According to the particularity of towns' construction in the southwestern mountainous areas of Yunnan Province, this study has built constructive land suit- ability evaluation index system which is different to flat ...According to the particularity of towns' construction in the southwestern mountainous areas of Yunnan Province, this study has built constructive land suit- ability evaluation index system which is different to flat area. Then this study deter- mined single evaluation factors index and comprehensive suitability index using "ex- treme conditions method" and "suitability index method", and analyzed and assessed the constructive land suitability on each evaluation unit polygons and its suitability level by using GIS software. Taking Lianghe County of Dehong Dai-Jingpo Au- tonomous Prefecture as an example to evaluate land suitability in Lianghe County's main towns around the gentle slope, the results show, in the evaluation area, the area of land suitable for construction and unsuitable for construction respectively ac- count 73.58% and 26.42%. And first-class, second and third-class of land suitable for construction should be composited at the ratio of about 11:49:40. The suitability evaluation index system and method developed in this paper is applicable for evalu- ating the construction land suitability in mountainous areas of southwest Yunnan Province, and will provide theoretical and technical support for land policy measures which strengthen the protection of farmland and promote the scientific development of urbanization in Yunnan Province and even similar mountainous areas of the whole China.展开更多
In this paper, the author reflects the evaluation and appraisal systems for the construction of the characteristic specialty. Guided by the selection of the contents and the path of the construction of the characteris...In this paper, the author reflects the evaluation and appraisal systems for the construction of the characteristic specialty. Guided by the selection of the contents and the path of the construction of the characteristic specialty, from the dimension of reviewing the problems existing in the construction, with the defects of the deliberative evaluation index as the power of the correction, on the foundation of distinguishing the necessity of the construction of the evaluation, the author u'eats the construction and the innovation as the connotation of the evaluating indexes, refers to the data for the professional evaluation as the reference model, and reconstructs the evaluation systems of the construction of the characteristic specialty.展开更多
In this paper, the author reflects the evaluation and appraisal systems for the construction of the characteristic specialty. Guided by the selection of the contents and the path of the construction of the characteris...In this paper, the author reflects the evaluation and appraisal systems for the construction of the characteristic specialty. Guided by the selection of the contents and the path of the construction of the characteristic specialty, from the dimension of reviewing the problems existing in the construction, with the defects of the deliberative evaluation index as the power of the correction, on the foundation of distinguishing the necessity of the construction of the evaluation, the author treats the construction and the innovation as the connotation of the evaluating indexes, refers to the data for the professional evaluation as the reference model, and reconstructs the evaluation systems of the construction of the characteristic specialty.展开更多
Lunar habitat construction is crucial for successful lunar exploration missions.Due to the limitations of transportation conditions,extensive global research has been conducted on lunar in situ material processing tec...Lunar habitat construction is crucial for successful lunar exploration missions.Due to the limitations of transportation conditions,extensive global research has been conducted on lunar in situ material processing techniques in recent years.The aim of this paper is to provide a comprehensive review,precise classification,and quantitative evaluation of these approaches,focusing specifically on four main approaches:reaction solidification(RS),sintering/melting(SM),bonding solidification(BS),and confinement formation(CF).Eight key indicators have been identified for the construction of low-cost and highperformance systems to assess the feasibility of these methods:in situ material ratio,curing temperature,curing time,implementation conditions,compressive strength,tensile strength,curing dimensions,and environmental adaptability.The scoring thresholds are determined by comparing the construction requirements with the actual capabilities.Among the evaluated methods,regolith bagging has emerged as a promising option due to its high in situ material ratio,low time requirement,lack of hightemperature requirements,and minimal shortcomings,with only the compressive strength falling below the neutral score.The compressive strength still maintains a value of 2–3 MPa.The proposed construction scheme utilizing regolith bags offers numerous advantages,including rapid and large-scale construction,ensured tensile strength,and reduced reliance on equipment and energy.In this study,guidelines for evaluating regolith solidification techniques are provided,and directions for improvement are offered.The proposed lunar habitat design based on regolith bags is a practical reference for future research.展开更多
