Based on global initiatives such as the clean energy transition and the development of renewable energy,the pumped storage power station has become a new and significant way of energy storage and regulation,and its co...Based on global initiatives such as the clean energy transition and the development of renewable energy,the pumped storage power station has become a new and significant way of energy storage and regulation,and its construction environment is more complex than that of a traditional reservoir.In particular,the stability of the rock strata in the underground reservoirs is affected by the seepage pressure and rock stress,which presents some challenges in achieving engineering safety and stability.Using the advantages of the numerical simulation method in dealing deal with nonlinear problems in engineering stability,in this study,the stability of the underground reservoir of the Shidangshan(SDS)pumped storage power station was numerically calculated and quantitatively analyzed based on fluid-structure coupling theory,providing an important reference for the safe operation and management of the underground reservoir.First,using the COMSOL software,a suitablemechanicalmodel was created in accordance with the geological structure and project characteristics of the underground reservoir.Next,the characteristics of the stress field,displacement field,and seepage field after excavation of the underground reservoir were simulated in light of the seepage effect of groundwater on the nearby rock of the underground reservoir.Finally,based on the construction specifications and Molar-Coulomb criterion,a thorough evaluation of the stability of the underground reservoir was performed through simulation of the filling and discharge conditions and anti-seepage strengthening measures.The findings demonstrate that the numerical simulation results have a certain level of reliability and are in accordance with the stress measured in the project area.The underground reservoir excavation resulted in a maximum displacement value of the rock mass around the caverns of 3.56 mm in a typical section,and the safety coefficient of the parts,as determined using the Molar-Coulomb criterion,was higher than 1,indicating that the project as a whole is in a stable state.展开更多
In the present study,multimodel ensemble forecast experiments of the global horizontal irradiance(GHI)were conducted using the dynamic variable weight technique.The study was based on the forecasts of four numerical m...In the present study,multimodel ensemble forecast experiments of the global horizontal irradiance(GHI)were conducted using the dynamic variable weight technique.The study was based on the forecasts of four numerical models,namely,the China Meteorological Administration Wind Energy and Solar Energy Prediction System,the Mesoscale Weather Numerical Prediction System of China Meteorological Administration,the China Meteorological Administration Regional Mesoscale Numerical Prediction System-Guangdong,and the Weather Research and Forecasting Model-Solar,and observational data from four photovoltaic(PV)power stations in Yangjiang City,Guangdong Province.The results show that compared with those of the monthly optimal numerical model forecasts,the dynamic variable weight-based ensemble forecasts exhibited 0.97%-15.96%smaller values of the mean absolute error and 3.31%-18.40%lower values of the root mean square error(RMSE).However,the increase in the correlation coefficient was not obvious.Specifically,the multimodel ensemble mainly improved the performance of GHI forecasts below 700 W m^(-2),particularly below 400 W m^(-2),with RMSE reductions as high as 7.56%-28.28%.In contrast,the RMSE increased at GHI levels above 700 W m^(-2).As for the key period of PV power station output(02:00-07:00),the accuracy of GHI forecasts could be improved by the multimodel ensemble:the multimodel ensemble could effectively decrease the daily maximum absolute error(AE max)of GHI forecasts.Moreover,with increasing forecasting difficulty under cloudy conditions,the multimodel ensemble,which yields data closer to the actual observations,could simulate GHI fluctuations more accurately.展开更多
A Beidou 3(BD3)system-based power reference station can provide high-precision time synchronization for power distribution systems by sending synchronization data packets to devices in a multi-hop routing fashion.Howe...A Beidou 3(BD3)system-based power reference station can provide high-precision time synchronization for power distribution systems by sending synchronization data packets to devices in a multi-hop routing fashion.However,optimizing route selection to reduce both time synchronization error and delay is a challenging problem.In this paper,we establish a software-defined network-enabled power reference station time synchronization framework based on BD3.Then,we formulate the joint problem to minimize cumulative synchronization error and delay through multi-hop route selection optimization.A back propagation(BP)neural network-improved intelligent time synchronization route selection algorithm named BP-RS is proposed to learn the optimal route selection,which uses a BP neural network to dynamically adjust the exploration factor to achieve rapid convergence.Simulation results show the superior performance of BP-RS in synchronization delay,synchronization error,and adaptability with changing routing topologies.展开更多
Since it was first proposed,the space solar power station(SSPS)has attracted great attention all over the world;it is a huge space system and provides energy for Earth.Although several schemes and abundant studies on ...Since it was first proposed,the space solar power station(SSPS)has attracted great attention all over the world;it is a huge space system and provides energy for Earth.Although several schemes and abundant studies on the SSPS have been proposed and conducted,it is still not realized.The reason why SSPS is still an idea is not only because it is a giant and complex project,but also due to the requirement for various excellent space materials.Among the diverse required materials,we believe energy materials are the most important.Herein,we review the space energy conversion materials for the SSPS.展开更多
To improve the operation efficiency of the photovoltaic power station complementary power generation system,an optimal allocation model of the photovoltaic power station complementary power generation capacity based o...To improve the operation efficiency of the photovoltaic power station complementary power generation system,an optimal allocation model of the photovoltaic power station complementary power generation capacity based on PSO-BP is proposed.Particle Swarm Optimization and BP neural network are used to establish the forecasting model,the Markov chain model is used to correct the forecasting error of the model,and the weighted fitting method is used to forecast the annual load curve,to complete the optimal allocation of complementary generating capacity of photovoltaic power stations.The experimental results show that thismethod reduces the average loss of photovoltaic output prediction,improves the prediction accuracy and recall rate of photovoltaic output prediction,and ensures the effective operation of the power system.展开更多
