity.Abandoned railways in urban centers significantly hinder transportation connectivity and adversely influence the aesthetic appeal of the city.The landscape transformation of these abandoned railways is of paramount importance in the context of urban renewal.These railway sites possess significant potential for stock utilization as specialized,underutilized spaces.Through the processes of re-planning,integration,and renewal,previously underutilized spaces can be revitalized and incorporated into the urban landscape in innovative ways.This approach not only enhances the availability of green leisure areas for residents but also contributes to the realization of sustainable urban development.
基金supported by Beijing Natural Science Foundation(L212029,L221009)the National Natural Science Foundation of China(62271043,62371033)the Ministry of Education of China(8091B032123).
文摘An emerging railway technology called smart railway promises to deliver higher transportation efficiency,enhanced comfort in services,and greater eco-friendliness.The smart railway is expected to integrate fifth-generation mobile communication(5G),Artificial Intelligence(AI),and other technologies,which poses new problems in the construction,operation and maintenance of railway wireless networks.Wireless Digital Twins(DTs),which have recently emerged as a new paradigm for the design of wireless networks,can address these problems and enable the whole lifecycle management of railway wireless networks.However,there are still many scientific issues and challenges for railway-oriented wireless DT.Relevant key technologies to solve these problems are introduced and described,including characterization of materials'physical-EM properties,autonomous reconstruction of Three-dimensional(3D)environment model,AI-empowered environmental cognition,Ray-Tracing(RT),model-based and AIbased RT acceleration,and generation of multi-spectra sensing data.Moreover,this paper presents our research results for each key technology and describes the wireless network planning and optimization system based on highperformance RT developed by our laboratory.This paper outlines the framework for realizing the wireless DT of smart railways,providing the direction for future research.
基金the China Railway Wuhan Bureau Group Co.,Ltd.under the 2023 Science and Technology Research and Development Plan(Second Batch)(Wuhan Railway Science and Information Letter[2023]No.269),classification code 23GD07.
文摘Purpose–The purpose of this study is to address the deficiency in safety monitoring technology for 27.5 kV high-voltage cables within the railway traction power supply by analyzing the grounding methods employed in high-speed railways and developing an effective monitoring solution.Design/methodology/approach–Through establishing a mathematical model of induced potential in the cable sheath and analyzing its influencing factors,the principle of grounding current monitoring is proposed.Furthermore,the accuracy of data collection and alarm function of the monitoring equipment were verified through laboratory simulation experiments.Finally,through practical application in the traction substation of the railway bureau on site,a large amount of data were collected to verify the stability and reliability of the monitoring system in actual environments.Findings–The experimental results show that the designed monitoring system can effectively monitor the grounding current of high-voltage cables and respond promptly to changes in cable insulation status.The system performs excellently in terms of data collection accuracy,real-time performance and reliability of alarm functions.In addition,the on-site trial results further confirm the accuracy and reliability of the monitoring system in practical applications,providing strong technical support for the safe operation of highspeed railway traction power supply systems.Originality/value–This study innovatively develops a 27.5kV high-voltage cable grounding current monitoring system,which provides a new technical means for evaluating the insulation status of cables by accurately measuring the grounding current.The design,experimental verification and application of this system in high-speed railway traction power supply systems have demonstrated significant academic value and practical significance,contributing innovative solutions to the field of railway power supply safety monitoring.
基金supported by the National Natural Science Foundation of China (Grant No. 52372425)the Fundamental Research Funds for the Central Universities (Science and Technology Leading Talent Team Poject) Grant No. 2022JBXT010。
文摘During the operation of sandy railways, the challenge posed by wind-blown sand is a persistent issue. An in-depth study on the influence of wind-blown sand content on the macroscopic and microscopic mechanical properties of the ballast bed is of great significance for understanding the potential problems of sandy railways and proposing reasonable and adequate maintenance and repair strategies. Building upon existing research, this study proposes a new assessment indicator for sand content. Utilizing the discrete element method(DEM) and fully considering the complex interactions between ballast and sand particles, three-dimensional(3D) multi-scale analysis models of sandy ballast beds with different wind-blown sand contents are established and validated through field experiments. The effects of varying wind-blown sand content on the microscopic contact distribution and macroscopic mechanical behavior(such as resistance and support stiffness) of ballast beds are carefully analyzed. The results show that with the increase in sand content, the average contact force and coordination number between ballast particles gradually decrease, and the disparity in contact forces between different layers of the ballast bed diminishes. The longitudinal and lateral resistance of the ballast bed initially decreases and then increases, with a critical point at 10% sand content. At 15% sand content, the lateral resistance is mainly shared by the ballast shoulder. The longitudinal resistance sharing ratio is always the largest on the sleeper side, followed by that at the sleeper bottom, and the smallest on the ballast shoulder. When the sand content exceeds 10%, the contribution of sand particles to stiffness significantly increases, leading to an accelerated growth rate of the overall support stiffness of the ballast bed, which is highly detrimental to the long-term service performance of the ballast bed. In conclusion, it is recommended that maintenance and repair operations should be promptly conducted when the sand content of the ballast bed reaches or exceeds 10%.
