Currently,there is significant attention placed on the construction,management,and maintenance of large service bridges.Within the realm of bridge maintenance management,the utilization of detection and monitoring tec...Currently,there is significant attention placed on the construction,management,and maintenance of large service bridges.Within the realm of bridge maintenance management,the utilization of detection and monitoring technology is indispensable.By employing these technologies,we can effectively identify any structural defects within the bridge,promptly uncover unknown risks,proactively establish maintenance strategies,and prevent the rapid deterioration of bridge conditions.This article aims to explore the advantages of applying bridge monitoring and testing technology and to discuss various methods for implementing detection and monitoring technology throughout the construction,management,and maintenance phases of large bridges.Ultimately,this will contribute to ensuring the safe operation of large bridges.展开更多
Highway infrastructure plays a crucial role in the healthy development of the social economy.Therefore,China has invested a lot of financial resources in the construction of road and bridge projects in recent years,re...Highway infrastructure plays a crucial role in the healthy development of the social economy.Therefore,China has invested a lot of financial resources in the construction of road and bridge projects in recent years,resulting in the rise in scale and number of road and bridge projects.Simultaneously,the quality of road bridges has garnered widespread attention,necessitating an exploration of common hazards associated with road bridges and the significance of their reinforcement.It is essential to delve into specific technical methods to enhance the quality and service life of road bridges.This paper elaborates on the common hazards faced by road bridges and proposes maintenance and reinforcement strategies to promote the healthy development of road bridge engineering.展开更多
The paper initiates by exploring the importance of maintaining,repairing,and reinforcing bridges.Subsequently,it delves into routine and preventative maintenance measures tailored for small to medium-sized bridges.Add...The paper initiates by exploring the importance of maintaining,repairing,and reinforcing bridges.Subsequently,it delves into routine and preventative maintenance measures tailored for small to medium-sized bridges.Additionally,the paper examines repair and reinforcement techniques specifically designed for deteriorated small and medium-sized bridges,encompassing methods for fortifying both the bridge foundation and upper and lower structures.Lastly,the paper proposes suggestions aimed at fostering discussions and exchanges on the development of maintenance and repair processes for deteriorated small and medium-sized bridges.展开更多
Effective application of digital integrated management and maintenance systems is essential for successful operation and maintenance management of bridge projects.This article analyzes the application strategy of such...Effective application of digital integrated management and maintenance systems is essential for successful operation and maintenance management of bridge projects.This article analyzes the application strategy of such systems.It provides an overview of comprehensive digital management and maintenance of bridges,an analysis of the basic components of the integrated management and maintenance system,and its application strategies.This study aims to offer guidance for the application of the system and to improve the quality of modern bridge engineering management and maintenance work.展开更多
Contract Bridge,a four-player imperfect information game,comprises two phases:bidding and playing.While computer programs excel at playing,bidding presents a challenging aspect due to the need for information exchange...Contract Bridge,a four-player imperfect information game,comprises two phases:bidding and playing.While computer programs excel at playing,bidding presents a challenging aspect due to the need for information exchange with partners and interference with communication of opponents.In this work,we introduce a Bridge bidding agent that combines supervised learning,deep reinforcement learning via self-play,and a test-time search approach.Our experiments demonstrate that our agent outperforms WBridge5,a highly regarded computer Bridge software that has won multiple world championships,by a performance of 0.98 IMPs(international match points)per deal over 10000 deals,with a much cost-effective approach.The performance significantly surpasses previous state-of-the-art(0.85 IMPs per deal).Note 0.1 IMPs per deal is a significant improvement in Bridge bidding.展开更多
For the maintenance of steel bridges,the mechanical properties of steel used in the bridges must be elucidated.When enough dimensions of specimens cannot be extracted from the actual members,miniaturized specimens are...For the maintenance of steel bridges,the mechanical properties of steel used in the bridges must be elucidated.When enough dimensions of specimens cannot be extracted from the actual members,miniaturized specimens are used for evaluation.In the case of the Charpy impact test,sub-and half-size specimens are specified instead of full-size specimens of which the thickness is 10 mm.The value of absorbed energy and energy transient temperature obtained by Charpy impact tests with sub-size and half-size specimens were investigated from the viewpoint of maintenance of bridges in this study.The absorbed energy was not in proportion to the thickness of specimens of steel used in the actual overage bridges.The tendency of energy transient temperature obtained by thin specimens of the overage steel differed from that of the present steel.A method for evaluating the performance against brittle fracture occurrence based on the WES3003 criterion was examined.The results show the significance of evaluation based on the energy transient temperature for reasonable maintenance of bridges.展开更多
