Review of the Relocation of General Zhang Fei’s Temple in View of the Three Gorges Dam Project
1
作者 Yuhua Zhu Fuhan Liu 《Journal of World Architecture》 2023年第6期19-29,共11页
As a national cultural property,General Zhang Fei’s Temple is the largest ancient architectural complex in the Three Gorges of the Yangtze River.It was built in the Han Dynasty and has a long history of nearly 2,000 ... As a national cultural property,General Zhang Fei’s Temple is the largest ancient architectural complex in the Three Gorges of the Yangtze River.It was built in the Han Dynasty and has a long history of nearly 2,000 years.In 1994,the Chinese government launched the Three Gorges Dam project at the Yangtze River and implemented the largest relocation project for the General Zhang Fei Temple to prevent it from being submerged.The temple was relocated 32 kilometers upstream along with the local people of Yunyang County,and the historic environment was rebuilt on the opposite side of the migrant city of New Yunyang County.The temple was restored successfully and the tradition of offering sacrifices to General Zhang Fei continued in the local community.The relocation project lasted for 8 years and became the largest cultural heritage conservation project of the People’s Republic of China at the end of the 20th century.This paper comprehensively summarizes and reviews the project goals,implementation process,and project highlights of this relocation,so as to provide an important case reference for heritage conservation projects in the future. 展开更多
关键词 General Zhang Fei’s Temple Relocation project three gorges Dam project Heritage conservation
下载PDF
Monitoring result analyses of high slope of five-step ship lock in the Three Gorges Project 被引量:4
2
作者 Qixiang Fan Hongbing Zhu Jun Gen 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2015年第2期199-206,共8页
The construction of the double-lane five-step ship lock of the Three Gorges Project (TGP) wascommenced in 1994, the excavation of the ship lock was completed by the end of 1999, and the ship lockwas put in operation... The construction of the double-lane five-step ship lock of the Three Gorges Project (TGP) wascommenced in 1994, the excavation of the ship lock was completed by the end of 1999, and the ship lockwas put in operation in June 2003. The side slopes of the ship lock are characterized by great height(170 m), steepness (70 m in height of upright slope), and great length (over 7000 m in total length). Inassociation with the ship lock, the surrounding rocks in slope have a high potential to deform, withwhich the magnitude of deformation is restricted. Monitoring results show that the deformation of thefive-step ship lock high slopes of the TGP primarily occurred in excavation period, and deformationtended to be stable and convergent during operation period, suggesting the allowable ranges of deformation.At present, the slopes and lock chambers are stable, and the ship lock works well under normaloperation condition, enabling the social and economic benefits of the TGP. 2015 Institute of Rock and Soil Mechanics, Chinese Academy of Sciences. Production and hosting byElsevier B.V. All rights reserved. 展开更多
关键词 three gorges project(TGP) Five-step ship lock SLOPE Monitoring analysis
下载PDF
Seismic hazard assessment of the Three Gorges Project 被引量:4
3
作者 Yao Yunsheng Wang Qiuliang +2 位作者 Li Jinggang Shen Xueling Kong Yuyang 《Geodesy and Geodynamics》 2013年第2期53-60,共8页
Seismic monitoring data for the past 50 years in the Three Gorges Reservoir area show that the reservoir head area is a typical weak seismic region with low seismieity before impoundment and that the epicenters were c... Seismic monitoring data for the past 50 years in the Three Gorges Reservoir area show that the reservoir head area is a typical weak seismic region with low seismieity before impoundment and that the epicenters were concentrated in the east and west sides of the Zigui Basin, most of which were natural tectonic earth- quakes. After impoundment, the seismic activity shifted to the segment between Badong and Zigui along the Yangtze River, mainly within 5 km of the reservoir bank. The seismogenesis was categorized into four types: Karst collapse earthquakes, earthquakes caused by Karst gas explosion, mining tunnel collapse earthquakes, and rock (terrane) slip earthquakes, all of which are related to the lithology, structure, and tectonics of near- surface geological bodies of the area. Compared with the seismicity before impoundment, the seismic frequency increase was remarkable, with most of the magnitudes below Ms2.0. Therefore, the intensity of the earth- quakes remained at a low level. On November 22, 2008, a magnitude 4.1 earthquake, the largest earthquake recorded since impoundment, occurred in Quyuan Town, Zigui County. The intensity and PGA of reservoir-in- duced earthquakes are higher than those of tectonic earthquakes with equal magnitude, but the peak intensity of reservoir-induced earthquakes is not likely to go beyond that of the estimated range from earlier studies. 展开更多
