Countermeasure Method for Stope Instability in Crown Pillar Area of Cut and Fill Underground Mine 被引量:1
1
作者 Tri Karian Hideki Shimada +3 位作者 Takashi Sasaoka Sugeng Wahyudi Deyu Qian Budi Sulistianto 《International Journal of Geosciences》 2016年第3期280-300,共21页
Maintaining stability as well as optimizing recovery of crown pillar, a pillar separating surface area with the uppermost stope in overhand cut and fill underground mining method, is important. Failures in stope may l... Maintaining stability as well as optimizing recovery of crown pillar, a pillar separating surface area with the uppermost stope in overhand cut and fill underground mining method, is important. Failures in stope may lead to crown pillar failures and cause surface subsidence. Increasing crown pillar thickness will increase crown pillar stability yet reduce mining recovery because part of crown pillar is formed by ore body. Preventing stope failure is the key to maintain stability and optimize recovery of crown pillar. Therefore, it is important to study countermeasure method for stope failure especially in crown pillar area. An attempt has been made to investigate the effectiveness of various countermeasures for stope failure in crown pillar area by means of parametric study. The result shows active type support system is effective for supporting stope in high vertical stress condition while the passive one needs to be installed if the stope is opened in high horizontal stress condition. In general, more supporting capacity from both type support systems is needed if the stope is opened in more severe geological condition. Another countermeasures, sill pillar and surface pile, are introduced for stope instability in crown pillar and non-crown pillar area. Sill pillar is an abandoned slice of unstable stope based on stability analysis. Sill pillar is very effective to stabilize stope both in crown pillar and non-crown pillar area, especially for stope in high horizontal stress condition. Sill pillar application in model with stress ratio 2 can optimize 20 meter thickness of crown pillar into 5 meter. Another proposed countermeasure is surface pile. Surface pile can be installed from the surface to improve stability of crown pillar and stope. The most effective use of surface pile is found in simulation of model with stress ratio 0.75 where surface pile can optimize 15 meter thickness of crown pillar into 5 meter. 展开更多
关键词 Crown Pillar stope stability Active and Passive Type Support System Sill Pillar Surface Pile
下载PDF
Safety analysis of Sormeh underground mine to improve sublevel stoping stability
2
作者 Mostafa Hosseini Amin Azhari +1 位作者 Rahman Lotfi Alireza Baghbanan 《Deep Underground Science and Engineering》 2023年第2期173-187,共15页
In underground mines,sublevel stoping is used among a variety of different methods for mining an orebody,which creates large underground openings.In this case,the stability of these openings is affected by a number of... In underground mines,sublevel stoping is used among a variety of different methods for mining an orebody,which creates large underground openings.In this case,the stability of these openings is affected by a number of factors,including the geometrical characteristics of the rock and mining-induced stresses.In this study,a sensitivity analysis was conducted with the numerical,squat pillar,and Mathews stability methods using the Taguchi technique to properly understand the influence of geometric parameters and stress on stope stability according to Sormeh underground mine data.The results show a full factorial analysis is more reliable since stope stability is a complex process.Furthermore,the numerical results indicate that overburden stress has the most impact on stope stability,followed by stope height.However,the results obtained with Mathews and squat pillar methods show that stope height has the greatest impact,followed by overburden stress and span.It appears that these methods overestimate the impact of stope height.Therefore,it is highly recommended that Mathews and squat pillar methods should not be used in high stope that is divided with several sill pillars.Nonetheless,Mathews method cannot accurately predict how the sill pillar impacts the stope stability.In addition,numerical analysis shows that all geometric parameters affect the roof safety factor,whereas the sill pillar has no significant influence on the safety factor of the hanging wall,which is primarily determined by the stope height–span ratio. 展开更多
关键词 numerical method rib pillar stope stability sublevel stoping underground mining
下载PDF
Orthogonal design and numerical simulation of room and pillar configurations in fractured stopes 被引量:7
3
作者 吴爱祥 黄明清 +3 位作者 韩斌 王贻明 于少峰 缪秀秀 《Journal of Central South University》 SCIE EI CAS 2014年第8期3338-3344,共7页
Room and pillar sizes are key factors for safe mining and ore recovery in open-stope mining. To investigate the influence of room and pillar configurations on stope stability in highly fractured and weakened areas, an... Room and pillar sizes are key factors for safe mining and ore recovery in open-stope mining. To investigate the influence of room and pillar configurations on stope stability in highly fractured and weakened areas, an orthogonal design with two factors, three levels and nine runs was proposed, followed by three-dimensional numerical simulation using ANSYS and FLAC3~. Results show that surface settlement after excavation is concentrically ringed, and increases with the decrease of pillar width and distances to stope gobs. In the meantime, the ore-control fault at the ore-rock boundary and the fractured argillaceous dolomite with intercalated slate at the hanging wall deteriorate the roof settlement. Additionally, stope stability is challenged due to pillar rheological yield and stress concentration, and both are induced by redistribution of stress and plastic zones after mining. Following an objective function and a constraint function, room and pillar configuration with widths of 14 m and 16 m, respectively, is presented as the optimization for improving the ore recovery rate while maintaining a safe working environment. 展开更多
关键词 orthogonal design numerical simulation surface movement roof settlement stope stability room and pillarconfiguration
下载PDF
Stability analysis of backflling in subsiding area and optimization of the stoping sequence 被引量:7
4
作者 Ping Wang Huiqiang Li +1 位作者 Yan Li Bo Cheng 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2013年第6期478-485,共8页
In underground mining by sublevel caving method, the deformation and damage of the surface induced by subsidence are the major challenging issues. The dynamic and soft backflling body increases the safety risks in the... In underground mining by sublevel caving method, the deformation and damage of the surface induced by subsidence are the major challenging issues. The dynamic and soft backflling body increases the safety risks in the subsiding area. In this paper, taking Zhangfushan iron mine as an example, the ore body and the general layout are focused on the safety of backflling of mined-out area. Then, we use the ANSYS software to construct a three-dimensional(3D) model for the mining area in the Zhangfushan iron mine. According to the simulation results of the initial mining stages, the ore body is stoped step by step as suggested in the design. The stability of the backflling is back analyzed based on the monitored displacements, considering the stress distribution to optimize the stoping sequence. The simulations show that a reasonable stoping sequence can minimize the concentration of high compressive stress and ensure the safety of stoping of the ore body. 展开更多
关键词 Mining engineering Backflling body Numerical simulations stability analysis Stoping sequence optimization