基金supported by the National Natural Science Foundation of China(Nos.U19A20105,51837009,51807167,51922090,U1966602 and 52077182)the Scientific and Technological Funds for Young Scientists of Sichuan(No.2019JDJQ0019)。
文摘As the unique power entrance,the pantograph-catenary electrical contact system maintains the efficiency and reliability of power transmission for the high-speed train.Along with the fast development of high-speed railways all over the world,some commercialized lines are built for covering the remote places under harsh environment,especially in China;these environmental elements including wind,sand,rain,thunder,ice and snow need to be considered during the design of the pantograph-catenary system.The pantograph-catenary system includes the pantograph,the contact wire and the interface—pantograph slide.As the key component,this pantograph slide plays a critical role in reliable power transmission under dynamic condition.The fundamental material characteristics of the pantograph slide and contact wire such as electrical conductivity,impact resistance,wear resistance,etc.,directly determine the sliding electrical contact performance of the pantograph-catenary system;meanwhile,different detection methods of the pantograph-catenary system are crucial for the reliability of service and maintenance.In addition,the challenges brought from extreme operational conditions are discussed,taking the Sichuan-Tibet Railway currently under construction as a special example with the high-altitude climate.The outlook for developing the ultra-high-speed train equipped with the novel pantograph-catenary system which can address the harsher operational environment is also involved.This paper has provided a comprehensive review of the high-speed railway pantograph-catenary systems,including its progress,challenges,outlooks in the history and future.
基金National Natural Science Foundation of China under Grant Nos.51622803,51378177 and 51420105013the 111 Project under Grant No.B13024
文摘Piled embankments,which offer many advantages,are increasingly popular in construction of high-speed railways in China.Although the performance of piled embankment under static loading is well-known,the behavior under the dynamic train load of a high-speed railway is not yet understood.In light of this,a heavily instrumented piled embankment model was set up,and a model test was carried out,in which a servo-hydraulic actuator outputting M-shaped waves was adopted to simulate the process of a running train.Earth pressure,settlement,strain in the geogrid and pile and excess pore water pressure were measured.The results show that the soil arching height under the dynamic train load of a high-speed railway is shorter than under static loading.The growth trend for accumulated settlement slowed down after long-term vibration although there was still a tendency for it to increase.Accumulated geogrid strain has an increasing tendency after long-term vibration.The closer the embankment edge,the greater the geogrid strain over the subsoil.Strains in the pile were smaller under dynamic train loads,and their distribution was different from that under static loading.At the same elevation,excess pore water pressure under the track slab was greater than that under the embankment shoulder.
基金supported by Climate Change Special Project of China Meteorological Administration(No CCSF2011-14)
文摘Based on the annual production data collected by the Statistic Center of the Ministry of Railways of the People's Republic of China, we calculated the energy saving and direct emission reductions of CO2, soot, SO2, CO, NOx and CnHm of electrified railways, and analyzed their dynamic characteristics during the period of 1975 2007. The results show that during this period, the annual mean values of energy saving is 1.23×10^6 tce, and direct emission reduction of CO2, soot, SO2, CO, NOx and CnHm are 4.267×10^6 t, 20.5×10^3 t, 3.0×10^3 t, 9.6×10^3 t, 67.9×10^3 t, and 6.9×10^3 t per year, respectively. The annual average increasing rates of energy saving is 139×10^3 tce, and direct emission reduction of CO2, soot, SO2, CO, NOx and CnHm are 483×10^3 t, 2.3×10^3 t, 0.34×10^3 t, 1.1×10^3 t, 7.7 ×10^3 t and 0.78×10^3 t per year, respectively. The electrified railways have played an important role in decreasing the energy consumption and air pollutant emissions of China's railway system. The results of this study could provide some reference knowledge for future reductions of energy consumption and waste gas emission in China's railway transportation.