Taking the changes of construction land in Wan’an County over the years as the research object,the quantity and spatial characteristics of construction land in Wan’an County were analyzed,and the overall situation a...Taking the changes of construction land in Wan’an County over the years as the research object,the quantity and spatial characteristics of construction land in Wan’an County were analyzed,and the overall situation and regional differences of construction land utilization in Wan’an County were revealed.From the aspects of main influencing factors such as land use structure,land use intensity,land input intensity and output benefit,an evaluation indicator system was established to evaluate the economical and intensive use level of construction land in Wan’an County.The results show that the score of the economical and intensive use level of construction land in Wan’an County was 56.92,which was the lowest among all the districts and counties in Ji’an City.Based on the evaluation results,the corresponding economizing and intensive strategies were put forward,and the safeguard measures for its implementation were explored.The purpose is to provide some support for the preparation of territorial spatial planning,the delineation of urban development boundaries,and the potential exploitation of construction land stock,hoping to improve the utilization efficiency and benefit of construction land in Wan’an County,and promote the economic growth of Wan’an County to the stage of high-quality development.展开更多
Eco-river construction is an important part of the urban river renovation, and also a hot research topic for the present river renovation. From the perspective of functional features of urban rivers, connotations of e...Eco-river construction is an important part of the urban river renovation, and also a hot research topic for the present river renovation. From the perspective of functional features of urban rivers, connotations of ecological river construction were further explored, evaluation index system was established on the basis of objective layer, criterion layer and index layer, so as to provide theoretical guidance and technical references for the ecological construction of urban rivers.展开更多
Under the background of community construction, green community has become a concentrated embodiment of human pursuit of high-quality life. Green community plays an important role in saving energy, improving living en...Under the background of community construction, green community has become a concentrated embodiment of human pursuit of high-quality life. Green community plays an important role in saving energy, improving living environment and promoting sustainable development. By establishing the evaluation index system of green community, this paper attempts to make a more comprehensive evaluation from the aspects of resources, environment and management mode of green community, to effectively evaluate the development level of green community, to provide reference for government departments to manage and develop the development of decision-making green community, to provide guidance for planning and designing green community environment, and to provide direction for the construction of green sustainable development. At the same time, it is beneficial to the promotion and development of green environmental protection technology.展开更多
Public bidding is the international current practice to contract construction project. But the decision on the bidding often is made according to the qualitative evaluation based on the subjective opinion of specialis...Public bidding is the international current practice to contract construction project. But the decision on the bidding often is made according to the qualitative evaluation based on the subjective opinion of specialists. Therefore, the fuzzy mathematics principle was applied and a synthetic evaluation model was established to provide an effective method for the development of quantitative bidding decision in this paper.展开更多
The theory of enterprise value management was applied to the performance evaluation of the discipline construction members in colleges and universities,and a value evaluation model of performance was established.Then,...The theory of enterprise value management was applied to the performance evaluation of the discipline construction members in colleges and universities,and a value evaluation model of performance was established.Then,using the analytic hierarchy process(AHP)and quantitative research method,it evaluated the cost of the discipline construction members and the functions realized.Finally,it determined the performance value level and came up with the value optimization recommendations.展开更多
To cope with multi-directional transmission coupling,spreading, amplification, and chain reaction of risks during multiproject parallel construction of warships, a risk transmission evaluation method is proposed, whic...To cope with multi-directional transmission coupling,spreading, amplification, and chain reaction of risks during multiproject parallel construction of warships, a risk transmission evaluation method is proposed, which integrates an intuitionistic cloud model with a fuzzy cognitive map. By virtue of expectancy Ex, entropy En, and hyper entropy He, the risk fuzziness and randomness of the knowledge of experts are organically combined to develop a method for converting bi-linguistic variable decision-making information into the quantitative information of the intuitionistic normal cloud(INC) model. Subsequently, the threshold function and weighted summation operation in the traditional fuzzy cognitive map is converted into the INC ordered weighted averaging operator to create the risk transmission model based on the intuitionistic fuzzy cognitive map(IFCM) and the algorithm for solving it. Subsequently, the risk influence sequencing method based on INC and the risk rating method based on nearness are proposed on the basis of Monte Carlo simulation in order to realize the mutual conversion of the qualitative and quantitative information in the risk evaluation results.Example analysis is presented to verify the effectiveness and practicality of the methods.展开更多
