期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
Difficulties and measures of driving super long piles in Bohai Gulf
1
作者 Shuwang Yan Jia Li +1 位作者 Liqiang Sun Guomin Sun 《Theoretical & Applied Mechanics Letters》 CAS CSCD 2015年第2期69-73,共5页
Long piles of the ocean oil platform are usually manufactured as the integration of several segments, which have to be assembled one by one during installation. During pile driving, excessive pore pressure will build ... Long piles of the ocean oil platform are usually manufactured as the integration of several segments, which have to be assembled one by one during installation. During pile driving, excessive pore pressure will build up in such a high level that hydraulic fracturing in the soil round the pile may take place, which will cause the soil to consolidate much faster during pile extension period. Consequently, after pile extension, the soil strength will recover to some extent and the driving resistance will increase considerably, which makes restarting driving the pile very difficult and even causes refusal. A finite element (FE) analysis procedure is presented for judging the risk of refusal by estimating the blow counts after pile extension, in which the regain of soil strength is considered. A case analysis in Bohai Gulf is performed using the proposed orocedure to exolain the nile refusal phenomenon. 展开更多
关键词 super long pile driving Refusal Excessive pore pressure Hydraulic fracture Finite element analysis Prevent measures
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部