Experimental research on mechanical properties of prestressed truss concrete composite beam encased with circular steel tube 被引量:3
1
作者 张博一 郑文忠 《Journal of Harbin Institute of Technology(New Series)》 EI CAS 2009年第3期338-345,共8页
Tests of 4 simply supported unbonded prestressed truss concrete composite beams encased with circular steel tube were carried out. It is found that the ratio of the stress increment of the unbonded tendon to that of t... Tests of 4 simply supported unbonded prestressed truss concrete composite beams encased with circular steel tube were carried out. It is found that the ratio of the stress increment of the unbonded tendon to that of the tensile steel tube is 0.252 during the using stage,and the average crack space of beams depends on the ratio of the sum of the bottom chord steel tube's outside diameter and the secondary bottom chord steel tube's section area to the effective tensile concrete area. The coefficient of uneven crack distribution is 1.68 and the formula for the calculation of crack width is established. Test results indicate that the ultimate stress increment of unbonded tendon in the beams decreases in linearity with the increase of the composite reinforcement index β0. The pure bending region of beams accords with the plane section assumption from loading to failure. The calculation formula of ultimate stress increment of the unbonded tendon and the method to calculate the bearing capacity of normal section of beams have been presented. Besides,the method to calculate the stiffness of this sort of beams is brought forward as well. 展开更多
关键词 truss concrete composite beam encased with circular steel tube bearing capacity of normal section STIFFNESS crack width unbonded prestressed tendon
下载PDF
大跨度公铁合建斜拉桥钢混板-桁组合梁关键节点空间受力特性
2
作者 施洲 赵旭泼 +3 位作者 周勇聪 刘振标 夏正春 印涛 《中国铁道科学》 EI CAS CSCD 北大核心 2024年第5期90-100,共11页
