期刊文献+
共找到2,527篇文章
< 1 2 127 >
每页显示 20 50 100
Simulation of Underground Reservoir Stability of Pumped Storage Power Station Based on Fluid-Structure Coupling
1
作者 Peng Qiao Shuangshuang Lan +1 位作者 Hongbiao Gu Zhengtan Mao 《Computer Modeling in Engineering & Sciences》 SCIE EI 2024年第5期1381-1399,共19页
Based on global initiatives such as the clean energy transition and the development of renewable energy,the pumped storage power station has become a new and significant way of energy storage and regulation,and its co... Based on global initiatives such as the clean energy transition and the development of renewable energy,the pumped storage power station has become a new and significant way of energy storage and regulation,and its construction environment is more complex than that of a traditional reservoir.In particular,the stability of the rock strata in the underground reservoirs is affected by the seepage pressure and rock stress,which presents some challenges in achieving engineering safety and stability.Using the advantages of the numerical simulation method in dealing deal with nonlinear problems in engineering stability,in this study,the stability of the underground reservoir of the Shidangshan(SDS)pumped storage power station was numerically calculated and quantitatively analyzed based on fluid-structure coupling theory,providing an important reference for the safe operation and management of the underground reservoir.First,using the COMSOL software,a suitablemechanicalmodel was created in accordance with the geological structure and project characteristics of the underground reservoir.Next,the characteristics of the stress field,displacement field,and seepage field after excavation of the underground reservoir were simulated in light of the seepage effect of groundwater on the nearby rock of the underground reservoir.Finally,based on the construction specifications and Molar-Coulomb criterion,a thorough evaluation of the stability of the underground reservoir was performed through simulation of the filling and discharge conditions and anti-seepage strengthening measures.The findings demonstrate that the numerical simulation results have a certain level of reliability and are in accordance with the stress measured in the project area.The underground reservoir excavation resulted in a maximum displacement value of the rock mass around the caverns of 3.56 mm in a typical section,and the safety coefficient of the parts,as determined using the Molar-Coulomb criterion,was higher than 1,indicating that the project as a whole is in a stable state. 展开更多
