Maintenance is an important technical measure to maintain and restore the performance status of equipment and ensure the safety of the production process in industrial production,and is an indispensable part of predic...Maintenance is an important technical measure to maintain and restore the performance status of equipment and ensure the safety of the production process in industrial production,and is an indispensable part of prediction and health management.However,most of the existing remaining useful life(RUL)prediction methods assume that there is no maintenance or only perfect maintenance during the whole life cycle;thus,the predicted RUL value of the system is obviously lower than its actual operating value.The complex environment of the system further increases the difficulty of maintenance,and its maintenance nodes and maintenance degree are limited by the construction period and working conditions,which increases the difficulty of RUL prediction.An RUL prediction method for a multi-omponent system based on the Wiener process considering maintenance is proposed.The performance degradation model of components is established by a dynamic Bayesian network as the initial model,which solves the uncertainty of insufficient data problems.Based on the experience of experts,the degree of degradation is divided according to Poisson process simulation random failure,and different maintenance strategies are used to estimate a variety of condition maintenance factors.An example of a subsea tree system is given to verify the effectiveness of the proposed method.展开更多
At present,the operation and maintenance of photovoltaic power generation systems mainly comprise regular maintenance,breakdown maintenance,and condition-based maintenance,which is very likely to lead to over-or under...At present,the operation and maintenance of photovoltaic power generation systems mainly comprise regular maintenance,breakdown maintenance,and condition-based maintenance,which is very likely to lead to over-or under-repair of equipment.Therefore,a preventive maintenance and replacement strategy for PV power generation systems based on reliability as a constraint is proposed.First,a hybrid failure function with a decreasing service age factor and an increasing failure rate factor is introduced to describe the deterioration of PV power generation equipment,and the equipment is replaced when its reliability drops to the replacement threshold in the last cycle.Then,based on the reliability as a constraint,the average maintenance cost and availability of the equipment are considered,and the non-periodic incomplete maintenance model of the PV power generation system is established to obtain the optimal number of repairs,each maintenance cycle and the replacement cycle of the PV power generation system components.Next,the inverter of a PV power plant is used as a research object.The model in this paper is compared and analyzed with the equal cycle maintenance model without considering reliability and the maintenance model without considering the equipment replacement threshold,Through model comparison,when the optimal maintenance strategy is(0.80,4),the average maintenance cost of this paper’s model are decreased by 20.3%and 5.54%and the availability is increased by 0.2395% and 0.0337%,respectively,compared with the equal-cycle maintenance model without considering the reliability constraint and the maintenance model without considering the equipment replacement threshold.Therefore,this maintenance model can ensure the high reliability of PV plant operation while increasing the equipment availability to improve the system economy.展开更多
This article explores the topic of fault diagnosis and maintenance strategies for instrument automation control systems,analyzing them through specific cases.The aim of this research is to improve the stability and re...This article explores the topic of fault diagnosis and maintenance strategies for instrument automation control systems,analyzing them through specific cases.The aim of this research is to improve the stability and reliability of the system by conducting a thorough investigation of faults and maintenance in instrument automation control systems.By doing so,this research hopes to provide a strong guarantee for the smooth progress of industrial production.展开更多
Effective application of digital integrated management and maintenance systems is essential for successful operation and maintenance management of bridge projects.This article analyzes the application strategy of such...Effective application of digital integrated management and maintenance systems is essential for successful operation and maintenance management of bridge projects.This article analyzes the application strategy of such systems.It provides an overview of comprehensive digital management and maintenance of bridges,an analysis of the basic components of the integrated management and maintenance system,and its application strategies.This study aims to offer guidance for the application of the system and to improve the quality of modern bridge engineering management and maintenance work.展开更多