In the maintenance work of highway and bridge engineering structures,the fracture delay of high-strength bolts is a content that needs to be focused on and researched.Based on this,the paper analyzes the fracture dela...In the maintenance work of highway and bridge engineering structures,the fracture delay of high-strength bolts is a content that needs to be focused on and researched.Based on this,the paper analyzes the fracture delay of high-strength bolts in highway bridge maintenance,including an overview of the fundamental research on fracture delay and related specific studies.It is hoped that this study can provide scientific reference for the reasonable maintenance of high-strength bolts,so as to ensure the overall maintenance effect of highway bridge projects.展开更多
Bridge engineering is an important part of basic engineering in today’s transportation field,and its quality and performance have a vital impact on the improvement and development of modern transportation engineering...Bridge engineering is an important part of basic engineering in today’s transportation field,and its quality and performance have a vital impact on the improvement and development of modern transportation engineering.With the continuous development of transportation engineering,the maintenance and reinforcement of existing bridges are also being given more emphasis.In order to scientifically evaluate the effectiveness of bridge maintenance and reinforcement,this paper analyzes its detection and evaluation,including the significance,key points,and main methods of detection and evaluation.Therefore,this analysis aim to provide some reference for the maintenance and reinforcement and the quality improvement of bridge engineering.展开更多
Corbels support the crossbeams of half-through arch bridges. They are prone to cracking easily due to their characteristics and complicated loading conditions. Based on a practical diagnosis of a bridge crossbeam, we ...Corbels support the crossbeams of half-through arch bridges. They are prone to cracking easily due to their characteristics and complicated loading conditions. Based on a practical diagnosis of a bridge crossbeam, we bonded steel plates onto bridge corbels to strengthen them. We carried out a numerical analysis on the effectiveness of the reinforcement by using the commercial sof^are ANSYS. The numerical analysis shows that the stresses near the section break increased slightly, but the variation amplitude was small and all the stresses were within an allowable range. The loading test indicates that it is feasible to strengthen the corbel with vertical bonded steel plates. Therefore, the reinforcement is effective and economical. This reinforcement method is suitable for this type of corbel and can be applied in similar cases.展开更多
This design is about Chongqing Wanzhou district KanKan river crossing test evaluation and reinforcement renovation. The bridge is an open spandrel stone arch bridge. After years of operating, defects arise from differ...This design is about Chongqing Wanzhou district KanKan river crossing test evaluation and reinforcement renovation. The bridge is an open spandrel stone arch bridge. After years of operating, defects arise from different parts. To verify whether the bridge meets the bearing capacity of highway grade I standard, this design firstly evaluates the bridge through the apparent diseases. Then it uses Midas/Civil to calculate the bearing capacity of lateral control section for Zhou Jiaba arch foot, L/4 and arch section. Using Midas/Civil control section load calculation, load test plan is made. In the end, by increasing cross-section method, the bridge reinforcement maintenance plan is made;that is increasing abdominal 26 cm concrete layer in the main arch ring of arch so that the bridge meets grade I highway capacity requirements.展开更多
In order to improve the maintenance of expressway bridges and tunnels as well as to maximize the utilization rate of expressway bridges and tunnels,this paper studies the countermeasures for the maintenance management...In order to improve the maintenance of expressway bridges and tunnels as well as to maximize the utilization rate of expressway bridges and tunnels,this paper studies the countermeasures for the maintenance management of expressway bridges and tunnels.Through theoretical analysis,this paper expounds the problems existing in the maintenance management of expressway bridges and tunnels as well as proposes corresponding solutions to these problems.By implementing the countermeasures for the maintenance management of expressway bridges and tunnels,it is possible improve the maintenance effect of expressway bridges and tunnels as well as ensure the smooth and safe operation of expressway bridges and tunnels.展开更多
Arch bridges provide significant technical and economic benefits under suitable conditions.In particular,concrete-filled steel tubular(CFST)arch bridges and steel-reinforced concrete(SRC)arch bridges are two types of ...Arch bridges provide significant technical and economic benefits under suitable conditions.In particular,concrete-filled steel tubular(CFST)arch bridges and steel-reinforced concrete(SRC)arch bridges are two types of arch bridges that have gained great economic competitiveness and span growth potential due to advancements in construction technology,engineering materials,and construction equipment over the past 30 years.Under the leadership of the author,two record-breaking arch bridges—that is,the Pingnan Third Bridge(a CFST arch bridge),with a span of 560 m,and the Tian’e Longtan Bridge(an SRC arch bridge),with a span of 600 m—have been built in the past five years,embodying great technological breakthroughs in the construction of these two types of arch bridges.This paper takes these two arch bridges as examples to systematically summarize the latest technological innovations and practices in the construction of CFST arch bridges and SRC arch bridges in China.The technological innovations of CFST arch bridges include cable-stayed fastening-hanging cantilevered assembly methods,new in-tube concrete materials,in-tube concrete pouring techniques,a novel thrust abutment foundation for nonrocky terrain,and measures to reduce the quantity of temporary facilities.The technological innovations of SRC arch bridges involve arch skeleton stiffness selection,the development of encasing concrete materials,encasing concrete pouring,arch rib stress mitigation,and longitudinal reinforcement optimization.To conclude,future research focuses and development directions for these two types of arch bridges are proposed.展开更多
