Whether the breakdown structure and coding system of construction projects are reasonable or not determines to a large degree the performance level of the entire project management. We analyze in detail the similariti...Whether the breakdown structure and coding system of construction projects are reasonable or not determines to a large degree the performance level of the entire project management. We analyze in detail the similarities and differences of two kinds of decomposing methods classified by type of work and construction elements based on the discussion of international typical coding standards system designing. We then deduce the differential coefficient relation between project breakdown structure (PBS) and work breakdown structure (WBS). At the same time we constitute a comprehensive construction project breakdown system including element code and type of work code and make a further schematic presentation of the implementation of the system’s functions.展开更多
To collect and share information of projects or products and make it consistent and correct so that the quality and costs of projects can be effectively controlled,an integrative project architecture integrating diffe...To collect and share information of projects or products and make it consistent and correct so that the quality and costs of projects can be effectively controlled,an integrative project architecture integrating different types of breakdown structures is necessary.In this paper,the international research status on work breakdown structure(WBS)was analyzed,and an integrative project architecture for commercial aero-engines was designed,where product breakdown structure(PBS),WBS,organization breakdown structure(OBS)and cost breakdown structure(CBS)were integrated and built.And the architecture was applied in information systems.A transfer from technological views of complex products through their lifecycles to management views has been realized with this standardized architecture,thus development tasks and costs can be controlled.展开更多
The flow structure of one isothermal swirling case in the Sydney swirl flame database was studied using two numerical methods. Results from the Reynolds-averaged Navier-Stokes (RANS) approach and large eddy simulation...The flow structure of one isothermal swirling case in the Sydney swirl flame database was studied using two numerical methods. Results from the Reynolds-averaged Navier-Stokes (RANS) approach and large eddy simulation (LES) were compared with experimental measurements. The simulations were applied in two different Cartesian grids which were investigated by a grid independence study for RANS and a post-estimator for LES. The RNG k-ε turbulence model was used in RANS and dynamic Smagorinsky-Lilly model was used as the sub-grid scale model in LES. A validation study and cross comparison of ensemble average and root mean square (RMS) results showed LES outperforms RANS statistic results. Flow field results indicated that both approaches could capture dominant flow structures, like vortex breakdown (VB), and precessing vortex core (PVC). Streamlines indicate that the formation mechanisms of VB deducted from the two methods were different. The vorticity field was also studied using a velocity gradient based method. This research gained in-depth understanding of isothermal swirling flow.展开更多
文摘Whether the breakdown structure and coding system of construction projects are reasonable or not determines to a large degree the performance level of the entire project management. We analyze in detail the similarities and differences of two kinds of decomposing methods classified by type of work and construction elements based on the discussion of international typical coding standards system designing. We then deduce the differential coefficient relation between project breakdown structure (PBS) and work breakdown structure (WBS). At the same time we constitute a comprehensive construction project breakdown system including element code and type of work code and make a further schematic presentation of the implementation of the system’s functions.
文摘To collect and share information of projects or products and make it consistent and correct so that the quality and costs of projects can be effectively controlled,an integrative project architecture integrating different types of breakdown structures is necessary.In this paper,the international research status on work breakdown structure(WBS)was analyzed,and an integrative project architecture for commercial aero-engines was designed,where product breakdown structure(PBS),WBS,organization breakdown structure(OBS)and cost breakdown structure(CBS)were integrated and built.And the architecture was applied in information systems.A transfer from technological views of complex products through their lifecycles to management views has been realized with this standardized architecture,thus development tasks and costs can be controlled.
基金the financial support of DONG Energy [PSO2007-7333]
文摘The flow structure of one isothermal swirling case in the Sydney swirl flame database was studied using two numerical methods. Results from the Reynolds-averaged Navier-Stokes (RANS) approach and large eddy simulation (LES) were compared with experimental measurements. The simulations were applied in two different Cartesian grids which were investigated by a grid independence study for RANS and a post-estimator for LES. The RNG k-ε turbulence model was used in RANS and dynamic Smagorinsky-Lilly model was used as the sub-grid scale model in LES. A validation study and cross comparison of ensemble average and root mean square (RMS) results showed LES outperforms RANS statistic results. Flow field results indicated that both approaches could capture dominant flow structures, like vortex breakdown (VB), and precessing vortex core (PVC). Streamlines indicate that the formation mechanisms of VB deducted from the two methods were different. The vorticity field was also studied using a velocity gradient based method. This research gained in-depth understanding of isothermal swirling flow.