A control and test system of a landing gear drop test rig is developed considering the drop test specifica- tions for the "Seagull 300" multi-functional amphibious airplane. In order to realize the automation of dro...A control and test system of a landing gear drop test rig is developed considering the drop test specifica- tions for the "Seagull 300" multi-functional amphibious airplane. In order to realize the automation of drop test process, a servo system is proposed and programmable logic controller(PLC) technology is used. Several key technologies for measuring the horizontal load, the vertical load and the transient rotational speed are studied. According to the requirements of CCAR-23-R3, the drop test of landing gears of the "Seagull 300" airplane is accomplished. Test results show that the system has a high accuracy of data collection. The system is stable and reliable. The drop test satisfies the requirements of the drop test specifications and the results can be used as the certification of airworthiness for this kind of airplane.展开更多
This paper presents a method of NTP-based time synchronization and a strategy of master-slave server structured time synchronization to ensure the test and control system of aeroengine to be time-synchronized. Based o...This paper presents a method of NTP-based time synchronization and a strategy of master-slave server structured time synchronization to ensure the test and control system of aeroengine to be time-synchronized. Based on time synchronization, the hierarchy and the integration of the measurement and control system of aeroengine are investigated. In result, our method is successfully applied for multiple front-end tests in a simulative altitude test facility of aeroengine.展开更多
基金Supported by the Aviation Science Foundation of China(2009ZA52001)the Research Foundation(20070287033)~~
文摘A control and test system of a landing gear drop test rig is developed considering the drop test specifica- tions for the "Seagull 300" multi-functional amphibious airplane. In order to realize the automation of drop test process, a servo system is proposed and programmable logic controller(PLC) technology is used. Several key technologies for measuring the horizontal load, the vertical load and the transient rotational speed are studied. According to the requirements of CCAR-23-R3, the drop test of landing gears of the "Seagull 300" airplane is accomplished. Test results show that the system has a high accuracy of data collection. The system is stable and reliable. The drop test satisfies the requirements of the drop test specifications and the results can be used as the certification of airworthiness for this kind of airplane.
文摘This paper presents a method of NTP-based time synchronization and a strategy of master-slave server structured time synchronization to ensure the test and control system of aeroengine to be time-synchronized. Based on time synchronization, the hierarchy and the integration of the measurement and control system of aeroengine are investigated. In result, our method is successfully applied for multiple front-end tests in a simulative altitude test facility of aeroengine.