This paper presents a project aimed at developing a trilingual visual dictionary for aircraft maintenance professionals and students.The project addresses the growing demand for accurate communication and technical te...This paper presents a project aimed at developing a trilingual visual dictionary for aircraft maintenance professionals and students.The project addresses the growing demand for accurate communication and technical terminology in the aviation industry,particularly in Brazil and China.The study employs a corpus-driven approach,analyzing a large corpus of aircraft maintenance manuals to extract key technical terms and their collocates.Using specialized subcorpora and a comparative analysis,this paper demonstrates challenges and solutions into the identification of high-frequency keywords and explores their contextual use in aviation documentation,emphasizing the need for clear and accurate technical communication.By incorporating these findings into a trilingual visual dictionary,the project aims to enhance the understanding and usage of aviation terminology.展开更多
In the face of data scarcity in the optimization of maintenance strategies for civil aircraft,traditional failure data-driven methods are encountering challenges owing to the increasing reliability of aircraft design....In the face of data scarcity in the optimization of maintenance strategies for civil aircraft,traditional failure data-driven methods are encountering challenges owing to the increasing reliability of aircraft design.This study addresses this issue by presenting a novel combined data fusion algorithm,which serves to enhance the accuracy and reliability of failure rate analysis for a specific aircraft model by integrating historical failure data from similar models as supplementary information.Through a comprehensive analysis of two different maintenance projects,this study illustrates the application process of the algorithm.Building upon the analysis results,this paper introduces the innovative equal integral value method as a replacement for the conventional equal interval method in the context of maintenance schedule optimization.The Monte Carlo simulation example validates that the equivalent essential value method surpasses the traditional method by over 20%in terms of inspection efficiency ratio.This discovery indicates that the equal critical value method not only upholds maintenance efficiency but also substantially decreases workload and maintenance costs.The findings of this study open up novel perspectives for airlines grappling with data scarcity,offer fresh strategies for the optimization of aviation maintenance practices,and chart a new course toward achieving more efficient and cost-effective maintenance schedule optimization through refined data analysis.展开更多
A multi-component system has the long fixed maintenance time, so the opportunistic maintenance policy is adopted to put preventive replacement and corrective replacement together, so that the long fixed maintenance ti...A multi-component system has the long fixed maintenance time, so the opportunistic maintenance policy is adopted to put preventive replacement and corrective replacement together, so that the long fixed maintenance time can be shared by more than one component, and the system availability can be improved. Then, the generation characteristics of the random failure time are researched based on the replacement maintenance and the minima[ maintenance. Furthermore, by choosing the opportunistic replacement ages of each component as opti- mized variables, a simulation algorithm based on an opportunistic maintenance policy is designed to maximize the total availability. Finally, the simulation result shows the validity of the algorithm by an example.展开更多
To investigate the effects of various random factors on the preventive maintenance (PM) decision-making of one type of two-unit series system, an optimal quasi-periodic PM policy is introduced. Assume that PM is per...To investigate the effects of various random factors on the preventive maintenance (PM) decision-making of one type of two-unit series system, an optimal quasi-periodic PM policy is introduced. Assume that PM is perfect for unit 1 and only mechanical service for unit 2 in the model. PM activity is randomly performed according to a dynamic PM plan distributed in each implementation period. A replacement is determined based on the competing results of unplanned and planned replacements. The unplanned replacement is trigged by a catastrophic failure of unit 2, and the planned replacement is executed when the PM number reaches the threshold N. Through modeling and analysis, a solution algorithm for an optimal implementation period and the PM number is given, and optimal process and parametric sensitivity are provided by a numerical example. Results show that the implementation period should be decreased as soon as possible under the condition of meeting the needs of practice, which can increase mean operating time and decrease the long-run cost rate.展开更多
In order to solve the urgent problem of how to manage and sustain highway tunnels with advanced information technology with the background of the rapid development in the modem traffic, and achieve the cost- effective...In order to solve the urgent problem of how to manage and sustain highway tunnels with advanced information technology with the background of the rapid development in the modem traffic, and achieve the cost- effectiveness optimal principle objectives under the premise of guaranteeing a smooth flow of traffic; a highway tunnel maintenance and management system framework and the key modules were proposed. First, the determined highway tunnel condition assessment index system was established according to the result of expert consulting forms. Secondly, the tunnel diseases, the corresponding maintenance measurements, and many-to-many relationship between diseases and maintenance measurements were introduced. Then, three kinds of 0-1 integer programming models were built according to different tunnel operators' needs in the optimization decision module. Finally, the further development and implementation of the system was prospected. The research results can provide references to tunnel researchers and managers.展开更多