Because of the randomness of wind power and photovoltaic(PV)output of new energy bases,the problem of peak regulation capability and voltage stability of ultra-high voltage direct current(UHVDC)transmission lines,we p...Because of the randomness of wind power and photovoltaic(PV)output of new energy bases,the problem of peak regulation capability and voltage stability of ultra-high voltage direct current(UHVDC)transmission lines,we proposed an optimum allocation method of installed capacity of the solar-thermal power station based on chance constrained programming in this work.Firstly,we established the uncertainty model of wind power and PV based on the chance constrained planning theory.Then we used the K-medoids clusteringmethod to cluster the scenarios considering the actual operation scenarios throughout the year.Secondly,we established the optimal configuration model based on the objective function of the strongest transient voltage stability and the lowest overall cost of operation.Finally,by quantitative analysis of actual wind power and photovoltaic new energy base,this work verified the feasibility of the proposed method.As a result of the simulations,we found that using the optimal configuration method of solar-thermal power stations could ensure an accurate allocation of installed capacity.When the installed capacity of the solar-thermal power station is 1×106 kW,the transient voltage recovery index(TVRI)is 0.359,which has a strong voltage support capacity for the system.Based on the results of this work,the optimal configuration of the installed capacity of the solar-thermal power plant can improve peak shaving performance,transient voltage support capability,and new energy consumption while satisfying the Direct Current(DC)outgoing transmission premise.展开更多
The virtual synchronous generator(VSG)can simulate synchronous machine’s operation mechanism in the control link of an energy storage converter,so that an electrochemical energy storage power station has the ability ...The virtual synchronous generator(VSG)can simulate synchronous machine’s operation mechanism in the control link of an energy storage converter,so that an electrochemical energy storage power station has the ability to actively support the power grid,from passive regulation to active support.Since energy storage is an important physical basis for realizing the inertia and damping characteristics in VSG control,energy storage constraints of the physical characteristics on the system control parameters are analyzed to provide a basis for the system parameter tuning.In a classic VSG control,its virtual inertia and damping coefficient remain unchanged.When the grid load changes greatly,the constant control strategy most likely result in the grid frequency deviation beyond the stable operation standard limitations.To solve this problem,a comprehensive control strategy considering electrified wire netting demand and energy storage unit state of charge(SOC)is proposed,and an adaptive optimization method of VSG parameters under different SOC is given.The energy storage battery can maintain a safe working state at any time and be smoothly disconnected,which can effectively improve the output frequency performance of energy storage system.Simulation results further demonstrated the effectiveness of the VSG control theoretical analysis.展开更多
This paper is devoted to development and study of models for operator training systems of heating power station processes management. It proposed a mathematical model describing the management processes of heating pow...This paper is devoted to development and study of models for operator training systems of heating power station processes management. It proposed a mathematical model describing the management processes of heating power units of the technological complex considering the relationship of technological variables in deviations effective in real time. A software complex is developed for the system of training of operators controlling processes in heating station units. Obtained results may be used in the course of development of computer training systems for operators of heating power stations with cross-linkage.展开更多
[Objective] The aim was to analyze characters of solar energy in photo- voltaic power stations in Shandong Province. [Method] The models of total solar radiation and scattered radiation were determined, and solar ener...[Objective] The aim was to analyze characters of solar energy in photo- voltaic power stations in Shandong Province. [Method] The models of total solar radiation and scattered radiation were determined, and solar energy resources in pho-tovoltaic power stations were evaluated based on illumination in horizontal plane and cloud data in 123 counties or cities and observed information in Jinan, Fushan and Juxian in 1988-2008. [Result] Solar energy in northern regions in Shandong proved most abundant, which is suitable for photovoltaic power generation; the optimal angle of tilt of photovoltaic array was at 35°, decreasing by 2°-3° compared with local latitude. Total solar radiation received by the slope with optimal angle of tilt exceeded 1 600 kw.h/(m2.a), increasing by 16% compared with horizontal planes. The maximal irradiance concluded by WRF in different regions tended to be volatile in 1 020-1 060 W/m2. [Conclusion] The research provides references for construction of photovoltaic power stations in Shandong Province.展开更多
This study investigated the influence of precipitators and wet flue gas desulfurization equipment on characteristics of PM_(2.5)emission from coal-fired power stations.We measured size distribution and removal efficie...This study investigated the influence of precipitators and wet flue gas desulfurization equipment on characteristics of PM_(2.5)emission from coal-fired power stations.We measured size distribution and removal efficiencies,including hybrid electrostatic precipitator/bag filters(ESP/BAGs)which have rarely been studied.A bimodal distribution of particle concentrations was observed at the inlet of each precipitator.After the precipitators,particle concentrations were significantly reduced.Although a bimodal distribution was still observed,all peak positions shifted to the smaller end.The removal efficiencies of hybrid ESP/BAGs reached 99%for PM_(2.5),which is considerably higher than those for other types of precipitators.In particular,the influence of hybrid ESP/BAG operating conditions on the performance of dust removal was explored.The efficiency of hybrid ESP/BAGs decreased by 1.9%when the first electrostatic field was shut down.The concentrations and distributions of particulate matter were also measured in three coal-fired power plants before and after desulfurization devices.The results showed diverse removal efficiencies for different desulfurization towers.The reason for the difference requires further research.We estimated the influence of removal technology for particulate matter on total emissions in China.Substituting ESPs with hybrid ESP/BAGs could reduce the total emissions to 104.3 thousand tons,with 47.48 thousand tons of PM_(2.5).展开更多