针对大跨度公铁合建斜拉桥—主跨808 m洪奇沥特大桥新型钢混板-桁组合梁的关键节点—辅助墩顶钢混节点,采用ANSYS软件建立钢桁-混凝土板组合梁部分节段细化的全桥多尺度有限元模型,分析边跨组合梁节点在受力最不利工况下的受力规律及传... 针对大跨度公铁合建斜拉桥—主跨808 m洪奇沥特大桥新型钢混板-桁组合梁的关键节点—辅助墩顶钢混节点,采用ANSYS软件建立钢桁-混凝土板组合梁部分节段细化的全桥多尺度有限元模型,分析边跨组合梁节点在受力最不利工况下的受力规律及传力特性,并讨论下弦杆等杆件截面等结构参数变化对节点受力、传力的影响规律。结果表明:最不利组合工况下,边跨组合梁辅助墩顶钢混节点处钢结构最不利Mises应力为265.9 MPa,混凝土局部最大名义拉应力为9.2 MPa,导致局部开裂而受力转移至钢结构;在辅助墩顶局部负弯矩影响下,内外节点板处应力总体呈“倒V”形分布,混凝土顶面及底面分别呈“鞍形”及“倒鞍”形分布;节点处下弦杆(含管内混凝土)、竖杆分别传递77.86%和40.15%荷载,为纵向、竖向主要传力构件;混凝土桥面厚度变化对自身应力影响明显,其厚度和下弦杆截面面积对纵向传力比影响大,竖杆截面面积对自身竖向传力影响相对明显;混凝土厚度及下弦杆、斜腹杆、竖杆截面为节点受力、传力的主要影响因素,其系数在0.8~1.1时,组合梁关键节点各构件应力及传力比均较为合理。 展开更多
关键词 公铁合建斜拉桥 钢混板-桁组合梁 关键节点 受力特性 传力机理
下载PDF
公铁合建斜拉桥钢桁-混凝土板组合梁受力特性
3
作者 施洲 赵旭泼 +2 位作者 刘振标 夏正春 印涛 《铁道科学与工程学报》 EI CAS CSCD 北大核心 2024年第7期2778-2789,共12页
以某主跨808 m的公铁合建新型钢桁-混凝土板组合梁斜拉桥为背景,采用ANSYS软件建立局部组合梁细化的全桥多尺度有限元模型,分析其在不同工况下双层组合梁的受力传力特性和混凝土桥面板荷载分配比,并讨论混凝土桥面板厚度t_(b)、横梁刚... 以某主跨808 m的公铁合建新型钢桁-混凝土板组合梁斜拉桥为背景,采用ANSYS软件建立局部组合梁细化的全桥多尺度有限元模型,分析其在不同工况下双层组合梁的受力传力特性和混凝土桥面板荷载分配比,并讨论混凝土桥面板厚度t_(b)、横梁刚度变化系数λ_(K)和钢与混凝土弹性模量比λ_(E)对组合梁受力传力的影响规律。结果表明:最不利组合工况下,钢桁架最不利Von Mises应力为183.6 MPa,混凝土桥面板最大拉应力为5.3 MPa,均满足结构受力要求;沿纵向路径,钢桁架和混凝土桥面应力在节间横梁间均呈“波形”分布;上下层混凝土桥面板顶、底面应力沿横向近似呈“W”和“M”状分布,表明桥面板承受一定沿横向不均匀分布弯矩;公路及铁路混凝土桥面最大剪力滞系数分别为1.45、1.36,更宽的公路混凝土桥面剪力滞效应更显著;公路及铁路混凝土桥面分别承担上、下层结构57.46%~79.99%和33.21%~62.81%的轴向荷载,为组合梁的主要传力构件;混凝土桥面板的应力随t_(b)及λ_(K)的增大而增大,随λ_(E)的增大而逐渐减小;混凝土桥面每层平均荷载分配比ξ与t_(b)成正比,与λ_(K)及λ_(E)成反比;当t_(b)、λ_(K)和λ_(E)参数的取值范围分别为0.8~1.4、0.4~1.6以及4~10时,组合梁混凝土桥面应力及荷载分配比ξ较为合理。 展开更多
关键词 大跨度公铁合建斜拉桥 钢桁-混凝土板组合梁 受力特性 传力特性 参数分析
下载PDF
深江铁路洪奇沥公铁两用大桥主桥方案构思与总体设计
4
作者 刘振标 夏正春 +2 位作者 印涛 文望青 严爱国 《桥梁建设》 EI CSCD 北大核心 2024年第5期124-132,共9页
深江铁路洪奇沥公铁两用大桥主桥采用(3×100+808+3×100)m超短边跨钢-混组合混合梁斜拉桥,一跨跨越通航水域。该桥公铁分层布置,上层布置8车道城市快速路,下层布置4线铁路。主梁采用倒梯形双主桁截面,桥面布置紧凑、受力明确... 深江铁路洪奇沥公铁两用大桥主桥采用(3×100+808+3×100)m超短边跨钢-混组合混合梁斜拉桥,一跨跨越通航水域。该桥公铁分层布置,上层布置8车道城市快速路,下层布置4线铁路。主梁采用倒梯形双主桁截面,桥面布置紧凑、受力明确、经济性好。中跨主梁采用板桁-箱桁组合结构钢梁,桥面结构参与主桁受力,具有高效综合性能。边跨主梁采用矩形钢管混凝土叠合板-桁组合梁,融结构受力和锚固压重于一体,叠合板采用32 cm厚预制板+40 cm厚现浇层。钢-混结合段采用“钢格室+承压板”构造,钢-混结合面位于桥塔向中跨侧4.6 m。桥塔采用H形混凝土塔,基础采用35根直径4.0 m的大直径钻孔灌注桩。斜拉索采用标准抗拉强度2000 MPa的平行钢丝成品索,最大规格为PES(C)7-547。索梁锚固采用副桁弦杆节点兜底钢锚箱结构,传力可靠、抗疲劳性能好。索塔锚固创新地采用自平衡交叉混合锚固技术,以适应大规格斜拉索锚固。钢桁梁采用“纵向分段、横向分区”制造、运输、现场吊装的施工方案。 展开更多