基金funded by FCT (Fun- dacāo Ciência e Tecnologia) under grant PD/BD/128051/2016the Shift2Rail In2Stempo project (grant 777515)+3 种基金partially supported by FCT R&D Unit SYSTEC—POCI-01-0145-FEDER-006933SYSTEC funded by FEDER funds through COMPETE2020by national funds through the FCT/MECco-funded by FEDER, in the scope of the PT2020 Partnership Agreement。
文摘The high dynamic power requirements present in modern railway transportation systems raise research challenges for an optimal operation of railway electrification. This paper presents a Monte Carlo analysis on the application of a power transfer device installed in the neutral zone and exchanging active power between two sections. The main analyzed parameters are the active power balance in the two neighbor traction power substations and the system power losses. A simulation framework is presented to comprise the desired analysis and a universe of randomly distributed scenarios are tested to evaluate the effectiveness of the power transfer device system. The results show that the density of trains and the relative branch length of a traction power substation should be considered in the evaluation phase of the best place to install a power transfer device, towards the reduction of the operational power losses, while maintaining the two substations balanced in terms of active power.
文摘High Speed Railway (HSR) provides its customers not only safety, security, comfort and on-time commuting, but also a fast transportation alternative to air travel or regular passenger rail services. Providing these benefits would not be possible without the tremendous growth and prevalence of wireless communication technologies. Due to advances in wireless communication systems, both trains and passengers are connected through high speed wireless networks to the Internet, data centers and railroad control centers. Railroad communities, academia, related industries and standards bodies, even the European Space Agency, are involved in advancing developments of HSR for highly connected train communication systems. The goal of these efforts is to provide the capabilities for uninterrupted high-speed fault-tolerant communication networks for all possible geographic, structural and weather conditions. This survey provides an overview of the current state-of-the-art and future trends for wireless technologies aiming to realize the concept of HSR communication services. Our goal is to highlight the challenges for these technologies, including GSM-R, Wi-Fi, WIMAX, LTE-R, RoF, LCX & Cognitive Radio, the offered solutions, their performance, and other related issues. Currently, providing HSR services is the goal of many countries across the globe. Europe, Japan & Taiwan, China, as well as North & South America have increased their efforts to advance HSR technologies to monitor and control not only the operations but also to deliver extensive broadband solutions to passengers. This survey determined a trend of the industry to transition control plane operations towards narrowband frequencies, i.e. LTE400/700, and to utilize concurrently other technologies for broadband access for passengers such that services of both user and train control systems are supported. With traditional technologies, a tradeoff was required and often favored train control services over passenger amenities. However, with the advances in communication systems, such as LTE-R and cognitive radios, it is becoming possible for system designers to offer rich services to passengers while also providing support for enhanced train control operations such as Positive Train Control.
基金Finnish Transport Agency for enabling the research
文摘Seasonally cold climate and resulting frost action set great demands to railway track substructure in order to maintain Irack geomelry. Chal- lenges culminate on high-speed lines, where the tolerances for roughness are the tightest. Problems may result in highly increased Irack maintenance and need for temporary speed reslrictions. The causes of frost action can be associated with subsoil, subballast or ballast. The major concern in frost protection is to avoid the freezing of frost susceptible subsoil by using sufficient thickness of subballast and relying on non-fi'ost-susctible subballast material. This paper provides an overview of the main research findings on the role of ballast, subballast and subsoil in frost acedon. In new comlruclion the material specificalions, design procedures and construction methods have been developed to ensure adequate performance of Irack subscatt, but special challenges exist in managing existing Wacks that were not designed for modem requirements. In order to perform cost-effective and sustainable track maintenance, it is necessary to recognize the problem areas and define the root-causes of problems. For locating the problem sections and defining the causes of defects, a sophisticated analysis based on integration of track geometry and ground penetrating radar (GPR) data has been developed and is summarized in this paper,
基金Project(2009BAG12A10)supported by the State Technical Support Program of ChinaProject(71201009)supported by National Natural Science Foundation of ChinaProject(RCS2009ZT009)supported by the State Key Laboratory of Rail Traffic Control and Safety,Beijing Jiaotong University,China
文摘Railway seat inventory control strategies play a crucial role in the growth of profit and train load factor. The railway passenger seat inventory control problem in China was addressed. Chinese passenger railway operation features and seat inventory control practice were analyzed firstly. A dynamic demand forecasting method was introduced to forecast the coming demand in a ticket booking period. By clustering, passengers' historical ticket bookings were used to forecast the demand to come in a ticket booking period with least squares support vector machine. Three seat inventory control methods: non-nested booking limits, nested booking limits and bid-price control, were modeled under a single-fare class. Different seat inventory control methods were compared with the same demand based on ticket booking data of Train T15 from Beijing West to Guangzhou. The result shows that the dynamic non-nested booking limits control method performs the best, which gives railway operators evidence to adjust the remaining capacity in a ticket booking period.
