Using vector-analysis, three kinds of roof blocks at the end face of fully mechanized long wall faces have been studied. Tbe result indicates that with face advancing, the three kinds of blocks may all become key bloc...Using vector-analysis, three kinds of roof blocks at the end face of fully mechanized long wall faces have been studied. Tbe result indicates that with face advancing, the three kinds of blocks may all become key blocks. It is put forward that the key blocks can reach into the scope of angle of fracture through supporting, and the fomulas for calculating supporting force needed for the three key blocks to maintain stadility have been derived.展开更多
Background of the development and achievement on sets equipment technologies for coal mine longwall face in China was reviewed initially. On the theoretical side, a coupling model of hydraulic support and surrounding ...Background of the development and achievement on sets equipment technologies for coal mine longwall face in China was reviewed initially. On the theoretical side, a coupling model of hydraulic support and surrounding rock, support pa- rameters optimization and threedimensional (3D) dynamic design method were presented. On the practical side, this paper out lined some of practical issues and discussed some relative methods and technologies. In thin seam coal longwall mining, how to lower equipment height is the first problem that should be solved. Roof pressure regularity, control of rooffall and collapse, and hydraulic support stability were investigated preferentially in 5-7 m coal seam longwall mining. The application of equip- ment for longwall mining with 5-7 m cutting height in China was concluded. The characteristics of full-mechanized top coal caving for extra thick seam coal were presented. The automation of top-caving hydraulic support and relevant equipment have achieved important breakthrough. At the end of this paper, further development of China's coal industry and longwall mining technologies and equipment were prospected in brief. This paper gives readers a comprehensive understanding of China's coal mine longwall face equipment technologies. It will give help to other countries on its coal mining development.展开更多
文摘Using vector-analysis, three kinds of roof blocks at the end face of fully mechanized long wall faces have been studied. Tbe result indicates that with face advancing, the three kinds of blocks may all become key blocks. It is put forward that the key blocks can reach into the scope of angle of fracture through supporting, and the fomulas for calculating supporting force needed for the three key blocks to maintain stadility have been derived.
文摘Background of the development and achievement on sets equipment technologies for coal mine longwall face in China was reviewed initially. On the theoretical side, a coupling model of hydraulic support and surrounding rock, support pa- rameters optimization and threedimensional (3D) dynamic design method were presented. On the practical side, this paper out lined some of practical issues and discussed some relative methods and technologies. In thin seam coal longwall mining, how to lower equipment height is the first problem that should be solved. Roof pressure regularity, control of rooffall and collapse, and hydraulic support stability were investigated preferentially in 5-7 m coal seam longwall mining. The application of equip- ment for longwall mining with 5-7 m cutting height in China was concluded. The characteristics of full-mechanized top coal caving for extra thick seam coal were presented. The automation of top-caving hydraulic support and relevant equipment have achieved important breakthrough. At the end of this paper, further development of China's coal industry and longwall mining technologies and equipment were prospected in brief. This paper gives readers a comprehensive understanding of China's coal mine longwall face equipment technologies. It will give help to other countries on its coal mining development.
基金Supported by the National Natural Science Foundation of china under Grant Nos.6053303060673091+4 种基金60772071(国家自然科学基金)the National High-Tech Research alld Development Plan of China under Grant Nos.2006AA01Z1222007AA01Z163(国家高技术研究发展计划(863))the 100 Talents Program of the Chinese Academy of Sciences(中国科学院"百人计划")the ISVISION Technology Co.Ltd.(上海银晨智能识别科技有限公司)