A single-machine scheduling with preventive periodic maintenance activities in a remanufacturing system including resumable and non-resumable jobs is studied.The objective is to find a schedule to minimize the makespa...A single-machine scheduling with preventive periodic maintenance activities in a remanufacturing system including resumable and non-resumable jobs is studied.The objective is to find a schedule to minimize the makespan and an LPT-LS algorithm is proposed.Non-resumable jobs are first scheduled in a machine by the longest processing time(LPT) rule,and then resumable jobs are scheduled by the list scheduling(LS) rule.And the worst-case ratios of this algorithm in three different cases in terms of the value of the total processing time of the resumable jobs(denoted as S2) are discussed.When S2 is longer than the spare time of the machine after the non-resumable jobs are assigned by the LPT rule,it is equal to 1.When S2 falls in between the spare time of the machine by the LPT rule and the optimal schedule rule,it is less than 2.When S2 is less than the spare time of the machine by the optimal schedule rule,it is less than 2.Finally,numerical examples are presented for verification.展开更多
A condition-based maintenance model for gamma deteriorating system under continuous inspection is studied. This methodology uses a gamma distribution to model the material degradation, and the impact of imperfect main...A condition-based maintenance model for gamma deteriorating system under continuous inspection is studied. This methodology uses a gamma distribution to model the material degradation, and the impact of imperfect maintenance actions on the system reliability is investigated. The state of a degrading system immediately after the imperfect maintenance action is assumed as a random variable and the maintenance time follows a geometric process. Furthermore, the explicit expressions for the long-run average cost and availability per unit time of the system are evaluated, an optimal policy (ε^*) could be determined numeri- cally or analytically according to the optimization model. At last, a numerical example for a degrading system modeled by a gamma process is presented to demonstrate the use of this policy in practical applications.展开更多
In this paper, a typical mei-yu front process with heavy rainfall from June 12 to 15 in 1998 is analyzed. The results show that the mei-yu front is a front system which consists of an iso-theta(e) dense area with stro...In this paper, a typical mei-yu front process with heavy rainfall from June 12 to 15 in 1998 is analyzed. The results show that the mei-yu front is a front system which consists of an iso-theta(e) dense area with strong horizontal gradient, a deep-convective cloud tower band, a passageway transporting warm and moist air flow from the summer monsoon surge in the mid and low levels to the south of the mei-yu front, and a migrating synoptic scale trough to the north of the mei-yu front, which transports cold and dry air southward in the mid and upper levels. The maintenance of the mei-yu front is realized by: (1) is a positive feedback between the moist physical process enhancing frontogenesis and the development of the strong convective system in front of the mei-yu front; (2) the sustaining system to the north of the mei-yu front which is a migrating synoptic scale trough transporting cold and dry air to the mei-yu front and positive vorticity to the mesoscale system in front of the mei-yu front.展开更多
We present an overview of some recent developments in the area of mathematical modeling of maintenance decisions for multi-unit systems. The emphasis is on three main groups of multicomponent maintenance optimization ...We present an overview of some recent developments in the area of mathematical modeling of maintenance decisions for multi-unit systems. The emphasis is on three main groups of multicomponent maintenance optimization models: the block replacement models, group maintenance models, and opportunistic maintenance models. Moreover, an example of a two-unit system maintenance process is provided in order to compare various maintenance policies.展开更多
Although opportunistic maintenance strategies are widely used for multi-component systems, all opportunistic mainte- nance strategies only consider economic dependence and do not take structural dependence into accoun...Although opportunistic maintenance strategies are widely used for multi-component systems, all opportunistic mainte- nance strategies only consider economic dependence and do not take structural dependence into account. An opportunistic main- tenance strategy is presented for a multi-component system that considers both structural dependence and economic dependence. The cost relation and time relation among components based on structural dependence are developed. The maintenance strategy for each component of a multi-component system involves one of five maintenance actions, namely, no-maintenance, a minimal maintenance action, an imperfect maintenance action, a perfect maintenance action, and a replacement action. The maintenance action is determined by the virtual age of the component, the life expectancy of the component, and the age threshold values. Monte Carlo simulation is designed to obtain the optimal oppor- tunistic maintenance strategy of the system over its lifetime. The simulation result reveals that the minimum maintenance cost with a strategy that considers structural dependence is less than that with a strategy that does not consider structural dependence. The availability with a strategy that considers structural dependence is greater than that with a strategy that does not consider structural dependence under the same conditions.展开更多
