In 2010,the first offshore wind turbine with integrated installation was established in Qidong sea area of Jiangsu Province,China,which led to the implementation phase of one-step-installation technique based on the d...In 2010,the first offshore wind turbine with integrated installation was established in Qidong sea area of Jiangsu Province,China,which led to the implementation phase of one-step-installation technique based on the design and construction of large-scale bucket-top-bearing (LSBTB) bucket foundation.The critical technique of LSBTB bucket foundation included self-floating towing,penetration with adjustment of horizontal levelness,removability and one-step-installation.The process of one-step-installation included the prefabrication of LSBTB bucket foundation in onshore construction base,installation and debugging of wind power,overall water transportation of foundation and wind power system,and installation of foundation and offshore wind turbine on the appointed sea area.The cost of one-step-installation technique was about 5 000 Yuan/kW,which was 30%-50% lower than that of the existing technique.The prefabrication of LSBTB bucket foundation took about two months.During the one-step-installation process,the installation and debugging of wind power and overall water transportation need about one to two days in sea area within 35 m depth.After the proposed technique is industrialized,the cost will be further reduced,and the installation capacity is expected to be up to 500 wind turbines per year.展开更多
In order to get atomic smooth rigid disk substrate surface, ultra-fined alumina slurry and nanometer silica slurry are prepared, and two steps chemical-mechanical polishing (CMP) of rigid disk substrate in the two s...In order to get atomic smooth rigid disk substrate surface, ultra-fined alumina slurry and nanometer silica slurry are prepared, and two steps chemical-mechanical polishing (CMP) of rigid disk substrate in the two slurries are studied. The results show that, during the first step CMP in the alumina slurry, a high material removal rate is reached, and the average roughness (Ra) and the average waviness (Wa) of the polished surfaces can be decreased from previous 1.4 nm and 1.6 nm to about 0.6 nm and 0.7 nm, respectively. By using the nanometer silica slurry and optimized polishing process parameters in the second step CMP, the Ra and the Wa of the polished surfaces can be further reduced to 0.038 nm and 0.06 am, respectively. Atom force microscopy (AFM) analysis shows that the final polished surfaces are ultra-smooth without micro-defects.展开更多
脱丁烷塔聚合物结垢问题是制约乙烯装置长周期运行的主要因素之一。目前新建装置通过降低操作压力在防止脱丁烷塔聚合物结垢方面取得了显著效果。以脱丁烷塔为例,对降压过程的可行性、经济性以及风险点进行分析和总结,利用化工流程模拟...脱丁烷塔聚合物结垢问题是制约乙烯装置长周期运行的主要因素之一。目前新建装置通过降低操作压力在防止脱丁烷塔聚合物结垢方面取得了显著效果。以脱丁烷塔为例,对降压过程的可行性、经济性以及风险点进行分析和总结,利用化工流程模拟软件Aspen Plus对降压后各项工艺参数进行模拟优化,将优化结果应用于实际生产过程。结果表明,脱丁烷塔的降压极限为350 kPa,降压后全塔温度降低约4℃,塔釜粗裂解汽油中的C_(4)摩尔分数降低0.32百分点,节省低压蒸汽1.3 t h,装置能耗和C_(4)产品损失降低,循环水侧压降、循环水在换热器内的流速和对数传热温差均在合理范围之内。展开更多
目的探讨复方苦参注射液用于WHO三阶梯止痛原则中的止痛价值。方法随机选取医院2019年7月—2022年4月150例癌痛患者,按照随机数字表法分为治疗组75例,对照组75例。对照组轻度癌痛患者使用布洛芬缓释片,中度癌痛患者使用盐酸曲马多缓释...目的探讨复方苦参注射液用于WHO三阶梯止痛原则中的止痛价值。方法随机选取医院2019年7月—2022年4月150例癌痛患者,按照随机数字表法分为治疗组75例,对照组75例。对照组轻度癌痛患者使用布洛芬缓释片,中度癌痛患者使用盐酸曲马多缓释片联合布洛芬缓释片,重度癌痛患者使用盐酸吗啡缓释片联合布洛芬缓释片联合醋酸地塞米松片处理,治疗组在对照组基础上加用复方苦参注射液,21 d为1个疗程。观察比较两组治疗后的疼痛有效缓解率以及疼痛程度数字评估量表(numerical rating scale,NRS)、EORTC QLQ—C30(EuroPean organization for Research and Treatment)量表评分、匹兹堡睡眠质量指数与安全性。结果经治疗,治疗组有效缓解率升高(P<0.05);治疗组的NRS评分明显升高(P<0.01);EORTC QLQ—C30量表评分部分升高(P<0.05);匹兹堡睡眠质量指数明显升高(P<0.01);两组在治疗期间均出现不良反应,但治疗组不良事件发生率在恶心呕吐与便秘两方面更低(P<0.05);结果差异均有统计学意义(P<0.05)。结论在WHO三阶梯止痛原则基础上,加用复方苦参注射液可以明显提高止痛效果,明显改善生活质量,提高患者睡眠质量,同时也可降低不良事件发生情况,因此值得在临床推广应用。展开更多
电-热-气-冷多能联供型微网对实现能源可持续发展具有重要的应用价值。针对多能联供系统碳排放量较高和负荷模型预测不准确问题,提出了一种基于滚动优化的电-热-气-冷系统多时间尺度低碳运行策略。首先,建立电-热-气-冷系统设备模型。其...电-热-气-冷多能联供型微网对实现能源可持续发展具有重要的应用价值。针对多能联供系统碳排放量较高和负荷模型预测不准确问题,提出了一种基于滚动优化的电-热-气-冷系统多时间尺度低碳运行策略。首先,建立电-热-气-冷系统设备模型。其次,构建日前与日内两阶段模型,在日前调度阶段引入含赏罚因数的碳交易机制,通过将卷积神经网络(convolutional neural networks,CNN)与双向长短期记忆网络(bi-directional long short term memory,Bi-LSTM)进行结合对风光功率进行预测,并以运行成本最低为目标进行优化。之后,建立日内多时间尺度的优化调度模型,以调度成本最低为目标进行求解。最后,以某市综合能源系统为研究对象进行分析。结果表明,所提出的方法能够有效减少碳排放,提高负荷模型预测的准确度的同时实现多能联供系统的低碳经济运行。展开更多