Based on the data of the construction industry in Henan Province, China, from 2005 to 2020, the high-quality development level of the construction industry in Henan Province is measured. Firstly, this paper constructs...Based on the data of the construction industry in Henan Province, China, from 2005 to 2020, the high-quality development level of the construction industry in Henan Province is measured. Firstly, this paper constructs the indicator system based on the high-quality development theory and the characteristic of the construction industry from seven dimensions: industrial scale, industrial efficiency, industrial benefits, industrial innovation, industrial risk, industrial potential, and the green development of the construction industry. Secondly, using the global principal component analysis (PCA) method to measure the high-quality development level. Thirdly, cluster analysis is applied to measure the relative changes of various dimensions in different stages. The results show that overall the high-quality development level of the construction industry in Henan province is increasing, but different indicators perform differently in various stages, and the changes in real estate policies have a significant impact on this. Finally, based on these findings, we think it is better to reduce real estate dependence, promote the application of new materials and technologies and maintain the stability of real estate policies.展开更多
This paper starts from the theoretical basis of constructivism and development evaluation study that learns the principles of communication, the use of educational psychology and other disciplines of knowledge. It is ...This paper starts from the theoretical basis of constructivism and development evaluation study that learns the principles of communication, the use of educational psychology and other disciplines of knowledge. It is to build a developmental evaluation and characteristics for the idea to the attention of the relevant confidence to meet and the evaluator' s expectations as of the five elements to stimulate learning motivation, build developmental evaluation principles to stimulate learning motivation of process model. Seven strategies are to stimulate and sustain the motivation of college students, while emphasizing mentor in the process of converting role as learner and developmental evaluation. Related strategies are used in the actual teaching of "Mechanical Engineering Materials" , "Graduation Design" , "Engineer Training" course, and it achieved satisfactory teaching effect, playing a role in promoting real learning and comprehensive evaluation of the development of college students.展开更多
Based on job analysis for the permanent departments of construction enterprises, by combining KPI assessment method and 360-degree evaluation method, this article establishes a set of human resource performance evalua...Based on job analysis for the permanent departments of construction enterprises, by combining KPI assessment method and 360-degree evaluation method, this article establishes a set of human resource performance evaluation indicator system; by determining indicators' weights and evaluators' grading weights through analytic hierarchy process (AHP), offering a kind of dynamic computing method for performance evaluation, and tightly linking the evaluation result to employees' personal interests, this article builds up a set of scientific performance evaluation system. This article takes the engineering department of construction enterprises for example to explain the calculation and application of performance evaluation result. This article provides construction enterprises with a method reference for human resource performance evaluation.展开更多
In order to strengthen the construction of university library,promote the sustainable development of university library,and provide a good library space environment for university students,this paper expounds the qual...In order to strengthen the construction of university library,promote the sustainable development of university library,and provide a good library space environment for university students,this paper expounds the quality evaluation of university library by establishing the evaluation index of space service quality,and puts forward the ways to improve the service quality of University Library for reference.展开更多
With the aim of deepening the college entrance examination reform,this paper analyzes the orientation and role of examination evaluation in the reform of college entrance examination.Firstly,the paper expounds the imp...With the aim of deepening the college entrance examination reform,this paper analyzes the orientation and role of examination evaluation in the reform of college entrance examination.Firstly,the paper expounds the implementation of the college entrance examination reform and affirms the necessity of several related educational reforms.Secondly,it expoxmds the orientation of examination evaluation.Finally,it summarizes the function of examination evaluation from four aspects:guiding the development of students*comprehensive quality,supervising teaching work,promoting the progress of teaching work,and guiding examination propositions.The advantages of examination evaluation are emphasized to promote the reform of college entrance examination and further drive the progress of the education reform in China.展开更多