关键词 斜拉桥 公路铁路两用桥 超短边跨多辅助墩体系 倒梯形双主桁截面 混合梁 钢-混组合梁 自平衡交叉锚固 桥梁设计
下载PDF
车辆荷载作用下钢-混凝土组合梁疲劳应力分析
5
作者 黄己伟 刘丹 《河南科技》 2024年第9期78-82,共5页
【目的】随着桥梁服役期延长和车辆荷载增加等多种因素的影响,结构承载力会变得越来越弱,疲劳寿命不断降低,最终可能导致低应力疲劳破坏。因此有必要对车辆荷载下拱桥钢混组合梁的疲劳细节应力进行研究。【方法】采用数值模拟的方法,利... 【目的】随着桥梁服役期延长和车辆荷载增加等多种因素的影响,结构承载力会变得越来越弱,疲劳寿命不断降低,最终可能导致低应力疲劳破坏。因此有必要对车辆荷载下拱桥钢混组合梁的疲劳细节应力进行研究。【方法】采用数值模拟的方法,利用Midas FEA NX软件建立3个标准长度的三维实体精细有限元模型,分析钢混组合梁易损疲劳关键点的位置,并研究车辆荷载横向最不利加载位置和纵向加载下的疲劳细节应力变化规律。【结果】结果表明,组合梁次横梁与中纵梁交点处有三处疲劳关键点;靠近桥梁中线位置是车辆荷载下钢梁疲劳最不利的横向加载位置;四种不同标准的纵向车辆加载时,三个疲劳关键点均出现两次应力峰值,且最大应力幅值均低于常幅疲劳强度的极限值。【结论】研究成果可为钢-混凝土组合梁试验和相关研究提供参考。 展开更多
关键词 拱桥 钢-混凝土组合梁 疲劳应力 S—N曲线 车辆荷载
下载PDF
宜宾新市金沙江大桥主桥总体设计 被引量:1
6
作者 田波 周霆 梁健 《世界桥梁》 北大核心 2024年第2期1-6,共6页
宜宾新市金沙江大桥主桥为(304+680+304)m双塔双索面钢桁梁斜拉桥,采用半飘浮体系,在桥塔横梁顶设置含限位功能的纵向阻尼器,两岸边跨各设置1个辅助墩。桥塔采用宝瓶形钢筋混凝土塔,四川岸和云南岸塔高分别为290.2 m和297.5 m,由上、中... 宜宾新市金沙江大桥主桥为(304+680+304)m双塔双索面钢桁梁斜拉桥,采用半飘浮体系,在桥塔横梁顶设置含限位功能的纵向阻尼器,两岸边跨各设置1个辅助墩。桥塔采用宝瓶形钢筋混凝土塔,四川岸和云南岸塔高分别为290.2 m和297.5 m,由上、中、下塔柱和上、中、下横梁及下塔柱横向连接隔板组成。主梁采用钢桁梁与钢-混组合桥面板的板桁结合型式,主桁横向中心距28 m,桁高6.8 m,标准节间长6.8 m,上、下弦杆与腹杆呈“N”形布置,采用焊接整体节点。桥面板采用钢-混组合桥面板。斜拉索采用环氧喷涂钢绞线体系,疲劳应力幅280 MPa,斜拉索在主桁上采用锚拉板锚固方式,在桥塔上采用钢锚梁锚固方式。采用桥面全回转吊机进行主桁、横桁单元件安装;钢-混组合桥面板滞后主梁2个节段施工。 展开更多
关键词 斜拉桥 宝瓶形桥塔 塔柱横向连接隔板 钢桁梁 钢-混组合桥面板 环氧喷涂钢绞线斜拉索 桥梁设计
下载PDF
重庆朝天门长江特大桥钢桁拱变形监测及变形分析
7
作者 杨远明 周鲜明 邓赟 《测绘通报》 CSCD 北大核心 2024年第S02期86-89,106,共5页
特大桥承受多种外部荷载和变形因素作用。主要的荷载包括桥梁自重、汽车自重、列车自重、与桥轴线平行的双向汽车及轨道交通车辆的动荷载、特殊情况下的汽车紧急制动荷载、不同时期和不同方向的风荷载、不同时期的气象变化及温度变化导... 特大桥承受多种外部荷载和变形因素作用。主要的荷载包括桥梁自重、汽车自重、列车自重、与桥轴线平行的双向汽车及轨道交通车辆的动荷载、特殊情况下的汽车紧急制动荷载、不同时期和不同方向的风荷载、不同时期的气象变化及温度变化导致的结构温度内应力、大气中化学成分的腐蚀作用、桥梁墩台及基础不均匀沉降、地基承载力差异造成桥梁墩桥台的变形、江水对桥墩桥台的冲刷力等。复杂的受力因素必然导致复杂的变形和位移,化繁为简,将结构体的力的作用分解为桥轴坐标系X、Y、Z3个方向的分力,其必然导致结构体3个方向的位移变形。本文结合朝天门长江特大桥的结构特点,以支撑桥面的钢桁拱的上弦线的变形监测点布置、变形监测方法、变形曲线的绘制及变形分析为例,以期对类似特殊大型监测体的变形监测起到参考作用。 展开更多
