The stability analysis is one of the chief problems at hydropower stations.The Tengzigou Hydropower Station is a significant project in Southwest China.The authors analyzed the engineering geological features and eval...The stability analysis is one of the chief problems at hydropower stations.The Tengzigou Hydropower Station is a significant project in Southwest China.The authors analyzed the engineering geological features and evaluated the stability of rock mass on left bank.For determining the parameters of rock mass stability on left bank,we adopted the method of numerical value calculation according to the theory of rigidity limited equilibrium,which will provide the theoretical evidences for this project.展开更多
Columnar jointed basalt, with a lot of small-spacing structural planes and poor integrity, is a kind of fractured rock mass. Through comprehensive study of columnar joints shape, roughness of fracture surface and chem...Columnar jointed basalt, with a lot of small-spacing structural planes and poor integrity, is a kind of fractured rock mass. Through comprehensive study of columnar joints shape, roughness of fracture surface and chemical composition of basalt, it is known that columnar joints of Baihetan dam area were formed as a result of cooling and shrinkage effects of magma. The columnar jointed basalt is mainly formed through chemical reaction of chlorite, kaolinite, epidote and tremolite, and the columnar joints mainly consist of chlorite according to slice identification and chemical analysis. Test results show that the columnar jointed basalt has high uniaxial compressive strength, low friction coefficient, and high cohesion, shear strength and deformation index. Meanwhile, the columnar jointed basalt is closely locked, and joint surfaces are well closed. The permeability of the rock is quite weak, and the P-wave velocity in the rock could get up to 5 000 m/s. All these show good rock properties. The columnar joints develop regularly, different from the general fractured rock masses. In summary, the columnar jointed basalt can be used directly as a foundation of dam.展开更多
Based on advanced computer technology, internet of things (lOT) technology, project management con- cept and professional technology and combined with the innovative theories, methods and techniques in earlier hy- d...Based on advanced computer technology, internet of things (lOT) technology, project management con- cept and professional technology and combined with the innovative theories, methods and techniques in earlier hy- dropower projects, the life-cycle risk management system of high earth-rock dam project for Nuozhadu project was developed. The system mainly includes digital dam, three-dimensional design, construction quality monito- ring, safety assessment and warning, etc, to integrally manage and analyze the dam design, constructional quality and safety monitoring information. It realized the dynamic updates of the comprehensive information and the safe- ty quality monitoring in the project life cycle, and provided the basic platform for the scientific management of the construction and operation safety of high earth-rock dam. Application in Nuozhadu earth-rock dam showed that construction safety monitoring and warning greatly helped accelerate the construction progress and improve project quality, and provided a new way for the quality safety control of high earth-rock dam.展开更多
The achievements of China’s hydropower construction in five decades are shown in the following statistical data. The concise analyses have been made in the aspects of technical economy, geologic exploration, dam cons...The achievements of China’s hydropower construction in five decades are shown in the following statistical data. The concise analyses have been made in the aspects of technical economy, geologic exploration, dam construction technique, underground engineering, flood discharging and energy dissipation etc, which represent the achievements and experiences in hydropower technologies.展开更多
Developer and owner:China Three Gorges Corporation(CTG)Engineering management:China Three Gorges Projects Development Corporation(CTGPC)Designer:Chengdu Engineering Corporation Co.,Ltd.,Power
文摘The stability analysis is one of the chief problems at hydropower stations.The Tengzigou Hydropower Station is a significant project in Southwest China.The authors analyzed the engineering geological features and evaluated the stability of rock mass on left bank.For determining the parameters of rock mass stability on left bank,we adopted the method of numerical value calculation according to the theory of rigidity limited equilibrium,which will provide the theoretical evidences for this project.
基金Supported by the National Natural Science Foundation of China (41172254)the Opening Fund of State Key Laboratory of Geohazard Prevention and Geoenvironment Protection, Chengdu University of Technology (SKLGP2010K020)
文摘Columnar jointed basalt, with a lot of small-spacing structural planes and poor integrity, is a kind of fractured rock mass. Through comprehensive study of columnar joints shape, roughness of fracture surface and chemical composition of basalt, it is known that columnar joints of Baihetan dam area were formed as a result of cooling and shrinkage effects of magma. The columnar jointed basalt is mainly formed through chemical reaction of chlorite, kaolinite, epidote and tremolite, and the columnar joints mainly consist of chlorite according to slice identification and chemical analysis. Test results show that the columnar jointed basalt has high uniaxial compressive strength, low friction coefficient, and high cohesion, shear strength and deformation index. Meanwhile, the columnar jointed basalt is closely locked, and joint surfaces are well closed. The permeability of the rock is quite weak, and the P-wave velocity in the rock could get up to 5 000 m/s. All these show good rock properties. The columnar joints develop regularly, different from the general fractured rock masses. In summary, the columnar jointed basalt can be used directly as a foundation of dam.
文摘Based on advanced computer technology, internet of things (lOT) technology, project management con- cept and professional technology and combined with the innovative theories, methods and techniques in earlier hy- dropower projects, the life-cycle risk management system of high earth-rock dam project for Nuozhadu project was developed. The system mainly includes digital dam, three-dimensional design, construction quality monito- ring, safety assessment and warning, etc, to integrally manage and analyze the dam design, constructional quality and safety monitoring information. It realized the dynamic updates of the comprehensive information and the safe- ty quality monitoring in the project life cycle, and provided the basic platform for the scientific management of the construction and operation safety of high earth-rock dam. Application in Nuozhadu earth-rock dam showed that construction safety monitoring and warning greatly helped accelerate the construction progress and improve project quality, and provided a new way for the quality safety control of high earth-rock dam.
文摘The achievements of China’s hydropower construction in five decades are shown in the following statistical data. The concise analyses have been made in the aspects of technical economy, geologic exploration, dam construction technique, underground engineering, flood discharging and energy dissipation etc, which represent the achievements and experiences in hydropower technologies.
文摘Developer and owner:China Three Gorges Corporation(CTG)Engineering management:China Three Gorges Projects Development Corporation(CTGPC)Designer:Chengdu Engineering Corporation Co.,Ltd.,Power