In order to realize the in-situ evaluation of reinforced concrete bridges subjected to fatigue for a long time or after earthquake, an evaluation method for cumulative damage of concrete structures based on unloading ...In order to realize the in-situ evaluation of reinforced concrete bridges subjected to fatigue for a long time or after earthquake, an evaluation method for cumulative damage of concrete structures based on unloading elastic modulus was proposed. First, according to the concrete stress-strain curve and the statistical relationship between residual strain and cumulative strain, the calculation method of static equivalent strain and residual strain concrete based on unloading elastic modulus and the method for estimating the strength of concrete after damage were proposed. The detailed steps of field test and analysis and the practical damage indicators of residual strain were given. Then, the evaluation method of existing stress and strain of Reinforced Concrete Bridge under dead load and the concept of “equivalent dead load bending moment” were put forward. On this basis, the paper analyzed the root cause of the decrease of bearing capacity of Reinforced Concrete Bridge after fatigue damage, and pointed out that the equivalent strain or residual strain of reinforced concrete increases under the fatigue effect, which led to the decreasing of actual live moment and deformation performance while the ultimate load-carrying capacity remained constant or very little decrease. The evaluation method of structure residual capacity was given, and through comparative analysis of eight T reinforced concrete beams that had been in service for 35 years with the static failure tests, the effectiveness of the method was verified.展开更多
Highway bridges are a crucial component in road transportation networks.These bridges must be maintained according to usage requirements regularly.Test results must be considered before devising a maintenance plan.Loa...Highway bridges are a crucial component in road transportation networks.These bridges must be maintained according to usage requirements regularly.Test results must be considered before devising a maintenance plan.Load testing is a vital method of assessing the quality and performance of highway bridges.The outcomes of these tests facilitate the formulation of maintenance plans.This article examines the definition of load testing,its significance,and the process of execution,with the goal of providing support for bridge inspection and maintenance.展开更多
The deterioration of the performance of offshore bridges is particularly prominent due to the complex natural environment,including the coupling effects of earthquake and seawater erosion.In particular,bridge piers ar...The deterioration of the performance of offshore bridges is particularly prominent due to the complex natural environment,including the coupling effects of earthquake and seawater erosion.In particular,bridge piers are the main energy-consuming and load-bearing components,so that excellent seismic capacity of bridge piers is the key to avoiding bridge damage.Although earthquake resistant behavior of ordinary reinforced concrete bridge piers(ordinary pier)can be improved by increasing the section size and reinforcement ratio of piers,the improvement of the earthquake resistant behavior is limited.To further improve the earthquake resistant behavior of bridge piers,high-tensile reinforcement engineered cementitious composite(ECC)bridge piers are utilized and time-varying seismic fragility analysis are conducted in this study.The refined model of a bridge pier is built by OpenSees.First,the influence of ECC replacement height on pier curvature is analyzed to determine the reasonable ECC height.Then,the time-varying fragility analysis of high-tensile reinforcement ECC piers(ECC composite piers)with durability damage are evaluated considering the time-varying law of materials.Four damage states,slight damage,moderate damage,extensive damage and complete collapse,are utilized in the study.These fragility curves indicate the durability damage can debase the earthquake resistant behavior of piers continually,the exceedance probability of the same state of destruction increases with the increase of peak ground acceleration(PGA)and service time of pier.The results also indicate that the corrosion level of chloride ion to pier is small during the early service period,and the bridge pier vulnerable curve is similar to that of the new bridge pier.As the level of chlorine ion corrosion deepens,transcendental probability is increased.Compared with the ordinary pier,the exceedance probability in each limit state of ECC composite piers is significantly reduced.The proposed ECC composite pies leads to better realistic time-varying earthquake resistant behavior.展开更多