关键词 桥梁组成结构 钢桁拱 变形监测 变形曲线 变形分析
下载PDF
钢管混凝土梁拱组合桥拱脚段钢管埋深研究
8
作者 荣帅 《城市道桥与防洪》 2024年第10期107-109,M0012,共4页
钢管混凝土梁拱组合桥拱脚段钢管主要有深埋式和浅埋式两种不同的形式,相对应的主梁梁端构造、钢筋及预应力布置也有所不同。实际工程中,这两种埋深形式使用均较为广泛,因此需要对拱脚段钢管埋深的影响进行研究,为实际工程提供参考。以... 钢管混凝土梁拱组合桥拱脚段钢管主要有深埋式和浅埋式两种不同的形式,相对应的主梁梁端构造、钢筋及预应力布置也有所不同。实际工程中,这两种埋深形式使用均较为广泛,因此需要对拱脚段钢管埋深的影响进行研究,为实际工程提供参考。以某130 m跨径钢管混凝土梁拱组合桥为例,分析了拱脚段钢管埋深对施工难度及主梁预应力用量的影响。建立数值分析模型,验证了浅埋式钢管拱脚构造的安全性,并提出了浅埋式拱脚的钢管埋深、端承压板设置、剪力件布置等相关构造要求。 展开更多
关键词 钢管混凝土梁拱组合桥 拱脚 数值分析
下载PDF
预应力混凝土钢管桁架叠合板生产工艺及质量管控
9
作者 刘伟 丁磊 《山西建筑》 2024年第18期100-103,共4页
预应力混凝土钢管桁架叠合板作为一种预制板,近年来广泛应用于实际工程项目,但因其为预应力板,且板较薄,对生产工艺的质量要求极为严格,通过介绍该板的生产流程、各个生产环节质量管控措施,对预应力混凝土钢管桁架叠合板的生产及质量管... 预应力混凝土钢管桁架叠合板作为一种预制板,近年来广泛应用于实际工程项目,但因其为预应力板,且板较薄,对生产工艺的质量要求极为严格,通过介绍该板的生产流程、各个生产环节质量管控措施,对预应力混凝土钢管桁架叠合板的生产及质量管控有一定的借鉴和参考意义。 展开更多
关键词 预应力混凝土钢管桁架叠合板 生产工艺 质量管控
下载PDF
温州市七都二桥总体方案研究
10
作者 黄越 陈海兴 《城市道桥与防洪》 2024年第9期86-90,M0010,共6页
七都岛作为温州国际未来科技岛的核心载体,其交通压力日益剧增,亟需谋划新通道以解决岛上的出行问题。从建设条件、纵断面控制因素等方面探讨建设的可行性;考虑慢行交通技术要求研究不同的接地方案;从景观定位论述主桥采用七跨连续中承... 七都岛作为温州国际未来科技岛的核心载体,其交通压力日益剧增,亟需谋划新通道以解决岛上的出行问题。从建设条件、纵断面控制因素等方面探讨建设的可行性;考虑慢行交通技术要求研究不同的接地方案;从景观定位论述主桥采用七跨连续中承式+上承式组合拱桥方案的合理性;考虑本桥特殊的交通功能,对比不同类型双层桥面结构形式,提出上层采用双边箱钢箱梁结构形式,下层采用钢桁架结构形式。该方案可为跨江市政桥梁设计提供参考。 展开更多
关键词 七都二桥 建设条件 纵断面控制 七跨连拱 钢箱桁架组合断面
下载PDF
流溪河大桥主桥重建方案设计研究
11
作者 刘杰 《城市道桥与防洪》 2024年第10期79-82,M0009,M0010,共6页
流溪河大桥位于广州市温泉旅游度假区,在桥梁建设过程中因规划条件发生变化,桥梁由立交形式跨越堤岸路变更为与堤岸路平交,建设中的主桥需要拆除重建或易地建设。为了最大限度地利用原有桥梁结构,降低工程造价,同时满足周边景区对桥梁... 流溪河大桥位于广州市温泉旅游度假区,在桥梁建设过程中因规划条件发生变化,桥梁由立交形式跨越堤岸路变更为与堤岸路平交,建设中的主桥需要拆除重建或易地建设。为了最大限度地利用原有桥梁结构,降低工程造价,同时满足周边景区对桥梁景观的要求,设计时结合已建条件,对不同重建方案进行了比较研究。经比选,最终确定主桥采用单跨125 m下承式钢筋混凝土系杆拱桥。主桥由系梁、拱肋、吊杆等组成,采用先梁后拱法施工。其中,拱肋采用钢筋混凝土结构,拱轴线为2次抛物线,矢跨比为1/5;系梁按整体箱形断面布置,采用单箱3室预应力混凝土箱形截面。流溪河大桥重建方案的设计思路和方法,可为今后同类型旧桥改造设计等提供参考。 展开更多
关键词 系杆拱桥 自锚式悬索桥 钢-混组合结构 旧桥基础利用 拆除重建
下载PDF
Flexural behaviour of SFRRAC two-way composite slab with different shapes 被引量:1