关键词 Underground reservoir fluid-structure coupling numerical simulation pumped storage power station filling and discharge
下载PDF
Prospect of new pumped-storage power station 被引量:3
2
作者 Jingyan Li Chuanbao Yi Sujie Gao 《Global Energy Interconnection》 2019年第3期235-243,共9页
In this paper, a new type of pumped-storage power station with faster response speed, wider regulation range, and better stability is proposed. The operational flexible of the traditional pumped-storage power station ... In this paper, a new type of pumped-storage power station with faster response speed, wider regulation range, and better stability is proposed. The operational flexible of the traditional pumped-storage power station can be improved with variable-speed pumped-storage tech no logy. Combined with chemical en ergy storage, the failure to achieve sec on d-order response speed and the insufficient safety and reliability of pumped-storage power units could be solved. With the better solar en ergy and site resources, the in teg rated performance can be improved by an optical storage system in stalled in future pumped-storage stations. Through the characteristics analysis of the new type of pumped-storage power station, three types of optimal station locations are proposed, namely, the load concentration area, new energy concentration area, and ultrahigh- voltage direct current receiver area. Taking the new pumped-storage power station as an example, the advantages of multi-energy cooperation and joint operation are analyzed. It can be predicted that the frequency and load regulation of the power grid will be more flexible, and the service capacity to the main power grid will be much stronger in the future. 展开更多
关键词 pumped-storage POWER station Variable-speed pumped-storage technology CHEMICAL ENERGY storage Solarenergy storage system
下载PDF
Study on integrated development and hybrid operation mode of nuclear power plant and pumped-storage power station 被引量:6
3
作者 Haizheng Wang Caide Peng 《Global Energy Interconnection》 2019年第4期336-341,共6页