An information system for ocean wave resources and its application to wave power utilization are introduced. It can manage, analyze and process the data in the monthly report of ocean wave observation records of the S...An information system for ocean wave resources and its application to wave power utilization are introduced. It can manage, analyze and process the data in the monthly report of ocean wave observation records of the State Ocean Administration, and can provide various kinds of curves and numerical characters of statistics. This system has been put into utility in Guangzhou Institute of Energy Conversion (GIEC), the Chinese Academy of Sciences since 1996. An application example is given of the investigation and analysis on ocean wave resource of the Nan Ao Island, Guangdong Province, where a 100 kW onshore OWC (oscillating water column) wave power station will be built. The wave power distribution is obtained in different wave directions for different wave periods. It is found that 70 percent of the wave power comes from the direction of ENE, and more than 95 percent of the wave power is related with direction E. The average wave power density is about 3 kW/m, and more than 80 percent of the wave power is distributed in the wave periods of 4 second to 5 second. Based on the analysis of wave resources, a site on the east coast of the island and a design width of 20 m for the 100 kW station are suggested.展开更多
The structural design and protective methods for the 100 kW shoreline wave power station in China are described in detail. The proper structural type is designed for effective minimization of wave loads and bending st...The structural design and protective methods for the 100 kW shoreline wave power station in China are described in detail. The proper structural type is designed for effective minimization of wave loads and bending stress. Various protective devices are adopted to protect the station in the extreme conditions against excessive power of airflow, excessive torsion of the shaft, over-pressure of the chamber, over-speed of rotation, power failure, and so on. It turns out that the structural design and protective methods for the 100 kW shoreline wave power station are successful.展开更多
Organic Rankine cycle(ORC) power plant operating with supercritical parameters supplied by low temperature slag-washing water(SWW) of blast furnace was investigated.A schematic of such installation was presented with ...Organic Rankine cycle(ORC) power plant operating with supercritical parameters supplied by low temperature slag-washing water(SWW) of blast furnace was investigated.A schematic of such installation was presented with a description of its operation and the algorithm of calculations of a supercritical power plant.Two typical organic fluids with sufficiently low critical parameters were selected as candidate working fluids in the plant to study the efficiency of the system with different organic fluids.An analysis of the influence on the effectiveness of operation of a plant was carried out.With the same temperature of slag-washing water,the specific work in turbine of fluid R143a is 45% higher than that obtained for the fluid R125,however,the specific work in pump of fluid R143a is approximate equal into that one of the fluid R125.展开更多
Due to the phenomenon of abandoning wind power and photo voltage(PV)power in the“Three Northern Areas”in China,this paper presents an optimal strategy for coordinating and dispatching“source-load”in power system b...Due to the phenomenon of abandoning wind power and photo voltage(PV)power in the“Three Northern Areas”in China,this paper presents an optimal strategy for coordinating and dispatching“source-load”in power system based on multiple time scales.On the basis of the analysis of the uncertainty of wind power and PV power as well as the characteristics of load side resource dispatching,the optimal model of coordinating and dispatching“source-load”in power system based on multiple time scales is established.It can simultaneously and effectively dispatch conventional generators,wind plant,PV power station,pumped-storage power station and load side resources by optimally using three time scales:day-ahead,intra-day and real-time.According to the latest predicted information of wind power,PV power and load,the original generation schedule can be rolled and amended by using the corresponding time scale.The effectiveness of the model can be verified by a real system.The simulation results show that the proposed model can make full use of“source-load”resources to improve the ability to consume wind power and PV power of the grid-connected system.展开更多
An anisotropic geomechanical model for jointed rock mass is presented. Simultaneously with deriving the orthotropic anisotropy elastic parameters along the positive axis, the equivalent compliance matrix for the defle...An anisotropic geomechanical model for jointed rock mass is presented. Simultaneously with deriving the orthotropic anisotropy elastic parameters along the positive axis, the equivalent compliance matrix for the deflection axis orthotropic anisotropy was derived through a three- dimensional coordinate transformation. In addition, Singh's analysis of the stress concentration effects of intermittent joints was adopted, based on two groups of intermittent joints and a set of cross- cutting joints in the jointed rock mass. The stress concentration effects caused by intermittent joints and the coupling effect of cross-cutting joints along the deflection-axis are also considered. The proposed anisotropic mechanics parameters method is applied to determine the deformation parameters of jointed granite at the Taishan Nuclear Power Station. Combined with the deterministic mechanical parameters of rock blocks and joints, the deformation parameters and their variability in jointed rock masses are estimated quantitatively. The computed results show that jointed granite at the Taishan Nuclear Power Station exhibits typical anisotropic mechanical characteristics; the elastic moduli in the two horizontal directions were similar, but the elastic modulus in the vertical direction was much greater. Jointed rock elastic moduli in the two horizontal and vertical directions were respectively about 24% and 37% of the core of rock, showing weakly orthotropic anisotropy; the ratio of elastic moduli in the vertical and horizontal directions was 1.53, clearly indicating the transversely isotropic rock mass mechanical characteristics. The method can be popularized to solve other rock mechanics problems in nuclear power engineering.展开更多