12
作者 Luo Bin Huang Wei 《Journal of Southeast University(English Edition)》 EI CAS 2020年第4期414-424,共11页
To promote the application of green renewable materials in concrete composite slabs(CCSs)and study the flexural behavior of CCSs with different shapes,the bending performances of three CCSs with a SFRRAC base plate,on... To promote the application of green renewable materials in concrete composite slabs(CCSs)and study the flexural behavior of CCSs with different shapes,the bending performances of three CCSs with a SFRRAC base plate,one cast-in-site concrete slab of ordinary concrete and one CCS of ordinary concrete by steel bar truss(as recommended in the technical specification for precast concrete structures in Chinese)were compared through experiments.The carrying capacity,flexural behaviour and bi-directional mechanical properties of the specimens were systematically analyzed from the failure modes,load-deflection curves,load-bar strain curves,load-slip curves and crack distributions.Results show that the bending failure process of CCSs with a SFRRAC base plate is similar to that of the cast-in-site concrete slab of ordinary concrete and CCS of ordinary concrete by steel bar truss,as all of them went through the plastic phase,elastic plastic phase and failure phase with fully developed cracks and deflection.No sudden breakage or horizontal cracking of the connecting interface between the base plate and concrete topping was observed.The shape of the base plate has a major impact on the bearing capacity of the CCS with the SFRRAC base plate.When calculating the ultimate bearing capacity with the plastic yield line theory,the influence of the base plate shape on the plastic yield line position should be taken into account. 展开更多
关键词 concrete composite slab(CCS) SHAPE steel bar truss bending performance ultimate bearing capacity
