In recent years,China has made significant progress in the construction of highways,resulting in an improved highway network that has provided robust support for economic and social development.However,the rapid expan...In recent years,China has made significant progress in the construction of highways,resulting in an improved highway network that has provided robust support for economic and social development.However,the rapid expansion of highway construction,power supply,and distribution has led to several challenges in mechanical and electrical engineering technology.Ensuring the safe,stable,and cost-effective operation of the power supply and distribution system to meet the diverse requirements of highway operations has become a pressing issue.This article takes an example of a highway electromechanical engineering power supply and distribution construction project to provide insight into the construction process of highway electromechanical engineering power supply and distribution technology.展开更多
It is need to establish site project department during the construction of electric power project.The head office should design and build the main structure,continually improve structure of project department,meantime...It is need to establish site project department during the construction of electric power project.The head office should design and build the main structure,continually improve structure of project department,meantime,positively apply principle of automatic control to improve the site management of electric power construction.In this article,the application strategy of principle of automatic control is analyzed focusing on the site work of electric power construction.展开更多
Using the improved prospect theory with the linear transformations of rewarding good and punishing bad(RGPBIT),a new investment ranking model for power grid construction projects(PGCPs)is proposed.Given the uncertaint...Using the improved prospect theory with the linear transformations of rewarding good and punishing bad(RGPBIT),a new investment ranking model for power grid construction projects(PGCPs)is proposed.Given the uncertainty of each index value under the market environment,fuzzy numbers are used to describe qualitative indicators and interval numbers are used to describe quantitative ones.Taking into account decision-maker’s subjective risk attitudes,a multi-criteria decision-making(MCDM)method based on improved prospect theory is proposed.First,the[−1,1]RGPBIT operator is proposed to normalize the original data,to obtain the best andworst schemes of PGCPs.Furthermore,the correlation coefficients between interval/fuzzy numbers and the best/worst schemes are defined and introduced to the prospect theory to improve its value function and loss function,and the positive and negative prospect value matrices of the project are obtained.Then,the optimization model with the maximum comprehensive prospect value is constructed,the optimal attribute weight is determined,and the PGCPs are ranked accordingly.Taking four PGCPs of the IEEERTS-79 node system as examples,an illustration of the feasibility and effectiveness of the proposed method is provided.展开更多
Due to the impact of the novel coronavirus outbreak,universities have adopted online teaching and carried out remote teaching.With the improvement of the epidemic and the approaching of the new school year,the organic...Due to the impact of the novel coronavirus outbreak,universities have adopted online teaching and carried out remote teaching.With the improvement of the epidemic and the approaching of the new school year,the organic connection between online teaching during the epidemic and offline course construction after the epidemic is not only a challenge for tertiary education teachers,but also an urgent issue to be addressed.Therefore,the power electronics course is taken as an example to explore this connection.展开更多
To meet society’s needs for undergraduate students to have engineering skills and to develop students’ability to operate Linux and engage in network software development,this paper proposes the construction of a new...To meet society’s needs for undergraduate students to have engineering skills and to develop students’ability to operate Linux and engage in network software development,this paper proposes the construction of a new specialized course for network engineering major--Linux system and network programming.This paper analyzes the course’s advantages,presents the contents of this course,designs a series of teaching methods aimed at improving students’engineering ability,proposes a course assessment method that will encourage students to practice,lists the development requirements for an examination software designed for this course,and finally,presents the results of our practice in teaching this course.展开更多
Community education study tour instructors are important action elements of community education tours.It is necessary to sort out the abilities of community education study tour instructors as well as construct a scie...Community education study tour instructors are important action elements of community education tours.It is necessary to sort out the abilities of community education study tour instructors as well as construct a scientific and reasonable professional ability index system for community education study tour instructors,so as to promote the high-quality development of community education as well as the modernization of lifelong education governance system and governance ability.Based on the practice of community education in Jiangsu and the basic theory of pedagogy,this paper puts forward five core vocational abilities of community education,including travel education and teaching ability,curriculum development ability,management and research ability,training and guidance ability,as well as study tour guarantee ability.This paper attempts to sort out the ability of community education study tour instructors through research and analysis.A three-dimensional and multi-dimensional framework of community education instructors’ability has been constructed to provide a path for the professional development of community education study tour instructors.展开更多