Space solar power station(SSPS)are important space infrastructure for humans to efficiently utilize solar energy and can effectively reduce the pollution of fossil fuels to the earth’s natural environment.As the ener...Space solar power station(SSPS)are important space infrastructure for humans to efficiently utilize solar energy and can effectively reduce the pollution of fossil fuels to the earth’s natural environment.As the energy conversion system of SSPS,solar array is an important unit for the successful service of SSPS.Today,solar arrays represent the standard technology for providing energy for spacecraft,thanks to their high conversion efficiency and reliability/stability in orbit.With the development of solar arrays,many new materials,new photovoltaic devices and new control systems have emerged.Solar arrays are directly exposed to the space environment,and harsh environmental factors can degrade the performance.To ensure the long-term safe inorbit service of SSPS as well as its ultra-large solar array,these new materials,devices,and control systems must operate certification and evaluation that can be used in space applications.In this review,the development history and research progress of SSPS and the corresponding space solar arrays are summarized and discussed,and the space environmental effects of solar arrays are analyzed at multiple levels(materials,devices,and systems).Finally,in response to the current space environmental effects of the ultra-large solar array used in the SSPS,future development trends and challenges are proposed.展开更多
The individual particles collected from a power station were analyzed by time of flight secondary ion mass spectrometry (TOF SIMS). The result indicates the presence of the polycyclic aromatic hydrocarbon (PAHs) as we...The individual particles collected from a power station were analyzed by time of flight secondary ion mass spectrometry (TOF SIMS). The result indicates the presence of the polycyclic aromatic hydrocarbon (PAHs) as well as the oxygenated one. They might be derived from the incomplete combustion of coals. SIMS has proved to be a rapid method for the qualitative analysis of PAHs and OPAHs absorbed on the aerosol particles. New perspectives for better understanding the SIMS spectra obtained from complex mixture such as environmental samples have been opened.展开更多
Optimal operation of a compressor station is important since it accounts for 25%to 50%of a company’s total operating budget.In short-term management of a compressor station,handling demand uncertainty is important ye...Optimal operation of a compressor station is important since it accounts for 25%to 50%of a company’s total operating budget.In short-term management of a compressor station,handling demand uncertainty is important yet challenging.Previous studies either require precise information about the distribution of uncertain parameters or greatly simplify the compressor model.We build a two-stage robust optimization framework of power cost minimization in a natural gas compressor station with nonidentical compressors.In the first stage,decision variables are the ON/OFF state of each compressor and discharge pressure.The worst-case cost of the second stage is incorporated in the first stage.Firststage decision variables feasibility is discussed and proper feasibility cuts are also proposed for the first stage.We employ a piece-wise approximation and propose accelerate methods.Our numerical results highlight two advantages of robust approach when managing uncertainty in practical settings:(1)the feasibility of first-stage decision can be increased by up to 45%,and(2)the worst-case cost can be reduced by up to 25%compared with stochastic programming models.Furthermore,our numerical experiments show that the designed accelerate algorithm has time improvements of 1518.9%on average(3785.9%at maximum).展开更多
The frequency stability of a marine power system is determined by the dynamic characteristic of the diesel engine speed regulation system in a marine power station. In order to reduce the effect of load disturbances a...The frequency stability of a marine power system is determined by the dynamic characteristic of the diesel engine speed regulation system in a marine power station. In order to reduce the effect of load disturbances and improve the dynamic precision of a diesel engine speed governor, a controller was designed for a diesel engine speed regulation system using H2 control theory. This transforms the specifications of the system into a standard H2 control problem. Firstly, the mathematical model of a diesel engine speed regulation system using an H2 speed governor is presented. To counter external disturbances and model uncertainty, the design of an H, speed governor rests on the problem of mixed sensitivity. Computer simulation verified that the H2 speed governor improves the dynamic precision of a system and the ability to adapt to load disturbances, thus enhancing the frequency stability of marine power systems.展开更多
Research to reliably predict the seismic response of nuclear power stations with a pile-raft foundation is needed to meet the high safety requirements of nuclear power stations.In this study,a scaled superstructure wi...Research to reliably predict the seismic response of nuclear power stations with a pile-raft foundation is needed to meet the high safety requirements of nuclear power stations.In this study,a scaled superstructure with a 4×3 pile-raft foundation,which is constructed in Shanxi kaolin clay,is modelled.Accordingly,the characteristics of seismic response for nuclear power stations with a pile-raft foundation are analyzed using dynamic centrifuge tests.In particular,multiple earthquake motions with different magnitudes and frequency properties are utilized to map the relationship between structural response and properties of earthquake motions.The results show that the seismic response of the soil,raft,and structure are significantly affected by the natural frequency and magnitude of the earthquake motion.The soil surface acceleration is lower than the raft acceleration.The results provide a reliable reference to better understand the seismic response of nuclear power stations.展开更多
基金funded by the BeijingNatural Science Foundation of China(8222003)National Natural Science Foundation of China(41807180).