The frequency-modulated continuous-wave (FMCW) synthetic aperture radar (SAR) is a light-weight, cost-effective, high-resolution imaging radar, which is suitable for a small flight platform. The signal model is de...The frequency-modulated continuous-wave (FMCW) synthetic aperture radar (SAR) is a light-weight, cost-effective, high-resolution imaging radar, which is suitable for a small flight platform. The signal model is derived for FMCW SAR used in unmanned aerial vehicles (UAV) reconnaissance and remote sensing. An appropriate algorithm is proposed. The algorithm performs the range cell migration correction (RCMC) for continuous nonchirped raw data using the energy invariance of the scaling of a signal in the scale domain. The azimuth processing is based on step transform without geometric resampling operation. The complete derivation of the algorithm is presented. The algorithm performance is shown by simulation results.展开更多
The optimality criteria (OC) method and mathematical programming (MP) were combined to found the sectional optimization model of frame structures. Different methods were adopted to deal with the different constrai...The optimality criteria (OC) method and mathematical programming (MP) were combined to found the sectional optimization model of frame structures. Different methods were adopted to deal with the different constraints. The stress constraints as local constraints were approached by zero-order approximation and transformed into movable sectional lower limits with the full stress criterion. The displacement constraints as global constraints were transformed into explicit expressions with the unit virtual load method. Thus an approximate explicit model for the sectional optimization of frame structures was built with stress and displacement constraints. To improve the resolution efficiency, the dual-quadratic programming was adopted to transform the original optimization model into a dual problem according to the dual theory and solved iteratively in its dual space. A method called approximate scaling step was adopted to reduce computations and smooth the iterative process. Negative constraints were deleted to reduce the size of the optimization model. With MSC/Nastran software as structural solver and MSC/Patran software as developing platform, the sectional optimization software of frame structures was accomplished, considering stress and displacement constraints. The examples show that the efficiency and accuracy are improved.展开更多
Large eddy simulation (LES) explicitly calculates the large-scale vortex field and parameterizes the small-scale vortices.In this study,LES and κ-ε models were developed for a specific geometrical configuration of b...Large eddy simulation (LES) explicitly calculates the large-scale vortex field and parameterizes the small-scale vortices.In this study,LES and κ-ε models were developed for a specific geometrical configuration of backward-facing step (BFS).The simulation results were validated with particle image velocimetry (PIV) measurements and direct numerical simulation (DNS).This LES simulation was carried out with a Reynolds number of 9000 in a pressurized water tunnel with an expansion ratio of 2.00.The results indicate that the LES model can reveal largescale vortex motion although with a larger grid-cell size.However,the LES model tends to overestimate the top wall separation and the Reynolds stress components for the BFS flow simulation without a sufficiently fine grid.Overall,LES is a potential tool for simulating separated flow controlled by large-scale vortices.展开更多
The complexity of distribution network model mainly depends on the model scale of grid-connected distributed photovoltaic (PV) power generation. Therefore, the simulation performance of multi-scale PV model is the key...The complexity of distribution network model mainly depends on the model scale of grid-connected distributed photovoltaic (PV) power generation. Therefore, the simulation performance of multi-scale PV model is the key factor of the simulation accuracy in the specific operating scenarios of distribution network. In this paper, a multi-scale model of grid connected PV distributed generation system is proposed based on the mathematical model of grid-connected distributed PV power generation. It is analyzed that differences of simulation performance, such as adaptability of simulation step size, accuracy of output and the effect on voltage profile of distribution network, between PV models with different scales in IEEE 33 node example. Simulation results indicate that the multi-scale model is effective in improving the accuracy and efficiency of simulation under different operating conditions of distribution network.展开更多