The nuclear power plant is suitable for base-load operation, while the pumped-storage unit mainly gives play to capacity benefit in the electric power system;hence, the integrated development and hybrid operation mode... The nuclear power plant is suitable for base-load operation, while the pumped-storage unit mainly gives play to capacity benefit in the electric power system;hence, the integrated development and hybrid operation mode of the two can better meet the needs of the electric power system. This article first presents an analysis of the necessity and superiority of such mode, then explains its meaning and analyzes the working routes. Finally, it proposes the business modes as follows: low price pumping water electricity plus nuclear power in the near term;nuclear power shifted to pumped storage power participating in market competition in the middle term;and, in the long term, nuclear power shifted to pumped storage power as primary and serving as an electric power system when needed. 展开更多
关键词 NUCLEAR POWER PLANT pumped-storage POWER station Integrated development HYBRID operation MODES
下载PDF
Equivalent Substitution Based Method for Calculation of Best Installed Capacity of Pumped Storage Power Station
4
作者 Jinming Li Tao Yu Huaizhi Wang 《Energy and Power Engineering》 2013年第3期46-51,共6页
This paper proposes a novel method to calculate the best installed capacity of pumped storage power station. First, we choose the day with maximum load as the typical day for every month and simulate the system runnin... This paper proposes a novel method to calculate the best installed capacity of pumped storage power station. First, we choose the day with maximum load as the typical day for every month and simulate the system running in two cases of whether the pumped storage power station is put into operation. The difference of the total coal consumption between the two cases is the peak load shifting benefit. Furthermore, we build load model and power generation model to calculate the benefit of emergency use and frequency modulation, which are the major projects of dynamic benefits. At last, on the premise of ensuring the system requirements, the developed method employs the maximum benefit of the unit capacity as the objective function to get the best installed capacity of pumped storage power station by simulations. Tests on a provincial power grid have shown that the developed method which combines of load characteristics, electric structure and other factors can get the best installed capacity of pumped storage power station easily and has a certain guiding significance for the planning and construction of the pumped storage power station. 展开更多