关键词 three gorges project RESERVOIR induced earthquake seismic hazard assessment
下载PDF
Key issues in rock mechanics of the Three Gorges Project in China 被引量:2
4
作者 Qixiang Fan Hongbing Zhu Xuchun Chen 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE 2011年第4期329-342,共14页
The Three Gorges Project is one of the essential key projects for flood controlling and water resources regulation in the Yangtze River. The project includes a river-crossing dam, underground powerhouses, and navigati... The Three Gorges Project is one of the essential key projects for flood controlling and water resources regulation in the Yangtze River. The project includes a river-crossing dam, underground powerhouses, and navigation structures. Because of the huge size and complicated construction technologies, the project faced a series of challenging engineering issues. In terms of rock mechanics, there are many key technical issues, including the sliding resistance and stability of the dam section along the foundations of powerhouses No.l-5, the ,,;lope stability of the double-line five-stage shiplock, excavation of large-scale underground powerhouses, and curtain grouting under the dam. With decades of scientific research and 16 years of practical construction experiences and reservoir operations, these key technical issues in construction of the Three Gorges Project are successfully resolved, which will attribute to the development of hydropower technology. On the basis of the monitoring data during construction and normal operation periods of the Three Gorges Project, this paper presents a systematic analysis of these key rock mechanical issues in terms of behaviors, solutions, dynamic controlling, monitoring arrangement and integrated assessment. 展开更多
关键词 three gorges project rock mechanics dam sliding resistance and stability high shiplock slope undergroundpowerhouses curtain grouting
下载PDF
THE EFFECTS OF THE THREE GORGES PROJECT ON ECOLOGY AND ENVIRONMENT 被引量:1
5
作者 夏宜铮 《Chinese Geographical Science》 SCIE CSCD 1994年第1期8-18,共11页
THEEFFECTSOFTHETHREEGORGESPROJECTONECOLOGYANDENVIRONMENTXiaYicheng(夏宜铮)(InstituteofHydrobiology,theChineseAc... THEEFFECTSOFTHETHREEGORGESPROJECTONECOLOGYANDENVIRONMENTXiaYicheng(夏宜铮)(InstituteofHydrobiology,theChineseAcademyofSciences,W... 展开更多
关键词 the CHANGJIANG RIVER three gorges project ECOLOGY and ENVIRONMENT
下载PDF
Effects of ecological projects on vegetation in the Three Gorges Area of Chongqing, China 被引量:1
6
作者 LI Feng ZHOU Wen-zuo +1 位作者 SHAO Zhou-ling ZHOU Xin-yao 《Journal of Mountain Science》 SCIE CSCD 2022年第1期121-135,共15页
The construction of the Three Gorges Reservoir and the resettlement project have caused increasing contradictions between human and land,and led to the deterioration of the ecological environment. In order to ameliora... The construction of the Three Gorges Reservoir and the resettlement project have caused increasing contradictions between human and land,and led to the deterioration of the ecological environment. In order to ameliorate ecological environment of the Three Gorges Area, the government carried out several ecological restoration projects to improve the vegetation coverage from 1990 s. This paper aims to quantitatively analyze the impact of ecological projects on the vegetation in the Three Gorges Area of Chongqing, China. Landsat and MODIS data from 1992 to 2015 were used to estimate vegetation coverage. In addition, the land cover data of the European Space Agency(ESA) was used to explore the impact of ecological projects on land cover change. The cropland accounted for about 62% and the forestland accounted for about 34% of the total area. There was more than 90% of the study area covered with high or very high vegetation coverage.From 1992 to 2015, a total of 272.7 km;croplands were converted into forestland in the Ecological Migration Project(EMP), 795.6 km;in the Grain for Green Project(GGP), and 13.77 km;in the Ecological Restoration Zone Project(ERZP). Among the three projects, the GGP was the most powerful measure,with a contribution rate of 1.6%. The implementation of the ecological projects improved vegetation coverage, which indicated that the ecological projects measures were effective in ecological restoration. 展开更多
关键词 Land cover change Fractional vegetation coverage Vegetation restoration Ecological projects MODIS three gorges Area
下载PDF
The practice of project construction and management of Three Gorges ship lock 被引量:2
7
作者 Fan Qixiang Yang Zongli Liu Gang 《Engineering Sciences》 EI 2011年第3期82-87,共6页
