To discuss the soil arching effect on the load transferring model and sharing ratios by the piles and inter-pile subsoil in the bidirectionally reinforced composite ground, the forming mechanism, mechanical behavior a...To discuss the soil arching effect on the load transferring model and sharing ratios by the piles and inter-pile subsoil in the bidirectionally reinforced composite ground, the forming mechanism, mechanical behavior and its effect factors were discussed in detail. Then, the unified strength theory was introduced to set up the elastoplastic equilibrium differential equation of the subsoil under the limit equilibrium state. And from the equation, the solutions were derived with the corresponding formulas presented to calculate the earth pressure over and beneath the horizontal reinforced cushion or pillow, the stress of inter-pile subsoil and the pile-soil stress ratio. Based on the obtained solutions and measured data from an engineering project, the influence rules by the soil property parameters (i.e., the cohesion c and internal friction angle φ) and pile spacing on the pile-soil stress ratio n were discussed respectively. The results show that to improve the load sharing ratio by the piles, the more effective means for filling materials with a larger value of φ is to increase the ratio of pile cap size to spacing, while to reduce the pile spacing properly and increase the value of cohesion c is advisable for those filling materials with a smaller value of φ.展开更多
In piled and geosynthetic-reinforced(PGR) embankment, the arching behavior determines the overburden load on piles and subsoils. Placement of geosynthetic is effective in reducing the relative displacement between pil...In piled and geosynthetic-reinforced(PGR) embankment, the arching behavior determines the overburden load on piles and subsoils. Placement of geosynthetic is effective in reducing the relative displacement between pile and subsoil. When the mobilized shear stress is less than the shear strength, partially developed arching will occur. Consequently, existing analytical methods, adopting the ultimate shear strength failure criterion, need to be improved. This study developed a simplified 2 D analytical method, which is based on the developing arching effect, to evaluate the load redistribution of the PGR embankment. Then, the influences of embankment height and internal friction angle, subsoil depth, ratio of pile cap width to pile clear spacing(RPC) and geosynthetic tensile stiffness on the critical height ratio, stress concentration ratio, soil arching ratio, geosynthetic tension and axial strain were investigated. This study suggests that a RPC of 1:1.0 and a one-way of single-layer geosynthetic tensile stiffness of 2000 kN/m should be considered as the sensitivity thresholds for the PGR embankment.展开更多
Shield tunneling and post-tunneling steady seepage are accompanied by stress and displacement variations,which could induce and influence the soil arching effect.Although there are many studies on the tunneling-induce...Shield tunneling and post-tunneling steady seepage are accompanied by stress and displacement variations,which could induce and influence the soil arching effect.Although there are many studies on the tunneling-induced soil arching effect,the research about the effect of seepage on soil arching effect is extremely lacking.In this study,a numerical model is firstly established and verified by field data.Then,a series of numerical models,whose simulation method of steady seepage is verified by adopting the conformal mapping technique,are established to study the soil arching evolution of deep-buried tunneling and post-construction steady seepage.The results indicate that seepage leads to an increase in effective vertical stress,which is consistent with the existing theory.The seepage weakens the soil arching effect resulting in the height of the arch zone reducing from 2.38D(D is the tunnel diameter)to 1.25D.The seepage leads to the further development of ground consolidation settlement,but the differential displacement in the soil mass decreases.The ground reaction curve in the steady seepage condition shows a bigger value than that after excavation.It is reasonable to control the ground loss ratio in the range of 0.5–1.0%,which can minimize overburden pressure with moderate ground deformation.展开更多
Cemented paste backfill(CPB) is largely used in underground mines worldwide.A key issue associated with application of CPB is to estimate the stresses in backfilled stopes and on barricades.Recent numerical and experi...Cemented paste backfill(CPB) is largely used in underground mines worldwide.A key issue associated with application of CPB is to estimate the stresses in backfilled stopes and on barricades.Recent numerical and experimental results show that arching effect is absent shortly after the placement of CPB in stopes.However,stress decreases in barricade drift with increasing distance between the measurement points and drawpoint have also been observed,demonstrating arching effect shortly after the pouring of CPB.To explain these paradoxes,CPB is considered as Bingham fluid having a yield shear stress.Three dimensional analytical solutions are proposed to evaluate the short-term total stresses in backfilled stopes and on barricades,accounting for the CPB's yield shear stress-induced arching effect.Stress diminution due to such arching effect in the backfilled stopes and on barricades is indeed obtained.But the reduction becomes insignificant using typical yield shear stress and stope geometry.More analyses indicate that the typical yield shear stress values do not fully correspond to field conditions where the yield shear stress would increase exponentially due to apparent consolidation(loss of water by drainage,a phenomenon similar to the desiccation of overly saturated fine-grained materials).展开更多
基金Project (07JJ4015) supported by the Natural Science Foundation of Hunan Province, China
文摘To discuss the soil arching effect on the load transferring model and sharing ratios by the piles and inter-pile subsoil in the bidirectionally reinforced composite ground, the forming mechanism, mechanical behavior and its effect factors were discussed in detail. Then, the unified strength theory was introduced to set up the elastoplastic equilibrium differential equation of the subsoil under the limit equilibrium state. And from the equation, the solutions were derived with the corresponding formulas presented to calculate the earth pressure over and beneath the horizontal reinforced cushion or pillow, the stress of inter-pile subsoil and the pile-soil stress ratio. Based on the obtained solutions and measured data from an engineering project, the influence rules by the soil property parameters (i.e., the cohesion c and internal friction angle φ) and pile spacing on the pile-soil stress ratio n were discussed respectively. The results show that to improve the load sharing ratio by the piles, the more effective means for filling materials with a larger value of φ is to increase the ratio of pile cap size to spacing, while to reduce the pile spacing properly and increase the value of cohesion c is advisable for those filling materials with a smaller value of φ.