关键词 STATIC BENEFITS Dynamic BENEFITS pumped storage Power station Best Installed Capacity
下载PDF
A large size pumped storage hydropower station wasstarted to construct in Jiangsu Province
5
《Electricity》 2001年第4期51-51,共1页
关键词 A large size pumped storage hydropower station wasstarted to construct in Jiangsu Province
下载PDF
Optimal Dispatching Model Considering the Pumped Sto-rage Power Plant in Hunan
6
作者 Xinfan Jiang Dunnan Liu +1 位作者 Siyuan Zhang Wenlei Zhang 《Energy and Power Engineering》 2013年第4期608-611,共4页
This paper made a research on the Intelligent Optimization Operating Modeling of Pumped Storage Power Station in Hunan Power Grid. First it introduces the characteristics of Hunan power grid and analysis the practical... This paper made a research on the Intelligent Optimization Operating Modeling of Pumped Storage Power Station in Hunan Power Grid. First it introduces the characteristics of Hunan power grid and analysis the practical requirement of dispatching. Then it brings forward the intelligent optimization model and set up running model for pumped storage power station of Hei Mi-feng. At last, it introduces the application of pumped storage power station in Hunan power grid and proves the effectiveness of the optimization models. 展开更多
关键词 Intelligent Optimization DISPATCHING Model pumped storage Power station
下载PDF
基于Microstation及奥维地图的抽水蓄能电站施工总布置设计 被引量:1
7
作者 陈俊 朱静萍 《云南水力发电》 2023年第3期219-222,共4页
抽水蓄能电站施工总布置设计涉及专业广、内容多、布置范围大,且设计周期不断被压缩,对工程设计人员要求逐渐提高,而传统的施工总布置设计方法效率较低,逐渐难以适应快节奏的设计工作。基于Microstation及奥维地图,利用多维设计手段以及... 抽水蓄能电站施工总布置设计涉及专业广、内容多、布置范围大,且设计周期不断被压缩,对工程设计人员要求逐渐提高,而传统的施工总布置设计方法效率较低,逐渐难以适应快节奏的设计工作。基于Microstation及奥维地图,利用多维设计手段以及GPS定位和导航功能,对抽水蓄能电站施工总布置设计进行研究。设计效果表明:基于Microstation及奥维地图的抽水蓄能电站施工总布置设计,提高了勘察设计效率及质量,减少了勘察设计失误,为抽水蓄能电站施工总布置设计提供了新思路。 展开更多
关键词 MICROstation 奥维地图 抽水蓄能电站 施工总布置
下载PDF
抽水蓄能机组特性曲线对电站水力过渡过程的影响 被引量:1
8
作者 王利英 王大开 +3 位作者 孙茂祥 樊红刚 张佳杰 王泽阳 《中国农村水利水电》 北大核心 2024年第4期223-229,共7页
为了研究抽水蓄能机组特性曲线对过渡过程的影响,采用三组比转速接近的已建电站的特性曲线对某电站进行了水力过渡过程计算分析。通过对比计算发现:减小飞逸曲线与机组运行轨迹线交点的单位转速,有助于降低机组最大转速上升率。初始工... 为了研究抽水蓄能机组特性曲线对过渡过程的影响,采用三组比转速接近的已建电站的特性曲线对某电站进行了水力过渡过程计算分析。通过对比计算发现:减小飞逸曲线与机组运行轨迹线交点的单位转速,有助于降低机组最大转速上升率。初始工况点应选在特性曲线相对平滑的地方,有助于减小机组在过渡过程中的流量变化,降低蜗壳进口最大压力。“s”特性斜率变化率越小,整体越平滑,尾水管进口最小压力越高。可以为项目前期选择合适的转轮提供理论依据。 展开更多