The double-line five-step ship-lock of Three Gorges Project (TGP) is an extra-large navigation structure with the maximum design total head and single-step delivery head in the world and complicated technical problems... The double-line five-step ship-lock of Three Gorges Project (TGP) is an extra-large navigation structure with the maximum design total head and single-step delivery head in the world and complicated technical problems.The shiplock is a challenging and world-class project integrating the advanced techniques and equipment,the up-to-date technologies and materials,as well as the advanced project management.Through 17-year construction and 9-year operation of the ship-lock,various difficulties in design,construction,equipment manufacturing and installation as well as system debugging have been overcome effectively.The project management ideas,management system,management methods,technological innovation and team building are summarized according to the management practice of the second stage main work of Three Gorges ship-lock. 展开更多
关键词 三峡船闸工程 项目管理 最新技术 三峡工程 设备制造 管理思想 管理制度 技术创新
下载PDF
Impact on Mountainous Agricultural Development in the Three Gorges Reservoir Area forced by Migrants of the Three Gorges Project 被引量:1
8
作者 Zhang Baolei 《Chinese Journal of Population,Resources and Environment》 北大核心 2008年第3期83-89,共7页
The Three Gorges Project attracts worldwide attention because of the Three Gorges migrants, and the agriculture of the Three Gorges Reservoir Area is a foundation for the development of the Three Gorges migrants. The ... The Three Gorges Project attracts worldwide attention because of the Three Gorges migrants, and the agriculture of the Three Gorges Reservoir Area is a foundation for the development of the Three Gorges migrants. The Three Gorges Reservoir Area is situated at the mountainous area with bad agricultural development conditions and relatively low levels of development. As a result, the large-scale migration has special influence on its agricultural development, which has attracted much attention. The paper analyzes influence that the migrants have forced on its agricultural development based on the scientific data, and makes some explorations on the models that are suitable for the development of mountainous agriculture in the Three Gorges Reservoir 展开更多
关键词 农业 发展计划 三峡库区 移民 三峡工程
下载PDF
The design of double line five step ship lock of Three Gorges Project 被引量:3
9
作者 Niu Xinqiang Tong Di Song Weibang 《Engineering Sciences》 EI 2011年第3期74-81,共8页
The general design and layout of the double-line five-step ship-lock,the water delivery technique for high head ship-lock,the key technical problems of fully lined ship-lock and the monitoring techniques for large-sca... The general design and layout of the double-line five-step ship-lock,the water delivery technique for high head ship-lock,the key technical problems of fully lined ship-lock and the monitoring techniques for large-scale miter gates and hoisting equipment under complicated operation conditions of Three Gorges Project (TGP) are introduced.Since the operation of ship-lock in 2003,the operation practice has proved that the design techniques are advanced,rational and reliable.The design and construction of the fully lined ship-lock promotes the development of design theory and practice of ship-lock projects,which makes the construction technology of ship-lock in the world reach a new level. 展开更多
关键词 工程设计理论 三峡船闸 高水头船闸 监测技术 双行 三峡工程 操作实践 复杂条件下
下载PDF
Impacts of the Three Gorges Project and Converting Farmland into Lake on the Microtus fortis Population in Dongting Lake Region 被引量:4
10
作者 Meiwen ZHANG Yong WANG +1 位作者 Bo LI Cong GUO 《Asian Agricultural Research》 2013年第6期69-73,共5页
The outbreak of Yantze vole ( Microtus fortis) population in Dongting Lake region is closely related to the evolvement of lake beaches,because the deposition of lake sediments results in the expansion of lake beaches,... The outbreak of Yantze vole ( Microtus fortis) population in Dongting Lake region is closely related to the evolvement of lake beaches,because the deposition of lake sediments results in the expansion of lake beaches,which provides the possibility of the increase of the vole's population. Reclaiming farmland from lake via building cofferdams,eliminating snails by building cofferdams for eradicating schistosomiasis,and over-hunting predators in the region cause the voles becoming a pest after the 1970s. In recent years,the Three Gorges Project and the conversion from farmland into lake have had deep impacts on the environment in the lake region. The dispatching of the down flow rate by the project has induced the expansion of the low and medium level beaches in the lake region,while converting farmland into lake directly has induced the expansion of the lake beaches,both of which have expanded the potential habitats of the vole's population. Therefore,more attention should be paid to the quantitative variation trend of the vole's population in the future. 展开更多
关键词 MICROTUS fortis POPULATION the three gorges Projec
下载PDF
The construction management system and practice of Three Gorges Project 被引量:1
11
作者 Cao Guangjing 《Engineering Sciences》 EI 2011年第3期31-36,共6页
