Case Study on Synchronous Construction Technology for Secondary Lining of Large-diameter Single track Shiel Shield-bored ored Tunnel
1
作者 WANG Zhenfei ZHAI Jinying(Translated) 《Chinese Railways》 2023年第2期29-34,共6页
The synchronous construction of the secondary lining during the boring of large-diameter shield faces challenges such as the design of the lining jumbo,the high requirements on the performance for the lining jumbo,the... The synchronous construction of the secondary lining during the boring of large-diameter shield faces challenges such as the design of the lining jumbo,the high requirements on the performance for the lining jumbo,the organization of the construction activities in the small and confined area,the horizontal transportation for shield boring and high safety management requirements.A super-long invert lining construction jumbo,as well as the matching California switch,is developed,which provides solution for the confliction between the invert lining construction and the horizontal transportation.The procedure and method for the synchronous operation of the shield boring and the secondary lining are developed by referring to the synchronous construction of the secondary lining during the boring of the TBMs in hard rocks.Due to the adoption of the synchronous operation of the shield boring and the secondary lining,the construction period is shortened and the construction cost is reduced.The paper can provide reference for the synchronous construction of the secondary lining in similar projects in the future. 展开更多
关键词 large-diameter shield-bored tunnel synchronous construction of secondary lining super-long invert lining construction jumbo California switch "arch+side wall"lining jumbo
下载PDF
Synchronous Construction and Operation of Coal Mine and Power Plant in Mining Area
2
作者 Zheng Yonglian (Diector ,Power under Yongxia Area Management Committee ,Henan)Wang Jiawer (Yongxia Mining Area Management Committee ,Henan) 《China Coal》 1997年第S1期34-35,共2页
In accordance with the experience withSynchronous construction of coal mine andpower plant in Yongxia mining area, thispaper discusses the existing issues regardingmine mouth power plant including capital,power grid c... In accordance with the experience withSynchronous construction of coal mine andpower plant in Yongxia mining area, thispaper discusses the existing issues regardingmine mouth power plant including capital,power grid connection, electricity price for gridconnection, installed capacity generation setselection as well as self- protection of coalindustry. It is regarded that under marketeconomy as long as the benefits of the threesectors of coal, electricity and the local arecomprehensively considered, a suitable waycan be arrived for conl industry to operate electricity business. 展开更多
关键词 Synchronous construction and Operation of Coal Mine and Power Plant in Mining Area