Purpose–This research addresses the diverse characteristics of existing railway steel bridges in China,including variations in construction age,design standards,structural types,manufacturing processes,materials and ...Purpose–This research addresses the diverse characteristics of existing railway steel bridges in China,including variations in construction age,design standards,structural types,manufacturing processes,materials and service conditions.It also focuses on prominent defects and challenges related to heavy transportation conditions,particularly low live haul reserves and severe fatigue problems.Design/methodology/approach–The study encompasses three key aspects:(1)Adaptability assessment:It begins with assessing the suitability of existing railway steel bridges for heavy-haul operations through comprehensive analyses,experiments and engineering applications.(2)Strengthening:To combat frequent crack defects in the vertical stiffener end structure of girder webs,fatigue performance tests and reinforcement scheme experiments were conducted.These experiments included the development of a hot-spot stress S-N curve for this structure,validating the effectiveness of methods like crack stop holes,ultrasonic hammering and flange angle steel.(3)Service life extension:Research on the cruciform welded joint structure(non-fusion transfer type)focused on fatigue performance over the long life cycle.This led to the establishment of a fatigue S-N curve,enhancing Chinese design codes.Findings–The research achieved several significant outcomes:(1)Successful implementation of strengthening and retrofitting measures on a 64-m single-span double-track railway steel truss girder on an existing heavy-duty line.(2)Post-reinforcement,a substantial 26%to 32%reduction in live haul stress on bridge members was achieved.(3)The strengthening and retrofitting efforts met design expectations,enabling the bridge to accommodate vehicles with a 30-ton axle haul on the railway line.Originality/value–This research systematically tackles challenges and defects associated with Chinese existing railway steel bridges,providing valuable insights into adaptability assessment,strengthening techniques and service life extension methods.Furthermore,the development of fatigue S-N curves and the successful implementation of bridge enhancements have practical implications for improving the resilience and operational capacity of railway steel bridges in China.展开更多
Digital cable-stayed bridge maintenance and management system (DCBMS) was developed for the need of maintenance and management of long-span cable-stayed bridges. In this paper, the major functions and theoretical ap...Digital cable-stayed bridge maintenance and management system (DCBMS) was developed for the need of maintenance and management of long-span cable-stayed bridges. In this paper, the major functions and theoretical application of eight modules were systematically stated with the background of Harbin Songhua River cable-stayed bridge, which include data management module, inspection and measurement module, assessment module, finite dement analysis module, disease diagnosis and prediction module, maintenance module, query module and help module. By analyzing and calculating the data from manual inspection database, basic database and health monitoring subsystem, DCBMS can accomplish the functions like life prediction, disease diagnosis, comprehensive assessment, maintenance and management of bridges. Therefore, the maintenance and management of long-span cable-stayed bridges can be made digital, professional and scientific. By running this system, a real-time and specific technical guidance can be provided for the maintainers and managers of long- span cable-stayed bridges.展开更多
This paper presents the method of reinforcing main girder of reinforced concrete cable-stayed bridge with prestressed steel strands.To verify the effectiveness of external prestressed strand reinforcement method.Stati...This paper presents the method of reinforcing main girder of reinforced concrete cable-stayed bridge with prestressed steel strands.To verify the effectiveness of external prestressed strand reinforcement method.Static load tests and health monitoring-based assessment were carried out before and after reinforcement.Field load test shows that the deflection and stress values of the main girder are reduced by 10%~20%after reinforcement,and the flexural strength and stiffness of the strengthened beam are improved.The deflection and strain data of health monitoring of the specified section are collected.The deflection of the second span is 4 mm~10 mm,the strain range of the upper edge of the second span is-10με~-40με,and the strain range of the lower edge is 30με~75με.These values show the deflection and strain values fluctuate within a prescribed range,verifying the safety of the bridge.The reinforcement method of prestressed steel strand is feasible and effective.It can provide reference basis for the application of external prestressed strand reinforcement technology in similar projects.展开更多
Bridges, especially highway bridges, are a key factor in nations’ development and flourish. Thus, great care should be taken to maintain and inspect their safety and serviceability. An immediate repair will prevent t...Bridges, especially highway bridges, are a key factor in nations’ development and flourish. Thus, great care should be taken to maintain and inspect their safety and serviceability. An immediate repair will prevent the loss of life and vehicles damage while crossing underpass and overpassing the heavy deteriorated bridges. Reinforced or pre-stressed concrete bridge girders become structurally deficient because of severed reasons including, increasing in the load requirements, corrosion of pre-stressing strands or reinforcement bars and collision of over-height trucks with the bulb of the concrete girders. The purpose of this case study is to evaluate and assess the damages of the highway bridges in Jordan. Since there is no mandatory program in Jordan for inspection of bridges and evaluating their conditions, this paper presents an inspection and assessment of two highway bridges along the desert highway which is the essential nerve connecting Jordan cities, and it also serves as an international road between many middle east countries. These two Bridges have never been investigated or checked since their construction in the late 1980s. The study results showed that the main factor causing the deterioration of these bridges is the collision of the over-height trucks with their elements. Relying on the collected data, solutions and repair methods were introduced to rehabilitate these bridges and assure their structural safety.展开更多
