The rapid development of electric buses has brought a surge in the number of bus hubs and their charging and discharging capacities.Therefore,the location and construction scale of bus hubs will greatly affect the ope...The rapid development of electric buses has brought a surge in the number of bus hubs and their charging and discharging capacities.Therefore,the location and construction scale of bus hubs will greatly affect the operation costs and benefits of an urban distribution network in the future.Through the scientific and reasonable planning of public transport hubs on the premise of meeting the needs of basic public transport services,it can reduce the negative impact of electric bus charging loads upon the power grids.Furthermore,it can use its flexible operation characteristics to provide flexible support for the distribution network.In this paper,taking the impact of public transport hub on the reliability of distribution network as the starting point,a three-level programming optimization model based on the value and economy of distribution network load loss is proposed.Through the upper model,several planning schemes can be generated,which provides boundary conditions for the expansion of middle-level optimization.The normal operation dispatching scheme of public transport hub obtained from the middle-level optimization results provides boundary conditions for the development of lower level optimization.Through the lower level optimization,the expected load loss of the whole distribution system including bus hub under the planning scheme given by the upper level can be obtained.The effectiveness of the model is verified by an IEEE-33 bus example.展开更多
Transport-based social exclusion is currently a serious social problem in Poland,and one which is apparently most severe at the level of the county(Polish powiat)in the south-eastof the country,including the Beskid Ni...Transport-based social exclusion is currently a serious social problem in Poland,and one which is apparently most severe at the level of the county(Polish powiat)in the south-eastof the country,including the Beskid Niski and Bieszczady Mountains.A deeper illustration of this problem requires both observation of changes in the suburban public-transport network and the identification of areas in which this has deteriorated significantly in quantity and quality.The chosen starting point for the research was therefore 1990,as a year in which–on the one hand–the Polish economy was already shifted to the new free-market principles;while–on the other–state PKS(Przedsiębiorstwo Komunikacji Samochodowej)non-urban bus transport enterprises still dominated public transport.The endpoint of the study is then the beginning of 2019(the author's research year).The article introduced here seeks to identify and present cartographically the changes affecting the public-transport network in the study area over the last 30 years,as well as to point to possible consequences of these processes.The background of the described changes is also discussed,as are the observed consequences of what is taking place.展开更多
In this paper, the open queueing network model is proposed for solving the problem of public transportation in cities. The vertices of the networks(i.e., the bus stops) are determined by means of the fuzzy clusteri...In this paper, the open queueing network model is proposed for solving the problem of public transportation in cities. The vertices of the networks(i.e., the bus stops) are determined by means of the fuzzy clustering method. The arcs (i.e., the paths of the public transportation) can be set up by using the shortest path model in the time sense or the 0 1 integer programming method.Applying the statistics method, we can calculate the parameters(such as the passenger flow's distribution, passenger flow's transition probability, mean waiting time for the bus etc. ) of the public transportation network. In this paper, we suggest to divide the network into two or three stages to implement the public transportation system in the form of ``frog jumping' fast transfer and ``permeation' fast dispersion.Combining the computer simulation and the evaluation of the achievement and effect of public transportation system, we modify the model so as to solve the public transportation problem better.展开更多
A systematic approach is proposed to the theme of safety,reliability and global quality of complex networks(material and immaterial)by means of special mathematical tools that allow an adequate geometric characterizat...A systematic approach is proposed to the theme of safety,reliability and global quality of complex networks(material and immaterial)by means of special mathematical tools that allow an adequate geometric characterization and study of the operation,even in the presence of multiple obstacles along the path.To that end,applying the theory of graphs to the problem under study and using a special mathematical model based on stochastic geometry,in this article we consider some regular lattices in which it is possible to schematize the elements of the network,with the fundamental cell with six,eight or 2(n+2)obstacles,calculating the probability of Laplace.In this way it is possible to measure the“degree of impedance”exerted by the anomalies along the network by the obstacles examined.The method can be extended to other regular and/or irregular geometric figures,whose union together constitutes the examined network,allowing to optimize the functioning of the complex system considered.展开更多
The lack of adequate and modern transport infrastructures makes the cost of transport in Africa higher than the rest of the world. Most of the transport infrastructures that exist were constructed during the colonial ...The lack of adequate and modern transport infrastructures makes the cost of transport in Africa higher than the rest of the world. Most of the transport infrastructures that exist were constructed during the colonial era which makes inter-regional connectivity difficult. The African Union in collaboration with other organization has committed to bridge the transport gap in Africa but still, face some challenges. This paper discusses the main issues that contribute for the weak nature of transportation in Sub-Saharan Africa with regards to the main transport modes and seeks to establish the possibility of sustainable intermodal transport through the integration of the different transport modes. Some policy reforms and other bilateral agreements such as deregulating the transport markets in West and Central Africa have been suggested to facilitate the development of an effective and efficient transport network in the Sub-Saharan African region.展开更多