After the discussion of accomplishments of ecological urban construction in Suzhou City, the current ecological urban construction in Suzhou has been compared with the national standard for ecological urban constructi...After the discussion of accomplishments of ecological urban construction in Suzhou City, the current ecological urban construction in Suzhou has been compared with the national standard for ecological urban construction. According to the actual situation of Suzhou urban construction, the health evaluation index system and standards for urban eco-system have been established based on natural, economic and social sub-system. By using mean square deviation, indexes' weights have been identified. After the quantitative research on the health condition of urban eco-system in Suzhou City from 2004 to 2008, it has found key problems existing in its ecological urban construction. The results show that Suzhou urban eco-system develops well in general, but the three sub-systems are coordinated with each other moderately, and natural sub-system suffers severe pressure.展开更多
Urban construction land suitability evaluation (UCLSE) is a complex system engineering and the basis for rational use of the limited urban land resources in China. It has an important practical value on urban constr...Urban construction land suitability evaluation (UCLSE) is a complex system engineering and the basis for rational use of the limited urban land resources in China. It has an important practical value on urban construction land use planning and management from the angle of methodology. As a widely used technique, traditional multi-criteria evaluation based on GIS (MCE-GIS), is not suitable for UCLSE. This study develops an improved MCE-GIS method which could be more suitable for UCLSE based on urban complex ecological system theory and the summary of the shortcomings of traditional MCE-GIS. The improvements include three aspects: a composite evaluation index system rather than natural indexes alone, an index weight calculated by using fuzzy Analytic Hierarchy Process (AHP) method rather than the common AHP method, and the integrated overlay rule, which includes selecting the minimum value, weighted linear combination (WLC) and simple summation. The main advantage of this improved technique is that it can make UCLSE more comprehensive, more operational and more reasonable. It can provide a scientific basis for decision making in the planning and management of urban construction land use. The improved MCE-GIS system has been adopted in the New Hefei City, Anhui Province, China. Based on the results of UCLSE in New Hefei, three functional areas including construction-appropriate areas, construction-restricted areas and construction-forbidden areas could be worked out, in which 36.90% of the total study area could be developed as urban construction land and the remaining 63.10% should be protected as reserves land or as ecological land. Furthermore, the results can orovide scientific decision suooort for spatial planning and eco-environment nrotection in New Hefei.展开更多
Considering both the characteristics of construction scheme evaluation and the lack of consideration of index proportionality after introducing comprehensive evaluation of independent perspectives into construction sc...Considering both the characteristics of construction scheme evaluation and the lack of consideration of index proportionality after introducing comprehensive evaluation of independent perspectives into construction scheme evaluation, a construction scheme evaluation model of independent perspectives was put forward through the study and optimization of comprehensive evaluation of independent perspectives. The feasibility and rationality of the optimized method were illustrated through a case study and the evaluation results were compared between the optimized method and non-optimized method. The optimized method has the practical value in construction scheme comparison.展开更多
The accurate assessment of the quality can materially affect the safety and life of the prefabricated construction.In this paper,we studied the overall module of concealed water supply pipeline,and a new complex seque...The accurate assessment of the quality can materially affect the safety and life of the prefabricated construction.In this paper,we studied the overall module of concealed water supply pipeline,and a new complex sequence quality evaluation model was established.By analyzing the small evaluation index elements of the model,the weight of the larger evaluation index could be deduced.The total quality evaluation score of the overall module could be obtained by calculating the weight value of the evaluation index,and then the quality standard of the overall module could be obtained.展开更多
基金Supported by National Natural Science Foundation of China(41261018)Lianghe Government Authorized Project~~
文摘According to the particularity of towns' construction in the southwestern mountainous areas of Yunnan Province, this study has built constructive land suit- ability evaluation index system which is different to flat area. Then this study deter- mined single evaluation factors index and comprehensive suitability index using "ex- treme conditions method" and "suitability index method", and analyzed and assessed the constructive land suitability on each evaluation unit polygons and its suitability level by using GIS software. Taking Lianghe County of Dehong Dai-Jingpo Au- tonomous Prefecture as an example to evaluate land suitability in Lianghe County's main towns around the gentle slope, the results show, in the evaluation area, the area of land suitable for construction and unsuitable for construction respectively ac- count 73.58% and 26.42%. And first-class, second and third-class of land suitable for construction should be composited at the ratio of about 11:49:40. The suitability evaluation index system and method developed in this paper is applicable for evalu- ating the construction land suitability in mountainous areas of southwest Yunnan Province, and will provide theoretical and technical support for land policy measures which strengthen the protection of farmland and promote the scientific development of urbanization in Yunnan Province and even similar mountainous areas of the whole China.