It is becoming an important social problem to make maintenance and rehabilitation of existing infrastructures such as bridges, buildings, etc. in the world. The kernel of such structure management is to develop a meth...It is becoming an important social problem to make maintenance and rehabilitation of existing infrastructures such as bridges, buildings, etc. in the world. The kernel of such structure management is to develop a method of safety assessment on items<span style="font-family:;" "=""> </span><span style="font-family:;" "="">which include remaining life and load carrying capacity. The purpose of this paper is to summarize the finding of up-to-date research articles concerning the application of knowledge-based systems to assessment and management of structures and to illustrate the potential of such systems in the structural engineering. In here, knowledge-based systems include knowledge-based expert systems incorporation with artificial neural networks, fuzzy reasoning and genetic or immune algorithms.</span><span style="font-family:;" "=""> </span><span style="font-family:;" "="">Specifically, two modern bridge management systems (BMS’s) are presented in the paper. The first is a BMS to assess the performance and derive optimal strategies for inspection and maintenance of concrete bridge structures using reliability based and knowledge-based systems. The second is the concrete bridge rating expert system (<i>J-BMS BREX</i>) to evaluate the performance of existing bridges by incorporating with artificial neural networks and fuzzy reasoning.</span>展开更多
文摘Currently,there is significant attention placed on the construction,management,and maintenance of large service bridges.Within the realm of bridge maintenance management,the utilization of detection and monitoring technology is indispensable.By employing these technologies,we can effectively identify any structural defects within the bridge,promptly uncover unknown risks,proactively establish maintenance strategies,and prevent the rapid deterioration of bridge conditions.This article aims to explore the advantages of applying bridge monitoring and testing technology and to discuss various methods for implementing detection and monitoring technology throughout the construction,management,and maintenance phases of large bridges.Ultimately,this will contribute to ensuring the safe operation of large bridges.
文摘Highway infrastructure plays a crucial role in the healthy development of the social economy.Therefore,China has invested a lot of financial resources in the construction of road and bridge projects in recent years,resulting in the rise in scale and number of road and bridge projects.Simultaneously,the quality of road bridges has garnered widespread attention,necessitating an exploration of common hazards associated with road bridges and the significance of their reinforcement.It is essential to delve into specific technical methods to enhance the quality and service life of road bridges.This paper elaborates on the common hazards faced by road bridges and proposes maintenance and reinforcement strategies to promote the healthy development of road bridge engineering.
文摘The paper initiates by exploring the importance of maintaining,repairing,and reinforcing bridges.Subsequently,it delves into routine and preventative maintenance measures tailored for small to medium-sized bridges.Additionally,the paper examines repair and reinforcement techniques specifically designed for deteriorated small and medium-sized bridges,encompassing methods for fortifying both the bridge foundation and upper and lower structures.Lastly,the paper proposes suggestions aimed at fostering discussions and exchanges on the development of maintenance and repair processes for deteriorated small and medium-sized bridges.
文摘Effective application of digital integrated management and maintenance systems is essential for successful operation and maintenance management of bridge projects.This article analyzes the application strategy of such systems.It provides an overview of comprehensive digital management and maintenance of bridges,an analysis of the basic components of the integrated management and maintenance system,and its application strategies.This study aims to offer guidance for the application of the system and to improve the quality of modern bridge engineering management and maintenance work.
文摘Contract Bridge,a four-player imperfect information game,comprises two phases:bidding and playing.While computer programs excel at playing,bidding presents a challenging aspect due to the need for information exchange with partners and interference with communication of opponents.In this work,we introduce a Bridge bidding agent that combines supervised learning,deep reinforcement learning via self-play,and a test-time search approach.Our experiments demonstrate that our agent outperforms WBridge5,a highly regarded computer Bridge software that has won multiple world championships,by a performance of 0.98 IMPs(international match points)per deal over 10000 deals,with a much cost-effective approach.The performance significantly surpasses previous state-of-the-art(0.85 IMPs per deal).Note 0.1 IMPs per deal is a significant improvement in Bridge bidding.
文摘For the maintenance of steel bridges,the mechanical properties of steel used in the bridges must be elucidated.When enough dimensions of specimens cannot be extracted from the actual members,miniaturized specimens are used for evaluation.In the case of the Charpy impact test,sub-and half-size specimens are specified instead of full-size specimens of which the thickness is 10 mm.The value of absorbed energy and energy transient temperature obtained by Charpy impact tests with sub-size and half-size specimens were investigated from the viewpoint of maintenance of bridges in this study.The absorbed energy was not in proportion to the thickness of specimens of steel used in the actual overage bridges.The tendency of energy transient temperature obtained by thin specimens of the overage steel differed from that of the present steel.A method for evaluating the performance against brittle fracture occurrence based on the WES3003 criterion was examined.The results show the significance of evaluation based on the energy transient temperature for reasonable maintenance of bridges.