Three Gorges Project (TGP),the largest water resources and hydropower project in the world with huge scale and complex techniques,has great comprehensive benefits mainly in flood control,power generation and navigatio... Three Gorges Project (TGP),the largest water resources and hydropower project in the world with huge scale and complex techniques,has great comprehensive benefits mainly in flood control,power generation and navigation improvement.Through 17-year construction and practice,the project has been successfully completed.Some valuable experience from the successful construction of TGP has been gained for the management system and mechanism of hydropower project construction in China.Its construction management mode produces important influences on the management system of domestic capital construction.With combination of the construction management practice of TGP,the characteristics of management system and mechanism are summarized,and the suggestions on current hydropower development system and construction management mode are put forward. 展开更多
关键词 建设管理体制 三峡工程 建设管理模式 水电工程 水利资源 管理制度 水电开发 机制
下载PDF
The construction design and practice of Three Gorges Project 被引量:1
12
作者 Weng Yonghong Xie Xiangrong Fan Wuyi 《Engineering Sciences》 EI 2011年第3期96-103,共8页
The construction of Three Gorges Project (TGP) is characterized by large construction scale,high construction intensity and complexity in technology.In view of various technical difficulties such as navigation in cons... The construction of Three Gorges Project (TGP) is characterized by large construction scale,high construction intensity and complexity in technology.In view of various technical difficulties such as navigation in construction period,two river closures,high-intensity concrete and earth-rock construction,high-intensity construction and demolition of RCC (roller compacted concrete) cofferdam in stage III and immediate navigation of double-line five-step shiplock after impoundment of reservoir,the scheme of river diversion during construction is adopted,namely "diversion in 3 stages,open channel navigation and cofferdam power generation".The practice and innovation achievements in river diversion during construction as well as earth-rock and concrete construction are presented emphatically. 展开更多
关键词 三峡工程 高强度混凝土 设计 土石方施工 碾压混凝土 建设规模 施工强度 水库蓄水
下载PDF
Key Technologies of the Hydraulic Structures of the Three Gorges Project 被引量:5
13
作者 马洪琪 迟福东 《Engineering》 SCIE EI 2016年第3期340-349,共10页
To date,the Three Gorges Project is the largest hydro junction in the world.It is the key project for the integrated water resource management and development of the Changjiang River.The technology of the project,with... To date,the Three Gorges Project is the largest hydro junction in the world.It is the key project for the integrated water resource management and development of the Changjiang River.The technology of the project,with its huge scale and comprehensive benefits,is extremely complicated,and the design difficulty is greater than that of any other hydro project in the world.A series of new design theories and methods have been proposed and applied in the design and research process.Many key technological problems regarding hydraulic structures have been overcome,such as a gravity dam with multi-layer large discharge orifices,a hydropower station of giant generating units,and a giant continual multi-step ship lock with a high water head. 展开更多
关键词 三峡工程 技术 水工结构 水资源综合管理 设计理论 水利工程项目 水利枢纽 长江流域
下载PDF
Compensation for Land Loss in Reservoir Resettlement: A Case Study of The Three Gorges Project, China
14
作者 D Wang Yi-qian, Tan YanCollege of Resources and Environment, Lanzhou University, Lanzhou 730000, Gansu,China West China Development Institute, Sichuan University, Chengdu 610065, Sichuan, China Department of Geographical and Environmental Studies, The University of Adelaide, South Australia 5005. Australia 《Wuhan University Journal of Natural Sciences》 CAS 2003年第03B期905-910,共6页
This paper studies current policies in compensation for land lost due to construction of the Three Gorges project (TGP), China. In the case study of Kaixian County, the value of land in the peri-urban areas is underes... This paper studies current policies in compensation for land lost due to construction of the Three Gorges project (TGP), China. In the case study of Kaixian County, the value of land in the peri-urban areas is underestimated. Some losses in land are tangible and thus measurable, but some losses are intangible and thus immeasurable. The land available in the resettlement areas is scarce and rarely of equivalent quality. This study suggests that the loss of agricultural land be compensated with alternative land and/or non-land-based livelihood strategies, including part compensation in monetary terms and preferential policies. 展开更多
关键词 COMPENSATION land inundation rural resettlement suburban district three gorges project
下载PDF