An optimal replacement model for gamma deteriorating systems is studied. This methodology uses a gamma distribution to model the material degradation, and the impact of imperfect maintenance actions on the system reli...An optimal replacement model for gamma deteriorating systems is studied. This methodology uses a gamma distribution to model the material degradation, and the impact of imperfect maintenance actions on the system reliability is investigated. The state of a degrading system immediately after the imperfect maintenance action is assumed as a random variable and the maintenance time follows a geometric process. A maintenance policy (N) is applied by which the system will be repaired whenever it experiences Nth preventive maintenance (PM), and an optimal policy (N*) could be determined numerically or analytically for minimizing the long-run average cost per unit time. Finally, a numerical example is presented to demonstrate the use of this policy.展开更多
Hydraulic system has a critical and important role in drilling machines.Any failure in this system leads to problems in power system and machine operation.Since the failure cannot be prevented entirely,it is important...Hydraulic system has a critical and important role in drilling machines.Any failure in this system leads to problems in power system and machine operation.Since the failure cannot be prevented entirely,it is important to minimize its probability.Reliability is one of the most effcient and important method to study safe operation probability of hydraulic systems.In this research,the reliability of hydraulic system of four rotary drilling machines in Sarcheshmeh Copper Mine in Iran has been analyzed.The data analysis shows that the time between failures(TBF)of Machines A and C obey the Weibull(2P)and Weibull(3P)distribution,respectively.Also,the TBF of Machines B and D obey the lognormal distribution.With regard to reliability plots of hydraulic systems,preventive reliability-based maintenance time intervals for 80%reliability levels for machines in this system are 10 h.展开更多
A collaborative optimization model for maintenance and spare ordering of a single-unit degrading system is proposed in this paper based on the continuous detection. A gamma distribution is used to model the material d...A collaborative optimization model for maintenance and spare ordering of a single-unit degrading system is proposed in this paper based on the continuous detection. A gamma distribution is used to model the material degradation. The degrading decrement after the imperfect maintenance action is assumed as a random variable normal distribution. This model aims to ob- tain the optimal maintenance policy and spare ordering point with the expected cost rate within system lifecycle as the optimization objective. The rationality and feasibility of the model are proved through a numerical example.展开更多
Condition-based maintenance(CBM) is receiving increasing attention in various engineering systems because of its effectiveness. This paper formulates a new CBM optimization problem for continuously monitored degrading...Condition-based maintenance(CBM) is receiving increasing attention in various engineering systems because of its effectiveness. This paper formulates a new CBM optimization problem for continuously monitored degrading systems considering imperfect maintenance actions. In terms of maintenance actions,in practice, they scarcely restore the system to an as-good-as new state due to residual damage. According to up-to-data researches, imperfect maintenance actions are likely to speed up the degradation process. Regarding the developed CBM optimization strategy, it can balance the maintenance cost and the availability by the searching the optimal preventive maintenance threshold.The maximum number of maintenance is also considered, which is regarded as an availability constraint in the CBM optimization problem. A numerical example is introduced, and experimental results can demonstrate the novelty, feasibility and flexibility of the proposed CBM optimization strategy.展开更多
In view of the high complexity of the objective world, an economic dependence between subsystems(paired and unpaired) is proposed, and then the maintenance cost and time under different economic dependences are formul...In view of the high complexity of the objective world, an economic dependence between subsystems(paired and unpaired) is proposed, and then the maintenance cost and time under different economic dependences are formulated in a simple and consistent manner. Selective maintenance problem under economic dependence(EDSMP) is presented based on a series–parallel system in this paper. A case study shows that the system reliability is promoted to a certain extent, which can validate the validity of the EDSMP model. The influence of the ratio of set-up cost on system performance is mainly discussed under different economic dependences. Several existing improvements of classical exhaust algorithm are further modified to solve a large sized EDSMP rapidly. Experimental results illustrate that these improvements can reduce CPU time significantly.Furthermore the contribution of each improvement is defined here, and then their contributions are compared thoroughly.展开更多