On March 25 1996, the electron beam flue gas desulfurization demonstration project of Chengdu Cogeneration Power Plant started formal construction This is at present the largest electron beam desulfurization project i...On March 25 1996, the electron beam flue gas desulfurization demonstration project of Chengdu Cogeneration Power Plant started formal construction This is at present the largest electron beam desulfurization project in power plants in the world, and is jointly constructed by Sichuan Electric Power Bureau and the EBARA Works of Japan, This is an important cooperation project in environment protection between展开更多
This paper mainly introduces the designand construction of the multi-flue chimneysof Beilungang Power Plant, ShidongkouSecond Power Plant and Waigaoqiao PowerPlant which have been used in East Chinaarea. This paper co...This paper mainly introduces the designand construction of the multi-flue chimneysof Beilungang Power Plant, ShidongkouSecond Power Plant and Waigaoqiao PowerPlant which have been used in East Chinaarea. This paper contains the generalsituation of construction, material selection,lifting scheme of steel inner flue, designfeatures and construction method. It could bereferential to concerned design andconstruction companies.展开更多
The Supervision during construction of Thailand PTA Co-generation, Which was contracted by our country extended into the quality guaranteed period. The supervision during the quality guaranteed period includes the mon...The Supervision during construction of Thailand PTA Co-generation, Which was contracted by our country extended into the quality guaranteed period. The supervision during the quality guaranteed period includes the monitor of the operation and maintenance of power plant,organization of subcontractor to treat the problems and defects occurred in the field in time, technical consultancy and communication in time, delivery of spare parts, and assistance of clearing Contractor’s quality deposit. It is proved by the practice that it is necessary to early out the supervision during quality guaranteed period.展开更多
Dust-storm is a kind of severe weather, which has comprehensive and significant impacts on socioeconomic development and people’s livelihood. Enhancing the abilities of dust-storm monitoring, predicting and service w...Dust-storm is a kind of severe weather, which has comprehensive and significant impacts on socioeconomic development and people’s livelihood. Enhancing the abilities of dust-storm monitoring, predicting and service will be of great benefit and the important significance to China and its people. At present, the comprehensive operation on dust-storm monitoring, predicting and service is still in a preliminary phase, the abilities of operation can’t meet the needs of implementing the real-time and quantitative monitoring and providing the efficient service. The implementation of the project of dust-storm monitoring, predicting and service system will greatly improve the service ability and level for the sustainable development and make a greater contribution to build the better-off society. The first phase project mainly involves monitoring subsystem, predicting, warning and service subsystem; communications and transmission subsystem, etc. In the first phase construction a series of major measures should be taken to address project overall benefits, such as making better use of current monitoring resource, taking into account the standards of data format and project integrative and extensive abilities and so on.展开更多
Based on the test results of Lize navigation-power junction construction diversion through the normal fix-bed model with the scale of 1:100, the navigation flow condition in each construction diversion period is studi...Based on the test results of Lize navigation-power junction construction diversion through the normal fix-bed model with the scale of 1:100, the navigation flow condition in each construction diversion period is studied. There are a lot of problems in the first construction diversion period, such as excessive flow velocity, poor flow pattern, low navigation discharge and so on. To solve these problems, the comprehensive engineering measures for improving the navigation flow condition during construction are put forward. Among them, the structure forms of construction diversion cofferdam are optimized. Finally, the highest safe navigation discharge and reasonable navigation route are proposed. The experimental results obtained from the optimization scheme of the first construction diversion period are better than these from the original scheme in terms of flow velocity, flow pattern and so on. The research results may serve as reference for similar engineering.展开更多
This essay is going to read the different kinds of beings in The Lord of the Rings as different stages of man,and to analyze how they construct or destruct their selves respectively over power.The Lord of the Rings is...This essay is going to read the different kinds of beings in The Lord of the Rings as different stages of man,and to analyze how they construct or destruct their selves respectively over power.The Lord of the Rings is read as a story about the self-construction and self-destruction of man,who begins to construct the sense of self from a very early stage in life,and becomes who he is in the continuous process of trying to identify himself with the image that keeps changing,of the frequently alternative construction and destruction of his self,and of intersubjectivity,the interrelation with other subjects.展开更多
The authors want to changed the web link of the software platform in this Briefing.Page 97,section 'INTRODUCTION',the web link of SHEsis is changed from http://www.nhgg.org/analysis tohttp://analysis.bio-x.