Incipient Motion of Bed Load Sediment and Its Application in the Three Gorges Hydro Project
15
作者 HE Wenshe~(1,3) CAO Shuyou~2 YUAN Jie~3 DAI Huichao~3 (1.Lanzhou Jiao Tong Univ.,Lanzhou 730070,China 2.State Key Lab.of Hydraulics and Mountain River Eng.,Sichuan Univ.,Chengdu 610065,China 3.China Yangtze Three Gorges Project Development Corporation,Hubei Yichang 443002,China) 《四川大学学报(工程科学版)》 EI CAS CSCD 北大核心 2005年第S1期102-105,共4页
A formula for the calculation of critical shear stress of non-uniform sediment was developed by on river bed has been established while considering the relative degree expose of grains.The values of the Coeffi- cients... A formula for the calculation of critical shear stress of non-uniform sediment was developed by on river bed has been established while considering the relative degree expose of grains.The values of the Coeffi- cients in the formula have been obtained.The formula has been verified with prototype observation data, flumes data of both nature and lightweight sand.The computed results fully reflect the characteristics of thresh- old motion of non-uniform sediment.The result have been used in some physical mo... 展开更多
关键词 non-uniform sediment incipient motion bed load three gorges Hydro project
下载PDF
Asesment on Crustal Stability Using Fuzzy Mathematics in Dam Region of Three Gorges Project on Yangtze River
16
《Journal of Earth Science》 SCIE CAS CSCD 1997年第2期48-51,共4页
AsesmentonCrustalStabilityUsingFuzzyMathematicsinDamRegionofThreeGorgesProjectonYangtzeRiver*TanChengxuanHuD... AsesmentonCrustalStabilityUsingFuzzyMathematicsinDamRegionofThreeGorgesProjectonYangtzeRiver*TanChengxuanHuDaogongInstituteof... 展开更多
关键词 project gorges Asesment REGION
下载PDF
The Impact of the Three Gorges Hydroelectric Project on and the Preservation Strategies for the Biodiversity in the Affected Region
17
作者 HE JINSHENG XIE ZONGQIANG 《生物多样性》 CAS CSCD 1995年第B06期63-72,共10页
关键词 生物多样性 三峡水电工程 保存策略 生物保护 潜在水灾
下载PDF
The dam design of Three Gorges Project
18
作者 Wang Xiaomao Xu Linxiang Liao Renqiang 《Engineering Sciences》 EI 2011年第3期57-65,共9页
The dam of Three Gorges Project is a concrete gravity dam with the crest elevation of 185 m,the maximum height of 181 m and dam axis length of 2 309.5 m.The dam consists of spillway,powerhouse,non-over flow,ship-lift,... The dam of Three Gorges Project is a concrete gravity dam with the crest elevation of 185 m,the maximum height of 181 m and dam axis length of 2 309.5 m.The dam consists of spillway,powerhouse,non-over flow,ship-lift,temporary ship-lock,left diversion wall and longitudinal cofferdam blocks.Some key techniques relating to dam structure design are presented,including hydraulics of flood discharge structure,dam joint design,layout and structural type of penstock,deep anti-sliding stability of dam foundation,reconstruction of temporary ship-lock and closed drainage and pumping of dam foundation. 展开更多
关键词 大坝设计 三峡工程 混凝土重力坝 深层抗滑稳定 临时船闸 结构设计 坝顶高程 三峡大坝
下载PDF
The flood control and regulation of Three Gorges Project
19
作者 Cai Qihua 《Engineering Sciences》 EI 2011年第3期15-21,共7页
The important role of Three Gorges Project (TGP) in the flood management of the Yangtze River Basin is summarized.The Optimal Regulation Schemes of the Three Gorge Reservoir is briefly described.The flood regulation e... The important role of Three Gorges Project (TGP) in the flood management of the Yangtze River Basin is summarized.The Optimal Regulation Schemes of the Three Gorge Reservoir is briefly described.The flood regulation effect of TGP is analyzed.Typical issues related to reservoir operation for flood regulation are discussed and suggestions are put forward for the future work. 展开更多
关键词 三峡工程 调控 防洪 洪水管理 长江流域 三峡库区 典型问题 洪水调度
下载PDF
Management Mode and Concrete Construction of the Three Gorges Project
20
作者 Cao Guangjing (China Three Gorges Project Development Corporation, Yichang, Hubei\ 443002) 《工程科学(英文版)》 2003年第1期80-83,90,共5页
The Three Gorges Project (TGP) is the largest concrete structure in the world to this day. The project, with a total amount of approximately 28 million m 3 of concrete, is characterized by complicated structures, inte... The Three Gorges Project (TGP) is the largest concrete structure in the world to this day. The project, with a total amount of approximately 28 million m 3 of concrete, is characterized by complicated structures, intensive construction and high technical standards, which should not only meet the requirements of stability but of special flood releasing, power generation and navigation improvement. Through a decade of engineering practice, a management mode that embodies the characteristics of TGP under construction has been formed. Various new techniques and technologies have been used to ensure the concrete quality. Design, construction and management measures adopted for the concrete works of the project are discussed in this article on an overall basis. 展开更多
关键词 three gorges project MANAGEMENT MODE CONCRETE
下载PDF