关键词 抽水蓄能电站 过渡过程 特性曲线 水电站
下载PDF
侧式进/出水口各孔道流量分配差异及影响因素
9
作者 高学平 马一鸣 +1 位作者 刘殷竹 朱洪涛 《天津大学学报(自然科学与工程技术版)》 EI CAS CSCD 北大核心 2024年第6期633-641,共9页
对于抽水蓄能电站侧式进/出水口各孔道流量分配,现有设计规范规定进/出水口相邻中边孔道的流量不均匀程度不宜超过10%,但实际工程设计难以达到此要求.本文以某抽水蓄能电站侧式进/出水口为例,通过优化进/出水口各体型参数,利用数值模拟... 对于抽水蓄能电站侧式进/出水口各孔道流量分配,现有设计规范规定进/出水口相邻中边孔道的流量不均匀程度不宜超过10%,但实际工程设计难以达到此要求.本文以某抽水蓄能电站侧式进/出水口为例,通过优化进/出水口各体型参数,利用数值模拟方法研究各孔道流量等水力参数,重点分析分流墩布置对各孔道流量分配的影响及其规律,试图使进流工况和出流工况相邻中边孔道的流量不均匀程度均最小.研究表明,改变扩散段分流墩布置能有效改善流量不均匀程度.对于3墩4孔侧式进/出水口,相邻中边孔道的流量不均匀程度在出流工况下随中边孔宽度比增大而增大,在进流工况下随中边孔宽度比增大而减小;当中边孔宽度比增大且中墩后移距离减小时,出流工况和进流工况下的流量不均匀程度均减小.对于2墩3孔侧式进/出水口,相邻中边孔道的流量不均匀程度不论在出流工况下还是在进流工况下,均随中边孔宽度比增大呈先减小后增大的规律.优化后的3墩4孔侧式进/出水口的中边孔宽度比取0.228∶0.272,中墩后移距离取0.36D(D为隧洞直径),其相邻中边孔道的流量不均匀程度均较优,在出流工况下为18.47%~19.43%,在进流工况下为19.82%~19.83%;优化后的2墩3孔侧式进/出水口的中边孔宽度比取0.310∶0.345,其相邻中边孔道的流量不均匀程度均较优,在出流工况下为19.47%~19.63%,在进流工况下为18.66%~18.67%.相邻中边孔道的流量不均匀程度较难满足不宜超过10%的设计规范要求.研究成果将有助于《抽水蓄能电站设计规范》中关于进/出水口水力指标要求的完善. 展开更多
关键词 抽水蓄能电站 侧式进/出水口 体型优化 流量分配 数值模拟
下载PDF
NB/T 35009-2024修订内容解读及抽水蓄能电站标准化工作历程回顾
10
作者 高洁 岳蕾 朱方亮 《中国标准化》 2024年第15期148-152,共5页
本文回顾了抽水蓄能电站选点规划标准化工作历程,从90年代选点规划工作范围逐步扩展,一批代表性站点规划落地,选点规划思想逐渐成熟,首版标准于2003年编制完成。到2009年全国范围抽水蓄能电站选点规划系统性开展,继22个省(区、市)完成... 本文回顾了抽水蓄能电站选点规划标准化工作历程,从90年代选点规划工作范围逐步扩展,一批代表性站点规划落地,选点规划思想逐渐成熟,首版标准于2003年编制完成。到2009年全国范围抽水蓄能电站选点规划系统性开展,继22个省(区、市)完成选点工作,第二版标准修订完成,有效指导了实践工作。随着抽水蓄能电站选点规划的管理流程和技术路线不断成熟,选点规划已成为前期工作和开工建设的重要基础。双碳目标提出以来,抽水蓄能中长期发展规划为行业发展带来新机遇新挑战,第三版标准修订工作适时开展,区分功能定位、明确技术要求,积极响应了当前新能源和抽水蓄能行业高质量发展的要求。 展开更多
关键词 抽水蓄能电站选点规划 抽水蓄能发展规划 抽水蓄能电站技术标准体系
下载PDF
侧式进 出水口顶板扩张角对拦污栅断面流速分布影响规律研究
11
作者 高学平 曾庆康 +1 位作者 朱洪涛 刘殷竹 《水利学报》 EI CSCD 北大核心 2024年第3期301-312,共12页
抽水蓄能电站侧式进出水口双向过流,其顶板扩张角的大小将直接影响拦污栅断面流速分布是否均匀,甚至出现反向流速。抽水蓄能电站设计规范将3°~5°作为侧式进出水口顶板扩张角的推荐范围,其依据是矩形渐扩管阻力系数最小的扩张... 抽水蓄能电站侧式进出水口双向过流,其顶板扩张角的大小将直接影响拦污栅断面流速分布是否均匀,甚至出现反向流速。抽水蓄能电站设计规范将3°~5°作为侧式进出水口顶板扩张角的推荐范围,其依据是矩形渐扩管阻力系数最小的扩张角度,但侧式进出水口体型较之复杂很多,因此有必要进一步探讨。本文以某侧式进出水口体型为研究对象,采用数值模拟方法,研究了11种角度的顶板扩张角对出流工况和进流工况拦污栅断面流速分布的影响。结果表明:在出流工况下,随着顶板扩张角的增大,中孔拦污栅断面的主流位置由居中部逐渐向底部降低,断面流速分布由上下基本对称趋于底部大上部小的上下不对称,当顶板扩张角较大时中孔拦污栅断面上部出现反向流速;随着顶板扩张角的增大,边孔拦污栅断面流速分布由基本均匀逐渐变为底部大上部小的不均匀分布;随着顶板扩张角的增大,中、边孔孔口流速不均匀系数均逐渐增大,但中孔拦污栅断面流速分布受顶板扩张角影响更大。在进流工况下,随着顶板扩张角的增大,中、边孔拦污栅断面流速分布及孔口流速不均匀系数均无明显影响。研究成果可为优化侧式进出水口设计提供指导。 展开更多
关键词 抽水蓄能电站 侧式进出水口 顶板扩张角 拦污栅断面流速 数值模拟
下载PDF
计及深度调峰的风-光-水-火-抽蓄多能源联网系统优化调度研究
12
作者 李卫国 丁硕 +1 位作者 安祎宁 蔡婷婷 《东北电力大学学报》 2024年第3期83-93,共11页