文摘Based on global initiatives such as the clean energy transition and the development of renewable energy,the pumped storage power station has become a new and significant way of energy storage and regulation,and its construction environment is more complex than that of a traditional reservoir.In particular,the stability of the rock strata in the underground reservoirs is affected by the seepage pressure and rock stress,which presents some challenges in achieving engineering safety and stability.Using the advantages of the numerical simulation method in dealing deal with nonlinear problems in engineering stability,in this study,the stability of the underground reservoir of the Shidangshan(SDS)pumped storage power station was numerically calculated and quantitatively analyzed based on fluid-structure coupling theory,providing an important reference for the safe operation and management of the underground reservoir.First,using the COMSOL software,a suitablemechanicalmodel was created in accordance with the geological structure and project characteristics of the underground reservoir.Next,the characteristics of the stress field,displacement field,and seepage field after excavation of the underground reservoir were simulated in light of the seepage effect of groundwater on the nearby rock of the underground reservoir.Finally,based on the construction specifications and Molar-Coulomb criterion,a thorough evaluation of the stability of the underground reservoir was performed through simulation of the filling and discharge conditions and anti-seepage strengthening measures.The findings demonstrate that the numerical simulation results have a certain level of reliability and are in accordance with the stress measured in the project area.The underground reservoir excavation resulted in a maximum displacement value of the rock mass around the caverns of 3.56 mm in a typical section,and the safety coefficient of the parts,as determined using the Molar-Coulomb criterion,was higher than 1,indicating that the project as a whole is in a stable state.
基金Innovation and Development Project of China Meteorological Administration(CXFZ2023J044)Innovation Foundation of CMA Public Meteorological Service Center(K2023002)+1 种基金“Tianchi Talents”Introduction Plan(2023)Key Innovation Team for Energy and Meteorology of China Meteorological Administration。
文摘In the present study,multimodel ensemble forecast experiments of the global horizontal irradiance(GHI)were conducted using the dynamic variable weight technique.The study was based on the forecasts of four numerical models,namely,the China Meteorological Administration Wind Energy and Solar Energy Prediction System,the Mesoscale Weather Numerical Prediction System of China Meteorological Administration,the China Meteorological Administration Regional Mesoscale Numerical Prediction System-Guangdong,and the Weather Research and Forecasting Model-Solar,and observational data from four photovoltaic(PV)power stations in Yangjiang City,Guangdong Province.The results show that compared with those of the monthly optimal numerical model forecasts,the dynamic variable weight-based ensemble forecasts exhibited 0.97%-15.96%smaller values of the mean absolute error and 3.31%-18.40%lower values of the root mean square error(RMSE).However,the increase in the correlation coefficient was not obvious.Specifically,the multimodel ensemble mainly improved the performance of GHI forecasts below 700 W m^(-2),particularly below 400 W m^(-2),with RMSE reductions as high as 7.56%-28.28%.In contrast,the RMSE increased at GHI levels above 700 W m^(-2).As for the key period of PV power station output(02:00-07:00),the accuracy of GHI forecasts could be improved by the multimodel ensemble:the multimodel ensemble could effectively decrease the daily maximum absolute error(AE max)of GHI forecasts.Moreover,with increasing forecasting difficulty under cloudy conditions,the multimodel ensemble,which yields data closer to the actual observations,could simulate GHI fluctuations more accurately.
基金supported by the Science and Technology Project of the China Southern Power Grid Company Limited under grant number GDKJXM20202032。
文摘A Beidou 3(BD3)system-based power reference station can provide high-precision time synchronization for power distribution systems by sending synchronization data packets to devices in a multi-hop routing fashion.However,optimizing route selection to reduce both time synchronization error and delay is a challenging problem.In this paper,we establish a software-defined network-enabled power reference station time synchronization framework based on BD3.Then,we formulate the joint problem to minimize cumulative synchronization error and delay through multi-hop route selection optimization.A back propagation(BP)neural network-improved intelligent time synchronization route selection algorithm named BP-RS is proposed to learn the optimal route selection,which uses a BP neural network to dynamically adjust the exploration factor to achieve rapid convergence.Simulation results show the superior performance of BP-RS in synchronization delay,synchronization error,and adaptability with changing routing topologies.
基金Project supported by Fundamental Research Funds for the Central Universities(Grant No.FRF-TP-20-006A2).