下载PDF
The New Arched Bridge over Dnipro in Kyiv
13
作者 Michael Korniiev 《Journal of Civil Engineering and Architecture》 2020年第3期133-143,共11页
The Podilskyi Arch bridge is crossing the Dnipro River in center of Kiev and is part of a 7.4 km long link which connects the center of Kiev with the “sleeping district” on the left bank of the river. The bridge has... The Podilskyi Arch bridge is crossing the Dnipro River in center of Kiev and is part of a 7.4 km long link which connects the center of Kiev with the “sleeping district” on the left bank of the river. The bridge has a main span of 344 m intended for six lanes of vehicles in the top level and two metro lines in the bottom level plus large diameter water pipes. The bridge is of steel, except of the reinforced concrete bases of the lower parts of the arches. The draft design works began in 1991 and in 2005 parallel design and construction work started. Due to the financial crisis in Ukraine, the work was interrupted for several years but construction recommenced in 2018 and the bridge is now planned to be completed in 2020 and the first stage of the transition in 2022. 展开更多
关键词 Ukraine Podilskyi BRIDGE CROSSING Dnipro RIVER composite steel and concrete ROAD overpasses arch BRIDGE loads and
下载PDF
重庆渝湘复线双堡特大桥主桥设计 被引量:3
14
作者 刘琪 聂尚杰 +1 位作者 丁少凌 郑国徽 《桥梁建设》 EI CSCD 北大核心 2023年第S01期16-24,共9页
重庆渝湘复线双堡特大桥主桥为2×405 m连续上承式钢管混凝土变截面桁架拱桥,矢跨比1/4.75,悬链线拱轴线,拱轴系数1.55。主拱圈由两幅拱肋和风撑组成。拱肋采用四肢格构式结构,单幅拱肋宽7.5 m,两幅拱肋横向中心距17.5 m。拱肋弦管... 重庆渝湘复线双堡特大桥主桥为2×405 m连续上承式钢管混凝土变截面桁架拱桥,矢跨比1/4.75,悬链线拱轴线,拱轴系数1.55。主拱圈由两幅拱肋和风撑组成。拱肋采用四肢格构式结构,单幅拱肋宽7.5 m,两幅拱肋横向中心距17.5 m。拱肋弦管采用Q390D钢,直径1400 mm,内灌C70自密实混凝土。风撑采用米字撑。拱上立柱采用双肢排架式空心矩形截面钢箱结构,桥面系采用连续钢-混组合梁,单跨27 m。中央拱座基础采用“浅挖拱座+桩基础”的构造形式,以适应岩溶发育区地质条件及降低连拱效应。拱肋采用900 m超长缆索吊装配合自平衡斜拉扣挂系统大节段吊装,桥面系采用地面组拼并张拉预应力、整体吊装的装配式施工方案。 展开更多
关键词 钢管混凝土拱桥 桁架拱 双跨连续拱桥 主拱圈 四肢格构式断面 中央拱座 超长缆索吊装 桥梁设计
下载PDF
预应力混凝土钢管桁架叠合板施工阶段性能分析研究 被引量:5
15