An architecture and design of a maintenance information management system for distributed manufacture system is presented in this paper, and its related key technologies are studied and implemented also. A frame of th...An architecture and design of a maintenance information management system for distributed manufacture system is presented in this paper, and its related key technologies are studied and implemented also. A frame of the maintenance information management system oriented human-machine monitoring is designed, and using object-oriented method, a general maintenance information management system based on SQL server engineering database and adopted client/server/database three-layer mode can be established. Then, discussions on control technologies of maintenance information management system and remote distributed diagnostics and maintenance system are emphasized. The system is not only able to identify and diagnose faults of distributed manufacture system quickly, improve system stability, but also has intelligent maintenance functions.展开更多
基金financially supported by the National Key Research and Development Program of China(Grant No.2022YFC3004802)the National Natural Science Foundation of China(Grant Nos.52171287,52325107)+3 种基金High Tech Ship Research Project of Ministry of Industry and Information Technology(Grant Nos.2023GXB01-05-004-03,GXBZH2022-293)the Science Foundation for Distinguished Young Scholars of Shandong Province(Grant No.ZR2022JQ25)the Taishan Scholars Project(Grant No.tsqn201909063)the sub project of the major special project of CNOOC Development Technology,“Research on the Integrated Technology of Intrinsic Safety of Offshore Oil Facilities”(Phase I),“Research on Dynamic Quantitative Analysis and Control Technology of Risks in Offshore Production Equipment”(Grant No.HFKJ-2D2X-AQ-2021-03)。
文摘Maintenance is an important technical measure to maintain and restore the performance status of equipment and ensure the safety of the production process in industrial production,and is an indispensable part of prediction and health management.However,most of the existing remaining useful life(RUL)prediction methods assume that there is no maintenance or only perfect maintenance during the whole life cycle;thus,the predicted RUL value of the system is obviously lower than its actual operating value.The complex environment of the system further increases the difficulty of maintenance,and its maintenance nodes and maintenance degree are limited by the construction period and working conditions,which increases the difficulty of RUL prediction.An RUL prediction method for a multi-omponent system based on the Wiener process considering maintenance is proposed.The performance degradation model of components is established by a dynamic Bayesian network as the initial model,which solves the uncertainty of insufficient data problems.Based on the experience of experts,the degree of degradation is divided according to Poisson process simulation random failure,and different maintenance strategies are used to estimate a variety of condition maintenance factors.An example of a subsea tree system is given to verify the effectiveness of the proposed method.
基金This researchwas supported by the National Natural Science Foundation of China(Nos.51767017 and 51867015)the Basic Research and Innovation Group Project of Gansu(No.18JR3RA133)the Natural Science Foundation of Gansu(No.21JR7RA258).
文摘At present,the operation and maintenance of photovoltaic power generation systems mainly comprise regular maintenance,breakdown maintenance,and condition-based maintenance,which is very likely to lead to over-or under-repair of equipment.Therefore,a preventive maintenance and replacement strategy for PV power generation systems based on reliability as a constraint is proposed.First,a hybrid failure function with a decreasing service age factor and an increasing failure rate factor is introduced to describe the deterioration of PV power generation equipment,and the equipment is replaced when its reliability drops to the replacement threshold in the last cycle.Then,based on the reliability as a constraint,the average maintenance cost and availability of the equipment are considered,and the non-periodic incomplete maintenance model of the PV power generation system is established to obtain the optimal number of repairs,each maintenance cycle and the replacement cycle of the PV power generation system components.Next,the inverter of a PV power plant is used as a research object.The model in this paper is compared and analyzed with the equal cycle maintenance model without considering reliability and the maintenance model without considering the equipment replacement threshold,Through model comparison,when the optimal maintenance strategy is(0.80,4),the average maintenance cost of this paper’s model are decreased by 20.3%and 5.54%and the availability is increased by 0.2395% and 0.0337%,respectively,compared with the equal-cycle maintenance model without considering the reliability constraint and the maintenance model without considering the equipment replacement threshold.Therefore,this maintenance model can ensure the high reliability of PV plant operation while increasing the equipment availability to improve the system economy.
文摘This article explores the topic of fault diagnosis and maintenance strategies for instrument automation control systems,analyzing them through specific cases.The aim of this research is to improve the stability and reliability of the system by conducting a thorough investigation of faults and maintenance in instrument automation control systems.By doing so,this research hopes to provide a strong guarantee for the smooth progress of industrial production.