文摘Since it was first proposed,the space solar power station(SSPS)has attracted great attention all over the world;it is a huge space system and provides energy for Earth.Although several schemes and abundant studies on the SSPS have been proposed and conducted,it is still not realized.The reason why SSPS is still an idea is not only because it is a giant and complex project,but also due to the requirement for various excellent space materials.Among the diverse required materials,we believe energy materials are the most important.Herein,we review the space energy conversion materials for the SSPS.
文摘To improve the operation efficiency of the photovoltaic power station complementary power generation system,an optimal allocation model of the photovoltaic power station complementary power generation capacity based on PSO-BP is proposed.Particle Swarm Optimization and BP neural network are used to establish the forecasting model,the Markov chain model is used to correct the forecasting error of the model,and the weighted fitting method is used to forecast the annual load curve,to complete the optimal allocation of complementary generating capacity of photovoltaic power stations.The experimental results show that thismethod reduces the average loss of photovoltaic output prediction,improves the prediction accuracy and recall rate of photovoltaic output prediction,and ensures the effective operation of the power system.
基金funded by Major Science and Technology Projects in Gansu Province(19ZD2GA003).
文摘Because of the randomness of wind power and photovoltaic(PV)output of new energy bases,the problem of peak regulation capability and voltage stability of ultra-high voltage direct current(UHVDC)transmission lines,we proposed an optimum allocation method of installed capacity of the solar-thermal power station based on chance constrained programming in this work.Firstly,we established the uncertainty model of wind power and PV based on the chance constrained planning theory.Then we used the K-medoids clusteringmethod to cluster the scenarios considering the actual operation scenarios throughout the year.Secondly,we established the optimal configuration model based on the objective function of the strongest transient voltage stability and the lowest overall cost of operation.Finally,by quantitative analysis of actual wind power and photovoltaic new energy base,this work verified the feasibility of the proposed method.As a result of the simulations,we found that using the optimal configuration method of solar-thermal power stations could ensure an accurate allocation of installed capacity.When the installed capacity of the solar-thermal power station is 1×106 kW,the transient voltage recovery index(TVRI)is 0.359,which has a strong voltage support capacity for the system.Based on the results of this work,the optimal configuration of the installed capacity of the solar-thermal power plant can improve peak shaving performance,transient voltage support capability,and new energy consumption while satisfying the Direct Current(DC)outgoing transmission premise.
基金supported by the Science and Technology Project of State Grid Corporation of China(W22KJ2722005)Tianyou Innovation Team of Lanzhou Jiaotong University(TY202009).
文摘The virtual synchronous generator(VSG)can simulate synchronous machine’s operation mechanism in the control link of an energy storage converter,so that an electrochemical energy storage power station has the ability to actively support the power grid,from passive regulation to active support.Since energy storage is an important physical basis for realizing the inertia and damping characteristics in VSG control,energy storage constraints of the physical characteristics on the system control parameters are analyzed to provide a basis for the system parameter tuning.In a classic VSG control,its virtual inertia and damping coefficient remain unchanged.When the grid load changes greatly,the constant control strategy most likely result in the grid frequency deviation beyond the stable operation standard limitations.To solve this problem,a comprehensive control strategy considering electrified wire netting demand and energy storage unit state of charge(SOC)is proposed,and an adaptive optimization method of VSG parameters under different SOC is given.The energy storage battery can maintain a safe working state at any time and be smoothly disconnected,which can effectively improve the output frequency performance of energy storage system.Simulation results further demonstrated the effectiveness of the VSG control theoretical analysis.
文摘This paper is devoted to development and study of models for operator training systems of heating power station processes management. It proposed a mathematical model describing the management processes of heating power units of the technological complex considering the relationship of technological variables in deviations effective in real time. A software complex is developed for the system of training of operators controlling processes in heating station units. Obtained results may be used in the course of development of computer training systems for operators of heating power stations with cross-linkage.
基金Supported by Shandong Meteorological Bureau Key Project (2010sdqxj105)~~
文摘[Objective] The aim was to analyze characters of solar energy in photo- voltaic power stations in Shandong Province. [Method] The models of total solar radiation and scattered radiation were determined, and solar energy resources in pho-tovoltaic power stations were evaluated based on illumination in horizontal plane and cloud data in 123 counties or cities and observed information in Jinan, Fushan and Juxian in 1988-2008. [Result] Solar energy in northern regions in Shandong proved most abundant, which is suitable for photovoltaic power generation; the optimal angle of tilt of photovoltaic array was at 35°, decreasing by 2°-3° compared with local latitude. Total solar radiation received by the slope with optimal angle of tilt exceeded 1 600 kw.h/(m2.a), increasing by 16% compared with horizontal planes. The maximal irradiance concluded by WRF in different regions tended to be volatile in 1 020-1 060 W/m2. [Conclusion] The research provides references for construction of photovoltaic power stations in Shandong Province.
基金Supported by the National Basic Research Pro-gram of China(973 Program)(2013CB228506).
