Waste and industrial by-products represent a significant percentage of the industrial landfill. The evaluation of these products has a dual effect: it avoids both the landfill (risk of environmental pollution) and lim...Waste and industrial by-products represent a significant percentage of the industrial landfill. The evaluation of these products has a dual effect: it avoids both the landfill (risk of environmental pollution) and limits the use of natural aggregates (depletion of natural resources and landscape fragmentation and the imbalance of the ecosystem). In recent years, applications for industrial waste have been taken into account in the construction of roads with a great interest in many industrialized countries and developing countries. The use of these materials in the construction of the road is a decision based on technical, economic and ecological criteria. In Algeria, the steel plant of El-Hadjar (Annaba), due to its activity generates a significant industrial waste (slag) which creates a storage problem and pollution. For industrialized countries, this product is an abundant raw material at low cost that must be used on a large scale public works. Our study implies the use of slag in the preparation of the subgrade and surface course (as coated). The results of chemical, physical and mechanical analyses of El-Hadjar slag and materials developed, compared to those of natural aggregates, can be used as aggregate in road construction.展开更多
In this paper,the monitoring data of road surface temperature,air temperature,wind speed,wind direction,relative humidity and precipitation from the automatic weather stations of Hurongxi,Hanyi,Wuhuang and Huanghuang ...In this paper,the monitoring data of road surface temperature,air temperature,wind speed,wind direction,relative humidity and precipitation from the automatic weather stations of Hurongxi,Hanyi,Wuhuang and Huanghuang on Huyu expressway from June 2013 to August 2014 were used to investigate the change characteristics of different sections' road surface temperatures in different seasons and sky conditions. The forecast models of the maximum and minimum road surface temperatures were established on different sections by statistical analysis methods,and the forecast results were verified. The results showed that the road surface temperature and air temperature of Hurongxi,Hanyi,Wuhuang and Huanghuang displayed obvious diurnal variation,but the difference between the road surface temperature and air temperature was larger. Compared with the other three sections,the maximum difference between the road surface temperature and air temperature on Hurongxi increased in winter and decreased in summer overall. The road surface temperature was close to air temperature on Hurongxi after sunset on sunny to cloudy and overcast in winter,while less than air temperature on Hanyi,Wuhuang and Huanghuang. The air temperature was less than road surface temperature on the four sections on rainy day and significant on Hurongxi. In summer,the air temperature was less than road surface temperature on the four sections under three sky conditions and the difference between them in afternoon was the biggest on sunny to cloudy and overcast. The road surface temperature was very close to each other among the four sections in January,while which was rising with the decrease of altitude in April,July and October. The forecast result of the road surface temperature was close to actual result on Hurongxi and Huanghuang,so which can be for reference. But there were some big errors between the forecast result and actual result in several timings on Hanyi and Wuhuang,so the forecast result should be corrected for actual business work.展开更多
文摘Waste and industrial by-products represent a significant percentage of the industrial landfill. The evaluation of these products has a dual effect: it avoids both the landfill (risk of environmental pollution) and limits the use of natural aggregates (depletion of natural resources and landscape fragmentation and the imbalance of the ecosystem). In recent years, applications for industrial waste have been taken into account in the construction of roads with a great interest in many industrialized countries and developing countries. The use of these materials in the construction of the road is a decision based on technical, economic and ecological criteria. In Algeria, the steel plant of El-Hadjar (Annaba), due to its activity generates a significant industrial waste (slag) which creates a storage problem and pollution. For industrialized countries, this product is an abundant raw material at low cost that must be used on a large scale public works. Our study implies the use of slag in the preparation of the subgrade and surface course (as coated). The results of chemical, physical and mechanical analyses of El-Hadjar slag and materials developed, compared to those of natural aggregates, can be used as aggregate in road construction.
基金Supported by 2017 Construction Project of Meteorological Guaranteeing Project of Mountain Torrent Geological Disaster Prevention and Control of Hubei Meteorological Service Center(Traffic Forecast Service Ability Construction)
文摘In this paper,the monitoring data of road surface temperature,air temperature,wind speed,wind direction,relative humidity and precipitation from the automatic weather stations of Hurongxi,Hanyi,Wuhuang and Huanghuang on Huyu expressway from June 2013 to August 2014 were used to investigate the change characteristics of different sections' road surface temperatures in different seasons and sky conditions. The forecast models of the maximum and minimum road surface temperatures were established on different sections by statistical analysis methods,and the forecast results were verified. The results showed that the road surface temperature and air temperature of Hurongxi,Hanyi,Wuhuang and Huanghuang displayed obvious diurnal variation,but the difference between the road surface temperature and air temperature was larger. Compared with the other three sections,the maximum difference between the road surface temperature and air temperature on Hurongxi increased in winter and decreased in summer overall. The road surface temperature was close to air temperature on Hurongxi after sunset on sunny to cloudy and overcast in winter,while less than air temperature on Hanyi,Wuhuang and Huanghuang. The air temperature was less than road surface temperature on the four sections on rainy day and significant on Hurongxi. In summer,the air temperature was less than road surface temperature on the four sections under three sky conditions and the difference between them in afternoon was the biggest on sunny to cloudy and overcast. The road surface temperature was very close to each other among the four sections in January,while which was rising with the decrease of altitude in April,July and October. The forecast result of the road surface temperature was close to actual result on Hurongxi and Huanghuang,so which can be for reference. But there were some big errors between the forecast result and actual result in several timings on Hanyi and Wuhuang,so the forecast result should be corrected for actual business work.