文摘In the maintenance work of highway and bridge engineering structures,the fracture delay of high-strength bolts is a content that needs to be focused on and researched.Based on this,the paper analyzes the fracture delay of high-strength bolts in highway bridge maintenance,including an overview of the fundamental research on fracture delay and related specific studies.It is hoped that this study can provide scientific reference for the reasonable maintenance of high-strength bolts,so as to ensure the overall maintenance effect of highway bridge projects.
文摘Bridge engineering is an important part of basic engineering in today’s transportation field,and its quality and performance have a vital impact on the improvement and development of modern transportation engineering.With the continuous development of transportation engineering,the maintenance and reinforcement of existing bridges are also being given more emphasis.In order to scientifically evaluate the effectiveness of bridge maintenance and reinforcement,this paper analyzes its detection and evaluation,including the significance,key points,and main methods of detection and evaluation.Therefore,this analysis aim to provide some reference for the maintenance and reinforcement and the quality improvement of bridge engineering.
文摘Corbels support the crossbeams of half-through arch bridges. They are prone to cracking easily due to their characteristics and complicated loading conditions. Based on a practical diagnosis of a bridge crossbeam, we bonded steel plates onto bridge corbels to strengthen them. We carried out a numerical analysis on the effectiveness of the reinforcement by using the commercial sof^are ANSYS. The numerical analysis shows that the stresses near the section break increased slightly, but the variation amplitude was small and all the stresses were within an allowable range. The loading test indicates that it is feasible to strengthen the corbel with vertical bonded steel plates. Therefore, the reinforcement is effective and economical. This reinforcement method is suitable for this type of corbel and can be applied in similar cases.
文摘This design is about Chongqing Wanzhou district KanKan river crossing test evaluation and reinforcement renovation. The bridge is an open spandrel stone arch bridge. After years of operating, defects arise from different parts. To verify whether the bridge meets the bearing capacity of highway grade I standard, this design firstly evaluates the bridge through the apparent diseases. Then it uses Midas/Civil to calculate the bearing capacity of lateral control section for Zhou Jiaba arch foot, L/4 and arch section. Using Midas/Civil control section load calculation, load test plan is made. In the end, by increasing cross-section method, the bridge reinforcement maintenance plan is made;that is increasing abdominal 26 cm concrete layer in the main arch ring of arch so that the bridge meets grade I highway capacity requirements.
文摘In order to improve the maintenance of expressway bridges and tunnels as well as to maximize the utilization rate of expressway bridges and tunnels,this paper studies the countermeasures for the maintenance management of expressway bridges and tunnels.Through theoretical analysis,this paper expounds the problems existing in the maintenance management of expressway bridges and tunnels as well as proposes corresponding solutions to these problems.By implementing the countermeasures for the maintenance management of expressway bridges and tunnels,it is possible improve the maintenance effect of expressway bridges and tunnels as well as ensure the smooth and safe operation of expressway bridges and tunnels.
基金financially supported by the Guangxi Key Research and Development Plan Program(AB22036007).
文摘Arch bridges provide significant technical and economic benefits under suitable conditions.In particular,concrete-filled steel tubular(CFST)arch bridges and steel-reinforced concrete(SRC)arch bridges are two types of arch bridges that have gained great economic competitiveness and span growth potential due to advancements in construction technology,engineering materials,and construction equipment over the past 30 years.Under the leadership of the author,two record-breaking arch bridges—that is,the Pingnan Third Bridge(a CFST arch bridge),with a span of 560 m,and the Tian’e Longtan Bridge(an SRC arch bridge),with a span of 600 m—have been built in the past five years,embodying great technological breakthroughs in the construction of these two types of arch bridges.This paper takes these two arch bridges as examples to systematically summarize the latest technological innovations and practices in the construction of CFST arch bridges and SRC arch bridges in China.The technological innovations of CFST arch bridges include cable-stayed fastening-hanging cantilevered assembly methods,new in-tube concrete materials,in-tube concrete pouring techniques,a novel thrust abutment foundation for nonrocky terrain,and measures to reduce the quantity of temporary facilities.The technological innovations of SRC arch bridges involve arch skeleton stiffness selection,the development of encasing concrete materials,encasing concrete pouring,arch rib stress mitigation,and longitudinal reinforcement optimization.To conclude,future research focuses and development directions for these two types of arch bridges are proposed.