基金This work was supported by the National Natural Science Foundation of China[Grant Nos.11790283,51978587,51708457]the Program of Introducing Talents of Discipline to Universities(111 Project)[Grant No.B16041].
文摘Motivated by the huge practical engineering demand for the fundamental understanding of mechanical characteristics of high-speed railway infrastructure,a fullscale multi-functional test platform for high-speed railway track–subgrade system is developed in this paper,and its main functions for investigating the mechanical performance of track–subgrade systems are elaborated with three typical experimental examples.Comprising the full-scale subgrade structure and all the five types of track structures adopted in Chinese high-speed railways,namely the CRTS I,the CRTS II and the CRTS III ballastless tracks,the double-block ballastless track and the ballasted track,the test platform is established strictly according to the construction standard of Chinese high-speed railways.Three kinds of effective loading methods are employed,including the real bogie loading,multi-point loading and the impact loading.Various types of sensors are adopted in different components of the five types of track–subgrade systems to measure the displacement,acceleration,pressure,structural strain and deformation,etc.Utilizing this test platform,both dynamic characteristics and long-term performance evolution of high-speed railway track–subgrade systems can be investigated,being able to satisfy the actual demand for large-scale operation of Chinese high-speed railways.As examples,three typical experimental studies are presented to elucidate the comprehensive functionalities of the full-scale multi-functional test platform for exploring the dynamic performance and its long-term evolution of ballastless track systems and for studying the long-term accumulative settlement of the ballasted track–subgrade system in high-speed railways.Some interesting phenomena and meaningful results are captured by the developed test platform,which provide a useful guidance for the scientific operation and maintenance of high-speed railway infrastructure.
文摘The GIS is a tool that allows us to study the logic of the distribution of phenomena that occur on the Earth’s surface. In this article, we propose exploring its potential for historical research over long periods. Here, we present a Historical GIS (HGIS) of the railways of Europe for the period 1830-2010. This is a response to the need to carry out spatialtemporal analyses in order to evaluate the territorial impact of the railway and its influence on the distribution of population. The main objectives of this work are: to publicise the existence of this spatial database;to explain the approach followed in order to produce it;and to highlight some of the results that have already been achieved by using it. To date, the possibilities offered by HGIS have hardly been explored in research into the territorial impact of the railway. Similarly, until now, little work has been done in this area at the European scale. The most innovative aspects of this HGIS therefore lie in the methodology used and the subject treated.
文摘Increasing railway traffic and energy utilization issues prompt electrified railway systems to be more economical,efficient and sustainable.As regenerative braking energy in railway systems has huge potential for optimized utilization,a lot of research has been focusing on how to use the energy efficiently and gain sustainable benefits.The energy storage system is an alternative because it not only deals with regenerative braking energy but also smooths drastic fluctuation of load power profile and optimizes energy management.In this work,we propose a co-phase traction power supply system with super capacitor(CSS_SC)for the purpose of realizing the function of energy management and power quality management in electrified railways.Besides,the coordinated control strategy is presented to match four working modes,including traction,regenerative braking,peak shaving and valley filling.A corresponding simulation model is built in MATLAB/Simulink to verify the feasibility of the proposed system under dynamic working conditions.The results demonstrate that CSS_SC is flexible to deal with four different working conditions and can realize energy saving within the allowable voltage unbalance of 0.008%in simulation in contrast to 1.3%of the standard limit.With such a control strategy,the performance of super capacitor is controlled to comply with efficiency and safety constraints.Finally,a case study demonstrates the improvement in power fluctuation with the valley-to-peak ratio reduced by 20.3%and the daily load factor increased by 17.9%.
基金supported by the National Key R&D Program of China under Grant 2022YFF0608103the National Natural Science Foundation of China under Grant 62001519 and 62271037。
文摘The internet of things(IoT)has been widely considered to be integrated with high-speed railways to improve safety and service.It is important to achieve reliable communication in IoT for railways(IoT-R)under high mobility scenarios and strict energy constraints.Orthogonal time frequency space(OTFS)modulation is a two-dimensional modulation technique that has the potential to overcome the challenges in high Doppler environments.In addition,OTFS can have lower peak-to-average power ratio(PAPR)compared to orthogonal frequency division multiplexing,which is especially important for the application of IoT-R.Therefore,OTFS modulation for IoT-R is investigated in this paper.In order to decrease PAPR of OTFS and promote the application of OTFS modulation in IoT-R,the peak windowing technique is used in this paper.This technique can reduce the PAPR of OTFS by reducing the peak power and does not require multiple iterations.The impacts of different window functions,window sizes and clipping levels on PAPR and bit error rate of OTFS are simulated and discussed.The simulation results show that the peak windowing technique can efficiently reduce the PAPR of OTFS for IoT-R.