文摘This study investigated the influence of precipitators and wet flue gas desulfurization equipment on characteristics of PM_(2.5)emission from coal-fired power stations.We measured size distribution and removal efficiencies,including hybrid electrostatic precipitator/bag filters(ESP/BAGs)which have rarely been studied.A bimodal distribution of particle concentrations was observed at the inlet of each precipitator.After the precipitators,particle concentrations were significantly reduced.Although a bimodal distribution was still observed,all peak positions shifted to the smaller end.The removal efficiencies of hybrid ESP/BAGs reached 99%for PM_(2.5),which is considerably higher than those for other types of precipitators.In particular,the influence of hybrid ESP/BAG operating conditions on the performance of dust removal was explored.The efficiency of hybrid ESP/BAGs decreased by 1.9%when the first electrostatic field was shut down.The concentrations and distributions of particulate matter were also measured in three coal-fired power plants before and after desulfurization devices.The results showed diverse removal efficiencies for different desulfurization towers.The reason for the difference requires further research.We estimated the influence of removal technology for particulate matter on total emissions in China.Substituting ESPs with hybrid ESP/BAGs could reduce the total emissions to 104.3 thousand tons,with 47.48 thousand tons of PM_(2.5).
文摘An information system for ocean wave resources and its application to wave power utilization are introduced. It can manage, analyze and process the data in the monthly report of ocean wave observation records of the State Ocean Administration, and can provide various kinds of curves and numerical characters of statistics. This system has been put into utility in Guangzhou Institute of Energy Conversion (GIEC), the Chinese Academy of Sciences since 1996. An application example is given of the investigation and analysis on ocean wave resource of the Nan Ao Island, Guangdong Province, where a 100 kW onshore OWC (oscillating water column) wave power station will be built. The wave power distribution is obtained in different wave directions for different wave periods. It is found that 70 percent of the wave power comes from the direction of ENE, and more than 95 percent of the wave power is related with direction E. The average wave power density is about 3 kW/m, and more than 80 percent of the wave power is distributed in the wave periods of 4 second to 5 second. Based on the analysis of wave resources, a site on the east coast of the island and a design width of 20 m for the 100 kW station are suggested.
文摘The structural design and protective methods for the 100 kW shoreline wave power station in China are described in detail. The proper structural type is designed for effective minimization of wave loads and bending stress. Various protective devices are adopted to protect the station in the extreme conditions against excessive power of airflow, excessive torsion of the shaft, over-pressure of the chamber, over-speed of rotation, power failure, and so on. It turns out that the structural design and protective methods for the 100 kW shoreline wave power station are successful.
基金Project(2011FZ050) supported by the Applied Basic Research Program of Yunnan Provincial Science and Technology Department,ChinaProject(2011J084) supported by the Master Program of Yunnan Province Education Department,China
文摘Organic Rankine cycle(ORC) power plant operating with supercritical parameters supplied by low temperature slag-washing water(SWW) of blast furnace was investigated.A schematic of such installation was presented with a description of its operation and the algorithm of calculations of a supercritical power plant.Two typical organic fluids with sufficiently low critical parameters were selected as candidate working fluids in the plant to study the efficiency of the system with different organic fluids.An analysis of the influence on the effectiveness of operation of a plant was carried out.With the same temperature of slag-washing water,the specific work in turbine of fluid R143a is 45% higher than that obtained for the fluid R125,however,the specific work in pump of fluid R143a is approximate equal into that one of the fluid R125.
基金Major Projects of Gansu Province(No.17ZD2GA010)Power Company Technology Projects of State Grid Corporation in Gansu Province(No.52272716000K)
文摘Due to the phenomenon of abandoning wind power and photo voltage(PV)power in the“Three Northern Areas”in China,this paper presents an optimal strategy for coordinating and dispatching“source-load”in power system based on multiple time scales.On the basis of the analysis of the uncertainty of wind power and PV power as well as the characteristics of load side resource dispatching,the optimal model of coordinating and dispatching“source-load”in power system based on multiple time scales is established.It can simultaneously and effectively dispatch conventional generators,wind plant,PV power station,pumped-storage power station and load side resources by optimally using three time scales:day-ahead,intra-day and real-time.According to the latest predicted information of wind power,PV power and load,the original generation schedule can be rolled and amended by using the corresponding time scale.The effectiveness of the model can be verified by a real system.The simulation results show that the proposed model can make full use of“source-load”resources to improve the ability to consume wind power and PV power of the grid-connected system.
基金part of a key project carried out in 2009-2012financially supported by Guang Dong Electric Power Design Institute (No. KB-2009-109 and EV00711W)
文摘An anisotropic geomechanical model for jointed rock mass is presented. Simultaneously with deriving the orthotropic anisotropy elastic parameters along the positive axis, the equivalent compliance matrix for the deflection axis orthotropic anisotropy was derived through a three- dimensional coordinate transformation. In addition, Singh's analysis of the stress concentration effects of intermittent joints was adopted, based on two groups of intermittent joints and a set of cross- cutting joints in the jointed rock mass. The stress concentration effects caused by intermittent joints and the coupling effect of cross-cutting joints along the deflection-axis are also considered. The proposed anisotropic mechanics parameters method is applied to determine the deformation parameters of jointed granite at the Taishan Nuclear Power Station. Combined with the deterministic mechanical parameters of rock blocks and joints, the deformation parameters and their variability in jointed rock masses are estimated quantitatively. The computed results show that jointed granite at the Taishan Nuclear Power Station exhibits typical anisotropic mechanical characteristics; the elastic moduli in the two horizontal directions were similar, but the elastic modulus in the vertical direction was much greater. Jointed rock elastic moduli in the two horizontal and vertical directions were respectively about 24% and 37% of the core of rock, showing weakly orthotropic anisotropy; the ratio of elastic moduli in the vertical and horizontal directions was 1.53, clearly indicating the transversely isotropic rock mass mechanical characteristics. The method can be popularized to solve other rock mechanics problems in nuclear power engineering.
