This paper applies the multiple ellipsoid model to the 16Ne (20Ne, 28Ne, 34Ne)-Na2 collision systems, and calcu- lates integral cross sections for rotational excitation at the incident energy of 190 meV. It can be s...This paper applies the multiple ellipsoid model to the 16Ne (20Ne, 28Ne, 34Ne)-Na2 collision systems, and calcu- lates integral cross sections for rotational excitation at the incident energy of 190 meV. It can be seen that the accuracy of the integral cross sections can be improved by increasing the number of equipotential ellipsoid surfaces. Moreover, by analysing the differences of these integral cross sections, it obtains the change rules of the integral cross sections with the increase of rotational angular quantum number j', and with the change of the mass of isotope substitution neon atom. Finally, the contribution of different regions of the potential to inelastic cross sections for 20Ne-Na2 collision system is investigated at relative incident energy of 190 meV.展开更多
Statistical analysis of the entrance and wall dynamics of a high-flux gas-solid riser was done using solid concentration time series data collected from a 76 mm internal diameter and 10 m high riser of a CFB system wi...Statistical analysis of the entrance and wall dynamics of a high-flux gas-solid riser was done using solid concentration time series data collected from a 76 mm internal diameter and 10 m high riser of a CFB system with a twin-riser operated at 4.0 to 10.0 m/s gas velocity and 50 to 550 kg/m2s solids flux. Spent fluid catalytic cracking catalyst particles with 67 μm mean diameter and density of 1500 kg/m3 together with 70% to 80% humid air was used. Solid concentration data were analysed using code prepared using FORTRAN 2008 to get statistical parameters and plot their profiles. Results obtained show that the gas-solid suspension flow in the riser is dominated by low solid concentration in the centre region and high solid concentration in the wall region which forms a core-annulus flow structure. The mean solid concentration in the wall region decreases with riser height from the dense bottom section to less dense in the fully developed flow section at the top of the riser. The gas-solid suspension flow in the centre region is dominated with uniform flow structure while the wall region is dominated with high fluctuations in solid concentration. Further, it was found that the entrance and developing flow sections of the riser exhibit high flow non-uniformities than the fully developed flow section of the riser. The flow non-uniformities in the entrance and developing flow section increase with increase in superficial gas velocity at constant solid flux. The wall region, from the entrance to the top sections of the riser along the axial direction exhibits both dilute and dense suspension flow.展开更多
为研究三模式掘进机使用TBM模式在全断面岩层中的施工技术,以广州地铁7号线二期萝岗站—水西站盾构区间工程为研究背景,分别从出渣方式、掘进参数控制、刀具管理和稳定器应用4个方面对三模式掘进机TBM模式施工技术进行总结。结果表明:1...为研究三模式掘进机使用TBM模式在全断面岩层中的施工技术,以广州地铁7号线二期萝岗站—水西站盾构区间工程为研究背景,分别从出渣方式、掘进参数控制、刀具管理和稳定器应用4个方面对三模式掘进机TBM模式施工技术进行总结。结果表明:1)本工程中三模式掘进机使用镶齿滚刀施工,相对光面滚刀的消耗更少,刀盘转矩更低;2)三模式掘进机TBM模式采用泥浆循环和螺旋输送机双通道出渣,可显著降低泥浆管堵塞的概率,提高出渣效率;3)三模式掘进机在前盾、中盾安装稳定器和撑靴,可保证全断面硬岩地层中掘进盾体不发生滚动,同时增强盾体稳定性;4)在全断面岩层中采用三模式掘进机TBM模式开挖隧道,刀盘转速为3.0 r/min,总推力约15000 k N,转矩可控制在1300 k N·m,推进速度为8~12 mm/min。展开更多
基金Project supported by the National Natural Science Foundation of China (Grant Nos. 10974139 and 10964002), the Doctoral Program Foundation of Institution of Higher Education of China (Grant No. 20050610010), the Science Technology Foundation of Guizhou Province of China (Grant No. [2009]2066) and Project of Aiding Elites' Research Condition of Guizhou Province (Grant No. TZJF-2008-42).
文摘This paper applies the multiple ellipsoid model to the 16Ne (20Ne, 28Ne, 34Ne)-Na2 collision systems, and calcu- lates integral cross sections for rotational excitation at the incident energy of 190 meV. It can be seen that the accuracy of the integral cross sections can be improved by increasing the number of equipotential ellipsoid surfaces. Moreover, by analysing the differences of these integral cross sections, it obtains the change rules of the integral cross sections with the increase of rotational angular quantum number j', and with the change of the mass of isotope substitution neon atom. Finally, the contribution of different regions of the potential to inelastic cross sections for 20Ne-Na2 collision system is investigated at relative incident energy of 190 meV.
文摘Statistical analysis of the entrance and wall dynamics of a high-flux gas-solid riser was done using solid concentration time series data collected from a 76 mm internal diameter and 10 m high riser of a CFB system with a twin-riser operated at 4.0 to 10.0 m/s gas velocity and 50 to 550 kg/m2s solids flux. Spent fluid catalytic cracking catalyst particles with 67 μm mean diameter and density of 1500 kg/m3 together with 70% to 80% humid air was used. Solid concentration data were analysed using code prepared using FORTRAN 2008 to get statistical parameters and plot their profiles. Results obtained show that the gas-solid suspension flow in the riser is dominated by low solid concentration in the centre region and high solid concentration in the wall region which forms a core-annulus flow structure. The mean solid concentration in the wall region decreases with riser height from the dense bottom section to less dense in the fully developed flow section at the top of the riser. The gas-solid suspension flow in the centre region is dominated with uniform flow structure while the wall region is dominated with high fluctuations in solid concentration. Further, it was found that the entrance and developing flow sections of the riser exhibit high flow non-uniformities than the fully developed flow section of the riser. The flow non-uniformities in the entrance and developing flow section increase with increase in superficial gas velocity at constant solid flux. The wall region, from the entrance to the top sections of the riser along the axial direction exhibits both dilute and dense suspension flow.
文摘为研究三模式掘进机使用TBM模式在全断面岩层中的施工技术,以广州地铁7号线二期萝岗站—水西站盾构区间工程为研究背景,分别从出渣方式、掘进参数控制、刀具管理和稳定器应用4个方面对三模式掘进机TBM模式施工技术进行总结。结果表明:1)本工程中三模式掘进机使用镶齿滚刀施工,相对光面滚刀的消耗更少,刀盘转矩更低;2)三模式掘进机TBM模式采用泥浆循环和螺旋输送机双通道出渣,可显著降低泥浆管堵塞的概率,提高出渣效率;3)三模式掘进机在前盾、中盾安装稳定器和撑靴,可保证全断面硬岩地层中掘进盾体不发生滚动,同时增强盾体稳定性;4)在全断面岩层中采用三模式掘进机TBM模式开挖隧道,刀盘转速为3.0 r/min,总推力约15000 k N,转矩可控制在1300 k N·m,推进速度为8~12 mm/min。