作者 张玉明 陈丽洁 +1 位作者 邓馨雨 程意 《建筑技术》 2023年第11期1354-1358,共5页
通过对3m跨、6m跨1.2m板宽预应力混凝土(平板)叠合板、预应力带肋混凝土叠合板、钢筋桁架叠合板、预应力混凝土钢管桁架叠合板的对比,发现无论大小跨度,预应力混凝土钢管桁架叠合板的应用均占据显著优势。底板中施加预应力和钢管桁架的... 通过对3m跨、6m跨1.2m板宽预应力混凝土(平板)叠合板、预应力带肋混凝土叠合板、钢筋桁架叠合板、预应力混凝土钢管桁架叠合板的对比,发现无论大小跨度,预应力混凝土钢管桁架叠合板的应用均占据显著优势。底板中施加预应力和钢管桁架的设置使预应力混凝土钢管桁架叠合板在施工阶段具有较大抗弯刚度。将底板厚度、桁架高度作为参数计算对比各种叠合板施工阶段抗弯刚度。对预应力混凝土钢管桁架叠合板,探讨钢管直径、壁厚对底板抗弯刚度、钢管长细比的影响。得出结论:预应力混凝土钢管桁架叠合板无论钢管是否灌浆在施工阶段都有较大优势,是否灌浆可根据抗弯刚度需求及施工水平确定。 展开更多
关键词 钢管桁架 叠合板 预应力混凝土 抗弯刚度
下载PDF
高速铁路大跨度钢桁架-混凝土板组合梁斜拉桥稳定性研究 被引量:1
16
作者 刘振标 夏正春 +2 位作者 胡方杰 余万庆 施洲 《铁道标准设计》 北大核心 2023年第11期68-75,共8页
为研究高速铁路大跨度钢桁架-混凝土板组合梁斜拉桥的稳定性,依托主跨300 m深茂铁路虎跳门水道特大桥,采用有限元软件ANSYS建立以梁单元为主的空间杆系有限元模型,对铁路钢桁架-混凝土板组合梁斜拉桥开展线弹性稳定分析,并进行考虑几何... 为研究高速铁路大跨度钢桁架-混凝土板组合梁斜拉桥的稳定性,依托主跨300 m深茂铁路虎跳门水道特大桥,采用有限元软件ANSYS建立以梁单元为主的空间杆系有限元模型,对铁路钢桁架-混凝土板组合梁斜拉桥开展线弹性稳定分析,并进行考虑几何初始变形及材料弹塑性的非线性稳定性分析。结果表明:在弹性稳定分析下,该桥梁的一阶失稳形式为主梁整体纵飘及塔纵弯失稳,二~四阶均为桥塔处的主梁下弦杆首先出现横向偏位而局部失稳;在运营阶段弹性稳定系数最小为7.639,第二、三阶和第四、五阶稳定系数分别相同且失稳形式为对称失稳;考虑最大几何初始变形(k=L/1 000)后,一阶稳定系数减小6.39%;考虑非线性因素影响后稳定系数降低明显,仅考虑几何非线性因素的影响后一阶、二阶和四阶稳定系数分别降低11.23%、9.01%和10.13%,而考虑几何及材料双重非线性因素影响后,一阶、二阶和四阶稳定系数分别降低67.78%、60.63%和52.56%,表明材料非线性对铁路钢桁架-混凝土板组合梁斜拉桥的稳定系数影响更为显著;考虑最大几何初始变形(k=L/1 000)以及双重非线性因素影响后,铁路钢桁架-混凝土板组合梁斜拉桥的稳定系数为1.985,大于规范1.7的要求。 展开更多
关键词 高速铁路 斜拉桥 钢桁架-混凝土板组合梁 稳定系数 非线性 几何初始变形 铁路桥
下载PDF
马鞍山长江公铁大桥主航道桥施工方案 被引量:4
17
作者 刘爱林 沈大才 《桥梁建设》 EI CSCD 北大核心 2023年第6期10-17,共8页
马鞍山长江公铁大桥主航道桥为双主跨1120 m的三塔钢桁梁斜拉桥,桥塔基础采用∅4.0 m超大直径钻孔桩基础,桥塔为钢-混组合塔(上塔柱为钢结构,中、下塔柱为C60混凝土结构),钢桁梁采用两节间大节段全焊设计、制造。边塔钻孔桩基础施工采用... 马鞍山长江公铁大桥主航道桥为双主跨1120 m的三塔钢桁梁斜拉桥,桥塔基础采用∅4.0 m超大直径钻孔桩基础,桥塔为钢-混组合塔(上塔柱为钢结构,中、下塔柱为C60混凝土结构),钢桁梁采用两节间大节段全焊设计、制造。边塔钻孔桩基础施工采用吹沙筑岛形成钻孔平台,钻孔采用旋挖钻分级扩钻成孔,承台采用钢管桩+钢板桩组合围堰施工;中塔钻孔桩基础施工采用栈桥+水上钢平台,钻孔采用旋挖钻+回转钻组合接力成孔,承台采用矩形双壁钢套箱围堰施工,底节双壁钢套箱围堰采用水中漂浮连接法拼装。桥塔混凝土塔柱采用液压爬模施工,钢塔柱采用15000 t·m塔吊分块吊装;下横梁采用落地支架分层现浇。岸上和牛屯河边滩上钢桁梁节段采用“提升站+运梁栈桥+运梁台车”方案转运至1800 t架梁吊机起吊位置正下方由吊机起吊架设;边、辅跨间钢桁梁采用全顶推法架设,其余钢桁梁采用架梁吊机整节段悬臂架设;边(中)塔处设置抗风牛腿、Z3-Z4号塔间设置1座抗风临时墩,以保证主梁大悬臂架设过程中的抗风稳定;主跨跨中钢桁梁采用整节段合龙方案,先进行Z3-Z4号塔间主跨合龙,后进行Z4-Z5号塔间主跨合龙。 展开更多