文摘In order to realize the in-situ evaluation of reinforced concrete bridges subjected to fatigue for a long time or after earthquake, an evaluation method for cumulative damage of concrete structures based on unloading elastic modulus was proposed. First, according to the concrete stress-strain curve and the statistical relationship between residual strain and cumulative strain, the calculation method of static equivalent strain and residual strain concrete based on unloading elastic modulus and the method for estimating the strength of concrete after damage were proposed. The detailed steps of field test and analysis and the practical damage indicators of residual strain were given. Then, the evaluation method of existing stress and strain of Reinforced Concrete Bridge under dead load and the concept of “equivalent dead load bending moment” were put forward. On this basis, the paper analyzed the root cause of the decrease of bearing capacity of Reinforced Concrete Bridge after fatigue damage, and pointed out that the equivalent strain or residual strain of reinforced concrete increases under the fatigue effect, which led to the decreasing of actual live moment and deformation performance while the ultimate load-carrying capacity remained constant or very little decrease. The evaluation method of structure residual capacity was given, and through comparative analysis of eight T reinforced concrete beams that had been in service for 35 years with the static failure tests, the effectiveness of the method was verified.
文摘Highway bridges are a crucial component in road transportation networks.These bridges must be maintained according to usage requirements regularly.Test results must be considered before devising a maintenance plan.Load testing is a vital method of assessing the quality and performance of highway bridges.The outcomes of these tests facilitate the formulation of maintenance plans.This article examines the definition of load testing,its significance,and the process of execution,with the goal of providing support for bridge inspection and maintenance.
基金National Natural Science Foundation of China under Grant No.51608488Scientific and Technological Project of Henan Province,China under Grant No.222102320006+1 种基金Zhengzhou University 2022 Annual Basic Research Foundation for Young Teachers,China under Grant No.JC22547025Postdoctoral Research Grant in Henan Province。
文摘The deterioration of the performance of offshore bridges is particularly prominent due to the complex natural environment,including the coupling effects of earthquake and seawater erosion.In particular,bridge piers are the main energy-consuming and load-bearing components,so that excellent seismic capacity of bridge piers is the key to avoiding bridge damage.Although earthquake resistant behavior of ordinary reinforced concrete bridge piers(ordinary pier)can be improved by increasing the section size and reinforcement ratio of piers,the improvement of the earthquake resistant behavior is limited.To further improve the earthquake resistant behavior of bridge piers,high-tensile reinforcement engineered cementitious composite(ECC)bridge piers are utilized and time-varying seismic fragility analysis are conducted in this study.The refined model of a bridge pier is built by OpenSees.First,the influence of ECC replacement height on pier curvature is analyzed to determine the reasonable ECC height.Then,the time-varying fragility analysis of high-tensile reinforcement ECC piers(ECC composite piers)with durability damage are evaluated considering the time-varying law of materials.Four damage states,slight damage,moderate damage,extensive damage and complete collapse,are utilized in the study.These fragility curves indicate the durability damage can debase the earthquake resistant behavior of piers continually,the exceedance probability of the same state of destruction increases with the increase of peak ground acceleration(PGA)and service time of pier.The results also indicate that the corrosion level of chloride ion to pier is small during the early service period,and the bridge pier vulnerable curve is similar to that of the new bridge pier.As the level of chlorine ion corrosion deepens,transcendental probability is increased.Compared with the ordinary pier,the exceedance probability in each limit state of ECC composite piers is significantly reduced.The proposed ECC composite pies leads to better realistic time-varying earthquake resistant behavior.
基金gratitude to the China High-Speed Rail Joint Fund(U1934209)the CARS Fund(2023YJ124)for their invaluable support during the course of this research project.
文摘Purpose–This research addresses the diverse characteristics of existing railway steel bridges in China,including variations in construction age,design standards,structural types,manufacturing processes,materials and service conditions.It also focuses on prominent defects and challenges related to heavy transportation conditions,particularly low live haul reserves and severe fatigue problems.Design/methodology/approach–The study encompasses three key aspects:(1)Adaptability assessment:It begins with assessing the suitability of existing railway steel bridges for heavy-haul operations through comprehensive analyses,experiments and engineering applications.(2)Strengthening:To combat frequent crack defects in the vertical stiffener end structure of girder webs,fatigue performance tests and reinforcement scheme experiments were conducted.These experiments included the development of a hot-spot stress S-N curve for this structure,validating the effectiveness of methods like crack stop holes,ultrasonic hammering and flange angle steel.(3)Service life extension:Research on the cruciform welded joint structure(non-fusion transfer type)focused on fatigue performance over the long life cycle.This led to the establishment of a fatigue S-N curve,enhancing Chinese design codes.Findings–The research achieved several significant outcomes:(1)Successful implementation of strengthening and retrofitting measures on a 64-m single-span double-track railway steel truss girder on an existing heavy-duty line.(2)Post-reinforcement,a substantial 26%to 32%reduction in live haul stress on bridge members was achieved.(3)The strengthening and retrofitting efforts met design expectations,enabling the bridge to accommodate vehicles with a 30-ton axle haul on the railway line.Originality/value–This research systematically tackles challenges and defects associated with Chinese existing railway steel bridges,providing valuable insights into adaptability assessment,strengthening techniques and service life extension methods.Furthermore,the development of fatigue S-N curves and the successful implementation of bridge enhancements have practical implications for improving the resilience and operational capacity of railway steel bridges in China.