The use of Internet of Things(IoT)applications become dominant in many systems.Its on-chip data processing and computations are also increasing consistently.The battery enabled and low leakage memory system at subthre...The use of Internet of Things(IoT)applications become dominant in many systems.Its on-chip data processing and computations are also increasing consistently.The battery enabled and low leakage memory system at subthreshold regime is a critical requirement for these IoT applications.The cache memory designed on Static Random-Access Memory(SRAM)cell with features such as low power,high speed,and process tolerance are highly important for the IoT memory system.Therefore,a process tolerant SRAM cell with low power,improved delay and better stability is presented in this research paper.The proposed cell comprises 11 transistors designed with symmetric approach for write operations and single ended circuit for read operations that exhibits an average dynamic power saving of 43.55%and 47.75%for write and 35.59%and 36.56%for read operations compared to 6 T and 8 T SRAM cells.The cell shows an improved write delay of 26.46%and 37.16%over 6 T and 8T and read delay is lowered by 50.64%and 72.90%against 6 T and 10 T cells.The symmetric design used in core latch to improve the write noise margin(WNM)by 17.78%and 6.67%whereas the single ended separate read circuit improves the Read Static Noise Margin(RSNM)by 1.88x and 0.33x compared to 6 T and 8T cells.The read power delay product and write power delay product are lower by 1.94x,1.39x and 0.17x,2.02x than 6 T and 8 T cells respectively.The lower variability from 5000 samples validates the robustness of the proposed cell.The simulations are carried out in Cadence virtuoso simulator tool with Generic Process Design Kit(GPDK)45 nm technology file in this work.展开更多
To build the top class of higher education by focusing on the goal of the“Double First-Class”,it needs to analyze the defect and deficiency and identify the demand for the training of the talent under the background...To build the top class of higher education by focusing on the goal of the“Double First-Class”,it needs to analyze the defect and deficiency and identify the demand for the training of the talent under the background of“Double First-Class”.Considering of those issues,it is suggested that building the curriculum system scientifically and rationally in following aspects:deepening the training objectives,professionalizing the structure and contents of the curriculum system,optimizing the content,enhancing the construction of practical education system and internationalizing the curriculum system.Also,with those aspects,a reference is provided for the cultivation of talents with innovative consciousness and ability to solve complex engineering problems under the background of the“Double First-Class”construction.展开更多
文摘In recent years,China has made significant progress in the construction of highways,resulting in an improved highway network that has provided robust support for economic and social development.However,the rapid expansion of highway construction,power supply,and distribution has led to several challenges in mechanical and electrical engineering technology.Ensuring the safe,stable,and cost-effective operation of the power supply and distribution system to meet the diverse requirements of highway operations has become a pressing issue.This article takes an example of a highway electromechanical engineering power supply and distribution construction project to provide insight into the construction process of highway electromechanical engineering power supply and distribution technology.
文摘It is need to establish site project department during the construction of electric power project.The head office should design and build the main structure,continually improve structure of project department,meantime,positively apply principle of automatic control to improve the site management of electric power construction.In this article,the application strategy of principle of automatic control is analyzed focusing on the site work of electric power construction.