文摘Effective application of digital integrated management and maintenance systems is essential for successful operation and maintenance management of bridge projects.This article analyzes the application strategy of such systems.It provides an overview of comprehensive digital management and maintenance of bridges,an analysis of the basic components of the integrated management and maintenance system,and its application strategies.This study aims to offer guidance for the application of the system and to improve the quality of modern bridge engineering management and maintenance work.
文摘This paper presents a project aimed at developing a trilingual visual dictionary for aircraft maintenance professionals and students.The project addresses the growing demand for accurate communication and technical terminology in the aviation industry,particularly in Brazil and China.The study employs a corpus-driven approach,analyzing a large corpus of aircraft maintenance manuals to extract key technical terms and their collocates.Using specialized subcorpora and a comparative analysis,this paper demonstrates challenges and solutions into the identification of high-frequency keywords and explores their contextual use in aviation documentation,emphasizing the need for clear and accurate technical communication.By incorporating these findings into a trilingual visual dictionary,the project aims to enhance the understanding and usage of aviation terminology.
文摘In the face of data scarcity in the optimization of maintenance strategies for civil aircraft,traditional failure data-driven methods are encountering challenges owing to the increasing reliability of aircraft design.This study addresses this issue by presenting a novel combined data fusion algorithm,which serves to enhance the accuracy and reliability of failure rate analysis for a specific aircraft model by integrating historical failure data from similar models as supplementary information.Through a comprehensive analysis of two different maintenance projects,this study illustrates the application process of the algorithm.Building upon the analysis results,this paper introduces the innovative equal integral value method as a replacement for the conventional equal interval method in the context of maintenance schedule optimization.The Monte Carlo simulation example validates that the equivalent essential value method surpasses the traditional method by over 20%in terms of inspection efficiency ratio.This discovery indicates that the equal critical value method not only upholds maintenance efficiency but also substantially decreases workload and maintenance costs.The findings of this study open up novel perspectives for airlines grappling with data scarcity,offer fresh strategies for the optimization of aviation maintenance practices,and chart a new course toward achieving more efficient and cost-effective maintenance schedule optimization through refined data analysis.
文摘A multi-component system has the long fixed maintenance time, so the opportunistic maintenance policy is adopted to put preventive replacement and corrective replacement together, so that the long fixed maintenance time can be shared by more than one component, and the system availability can be improved. Then, the generation characteristics of the random failure time are researched based on the replacement maintenance and the minima[ maintenance. Furthermore, by choosing the opportunistic replacement ages of each component as opti- mized variables, a simulation algorithm based on an opportunistic maintenance policy is designed to maximize the total availability. Finally, the simulation result shows the validity of the algorithm by an example.
基金The National Natural Science Foundation of China(No.51275090,71201025)the Program for Special Talent in Six Fields of Jiangsu Province(No.2008144)+1 种基金the Scientific Research Foundation of Graduate School of Southeast University(No.YBJJ1302)the Scientific Innovation Research of College Graduates in Jiangsu Province(No.CXLX12_0078)
文摘To investigate the effects of various random factors on the preventive maintenance (PM) decision-making of one type of two-unit series system, an optimal quasi-periodic PM policy is introduced. Assume that PM is perfect for unit 1 and only mechanical service for unit 2 in the model. PM activity is randomly performed according to a dynamic PM plan distributed in each implementation period. A replacement is determined based on the competing results of unplanned and planned replacements. The unplanned replacement is trigged by a catastrophic failure of unit 2, and the planned replacement is executed when the PM number reaches the threshold N. Through modeling and analysis, a solution algorithm for an optimal implementation period and the PM number is given, and optimal process and parametric sensitivity are provided by a numerical example. Results show that the implementation period should be decreased as soon as possible under the condition of meeting the needs of practice, which can increase mean operating time and decrease the long-run cost rate.
基金The US National Science Foundation(No.CM M I-0408390,CM M I-0644552)the National Natural Science Foundation of China(No.U1134206,51250110075,51150110478)+1 种基金the Western Project of M inistry of Communications of China(No.0901005C)the Natural Science Foundation of Jiangsu Province(No.BK200910046)
文摘In order to solve the urgent problem of how to manage and sustain highway tunnels with advanced information technology with the background of the rapid development in the modem traffic, and achieve the cost- effectiveness optimal principle objectives under the premise of guaranteeing a smooth flow of traffic; a highway tunnel maintenance and management system framework and the key modules were proposed. First, the determined highway tunnel condition assessment index system was established according to the result of expert consulting forms. Secondly, the tunnel diseases, the corresponding maintenance measurements, and many-to-many relationship between diseases and maintenance measurements were introduced. Then, three kinds of 0-1 integer programming models were built according to different tunnel operators' needs in the optimization decision module. Finally, the further development and implementation of the system was prospected. The research results can provide references to tunnel researchers and managers.