多种能源联网运行逐步成为未来电力系统发展的方向,多能源联网系统的优化调度是应对规模化新能源并网消纳的重要手段。文中建立了计及火电机组深度调峰成本的风-光-水-火-抽蓄联网系统成本模型和考虑调峰主动性的风-光-水-火-抽蓄联网... 多种能源联网运行逐步成为未来电力系统发展的方向,多能源联网系统的优化调度是应对规模化新能源并网消纳的重要手段。文中建立了计及火电机组深度调峰成本的风-光-水-火-抽蓄联网系统成本模型和考虑调峰主动性的风-光-水-火-抽蓄联网系统日前优化调度模型。针对多能源耦合系统结构复杂的情况,提出了分层优化调度的模型求解策略。上层模型以净负荷波动最小为优化目标,得到等效负荷曲线;下层模型根据上层模型的调度结果,以调峰运行的经济性最优和新能源弃电率最低为目标函数,计及调峰主动性,求解考虑火电机组深度调峰煤耗特性的含新能源系统的经济调度问题。仿真算例表明所建模型实现了多能源联网系统的互补运行,提升了火电机组的深度调峰能力,降低新能源弃电率和系统运行成本。 展开更多
关键词 多能源系统 抽水蓄能电站 深度调峰 优化调度 调峰主动性
下载PDF
接立面转弯隧洞的侧式出水口水力特性
13
作者 高学平 魏南疆 刘殷竹 《长江科学院院报》 CSCD 北大核心 2024年第7期94-102,共9页
对于接立面转弯隧洞的侧式出水口,立面转弯隧洞的转弯段将直接影响侧式出水口的水力特性。若立面转弯隧洞参数设计不合理,极易导致侧式出水口内部发生流动分离。选取RSM紊流模型,针对接立面转弯隧洞的侧式出水口进行数值模拟,探究立面... 对于接立面转弯隧洞的侧式出水口,立面转弯隧洞的转弯段将直接影响侧式出水口的水力特性。若立面转弯隧洞参数设计不合理,极易导致侧式出水口内部发生流动分离。选取RSM紊流模型,针对接立面转弯隧洞的侧式出水口进行数值模拟,探究立面转弯隧洞曲率半径R、弯道后直隧洞长度L及转弯角度α等参数对出水口水力特性的影响规律,并对隧洞内流动过程进行了讨论。增加立面转弯隧洞曲率半径R和弯道后直隧洞长度L能显著改善出水口的水力指标。当曲率半径R≥12 D(D为隧洞直径)、弯道后直隧洞长度L≥16 D时,侧式出水口内部无明显流动分离,拦污栅断面流速分布均匀且无反向流速区。研究成果将对抽水蓄能电站侧式进/出水口的设计提供指导。 展开更多
关键词 抽水蓄能电站 侧式出水口 立面转弯隧洞 水力特性 数值模拟
下载PDF
基于组合赋权-云模型的抽蓄电站高质量发展评价体系
14
作者 余恩海 佟佳颖 刘琳 《电力科学与工程》 2024年第5期64-71,共8页
为科学评价生产期抽蓄电站高质量发展现状、把握电站发展的薄弱环节、明确建设期及新投运电站发展方向,根据抽蓄电站定位及高质量发展内涵,经过2轮筛选,构建了包含服务电力系统稳定运行、经济、绿色、创新、共享5个一级指标以及18个二... 为科学评价生产期抽蓄电站高质量发展现状、把握电站发展的薄弱环节、明确建设期及新投运电站发展方向,根据抽蓄电站定位及高质量发展内涵,经过2轮筛选,构建了包含服务电力系统稳定运行、经济、绿色、创新、共享5个一级指标以及18个二级指标的评价指标体系;选用层次分析法–决策实验分析方法确定指标权重,运用云模型评价各电站高质量发展等级。最后,选取A抽蓄电站为算例验证评价体系适用性。评价结果显示,该电站服务电力系统稳定运行、绿色和共享3个指标表现均为良好,经济和创新指标表现为中等,与电站实际运行情况相符合。该验证结果表明,采用上述方法构建的评价指标体系有很好的适用性。 展开更多
关键词 抽水蓄能电站 高质量发展评价 层次分析法 决策实验室分析法 云模型 新型电力系统
下载PDF
抽蓄电站全库盆防渗水库渗流缺陷影响分析
15
作者 王润英 赵凯文 林思雨 《水电能源科学》 北大核心 2024年第3期105-109,共5页
针对抽蓄电站全库盆防渗水库土工膜缺陷导致水库渗流量产生变化的安全问题,结合陕西省某抽蓄电站水库库底土工膜防渗工程,采用单因素影响分析和多因素影响分析方法进行抽蓄电站全库盆防渗水库渗流缺陷影响分析。结果表明,水头大小、缺... 针对抽蓄电站全库盆防渗水库土工膜缺陷导致水库渗流量产生变化的安全问题,结合陕西省某抽蓄电站水库库底土工膜防渗工程,采用单因素影响分析和多因素影响分析方法进行抽蓄电站全库盆防渗水库渗流缺陷影响分析。结果表明,水头大小、缺陷大小、缺陷个数均正向影响抽蓄水库渗流量,而缺陷位置与抽蓄水库渗流量的相关性不明显。其中缺陷大小是影响抽蓄水库渗流量的主要因素,其次为水头大小,再次为缺陷个数。 展开更多
关键词 抽蓄电站全库盆防渗水库 土工膜缺陷 渗流量 缺陷影响分析
下载PDF
含废旧矿井抽蓄电站的源-荷-储协同控制调频研究
16
作者 骆钊 田肖 +3 位作者 莫熙 聂灵峰 沈鑫 雷元庆 《电力系统保护与控制》 EI CSCD 北大核心 2024年第8期134-144,共11页
针对新能源在电网中渗透率不断提高导致系统调频容量和频率响应能力不足的问题,提出一种含废旧矿井抽蓄电站的源-荷-储协同控制调频方法。首先,建立了电解铝工业负荷、废旧矿井抽蓄电站和超级电容频率响应模型。然后,基于模型预测控制理... 针对新能源在电网中渗透率不断提高导致系统调频容量和频率响应能力不足的问题,提出一种含废旧矿井抽蓄电站的源-荷-储协同控制调频方法。首先,建立了电解铝工业负荷、废旧矿井抽蓄电站和超级电容频率响应模型。然后,基于模型预测控制理论,以系统状态量和控制量的加权函数最小为目标,设计区域信息互动的分布式模型预测控制器,并提出含废旧矿井抽蓄电站的源-荷-储协同控制调频方法。最后,将分布式模型预测控制器应用在所提源-荷-储协同控制方法中,并在改进的IEEE标准两区域LFC模型中进行仿真。结果表明所提方法可以缩短频率恢复时间,减小最大频差值,改善系统调频动态性能。 展开更多