文摘Using the improved prospect theory with the linear transformations of rewarding good and punishing bad(RGPBIT),a new investment ranking model for power grid construction projects(PGCPs)is proposed.Given the uncertainty of each index value under the market environment,fuzzy numbers are used to describe qualitative indicators and interval numbers are used to describe quantitative ones.Taking into account decision-maker’s subjective risk attitudes,a multi-criteria decision-making(MCDM)method based on improved prospect theory is proposed.First,the[−1,1]RGPBIT operator is proposed to normalize the original data,to obtain the best andworst schemes of PGCPs.Furthermore,the correlation coefficients between interval/fuzzy numbers and the best/worst schemes are defined and introduced to the prospect theory to improve its value function and loss function,and the positive and negative prospect value matrices of the project are obtained.Then,the optimization model with the maximum comprehensive prospect value is constructed,the optimal attribute weight is determined,and the PGCPs are ranked accordingly.Taking four PGCPs of the IEEERTS-79 node system as examples,an illustration of the feasibility and effectiveness of the proposed method is provided.
基金the Research and Practice of“Power Electronics Technology”Online Course Construction(kczx202007)the Research of“Power Electronics Technology”Course Blended Teaching Reform(2020yb06)Oriented to the New Engineering Discipline by Higher-Order Learning,which is a university-level project of Qilu University of Technology(Shandong Academy of Sciences).
文摘Due to the impact of the novel coronavirus outbreak,universities have adopted online teaching and carried out remote teaching.With the improvement of the epidemic and the approaching of the new school year,the organic connection between online teaching during the epidemic and offline course construction after the epidemic is not only a challenge for tertiary education teachers,but also an urgent issue to be addressed.Therefore,the power electronics course is taken as an example to explore this connection.
基金supported by the Teaching Research and Reform Project of Qingdao University of Technology under Grant 2024-10335040。
文摘To meet society’s needs for undergraduate students to have engineering skills and to develop students’ability to operate Linux and engage in network software development,this paper proposes the construction of a new specialized course for network engineering major--Linux system and network programming.This paper analyzes the course’s advantages,presents the contents of this course,designs a series of teaching methods aimed at improving students’engineering ability,proposes a course assessment method that will encourage students to practice,lists the development requirements for an examination software designed for this course,and finally,presents the results of our practice in teaching this course.
基金This research was supported by the Research on“Jiangsu Province Social Education Planning Project”2020 Key Project“Study Tour(Research)Guidance Professional Ability Evaluation”(Project Number:JSS-B-2020011).
文摘Community education study tour instructors are important action elements of community education tours.It is necessary to sort out the abilities of community education study tour instructors as well as construct a scientific and reasonable professional ability index system for community education study tour instructors,so as to promote the high-quality development of community education as well as the modernization of lifelong education governance system and governance ability.Based on the practice of community education in Jiangsu and the basic theory of pedagogy,this paper puts forward five core vocational abilities of community education,including travel education and teaching ability,curriculum development ability,management and research ability,training and guidance ability,as well as study tour guarantee ability.This paper attempts to sort out the ability of community education study tour instructors through research and analysis.A three-dimensional and multi-dimensional framework of community education instructors’ability has been constructed to provide a path for the professional development of community education study tour instructors.
文摘On March 25 1996, the electron beam flue gas desulfurization demonstration project of Chengdu Cogeneration Power Plant started formal construction This is at present the largest electron beam desulfurization project in power plants in the world, and is jointly constructed by Sichuan Electric Power Bureau and the EBARA Works of Japan, This is an important cooperation project in environment protection between
文摘This paper mainly introduces the designand construction of the multi-flue chimneysof Beilungang Power Plant, ShidongkouSecond Power Plant and Waigaoqiao PowerPlant which have been used in East Chinaarea. This paper contains the generalsituation of construction, material selection,lifting scheme of steel inner flue, designfeatures and construction method. It could bereferential to concerned design andconstruction companies.
文摘The Supervision during construction of Thailand PTA Co-generation, Which was contracted by our country extended into the quality guaranteed period. The supervision during the quality guaranteed period includes the monitor of the operation and maintenance of power plant,organization of subcontractor to treat the problems and defects occurred in the field in time, technical consultancy and communication in time, delivery of spare parts, and assistance of clearing Contractor’s quality deposit. It is proved by the practice that it is necessary to early out the supervision during quality guaranteed period.