基金The National Natural Science Foundation of China (No.70971022,71271054)the Scientific Research Innovation Project for College Graduates in Jiangsu Province(No.CXLX_0157)the Scientific Research Foundation of the Education Department of Anhui Province(No.2011sk123)
文摘A single-machine scheduling with preventive periodic maintenance activities in a remanufacturing system including resumable and non-resumable jobs is studied.The objective is to find a schedule to minimize the makespan and an LPT-LS algorithm is proposed.Non-resumable jobs are first scheduled in a machine by the longest processing time(LPT) rule,and then resumable jobs are scheduled by the list scheduling(LS) rule.And the worst-case ratios of this algorithm in three different cases in terms of the value of the total processing time of the resumable jobs(denoted as S2) are discussed.When S2 is longer than the spare time of the machine after the non-resumable jobs are assigned by the LPT rule,it is equal to 1.When S2 falls in between the spare time of the machine by the LPT rule and the optimal schedule rule,it is less than 2.When S2 is less than the spare time of the machine by the optimal schedule rule,it is less than 2.Finally,numerical examples are presented for verification.
基金supported by the National watural Science Foundation of China (60904002)
文摘A condition-based maintenance model for gamma deteriorating system under continuous inspection is studied. This methodology uses a gamma distribution to model the material degradation, and the impact of imperfect maintenance actions on the system reliability is investigated. The state of a degrading system immediately after the imperfect maintenance action is assumed as a random variable and the maintenance time follows a geometric process. Furthermore, the explicit expressions for the long-run average cost and availability per unit time of the system are evaluated, an optimal policy (ε^*) could be determined numeri- cally or analytically according to the optimization model. At last, a numerical example for a degrading system modeled by a gamma process is presented to demonstrate the use of this policy in practical applications.
文摘In this paper, a typical mei-yu front process with heavy rainfall from June 12 to 15 in 1998 is analyzed. The results show that the mei-yu front is a front system which consists of an iso-theta(e) dense area with strong horizontal gradient, a deep-convective cloud tower band, a passageway transporting warm and moist air flow from the summer monsoon surge in the mid and low levels to the south of the mei-yu front, and a migrating synoptic scale trough to the north of the mei-yu front, which transports cold and dry air southward in the mid and upper levels. The maintenance of the mei-yu front is realized by: (1) is a positive feedback between the moist physical process enhancing frontogenesis and the development of the strong convective system in front of the mei-yu front; (2) the sustaining system to the north of the mei-yu front which is a migrating synoptic scale trough transporting cold and dry air to the mei-yu front and positive vorticity to the mesoscale system in front of the mei-yu front.
文摘We present an overview of some recent developments in the area of mathematical modeling of maintenance decisions for multi-unit systems. The emphasis is on three main groups of multicomponent maintenance optimization models: the block replacement models, group maintenance models, and opportunistic maintenance models. Moreover, an example of a two-unit system maintenance process is provided in order to compare various maintenance policies.
基金supported by the Postdoctoral Science Foundation of China(20080431380)
文摘Although opportunistic maintenance strategies are widely used for multi-component systems, all opportunistic mainte- nance strategies only consider economic dependence and do not take structural dependence into account. An opportunistic main- tenance strategy is presented for a multi-component system that considers both structural dependence and economic dependence. The cost relation and time relation among components based on structural dependence are developed. The maintenance strategy for each component of a multi-component system involves one of five maintenance actions, namely, no-maintenance, a minimal maintenance action, an imperfect maintenance action, a perfect maintenance action, and a replacement action. The maintenance action is determined by the virtual age of the component, the life expectancy of the component, and the age threshold values. Monte Carlo simulation is designed to obtain the optimal oppor- tunistic maintenance strategy of the system over its lifetime. The simulation result reveals that the minimum maintenance cost with a strategy that considers structural dependence is less than that with a strategy that does not consider structural dependence. The availability with a strategy that considers structural dependence is greater than that with a strategy that does not consider structural dependence under the same conditions.
