Self-anchored suspension bridge is composed of tower and its foundation, stiffened beam, main cable, sling, side pier and its foundation, auxiliary pier and its foundation. The performance and importance of the compon...Self-anchored suspension bridge is composed of tower and its foundation, stiffened beam, main cable, sling, side pier and its foundation, auxiliary pier and its foundation. The performance and importance of the components of the bridge are different. The main tower of self-anchored suspension bridge is a very important component. Once the injury and damage occur under earthquake, it is not only difficult to inspect and repair, let alone replace. This paper calculates the seismic performance of self-anchored suspen-sion bridge steel tower based on the application of Wuhan Gutian Bridge steel tower.展开更多
Compared to the conventional two-tower suspension bridge, the three-tower suspension bridge has obviously different characteristics in structural performance because of the extra middle tower and main span. The constr...Compared to the conventional two-tower suspension bridge, the three-tower suspension bridge has obviously different characteristics in structural performance because of the extra middle tower and main span. The construction sequence for the stiffening girder is significantly different between the three-tower suspension bridge and the two-tower suspension bridge. The tangential angle of the main cable is one of the controlling factors of the stiffening girder erection stage for a suspension bridge. According to 5 feasible cases for the stiffening girder erection scheme in Taizhou Bridge, the research about the tangential angle in each case mentioned above was made, and some factors that should be taken into account for the erection scheme of stiffening girder were pointed out.展开更多
Taizhou Bridge, located at the middle of Jiangsu Province, connecting Taizhou City and Zhenjiang City, started in Dec. 2007. The bridge is the first kilometer level three-pylon suspension bridge in the world, and it a...Taizhou Bridge, located at the middle of Jiangsu Province, connecting Taizhou City and Zhenjiang City, started in Dec. 2007. The bridge is the first kilometer level three-pylon suspension bridge in the world, and it adopts longitudinal herringbone shape steel middle pylon for the first time in the world. The foundation of the middle tower is the deepest underwater caisson in soil on earth. A great many of technical innovations such as the design techniques of three-pylon suspension bridge,precisely locating and bottom-sealing techniques of the large scale caisson foundation, manufacturing, combination techniques of steel and concrete in the middle tower, welding of extra thick steel plate, manufacture and control techniques of abnormal sections of the middle tower and so on were introduced.展开更多
文摘Self-anchored suspension bridge is composed of tower and its foundation, stiffened beam, main cable, sling, side pier and its foundation, auxiliary pier and its foundation. The performance and importance of the components of the bridge are different. The main tower of self-anchored suspension bridge is a very important component. Once the injury and damage occur under earthquake, it is not only difficult to inspect and repair, let alone replace. This paper calculates the seismic performance of self-anchored suspen-sion bridge steel tower based on the application of Wuhan Gutian Bridge steel tower.
基金National Science and Technology Support Program of China(No.2009BAG15B02)Key Programs for Science and Technology Development of Chinese Transportation Industry(No.2008-353-332-190)
文摘Compared to the conventional two-tower suspension bridge, the three-tower suspension bridge has obviously different characteristics in structural performance because of the extra middle tower and main span. The construction sequence for the stiffening girder is significantly different between the three-tower suspension bridge and the two-tower suspension bridge. The tangential angle of the main cable is one of the controlling factors of the stiffening girder erection stage for a suspension bridge. According to 5 feasible cases for the stiffening girder erection scheme in Taizhou Bridge, the research about the tangential angle in each case mentioned above was made, and some factors that should be taken into account for the erection scheme of stiffening girder were pointed out.
基金National Science and Technology Support Program of China ( No. 2009BAG15B01)Key Programs for Science and Technology Development of Chinese Transportation Industry( No. 2008-353-332-190)
文摘Taizhou Bridge, located at the middle of Jiangsu Province, connecting Taizhou City and Zhenjiang City, started in Dec. 2007. The bridge is the first kilometer level three-pylon suspension bridge in the world, and it adopts longitudinal herringbone shape steel middle pylon for the first time in the world. The foundation of the middle tower is the deepest underwater caisson in soil on earth. A great many of technical innovations such as the design techniques of three-pylon suspension bridge,precisely locating and bottom-sealing techniques of the large scale caisson foundation, manufacturing, combination techniques of steel and concrete in the middle tower, welding of extra thick steel plate, manufacture and control techniques of abnormal sections of the middle tower and so on were introduced.