At the beginning of the twentieth century, the United States was leading in the public transit sector, but following World War II, private automobiles became more affordable and gained popularity. Transportation infra...At the beginning of the twentieth century, the United States was leading in the public transit sector, but following World War II, private automobiles became more affordable and gained popularity. Transportation infrastructure investments that increased road capacity further facilitated the increase in automobile use at the expense of reduced public transit ridership. With the increase of dependency on automobiles and the continuing growth of private automobile ownership and use, various problems became major challenges in big cities of USA. These include traffic congestion, air pollution, road and parking infrastructure costs, energy consumption, traffic safety, fewer mobility options for the non-drivers, and a decline in the image and use of public transit. This study uses a medium sized city, Birmingham as a case study to investigate the potential of public transit to reduce automobile trips and in turn improve the overall performance of the road network by addressing the abovementioned challenges. An agent-based simulation model was developed for the Birmingham metropolitan region using the Multi-agent Transport Simulation (MATSim) platform. Three scenarios were considered with gradually increased transit ridership to identify the benefits of increased public transit. Traffic volume, network average speed, and travel times were used as performance measures for the evaluation of the designated scenarios. Results suggest that modal shifts toward public transit and reduction in travel demand for an automobile can result in improvements in speed and travel time for all users. Therefore, investments for improving transit quality and frequency of service, as well as campaigns to improve the image of public transit and make it a mode of choice for transportation users can increase transit ridership and, in turn, improve network operations, thus are deemed worthy for medium sized cities.展开更多
An inevitable trend has already taken shape for the application of the 5th Generation Mobile Communication Technology(5G)in the railway sector.The application scenarios and business types of the railway sector are com...An inevitable trend has already taken shape for the application of the 5th Generation Mobile Communication Technology(5G)in the railway sector.The application scenarios and business types of the railway sector are complex and diverse,so it is indispensable to test and verify the railway 5G before actual deployment.The design and creation of the railway 5G integrated innovation test platform provides engineering design,test and verification conditions for the networking,coverage and business development of 5G public networks and 5G-R in railway scenarios.This paper introduces the design of the overall architecture for the integrated railway 5G innovation test platform according to the railway network requirements,application scenarios and intelligent development trend;respectively elaborates on the design of the 5G-R core network,bearer network and wireless access along loop tracks,in combination with the characteristics of railway scenarios and the requirements of railway dispatching,operation and safety;raises further solutions on the network deployment and coverage schemes of 5G public networks so as to meet the application requirements of 5G public networks.The study results show that the integrated railway 5G innovation test platform scheme contains co-existence of 5G public and private networks,combines the indoor and outdoor scenarios,as well as takes into account of the dynamic and static tests so as to meet the environmental requirements for the integrated railway 5G test and application of all network functions,for which it can provide comprehensive technical support for railway 5G technology research and development,standard formulation,testing,etc.展开更多
文摘The rapid development of electric buses has brought a surge in the number of bus hubs and their charging and discharging capacities.Therefore,the location and construction scale of bus hubs will greatly affect the operation costs and benefits of an urban distribution network in the future.Through the scientific and reasonable planning of public transport hubs on the premise of meeting the needs of basic public transport services,it can reduce the negative impact of electric bus charging loads upon the power grids.Furthermore,it can use its flexible operation characteristics to provide flexible support for the distribution network.In this paper,taking the impact of public transport hub on the reliability of distribution network as the starting point,a three-level programming optimization model based on the value and economy of distribution network load loss is proposed.Through the upper model,several planning schemes can be generated,which provides boundary conditions for the expansion of middle-level optimization.The normal operation dispatching scheme of public transport hub obtained from the middle-level optimization results provides boundary conditions for the development of lower level optimization.Through the lower level optimization,the expected load loss of the whole distribution system including bus hub under the planning scheme given by the upper level can be obtained.The effectiveness of the model is verified by an IEEE-33 bus example.
基金financed by the National Science Centre entitled:An empirical pilot study on transport exclusion in mountain areas based on the example of the Low Beskids and the Bieszczady counties (Miniatura 2, contract number 2018/02/X/HS4/00451)
文摘Transport-based social exclusion is currently a serious social problem in Poland,and one which is apparently most severe at the level of the county(Polish powiat)in the south-eastof the country,including the Beskid Niski and Bieszczady Mountains.A deeper illustration of this problem requires both observation of changes in the suburban public-transport network and the identification of areas in which this has deteriorated significantly in quantity and quality.The chosen starting point for the research was therefore 1990,as a year in which–on the one hand–the Polish economy was already shifted to the new free-market principles;while–on the other–state PKS(Przedsiębiorstwo Komunikacji Samochodowej)non-urban bus transport enterprises still dominated public transport.The endpoint of the study is then the beginning of 2019(the author's research year).The article introduced here seeks to identify and present cartographically the changes affecting the public-transport network in the study area over the last 30 years,as well as to point to possible consequences of these processes.The background of the described changes is also discussed,as are the observed consequences of what is taking place.