文摘In this paper, the author reflects the evaluation and appraisal systems for the construction of the characteristic specialty. Guided by the selection of the contents and the path of the construction of the characteristic specialty, from the dimension of reviewing the problems existing in the construction, with the defects of the deliberative evaluation index as the power of the correction, on the foundation of distinguishing the necessity of the construction of the evaluation, the author u'eats the construction and the innovation as the connotation of the evaluating indexes, refers to the data for the professional evaluation as the reference model, and reconstructs the evaluation systems of the construction of the characteristic specialty.
文摘In this paper, the author reflects the evaluation and appraisal systems for the construction of the characteristic specialty. Guided by the selection of the contents and the path of the construction of the characteristic specialty, from the dimension of reviewing the problems existing in the construction, with the defects of the deliberative evaluation index as the power of the correction, on the foundation of distinguishing the necessity of the construction of the evaluation, the author treats the construction and the innovation as the connotation of the evaluating indexes, refers to the data for the professional evaluation as the reference model, and reconstructs the evaluation systems of the construction of the characteristic specialty.
基金supported by the National Natural Science Foundation of China(42241109)the Guoqiang Institute,Tsinghua University(2021GQG1001)the New Cornerstone Science Foundation through the XPLORER PRIZE.
文摘Lunar habitat construction is crucial for successful lunar exploration missions.Due to the limitations of transportation conditions,extensive global research has been conducted on lunar in situ material processing techniques in recent years.The aim of this paper is to provide a comprehensive review,precise classification,and quantitative evaluation of these approaches,focusing specifically on four main approaches:reaction solidification(RS),sintering/melting(SM),bonding solidification(BS),and confinement formation(CF).Eight key indicators have been identified for the construction of low-cost and highperformance systems to assess the feasibility of these methods:in situ material ratio,curing temperature,curing time,implementation conditions,compressive strength,tensile strength,curing dimensions,and environmental adaptability.The scoring thresholds are determined by comparing the construction requirements with the actual capabilities.Among the evaluated methods,regolith bagging has emerged as a promising option due to its high in situ material ratio,low time requirement,lack of hightemperature requirements,and minimal shortcomings,with only the compressive strength falling below the neutral score.The compressive strength still maintains a value of 2–3 MPa.The proposed construction scheme utilizing regolith bags offers numerous advantages,including rapid and large-scale construction,ensured tensile strength,and reduced reliance on equipment and energy.In this study,guidelines for evaluating regolith solidification techniques are provided,and directions for improvement are offered.The proposed lunar habitat design based on regolith bags is a practical reference for future research.
文摘Taking the changes of construction land in Wan’an County over the years as the research object,the quantity and spatial characteristics of construction land in Wan’an County were analyzed,and the overall situation and regional differences of construction land utilization in Wan’an County were revealed.From the aspects of main influencing factors such as land use structure,land use intensity,land input intensity and output benefit,an evaluation indicator system was established to evaluate the economical and intensive use level of construction land in Wan’an County.The results show that the score of the economical and intensive use level of construction land in Wan’an County was 56.92,which was the lowest among all the districts and counties in Ji’an City.Based on the evaluation results,the corresponding economizing and intensive strategies were put forward,and the safeguard measures for its implementation were explored.The purpose is to provide some support for the preparation of territorial spatial planning,the delineation of urban development boundaries,and the potential exploitation of construction land stock,hoping to improve the utilization efficiency and benefit of construction land in Wan’an County,and promote the economic growth of Wan’an County to the stage of high-quality development.
基金Supported by National Key and Specialized Scientific and Technological Program of Water Pollution Control and Improvement(2008ZX07421-001)the"Twelfth Five-year"Foundation Program of Shanghai Water Utilities(2011-07)
文摘Eco-river construction is an important part of the urban river renovation, and also a hot research topic for the present river renovation. From the perspective of functional features of urban rivers, connotations of ecological river construction were further explored, evaluation index system was established on the basis of objective layer, criterion layer and index layer, so as to provide theoretical guidance and technical references for the ecological construction of urban rivers.
文摘Under the background of community construction, green community has become a concentrated embodiment of human pursuit of high-quality life. Green community plays an important role in saving energy, improving living environment and promoting sustainable development. By establishing the evaluation index system of green community, this paper attempts to make a more comprehensive evaluation from the aspects of resources, environment and management mode of green community, to effectively evaluate the development level of green community, to provide reference for government departments to manage and develop the development of decision-making green community, to provide guidance for planning and designing green community environment, and to provide direction for the construction of green sustainable development. At the same time, it is beneficial to the promotion and development of green environmental protection technology.