基金Sponsored by the Research Fund for the Doctoral Program of Higher Education of China(Grant No.20050213008)Scientific and Technical Plan Item of Communications Department of Heilongjiang Province of China(Grant No.2004).
文摘Digital cable-stayed bridge maintenance and management system (DCBMS) was developed for the need of maintenance and management of long-span cable-stayed bridges. In this paper, the major functions and theoretical application of eight modules were systematically stated with the background of Harbin Songhua River cable-stayed bridge, which include data management module, inspection and measurement module, assessment module, finite dement analysis module, disease diagnosis and prediction module, maintenance module, query module and help module. By analyzing and calculating the data from manual inspection database, basic database and health monitoring subsystem, DCBMS can accomplish the functions like life prediction, disease diagnosis, comprehensive assessment, maintenance and management of bridges. Therefore, the maintenance and management of long-span cable-stayed bridges can be made digital, professional and scientific. By running this system, a real-time and specific technical guidance can be provided for the maintainers and managers of long- span cable-stayed bridges.
文摘This paper presents the method of reinforcing main girder of reinforced concrete cable-stayed bridge with prestressed steel strands.To verify the effectiveness of external prestressed strand reinforcement method.Static load tests and health monitoring-based assessment were carried out before and after reinforcement.Field load test shows that the deflection and stress values of the main girder are reduced by 10%~20%after reinforcement,and the flexural strength and stiffness of the strengthened beam are improved.The deflection and strain data of health monitoring of the specified section are collected.The deflection of the second span is 4 mm~10 mm,the strain range of the upper edge of the second span is-10με~-40με,and the strain range of the lower edge is 30με~75με.These values show the deflection and strain values fluctuate within a prescribed range,verifying the safety of the bridge.The reinforcement method of prestressed steel strand is feasible and effective.It can provide reference basis for the application of external prestressed strand reinforcement technology in similar projects.
文摘Bridges, especially highway bridges, are a key factor in nations’ development and flourish. Thus, great care should be taken to maintain and inspect their safety and serviceability. An immediate repair will prevent the loss of life and vehicles damage while crossing underpass and overpassing the heavy deteriorated bridges. Reinforced or pre-stressed concrete bridge girders become structurally deficient because of severed reasons including, increasing in the load requirements, corrosion of pre-stressing strands or reinforcement bars and collision of over-height trucks with the bulb of the concrete girders. The purpose of this case study is to evaluate and assess the damages of the highway bridges in Jordan. Since there is no mandatory program in Jordan for inspection of bridges and evaluating their conditions, this paper presents an inspection and assessment of two highway bridges along the desert highway which is the essential nerve connecting Jordan cities, and it also serves as an international road between many middle east countries. These two Bridges have never been investigated or checked since their construction in the late 1980s. The study results showed that the main factor causing the deterioration of these bridges is the collision of the over-height trucks with their elements. Relying on the collected data, solutions and repair methods were introduced to rehabilitate these bridges and assure their structural safety.
文摘It is becoming an important social problem to make maintenance and rehabilitation of existing infrastructures such as bridges, buildings, etc. in the world. The kernel of such structure management is to develop a method of safety assessment on items<span style="font-family:;" "=""> </span><span style="font-family:;" "="">which include remaining life and load carrying capacity. The purpose of this paper is to summarize the finding of up-to-date research articles concerning the application of knowledge-based systems to assessment and management of structures and to illustrate the potential of such systems in the structural engineering. In here, knowledge-based systems include knowledge-based expert systems incorporation with artificial neural networks, fuzzy reasoning and genetic or immune algorithms.</span><span style="font-family:;" "=""> </span><span style="font-family:;" "="">Specifically, two modern bridge management systems (BMS’s) are presented in the paper. The first is a BMS to assess the performance and derive optimal strategies for inspection and maintenance of concrete bridge structures using reliability based and knowledge-based systems. The second is the concrete bridge rating expert system (<i>J-BMS BREX</i>) to evaluate the performance of existing bridges by incorporating with artificial neural networks and fuzzy reasoning.</span>