基金supported by the National Natural Science Foundation of China (60904002)
文摘An optimal replacement model for gamma deteriorating systems is studied. This methodology uses a gamma distribution to model the material degradation, and the impact of imperfect maintenance actions on the system reliability is investigated. The state of a degrading system immediately after the imperfect maintenance action is assumed as a random variable and the maintenance time follows a geometric process. A maintenance policy (N) is applied by which the system will be repaired whenever it experiences Nth preventive maintenance (PM), and an optimal policy (N*) could be determined numerically or analytically for minimizing the long-run average cost per unit time. Finally, a numerical example is presented to demonstrate the use of this policy.
基金the R&D center of Iranian National Copper Company for its financial support
文摘Hydraulic system has a critical and important role in drilling machines.Any failure in this system leads to problems in power system and machine operation.Since the failure cannot be prevented entirely,it is important to minimize its probability.Reliability is one of the most effcient and important method to study safe operation probability of hydraulic systems.In this research,the reliability of hydraulic system of four rotary drilling machines in Sarcheshmeh Copper Mine in Iran has been analyzed.The data analysis shows that the time between failures(TBF)of Machines A and C obey the Weibull(2P)and Weibull(3P)distribution,respectively.Also,the TBF of Machines B and D obey the lognormal distribution.With regard to reliability plots of hydraulic systems,preventive reliability-based maintenance time intervals for 80%reliability levels for machines in this system are 10 h.
基金supported by the National Natural Science Foundation of China (60904002 70971132)
文摘A collaborative optimization model for maintenance and spare ordering of a single-unit degrading system is proposed in this paper based on the continuous detection. A gamma distribution is used to model the material degradation. The degrading decrement after the imperfect maintenance action is assumed as a random variable normal distribution. This model aims to ob- tain the optimal maintenance policy and spare ordering point with the expected cost rate within system lifecycle as the optimization objective. The rationality and feasibility of the model are proved through a numerical example.
基金supported by the National Natural Science Foundation of China(61873122)the Priority Academic Program Development of Jiangsu Higher Education Institutions。
文摘Condition-based maintenance(CBM) is receiving increasing attention in various engineering systems because of its effectiveness. This paper formulates a new CBM optimization problem for continuously monitored degrading systems considering imperfect maintenance actions. In terms of maintenance actions,in practice, they scarcely restore the system to an as-good-as new state due to residual damage. According to up-to-data researches, imperfect maintenance actions are likely to speed up the degradation process. Regarding the developed CBM optimization strategy, it can balance the maintenance cost and the availability by the searching the optimal preventive maintenance threshold.The maximum number of maintenance is also considered, which is regarded as an availability constraint in the CBM optimization problem. A numerical example is introduced, and experimental results can demonstrate the novelty, feasibility and flexibility of the proposed CBM optimization strategy.
基金supported by the National Science Foundation of China (Grant No. 61305083)
文摘In view of the high complexity of the objective world, an economic dependence between subsystems(paired and unpaired) is proposed, and then the maintenance cost and time under different economic dependences are formulated in a simple and consistent manner. Selective maintenance problem under economic dependence(EDSMP) is presented based on a series–parallel system in this paper. A case study shows that the system reliability is promoted to a certain extent, which can validate the validity of the EDSMP model. The influence of the ratio of set-up cost on system performance is mainly discussed under different economic dependences. Several existing improvements of classical exhaust algorithm are further modified to solve a large sized EDSMP rapidly. Experimental results illustrate that these improvements can reduce CPU time significantly.Furthermore the contribution of each improvement is defined here, and then their contributions are compared thoroughly.
文摘An architecture and design of a maintenance information management system for distributed manufacture system is presented in this paper, and its related key technologies are studied and implemented also. A frame of the maintenance information management system oriented human-machine monitoring is designed, and using object-oriented method, a general maintenance information management system based on SQL server engineering database and adopted client/server/database three-layer mode can be established. Then, discussions on control technologies of maintenance information management system and remote distributed diagnostics and maintenance system are emphasized. The system is not only able to identify and diagnose faults of distributed manufacture system quickly, improve system stability, but also has intelligent maintenance functions.