基金acknowledge financial support provided by the National Key Research and Development Program of China(2022YFF0503600).
文摘Space solar power station(SSPS)are important space infrastructure for humans to efficiently utilize solar energy and can effectively reduce the pollution of fossil fuels to the earth’s natural environment.As the energy conversion system of SSPS,solar array is an important unit for the successful service of SSPS.Today,solar arrays represent the standard technology for providing energy for spacecraft,thanks to their high conversion efficiency and reliability/stability in orbit.With the development of solar arrays,many new materials,new photovoltaic devices and new control systems have emerged.Solar arrays are directly exposed to the space environment,and harsh environmental factors can degrade the performance.To ensure the long-term safe inorbit service of SSPS as well as its ultra-large solar array,these new materials,devices,and control systems must operate certification and evaluation that can be used in space applications.In this review,the development history and research progress of SSPS and the corresponding space solar arrays are summarized and discussed,and the space environmental effects of solar arrays are analyzed at multiple levels(materials,devices,and systems).Finally,in response to the current space environmental effects of the ultra-large solar array used in the SSPS,future development trends and challenges are proposed.
文摘The individual particles collected from a power station were analyzed by time of flight secondary ion mass spectrometry (TOF SIMS). The result indicates the presence of the polycyclic aromatic hydrocarbon (PAHs) as well as the oxygenated one. They might be derived from the incomplete combustion of coals. SIMS has proved to be a rapid method for the qualitative analysis of PAHs and OPAHs absorbed on the aerosol particles. New perspectives for better understanding the SIMS spectra obtained from complex mixture such as environmental samples have been opened.
基金the support from the National Science Foundation of China(Grant 71822105)。
文摘Optimal operation of a compressor station is important since it accounts for 25%to 50%of a company’s total operating budget.In short-term management of a compressor station,handling demand uncertainty is important yet challenging.Previous studies either require precise information about the distribution of uncertain parameters or greatly simplify the compressor model.We build a two-stage robust optimization framework of power cost minimization in a natural gas compressor station with nonidentical compressors.In the first stage,decision variables are the ON/OFF state of each compressor and discharge pressure.The worst-case cost of the second stage is incorporated in the first stage.Firststage decision variables feasibility is discussed and proper feasibility cuts are also proposed for the first stage.We employ a piece-wise approximation and propose accelerate methods.Our numerical results highlight two advantages of robust approach when managing uncertainty in practical settings:(1)the feasibility of first-stage decision can be increased by up to 45%,and(2)the worst-case cost can be reduced by up to 25%compared with stochastic programming models.Furthermore,our numerical experiments show that the designed accelerate algorithm has time improvements of 1518.9%on average(3785.9%at maximum).
基金Supported by the National Natural Science Foundation of China under Grant No.60774072Heilongjiang Province Natural Science Foundation under Grant No.F01-24Harbin Engineering University Basic Research Foundation under Grant No. HEUFP05014.
文摘The frequency stability of a marine power system is determined by the dynamic characteristic of the diesel engine speed regulation system in a marine power station. In order to reduce the effect of load disturbances and improve the dynamic precision of a diesel engine speed governor, a controller was designed for a diesel engine speed regulation system using H2 control theory. This transforms the specifications of the system into a standard H2 control problem. Firstly, the mathematical model of a diesel engine speed regulation system using an H2 speed governor is presented. To counter external disturbances and model uncertainty, the design of an H, speed governor rests on the problem of mixed sensitivity. Computer simulation verified that the H2 speed governor improves the dynamic precision of a system and the ability to adapt to load disturbances, thus enhancing the frequency stability of marine power systems.
基金Supported by:Scientific Research Program of China General Nuclear Power Corporation(CGN)under Grant No.K-A2017.054Postgraduate Research and Practice Innovation Program of Jiangsu Province under Grant No.KYCX19_0093。
文摘Research to reliably predict the seismic response of nuclear power stations with a pile-raft foundation is needed to meet the high safety requirements of nuclear power stations.In this study,a scaled superstructure with a 4×3 pile-raft foundation,which is constructed in Shanxi kaolin clay,is modelled.Accordingly,the characteristics of seismic response for nuclear power stations with a pile-raft foundation are analyzed using dynamic centrifuge tests.In particular,multiple earthquake motions with different magnitudes and frequency properties are utilized to map the relationship between structural response and properties of earthquake motions.The results show that the seismic response of the soil,raft,and structure are significantly affected by the natural frequency and magnitude of the earthquake motion.The soil surface acceleration is lower than the raft acceleration.The results provide a reliable reference to better understand the seismic response of nuclear power stations.