文摘In this paper, the open queueing network model is proposed for solving the problem of public transportation in cities. The vertices of the networks(i.e., the bus stops) are determined by means of the fuzzy clustering method. The arcs (i.e., the paths of the public transportation) can be set up by using the shortest path model in the time sense or the 0 1 integer programming method.Applying the statistics method, we can calculate the parameters(such as the passenger flow's distribution, passenger flow's transition probability, mean waiting time for the bus etc. ) of the public transportation network. In this paper, we suggest to divide the network into two or three stages to implement the public transportation system in the form of ``frog jumping' fast transfer and ``permeation' fast dispersion.Combining the computer simulation and the evaluation of the achievement and effect of public transportation system, we modify the model so as to solve the public transportation problem better.
文摘A systematic approach is proposed to the theme of safety,reliability and global quality of complex networks(material and immaterial)by means of special mathematical tools that allow an adequate geometric characterization and study of the operation,even in the presence of multiple obstacles along the path.To that end,applying the theory of graphs to the problem under study and using a special mathematical model based on stochastic geometry,in this article we consider some regular lattices in which it is possible to schematize the elements of the network,with the fundamental cell with six,eight or 2(n+2)obstacles,calculating the probability of Laplace.In this way it is possible to measure the“degree of impedance”exerted by the anomalies along the network by the obstacles examined.The method can be extended to other regular and/or irregular geometric figures,whose union together constitutes the examined network,allowing to optimize the functioning of the complex system considered.
文摘The lack of adequate and modern transport infrastructures makes the cost of transport in Africa higher than the rest of the world. Most of the transport infrastructures that exist were constructed during the colonial era which makes inter-regional connectivity difficult. The African Union in collaboration with other organization has committed to bridge the transport gap in Africa but still, face some challenges. This paper discusses the main issues that contribute for the weak nature of transportation in Sub-Saharan Africa with regards to the main transport modes and seeks to establish the possibility of sustainable intermodal transport through the integration of the different transport modes. Some policy reforms and other bilateral agreements such as deregulating the transport markets in West and Central Africa have been suggested to facilitate the development of an effective and efficient transport network in the Sub-Saharan African region.
文摘At the beginning of the twentieth century, the United States was leading in the public transit sector, but following World War II, private automobiles became more affordable and gained popularity. Transportation infrastructure investments that increased road capacity further facilitated the increase in automobile use at the expense of reduced public transit ridership. With the increase of dependency on automobiles and the continuing growth of private automobile ownership and use, various problems became major challenges in big cities of USA. These include traffic congestion, air pollution, road and parking infrastructure costs, energy consumption, traffic safety, fewer mobility options for the non-drivers, and a decline in the image and use of public transit. This study uses a medium sized city, Birmingham as a case study to investigate the potential of public transit to reduce automobile trips and in turn improve the overall performance of the road network by addressing the abovementioned challenges. An agent-based simulation model was developed for the Birmingham metropolitan region using the Multi-agent Transport Simulation (MATSim) platform. Three scenarios were considered with gradually increased transit ridership to identify the benefits of increased public transit. Traffic volume, network average speed, and travel times were used as performance measures for the evaluation of the designated scenarios. Results suggest that modal shifts toward public transit and reduction in travel demand for an automobile can result in improvements in speed and travel time for all users. Therefore, investments for improving transit quality and frequency of service, as well as campaigns to improve the image of public transit and make it a mode of choice for transportation users can increase transit ridership and, in turn, improve network operations, thus are deemed worthy for medium sized cities.
文摘An inevitable trend has already taken shape for the application of the 5th Generation Mobile Communication Technology(5G)in the railway sector.The application scenarios and business types of the railway sector are complex and diverse,so it is indispensable to test and verify the railway 5G before actual deployment.The design and creation of the railway 5G integrated innovation test platform provides engineering design,test and verification conditions for the networking,coverage and business development of 5G public networks and 5G-R in railway scenarios.This paper introduces the design of the overall architecture for the integrated railway 5G innovation test platform according to the railway network requirements,application scenarios and intelligent development trend;respectively elaborates on the design of the 5G-R core network,bearer network and wireless access along loop tracks,in combination with the characteristics of railway scenarios and the requirements of railway dispatching,operation and safety;raises further solutions on the network deployment and coverage schemes of 5G public networks so as to meet the application requirements of 5G public networks.The study results show that the integrated railway 5G innovation test platform scheme contains co-existence of 5G public and private networks,combines the indoor and outdoor scenarios,as well as takes into account of the dynamic and static tests so as to meet the environmental requirements for the integrated railway 5G test and application of all network functions,for which it can provide comprehensive technical support for railway 5G technology research and development,standard formulation,testing,etc.