文摘The paper introduces some findings about a sensitivity analysis conducted on every geometrical and mechanical parameters which characterize the use of a railway superstructure at the high velocity. This analysis was carried out by implementing a forecast model that is derived from the simplified Gazetas and Dobry one. This model turns out to be particularly appropriate in the explication of problems connected to high velocity, since it evaluates both inertial and viscous effects activated by the moving load speed. The model implementation requires the transfer function determination that represents the action occurred by the bed surfaces on the railway and it therefore contains information concerning the geometrical and the mechanical characteristics of the embankment, of the ballast and of the sub-ballast. The transfer function H has been evaluated with the finite elements method and particularly, by resorting the ANSYS code with a harmonic structural analysis in the frequencies field. The authors, from the critic examination of the system's dynamics response in its entirety, glean a series of observations both of a general and a specific character, finally attaining a propose of a design modification of the standard railway superstructure at the high velocity of train operation adopted today especially in Italy.
基金support and motivation provided by the National Natural Science Foundation of China (No. 51075340)the Fok YingTong Education Foundation for Young Teachers in the Higher Education Institutions of China (No. 121075)the Program for Innovation Research Team in University in China (No. IRT1178)
文摘In order to analyze the characteristics of wheel-rail vibration of the vertical section in a high-speed railway, a vehicle-line dynamics model is established using the dynamics software SIMPACK. Through this model, the paper analyzes the influence of vertical section parameters, including vertical section slope and vertical curve radius, on wheel-rail dynamics interaction and the acting region of wheel-rail vibration. In addition, the characteristics of wheel- rail vibration of the vertical section under different velocities are investigated. The results show that the variation of wheel load is not sensitive to the vertical section slope but is greatly affected by the vertical curve radius. It was also observed that the smaller the vertical curve radius is, the more severe the interaction between the wheel and rail be- comes. Furthermore, the acting region of wheel-rail vibration expands with the vertical curve radius increasing. On another note, it is necessary to match the slope and vertical curve radius reasonably, on account of the influence of operation speed on the characteristics of wheel-rail vibration. This is especially important at the design stage of vertical sec- tions for lines of different grades.
文摘This paper systematically analyzes and proves the favorable factors of utilizing the ports and the railways in Northeast China for the Asia-Europe land bridge transportation. It will be more beneficial to Dalian Port and HaDa (Harbin-Dalian) and Binzhou (Harbin-Manzhouli) railways in Northeast China to the Siberia railway in Russia than 1) to other ports and the corresponding railways in China, 2) to the Nakhodka Port in Russia and the corresponding railways and 3) to the Chongjin Port in North Korea and the corresponding railways. This paper also puts forward the reform measures to adopt the ports and the railways in the northeast region in China for the land bridge transportation and the problems in transportation policies and management systems.
基金funded by the Key Research and Development Project of China Academy of Railway Sciences Corporation Limited(2021YJ310).
文摘Purpose–This research aims to improve the performance of rail fastener defect inspection method for multi railways,to effectively ensure the safety of railway operation.Design/methodology/approach–Firstly,a fastener region location method based on online learning strategy was proposed,which can locate fastener regions according to the prior knowledge of track image and template matching method.Online learning strategy is used to update the template library dynamically,so that the method not only can locate fastener regions in the track images of multi railways,but also can automatically collect and annotate fastener samples.Secondly,a fastener defect recognition method based on deep convolutional neural network was proposed.The structure of recognition network was designed according to the smaller size and the relatively single content of the fastener region.The data augmentation method based on the sample random sorting strategy is adopted to reduce the impact of the imbalance of sample size on recognition performance.Findings–Test verification of the proposed method is conducted based on the rail fastener datasets of multi railways.Specifically,fastener location module has achieved an average detection rate of 99.36%,and fastener defect recognition module has achieved an average precision of 96.82%.Originality/value–The proposed method can accurately locate fastener regions and identify fastener defect in the track images of different railways,which has high reliability and strong adaptability to multi railways.