文摘Dust-storm is a kind of severe weather, which has comprehensive and significant impacts on socioeconomic development and people’s livelihood. Enhancing the abilities of dust-storm monitoring, predicting and service will be of great benefit and the important significance to China and its people. At present, the comprehensive operation on dust-storm monitoring, predicting and service is still in a preliminary phase, the abilities of operation can’t meet the needs of implementing the real-time and quantitative monitoring and providing the efficient service. The implementation of the project of dust-storm monitoring, predicting and service system will greatly improve the service ability and level for the sustainable development and make a greater contribution to build the better-off society. The first phase project mainly involves monitoring subsystem, predicting, warning and service subsystem; communications and transmission subsystem, etc. In the first phase construction a series of major measures should be taken to address project overall benefits, such as making better use of current monitoring resource, taking into account the standards of data format and project integrative and extensive abilities and so on.
文摘Based on the test results of Lize navigation-power junction construction diversion through the normal fix-bed model with the scale of 1:100, the navigation flow condition in each construction diversion period is studied. There are a lot of problems in the first construction diversion period, such as excessive flow velocity, poor flow pattern, low navigation discharge and so on. To solve these problems, the comprehensive engineering measures for improving the navigation flow condition during construction are put forward. Among them, the structure forms of construction diversion cofferdam are optimized. Finally, the highest safe navigation discharge and reasonable navigation route are proposed. The experimental results obtained from the optimization scheme of the first construction diversion period are better than these from the original scheme in terms of flow velocity, flow pattern and so on. The research results may serve as reference for similar engineering.
文摘This essay is going to read the different kinds of beings in The Lord of the Rings as different stages of man,and to analyze how they construct or destruct their selves respectively over power.The Lord of the Rings is read as a story about the self-construction and self-destruction of man,who begins to construct the sense of self from a very early stage in life,and becomes who he is in the continuous process of trying to identify himself with the image that keeps changing,of the frequently alternative construction and destruction of his self,and of intersubjectivity,the interrelation with other subjects.
文摘The authors want to changed the web link of the software platform in this Briefing.Page 97,section 'INTRODUCTION',the web link of SHEsis is changed from http://www.nhgg.org/analysis tohttp://analysis.bio-x.
文摘The use of Internet of Things(IoT)applications become dominant in many systems.Its on-chip data processing and computations are also increasing consistently.The battery enabled and low leakage memory system at subthreshold regime is a critical requirement for these IoT applications.The cache memory designed on Static Random-Access Memory(SRAM)cell with features such as low power,high speed,and process tolerance are highly important for the IoT memory system.Therefore,a process tolerant SRAM cell with low power,improved delay and better stability is presented in this research paper.The proposed cell comprises 11 transistors designed with symmetric approach for write operations and single ended circuit for read operations that exhibits an average dynamic power saving of 43.55%and 47.75%for write and 35.59%and 36.56%for read operations compared to 6 T and 8 T SRAM cells.The cell shows an improved write delay of 26.46%and 37.16%over 6 T and 8T and read delay is lowered by 50.64%and 72.90%against 6 T and 10 T cells.The symmetric design used in core latch to improve the write noise margin(WNM)by 17.78%and 6.67%whereas the single ended separate read circuit improves the Read Static Noise Margin(RSNM)by 1.88x and 0.33x compared to 6 T and 8T cells.The read power delay product and write power delay product are lower by 1.94x,1.39x and 0.17x,2.02x than 6 T and 8 T cells respectively.The lower variability from 5000 samples validates the robustness of the proposed cell.The simulations are carried out in Cadence virtuoso simulator tool with Generic Process Design Kit(GPDK)45 nm technology file in this work.
文摘To build the top class of higher education by focusing on the goal of the“Double First-Class”,it needs to analyze the defect and deficiency and identify the demand for the training of the talent under the background of“Double First-Class”.Considering of those issues,it is suggested that building the curriculum system scientifically and rationally in following aspects:deepening the training objectives,professionalizing the structure and contents of the curriculum system,optimizing the content,enhancing the construction of practical education system and internationalizing the curriculum system.Also,with those aspects,a reference is provided for the cultivation of talents with innovative consciousness and ability to solve complex engineering problems under the background of the“Double First-Class”construction.