基金Project(51508279) supported by the National Natural Science Foundation of ChinaProject(KFJ170104) supported by the Open Fund of National Engineering Laboratory of Highway Maintenance Technology of Changsha University of Science & Technology, China+1 种基金Project(BK20150885) supported by the Jiangsu Provincial Natural Science Fund, ChinaProject(2019003) supported by the Key Laboratory of Ministry of Education for Geomechanics and Embankment Engineering of Hohai University, China。
文摘In piled and geosynthetic-reinforced(PGR) embankment, the arching behavior determines the overburden load on piles and subsoils. Placement of geosynthetic is effective in reducing the relative displacement between pile and subsoil. When the mobilized shear stress is less than the shear strength, partially developed arching will occur. Consequently, existing analytical methods, adopting the ultimate shear strength failure criterion, need to be improved. This study developed a simplified 2 D analytical method, which is based on the developing arching effect, to evaluate the load redistribution of the PGR embankment. Then, the influences of embankment height and internal friction angle, subsoil depth, ratio of pile cap width to pile clear spacing(RPC) and geosynthetic tensile stiffness on the critical height ratio, stress concentration ratio, soil arching ratio, geosynthetic tension and axial strain were investigated. This study suggests that a RPC of 1:1.0 and a one-way of single-layer geosynthetic tensile stiffness of 2000 kN/m should be considered as the sensitivity thresholds for the PGR embankment.
基金supported by the National Natural Science Foundation of China(Grant Nos.52090082,51938005,52122807,and 52108318)China Hunan Provincial Science&Technology Department(Grant Nos.2021RC3043 and 2021JJ30119).
文摘Shield tunneling and post-tunneling steady seepage are accompanied by stress and displacement variations,which could induce and influence the soil arching effect.Although there are many studies on the tunneling-induced soil arching effect,the research about the effect of seepage on soil arching effect is extremely lacking.In this study,a numerical model is firstly established and verified by field data.Then,a series of numerical models,whose simulation method of steady seepage is verified by adopting the conformal mapping technique,are established to study the soil arching evolution of deep-buried tunneling and post-construction steady seepage.The results indicate that seepage leads to an increase in effective vertical stress,which is consistent with the existing theory.The seepage weakens the soil arching effect resulting in the height of the arch zone reducing from 2.38D(D is the tunnel diameter)to 1.25D.The seepage leads to the further development of ground consolidation settlement,but the differential displacement in the soil mass decreases.The ground reaction curve in the steady seepage condition shows a bigger value than that after excavation.It is reasonable to control the ground loss ratio in the range of 0.5–1.0%,which can minimize overburden pressure with moderate ground deformation.
基金the Natural Sciences and Engineering Research Council of Canada(NSERC)Institut de recherche Robert-Sauve en sante et en securite du travail(IRSST)industrial partners of the Research Institute on Mines and the Environment(RIME UQAT-Polytechnique)
文摘Cemented paste backfill(CPB) is largely used in underground mines worldwide.A key issue associated with application of CPB is to estimate the stresses in backfilled stopes and on barricades.Recent numerical and experimental results show that arching effect is absent shortly after the placement of CPB in stopes.However,stress decreases in barricade drift with increasing distance between the measurement points and drawpoint have also been observed,demonstrating arching effect shortly after the pouring of CPB.To explain these paradoxes,CPB is considered as Bingham fluid having a yield shear stress.Three dimensional analytical solutions are proposed to evaluate the short-term total stresses in backfilled stopes and on barricades,accounting for the CPB's yield shear stress-induced arching effect.Stress diminution due to such arching effect in the backfilled stopes and on barricades is indeed obtained.But the reduction becomes insignificant using typical yield shear stress and stope geometry.More analyses indicate that the typical yield shear stress values do not fully correspond to field conditions where the yield shear stress would increase exponentially due to apparent consolidation(loss of water by drainage,a phenomenon similar to the desiccation of overly saturated fine-grained materials).