关键词 公路铁路两用桥 斜拉桥 桩基础 钢-混组合塔 钢桁梁 顶推法架设 悬臂架设 施工方案
下载PDF
沪苏通长江公铁大桥天生港专用航道桥施工控制关键技术 被引量:2
18
作者 李进洲 《世界桥梁》 北大核心 2023年第3期43-50,共8页
沪苏通长江公铁大桥天生港专用航道桥为(140+336+140)m刚性梁柔性拱桥,主梁为三主桁双层板桁组合结构,采用“先梁后拱,主梁双悬臂拼装,拱肋竖向转体”方案进行施工。为确保成桥线形和内力满足设计要求,采用MIDAS Civil软件建立全桥有限... 沪苏通长江公铁大桥天生港专用航道桥为(140+336+140)m刚性梁柔性拱桥,主梁为三主桁双层板桁组合结构,采用“先梁后拱,主梁双悬臂拼装,拱肋竖向转体”方案进行施工。为确保成桥线形和内力满足设计要求,采用MIDAS Civil软件建立全桥有限元模型,进行施工全过程和成桥分析,基于无应力状态法开展施工控制。钢梁墩顶节间施工时,设置墩旁托架,利用浮吊拼装;对称悬拼期间,为保证纵向稳定性,采用水袋对边跨进行配重,利用扣塔分别张拉2对扣索以改善钢梁受力并调整钢梁线形;采用预降边支点、4号墩钢梁整体预偏,以及扣索索力调整等措施进行钢梁中跨合龙;拱肋竖转后,主要通过扣索完成拱肋合龙调位;拱肋合龙后,从中间向两边张拉吊杆。经实测,该桥钢梁合龙口相对高差在10 mm以内;拱肋合龙口轴向偏差最大2 mm,相对高差最大1 mm;吊杆索力与设计目标索力偏差均在5%内,满足施工控制要求。 展开更多
关键词 刚性梁柔性拱桥 板桁组合结构 钢梁合龙 拱肋合龙 线形 索力 施工控制
下载PDF
钢管拱切线拼装坐标修正在ANSYS中的实现方法 被引量:2
19
作者 周水兴 周琳淇 刘增武 《重庆交通大学学报(自然科学版)》 CAS CSCD 北大核心 2023年第6期18-23,共6页
钢管混凝土拱桥钢管拱肋多采用分段安装,可采用ANSYS的生死单元进行过程分析,受到未激活单元虚位移影响,节段单元在ANSYS程序中并非在切线位置上激活。针对桁式断面的钢管混凝土拱桥,提出用悬臂端节点位移平均值作为拱肋整个截面的位移... 钢管混凝土拱桥钢管拱肋多采用分段安装,可采用ANSYS的生死单元进行过程分析,受到未激活单元虚位移影响,节段单元在ANSYS程序中并非在切线位置上激活。针对桁式断面的钢管混凝土拱桥,提出用悬臂端节点位移平均值作为拱肋整个截面的位移来修正激活前的单元坐标,使其处在前一节段的切线位置上;给出了坐标修正的计算公式,编制了钢管拱安装计算命令流,用于一座320m跨钢管混凝土拱桥施工中。结果表明:在实现扣索一次张拉的前提下,实测扣索力与理论索力的误差在3%以内,上、下游拱肋高程差控制在5mm内,成拱后的拱肋线形与裸拱自重线形吻合良好。 展开更多
关键词 桥梁工程 钢管混凝土拱桥 虚位移 切线拼装 坐标修正 桁式断面
下载PDF
大跨长联钢-混组合梁桥面板预制胶拼施工技术 被引量:4
20
作者 潘军 《世界桥梁》 北大核心 2023年第2期1-7,共7页
孟加拉国帕德玛大桥主桥上部结构为6×(6×150) m+1×(5×150) m七联大跨度连续钢-混组合梁。公路桥面设有平曲线,桥面板底部设横肋、板内设纵向预应力钢绞线,桥面板剪力钉(环)槽口边缘与钢梁剪力钉(环)间距小,槽口内... 孟加拉国帕德玛大桥主桥上部结构为6×(6×150) m+1×(5×150) m七联大跨度连续钢-混组合梁。公路桥面设有平曲线,桥面板底部设横肋、板内设纵向预应力钢绞线,桥面板剪力钉(环)槽口边缘与钢梁剪力钉(环)间距小,槽口内纵、横钢筋多且与剪力钉(环)间距小,混凝土桥面板的预制、安装精度和质量控制要求高。桥面板分块整幅在预制场匹配预制,桥上通过胶拼连接,然后分区段进行永久预应力筋张拉、孔道压浆、剪力钉(环)槽口混凝土灌注,将混凝土桥面板与连续钢桁梁组合。混凝土桥面板采用长短线结合匹配预制技术,节省了模板和场地投入,保证了预制精度和预制速度;采用架板机拼装、胶拼连接、分区段张拉永久预应力筋、钢梁上铺设滑动层减少预应力张拉损失、灌注剪力钉(环)槽口混凝土进行组合等安装技术,完成了大跨长联钢桁梁桥公路桥面板的安装施工。 展开更多
关键词 钢桁梁桥 大跨长联 钢-混组合梁 桥面板 匹配预制 胶拼连接 纵向预应力 施工技术
下载PDF