基金Supported by National High Technology Research and Development Program of China("863"Program,No.2012AA051705)National Natural Science Foundation of China(No.51109160)International Science and Technology Cooperation Program of China(No.2012DFA70490)
文摘In 2010,the first offshore wind turbine with integrated installation was established in Qidong sea area of Jiangsu Province,China,which led to the implementation phase of one-step-installation technique based on the design and construction of large-scale bucket-top-bearing (LSBTB) bucket foundation.The critical technique of LSBTB bucket foundation included self-floating towing,penetration with adjustment of horizontal levelness,removability and one-step-installation.The process of one-step-installation included the prefabrication of LSBTB bucket foundation in onshore construction base,installation and debugging of wind power,overall water transportation of foundation and wind power system,and installation of foundation and offshore wind turbine on the appointed sea area.The cost of one-step-installation technique was about 5 000 Yuan/kW,which was 30%-50% lower than that of the existing technique.The prefabrication of LSBTB bucket foundation took about two months.During the one-step-installation process,the installation and debugging of wind power and overall water transportation need about one to two days in sea area within 35 m depth.After the proposed technique is industrialized,the cost will be further reduced,and the installation capacity is expected to be up to 500 wind turbines per year.
基金This project is supported by National Basic Research Program of China (973 Program, N0.2003CB716201)National Natural Science Foundation of China (No.50575131)Science Foundation of Shanghai Municipal Commission of Science and Technology, China(No.0452nm013).
文摘In order to get atomic smooth rigid disk substrate surface, ultra-fined alumina slurry and nanometer silica slurry are prepared, and two steps chemical-mechanical polishing (CMP) of rigid disk substrate in the two slurries are studied. The results show that, during the first step CMP in the alumina slurry, a high material removal rate is reached, and the average roughness (Ra) and the average waviness (Wa) of the polished surfaces can be decreased from previous 1.4 nm and 1.6 nm to about 0.6 nm and 0.7 nm, respectively. By using the nanometer silica slurry and optimized polishing process parameters in the second step CMP, the Ra and the Wa of the polished surfaces can be further reduced to 0.038 nm and 0.06 am, respectively. Atom force microscopy (AFM) analysis shows that the final polished surfaces are ultra-smooth without micro-defects.
文摘脱丁烷塔聚合物结垢问题是制约乙烯装置长周期运行的主要因素之一。目前新建装置通过降低操作压力在防止脱丁烷塔聚合物结垢方面取得了显著效果。以脱丁烷塔为例,对降压过程的可行性、经济性以及风险点进行分析和总结,利用化工流程模拟软件Aspen Plus对降压后各项工艺参数进行模拟优化,将优化结果应用于实际生产过程。结果表明,脱丁烷塔的降压极限为350 kPa,降压后全塔温度降低约4℃,塔釜粗裂解汽油中的C_(4)摩尔分数降低0.32百分点,节省低压蒸汽1.3 t h,装置能耗和C_(4)产品损失降低,循环水侧压降、循环水在换热器内的流速和对数传热温差均在合理范围之内。
文摘目的探讨复方苦参注射液用于WHO三阶梯止痛原则中的止痛价值。方法随机选取医院2019年7月—2022年4月150例癌痛患者,按照随机数字表法分为治疗组75例,对照组75例。对照组轻度癌痛患者使用布洛芬缓释片,中度癌痛患者使用盐酸曲马多缓释片联合布洛芬缓释片,重度癌痛患者使用盐酸吗啡缓释片联合布洛芬缓释片联合醋酸地塞米松片处理,治疗组在对照组基础上加用复方苦参注射液,21 d为1个疗程。观察比较两组治疗后的疼痛有效缓解率以及疼痛程度数字评估量表(numerical rating scale,NRS)、EORTC QLQ—C30(EuroPean organization for Research and Treatment)量表评分、匹兹堡睡眠质量指数与安全性。结果经治疗,治疗组有效缓解率升高(P<0.05);治疗组的NRS评分明显升高(P<0.01);EORTC QLQ—C30量表评分部分升高(P<0.05);匹兹堡睡眠质量指数明显升高(P<0.01);两组在治疗期间均出现不良反应,但治疗组不良事件发生率在恶心呕吐与便秘两方面更低(P<0.05);结果差异均有统计学意义(P<0.05)。结论在WHO三阶梯止痛原则基础上,加用复方苦参注射液可以明显提高止痛效果,明显改善生活质量,提高患者睡眠质量,同时也可降低不良事件发生情况,因此值得在临床推广应用。
文摘电-热-气-冷多能联供型微网对实现能源可持续发展具有重要的应用价值。针对多能联供系统碳排放量较高和负荷模型预测不准确问题,提出了一种基于滚动优化的电-热-气-冷系统多时间尺度低碳运行策略。首先,建立电-热-气-冷系统设备模型。其次,构建日前与日内两阶段模型,在日前调度阶段引入含赏罚因数的碳交易机制,通过将卷积神经网络(convolutional neural networks,CNN)与双向长短期记忆网络(bi-directional long short term memory,Bi-LSTM)进行结合对风光功率进行预测,并以运行成本最低为目标进行优化。之后,建立日内多时间尺度的优化调度模型,以调度成本最低为目标进行求解。最后,以某市综合能源系统为研究对象进行分析。结果表明,所提出的方法能够有效减少碳排放,提高负荷模型预测的准确度的同时实现多能联供系统的低碳经济运行。