关键词 负荷频率控制 废旧矿井抽蓄电站 超级电容 分布式模型预测控制
下载PDF
新型电力系统下抽水蓄能电站高质量发展探究
17
作者 李泓泽 李栩萌 《华北电力大学学报(社会科学版)》 2024年第4期51-59,共9页
为实现“双碳”目标,我国新能源装机规模快速增长,建设以新能源为主体的新型电力系统势在必行。新型电力系统中新能源大规模并网,对灵活性资源有了更高要求。抽水蓄能电站作为技术成熟的储能电站,在解决以新能源为主体的新型电力系统负... 为实现“双碳”目标,我国新能源装机规模快速增长,建设以新能源为主体的新型电力系统势在必行。新型电力系统中新能源大规模并网,对灵活性资源有了更高要求。抽水蓄能电站作为技术成熟的储能电站,在解决以新能源为主体的新型电力系统负荷波动方面发挥重要价值,能够同时应对源荷双侧的挑战。然而,抽水蓄能电站成本回收机制的不清晰对其发展模式造成阻碍,本文依据抽水蓄能电站在不同市场环境下的价值属性,对抽水蓄能电站成本回收机制提出建议,推动我国抽水蓄能产业可持续发展,满足新型电力系统建设需要。 展开更多
关键词 新型电力系统 抽水蓄能电站 成本回收机制 容量电价
下载PDF
抽水蓄能电站无压泄洪洞台阶消能型式研究
18
作者 刘洁玉 尚渝钧 +1 位作者 刘合睿 刘洁 《西北水电》 2024年第3期74-80,共7页
基于甘肃某抽水蓄能电站泄洪洞洞内消能设计,探讨在流量及底坡恒定的条件下,台阶尺寸与消能率的相关关系,探寻台阶尺寸的初拟原则,采用现行NB/T 10867-2021《溢洪道设计规范》中跌落流上限及滑行流下限的经验公式(坡角范围为2.86°~... 基于甘肃某抽水蓄能电站泄洪洞洞内消能设计,探讨在流量及底坡恒定的条件下,台阶尺寸与消能率的相关关系,探寻台阶尺寸的初拟原则,采用现行NB/T 10867-2021《溢洪道设计规范》中跌落流上限及滑行流下限的经验公式(坡角范围为2.86°~59.53°)进行台阶消能流态的初步判别,通过Chanson半经验公式理论计算和CFD数值模拟水工隧洞底板布置不同台阶尺寸对应的消能特性。结果表明:在流量及坡度不变的情况下,台阶尺寸(台阶步长及高度)对消能率的影响有限;台阶尺寸越大,水力要素受流动边界条件影响和扰动越明显;初拟台阶尺寸时,应分析水流掺气点位置及出现掺气均匀流位置随台阶尺寸变化向上游移动的速率,同时结合实际边界条件、便于施工及后期运维等方面综合考虑,台阶高差宜控制在0.20~0.60 m。 展开更多
关键词 抽水蓄能电站 泄洪洞 台阶消能 流态 消能率
下载PDF
抽水蓄能电站建设及运营对地下水环境影响研究——以陕西大庄里抽水蓄能电站为例
19
作者 刘艳领 张文栋 +1 位作者 程岩 郑龙浩 《西北水电》 2024年第3期26-34,共9页
抽水蓄能电站以其可持续性和高效性的调峰、调频、调相及事故备用电站,是中国电网系统中的关键一环,其对地下水环境影响一直是建设发展的重点和难点。为探究抽水蓄能电站建设运营对地下水环境的影响,以陕西省抽水蓄能规划“十四五”重... 抽水蓄能电站以其可持续性和高效性的调峰、调频、调相及事故备用电站,是中国电网系统中的关键一环,其对地下水环境影响一直是建设发展的重点和难点。为探究抽水蓄能电站建设运营对地下水环境的影响,以陕西省抽水蓄能规划“十四五”重点实施项目大庄里抽水蓄能电站为工程实例,分析讨论抽水蓄能电站的建设及运营对地下水环境影响,通过分析区域水文地质条件,结合压水试验和水质分析,开展场地地下水环境评价,结合渗流场模拟,预测建设期和运营期地下水环境影响,提出相应的环境保护措施。结果表明:工程建设期及运营期对地下水环境的影响主要体现在地下水位的下降。上水库地下水埋深浅,水量不丰,库岸开挖将改变地下水的排泄条件,库周地下水位会发生10 m以内的小幅度下降;输水系统建设开挖将改变天然渗流场状态,导致沿线整体水位下降,局部降幅可达78 m;下水库坝、库地下水位埋深差异大,地下水坡降约为30%,开挖易于破碎花岗岩体处形成局部渗流和地下水排泄。研究成果对其他抽水蓄能电站地下水环境影响评价工作具有指导意义。 展开更多
关键词 抽水蓄能电站 水文地质环境 地下水环境 地下水环境保护
下载PDF
浑源抽水蓄能电站下水库拦排沙系统防沙效果的试验研究
20
作者 侯燕翔 向波 +1 位作者 刘书宝 杨威 《泥沙研究》 CAS CSCD 北大核心 2024年第3期48-54,共7页
设置拦排沙系统是缓解抽水蓄能电站泥沙问题的有效方法之一。为验证浑源抽水蓄能电站下水库拦排沙系统的防沙效果,建立了浑源抽水蓄能电站下水库泥沙物理模型,进行了不同频率洪水入库试验。通过比较有、无拦排沙系统的输沙量及悬沙特性... 设置拦排沙系统是缓解抽水蓄能电站泥沙问题的有效方法之一。为验证浑源抽水蓄能电站下水库拦排沙系统的防沙效果,建立了浑源抽水蓄能电站下水库泥沙物理模型,进行了不同频率洪水入库试验。通过比较有、无拦排沙系统的输沙量及悬沙特性,论证了拦排沙系统的拦沙效果,并分析了影响拦沙效果的主要因素。结果表明:不建拦沙坝情况,进入下水库的泥沙直接相关于上游水沙条件,其相关系数大于0.8;修建拦排沙系统后,进入下库沙量明显减少、悬沙粒径细化,拦沙效果与拦沙库淤积情况的相关系数均大于0.7,拦沙库的淤积情况是拦沙效果的主要影响因素,而上游水沙条件的影响较小。 展开更多
关键词 多沙河流 抽水蓄能电站 拦排沙系统 防沙效果
下载PDF
上一页 1 2 127 下一页 到第
使用帮助 返回顶部