Pier-Pile integral structures provide construction works with many environmental and landscape advantages. For example, the space required to construct these structures is smaller than that of other bridges due to the...Pier-Pile integral structures provide construction works with many environmental and landscape advantages. For example, the space required to construct these structures is smaller than that of other bridges due to the footing being removed, meaning that it is not necessity to greatly change the surroundings of these bridges. While there are environmental and landscape advantages, there are also a few demerits for the overall land-scape designs, including demerits in the design of this proposed structure which consists of relatively slender parts. This proposed structure has already been constructed in areas where possibility of a severe earthquake is low. However, some problems that have yet to be examined are related to the use of this proposed structure in areas where earthquakes are frequent. Lacking detailed studies of its behavior during severe earthquakes, it is currently difficult to construct these structures in Japan. Consequently, it is necessary to investigate in detail limited performance about compression and bending moment, and earthquake- resistant performance of these structures in order to resolve these problems. In this paper, It was clarified the relationship between the rigidity of the ground and the effective buckling length by buckling analysis and elasto- plastic finite deformation analysis. Moreover, it was proposed a simplified formula using a proposed characteristic value β and several factors for analysis accuracy. A simplified formula would support to determine the effective buckling length to design the pier using the load-bearing capacity curve based on the slenderness ratio parameter.展开更多
为解决水深45.000 m深海风机钢管桩基础安装作业可靠性差和精度低等问题,对一种新型深海风机钢管桩基础安装用导向架进行结构优化。采用有限元法(Finite Element Method, FEM)与试验相结合的方法,从环境参数与作用载荷、结构形式、作业...为解决水深45.000 m深海风机钢管桩基础安装作业可靠性差和精度低等问题,对一种新型深海风机钢管桩基础安装用导向架进行结构优化。采用有限元法(Finite Element Method, FEM)与试验相结合的方法,从环境参数与作用载荷、结构形式、作业工况和结构强度与结构稳定性等方面对导向架进行综合研究。经海试验证,优化的导向架的打桩精度与打桩高效性均满足技术指标要求,可大幅提高深海风机钢管桩基础安装作业速度和质量。展开更多
This paper introduces a new prefabricated recyclable double-row piles retaining system for excavations in silty clay ground.Laboratory model test and numerical simulation are conducted to study the system behavior upo...This paper introduces a new prefabricated recyclable double-row piles retaining system for excavations in silty clay ground.Laboratory model test and numerical simulation are conducted to study the system behavior upon excavation.The horizontal displacement(δ_(h)),Von Mises stress(δ_(M)),strain(ε),ground surface settlement(δ_(v)),and earth pressure are systematically investigated.Furthermore,the monitoring data of 13 excavation cases supported by double-row piles retaining system are presented and discussed.The experimental results can basically match the numerical results,and the maximumδ_(M),maximum bending moment(M_(max)),maximum horizontal displacement(δ_(hm))of structural members are all less than the tolerance limits.The ground surface settlement model of double-row piles retaining system consists of three zones,i.e.,rebound influence zone,primary influence zone and secondary influence zone.The dhm values are 0.07%–1.42%of the excavation depth(He).The maximum ground surface settlement(δ_(vm))is generally less than dhm.The ratio ofδ_(vm)=δ_(hm)varies between 0.09 and 0.76,with an average value of 0.5.The observed earth pressure on the retained side of front pile(paf)is about 0.53–0.57γH below the excavation surface.Above the excavation surface,p_(af)decreases dramatically when getting closer to the ground surface.展开更多
文摘Pier-Pile integral structures provide construction works with many environmental and landscape advantages. For example, the space required to construct these structures is smaller than that of other bridges due to the footing being removed, meaning that it is not necessity to greatly change the surroundings of these bridges. While there are environmental and landscape advantages, there are also a few demerits for the overall land-scape designs, including demerits in the design of this proposed structure which consists of relatively slender parts. This proposed structure has already been constructed in areas where possibility of a severe earthquake is low. However, some problems that have yet to be examined are related to the use of this proposed structure in areas where earthquakes are frequent. Lacking detailed studies of its behavior during severe earthquakes, it is currently difficult to construct these structures in Japan. Consequently, it is necessary to investigate in detail limited performance about compression and bending moment, and earthquake- resistant performance of these structures in order to resolve these problems. In this paper, It was clarified the relationship between the rigidity of the ground and the effective buckling length by buckling analysis and elasto- plastic finite deformation analysis. Moreover, it was proposed a simplified formula using a proposed characteristic value β and several factors for analysis accuracy. A simplified formula would support to determine the effective buckling length to design the pier using the load-bearing capacity curve based on the slenderness ratio parameter.
文摘为解决水深45.000 m深海风机钢管桩基础安装作业可靠性差和精度低等问题,对一种新型深海风机钢管桩基础安装用导向架进行结构优化。采用有限元法(Finite Element Method, FEM)与试验相结合的方法,从环境参数与作用载荷、结构形式、作业工况和结构强度与结构稳定性等方面对导向架进行综合研究。经海试验证,优化的导向架的打桩精度与打桩高效性均满足技术指标要求,可大幅提高深海风机钢管桩基础安装作业速度和质量。
基金supported by the National Key Research and Development Program of China(Grant No.2021YFC3100803)the National Natural Science Founda tion of China(Grant Nos.52208380 and 52078506)+2 种基金the Guangdong Basic and Applied Basic ResearchFoundation,China(Grant No.2023A1515012159)Open Research Fund of State Key Laboratory of Geomechanics and Geotechnical Engineering,Institute of Rock and Soil Mechanics,Chinese Academy of Sciences(Grant No.SKLGME021022)the Science and Technology Program of Guangzhou Municipal Construction Group Co.,Ltd.,China(Grant No.2022-KJ004).
文摘This paper introduces a new prefabricated recyclable double-row piles retaining system for excavations in silty clay ground.Laboratory model test and numerical simulation are conducted to study the system behavior upon excavation.The horizontal displacement(δ_(h)),Von Mises stress(δ_(M)),strain(ε),ground surface settlement(δ_(v)),and earth pressure are systematically investigated.Furthermore,the monitoring data of 13 excavation cases supported by double-row piles retaining system are presented and discussed.The experimental results can basically match the numerical results,and the maximumδ_(M),maximum bending moment(M_(max)),maximum horizontal displacement(δ_(hm))of structural members are all less than the tolerance limits.The ground surface settlement model of double-row piles retaining system consists of three zones,i.e.,rebound influence zone,primary influence zone and secondary influence zone.The dhm values are 0.07%–1.42%of the excavation depth(He).The maximum ground surface settlement(δ_(vm))is generally less than dhm.The ratio ofδ_(vm)=δ_(hm)varies between 0.09 and 0.76,with an average value of 0.5.The observed earth pressure on the retained side of front pile(paf)is about 0.53–0.57γH below the excavation surface.Above the excavation surface,p_(af)decreases dramatically when getting closer to the ground surface.