文摘The frequency-modulated continuous-wave (FMCW) synthetic aperture radar (SAR) is a light-weight, cost-effective, high-resolution imaging radar, which is suitable for a small flight platform. The signal model is derived for FMCW SAR used in unmanned aerial vehicles (UAV) reconnaissance and remote sensing. An appropriate algorithm is proposed. The algorithm performs the range cell migration correction (RCMC) for continuous nonchirped raw data using the energy invariance of the scaling of a signal in the scale domain. The azimuth processing is based on step transform without geometric resampling operation. The complete derivation of the algorithm is presented. The algorithm performance is shown by simulation results.
基金Project supported by the National Natural Science Foundation of China(No. 10472003) the Natural Science Foundation of Beijing(No.3002002) the Science Foundation of Beijing Municipal Commission of Education(No.KM200410005019)
文摘The optimality criteria (OC) method and mathematical programming (MP) were combined to found the sectional optimization model of frame structures. Different methods were adopted to deal with the different constraints. The stress constraints as local constraints were approached by zero-order approximation and transformed into movable sectional lower limits with the full stress criterion. The displacement constraints as global constraints were transformed into explicit expressions with the unit virtual load method. Thus an approximate explicit model for the sectional optimization of frame structures was built with stress and displacement constraints. To improve the resolution efficiency, the dual-quadratic programming was adopted to transform the original optimization model into a dual problem according to the dual theory and solved iteratively in its dual space. A method called approximate scaling step was adopted to reduce computations and smooth the iterative process. Negative constraints were deleted to reduce the size of the optimization model. With MSC/Nastran software as structural solver and MSC/Patran software as developing platform, the sectional optimization software of frame structures was accomplished, considering stress and displacement constraints. The examples show that the efficiency and accuracy are improved.
基金supported by the National Natural Science Foundation of China(Grant No.51379128)
文摘Large eddy simulation (LES) explicitly calculates the large-scale vortex field and parameterizes the small-scale vortices.In this study,LES and κ-ε models were developed for a specific geometrical configuration of backward-facing step (BFS).The simulation results were validated with particle image velocimetry (PIV) measurements and direct numerical simulation (DNS).This LES simulation was carried out with a Reynolds number of 9000 in a pressurized water tunnel with an expansion ratio of 2.00.The results indicate that the LES model can reveal largescale vortex motion although with a larger grid-cell size.However,the LES model tends to overestimate the top wall separation and the Reynolds stress components for the BFS flow simulation without a sufficiently fine grid.Overall,LES is a potential tool for simulating separated flow controlled by large-scale vortices.
文摘The complexity of distribution network model mainly depends on the model scale of grid-connected distributed photovoltaic (PV) power generation. Therefore, the simulation performance of multi-scale PV model is the key factor of the simulation accuracy in the specific operating scenarios of distribution network. In this paper, a multi-scale model of grid connected PV distributed generation system is proposed based on the mathematical model of grid-connected distributed PV power generation. It is analyzed that differences of simulation performance, such as adaptability of simulation step size, accuracy of output and the effect on voltage profile of distribution network, between PV models with different scales in IEEE 33 node example. Simulation results indicate that the multi-scale model is effective in improving the accuracy and efficiency of simulation under different operating conditions of distribution network.