文摘Public bidding is the international current practice to contract construction project. But the decision on the bidding often is made according to the qualitative evaluation based on the subjective opinion of specialists. Therefore, the fuzzy mathematics principle was applied and a synthetic evaluation model was established to provide an effective method for the development of quantitative bidding decision in this paper.
基金Project of the 13th Five-Year Plan for Education and Science of Tianjin"Study on Dynamic Monitoring Mechanism of Discipline Construction Performance in Colleges and Universities"(HE3078).
文摘The theory of enterprise value management was applied to the performance evaluation of the discipline construction members in colleges and universities,and a value evaluation model of performance was established.Then,using the analytic hierarchy process(AHP)and quantitative research method,it evaluated the cost of the discipline construction members and the functions realized.Finally,it determined the performance value level and came up with the value optimization recommendations.
基金supported by the National Natural Science Foundation of China(71501183).
文摘To cope with multi-directional transmission coupling,spreading, amplification, and chain reaction of risks during multiproject parallel construction of warships, a risk transmission evaluation method is proposed, which integrates an intuitionistic cloud model with a fuzzy cognitive map. By virtue of expectancy Ex, entropy En, and hyper entropy He, the risk fuzziness and randomness of the knowledge of experts are organically combined to develop a method for converting bi-linguistic variable decision-making information into the quantitative information of the intuitionistic normal cloud(INC) model. Subsequently, the threshold function and weighted summation operation in the traditional fuzzy cognitive map is converted into the INC ordered weighted averaging operator to create the risk transmission model based on the intuitionistic fuzzy cognitive map(IFCM) and the algorithm for solving it. Subsequently, the risk influence sequencing method based on INC and the risk rating method based on nearness are proposed on the basis of Monte Carlo simulation in order to realize the mutual conversion of the qualitative and quantitative information in the risk evaluation results.Example analysis is presented to verify the effectiveness and practicality of the methods.
文摘Based on the data of the construction industry in Henan Province, China, from 2005 to 2020, the high-quality development level of the construction industry in Henan Province is measured. Firstly, this paper constructs the indicator system based on the high-quality development theory and the characteristic of the construction industry from seven dimensions: industrial scale, industrial efficiency, industrial benefits, industrial innovation, industrial risk, industrial potential, and the green development of the construction industry. Secondly, using the global principal component analysis (PCA) method to measure the high-quality development level. Thirdly, cluster analysis is applied to measure the relative changes of various dimensions in different stages. The results show that overall the high-quality development level of the construction industry in Henan province is increasing, but different indicators perform differently in various stages, and the changes in real estate policies have a significant impact on this. Finally, based on these findings, we think it is better to reduce real estate dependence, promote the application of new materials and technologies and maintain the stability of real estate policies.
文摘This paper starts from the theoretical basis of constructivism and development evaluation study that learns the principles of communication, the use of educational psychology and other disciplines of knowledge. It is to build a developmental evaluation and characteristics for the idea to the attention of the relevant confidence to meet and the evaluator' s expectations as of the five elements to stimulate learning motivation, build developmental evaluation principles to stimulate learning motivation of process model. Seven strategies are to stimulate and sustain the motivation of college students, while emphasizing mentor in the process of converting role as learner and developmental evaluation. Related strategies are used in the actual teaching of "Mechanical Engineering Materials" , "Graduation Design" , "Engineer Training" course, and it achieved satisfactory teaching effect, playing a role in promoting real learning and comprehensive evaluation of the development of college students.
文摘Based on job analysis for the permanent departments of construction enterprises, by combining KPI assessment method and 360-degree evaluation method, this article establishes a set of human resource performance evaluation indicator system; by determining indicators' weights and evaluators' grading weights through analytic hierarchy process (AHP), offering a kind of dynamic computing method for performance evaluation, and tightly linking the evaluation result to employees' personal interests, this article builds up a set of scientific performance evaluation system. This article takes the engineering department of construction enterprises for example to explain the calculation and application of performance evaluation result. This article provides construction enterprises with a method reference for human resource performance evaluation.
文摘In order to strengthen the construction of university library,promote the sustainable development of university library,and provide a good library space environment for university students,this paper expounds the quality evaluation of university library by establishing the evaluation index of space service quality,and puts forward the ways to improve the service quality of University Library for reference.
文摘With the aim of deepening the college entrance examination reform,this paper analyzes the orientation and role of examination evaluation in the reform of college entrance examination.Firstly,the paper expounds the implementation of the college entrance examination reform and affirms the necessity of several related educational reforms.Secondly,it expoxmds the orientation of examination evaluation.Finally,it summarizes the function of examination evaluation from four aspects:guiding the development of students*comprehensive quality,supervising teaching work,promoting the progress of teaching work,and guiding examination propositions.The advantages of examination evaluation are emphasized to promote the reform of college entrance examination and further drive the progress of the education reform in China.
文摘After the discussion of accomplishments of ecological urban construction in Suzhou City, the current ecological urban construction in Suzhou has been compared with the national standard for ecological urban construction. According to the actual situation of Suzhou urban construction, the health evaluation index system and standards for urban eco-system have been established based on natural, economic and social sub-system. By using mean square deviation, indexes' weights have been identified. After the quantitative research on the health condition of urban eco-system in Suzhou City from 2004 to 2008, it has found key problems existing in its ecological urban construction. The results show that Suzhou urban eco-system develops well in general, but the three sub-systems are coordinated with each other moderately, and natural sub-system suffers severe pressure.
基金Under the auspices of National Natural Science Foundation of China(No.41201168)Fundamental Research Funds for the Central Universities(No.2013HGXJ0207)
文摘Urban construction land suitability evaluation (UCLSE) is a complex system engineering and the basis for rational use of the limited urban land resources in China. It has an important practical value on urban construction land use planning and management from the angle of methodology. As a widely used technique, traditional multi-criteria evaluation based on GIS (MCE-GIS), is not suitable for UCLSE. This study develops an improved MCE-GIS method which could be more suitable for UCLSE based on urban complex ecological system theory and the summary of the shortcomings of traditional MCE-GIS. The improvements include three aspects: a composite evaluation index system rather than natural indexes alone, an index weight calculated by using fuzzy Analytic Hierarchy Process (AHP) method rather than the common AHP method, and the integrated overlay rule, which includes selecting the minimum value, weighted linear combination (WLC) and simple summation. The main advantage of this improved technique is that it can make UCLSE more comprehensive, more operational and more reasonable. It can provide a scientific basis for decision making in the planning and management of urban construction land use. The improved MCE-GIS system has been adopted in the New Hefei City, Anhui Province, China. Based on the results of UCLSE in New Hefei, three functional areas including construction-appropriate areas, construction-restricted areas and construction-forbidden areas could be worked out, in which 36.90% of the total study area could be developed as urban construction land and the remaining 63.10% should be protected as reserves land or as ecological land. Furthermore, the results can orovide scientific decision suooort for spatial planning and eco-environment nrotection in New Hefei.
文摘Considering both the characteristics of construction scheme evaluation and the lack of consideration of index proportionality after introducing comprehensive evaluation of independent perspectives into construction scheme evaluation, a construction scheme evaluation model of independent perspectives was put forward through the study and optimization of comprehensive evaluation of independent perspectives. The feasibility and rationality of the optimized method were illustrated through a case study and the evaluation results were compared between the optimized method and non-optimized method. The optimized method has the practical value in construction scheme comparison.
基金National Natural Science Foundation of China(No.71403052)Educational Commission of Fujian Province,China(Nos.JAS170304,JAS170303)+1 种基金Youth Foundation of Fujian University of Technology,China(No.GY-S17101)Education Research Foundation of Fujian University of Technology,China(Nos.GB-K-17-28,GB-J-16-12)
文摘The accurate assessment of the quality can materially affect the safety and life of the prefabricated construction.In this paper,we studied the overall module of concealed water supply pipeline,and a new complex sequence quality evaluation model was established.By analyzing the small evaluation index elements of the model,the weight of the larger evaluation index could be deduced.The total quality evaluation score of the overall module could be obtained by calculating the weight value of the evaluation index,and then the quality standard of the overall module could be obtained.