The construction of new agricultural science requires the use of modern scientific and technological means to transform and enhance current agricultural related majors.The agricultural water conservancy engineering ma...The construction of new agricultural science requires the use of modern scientific and technological means to transform and enhance current agricultural related majors.The agricultural water conservancy engineering major,with its inherent disciplinary advantages,plays an indispensable and important role in the construction of new agricultural science.In recent years,the lack of professional cognitive education has gradually become a significant problem in the training of talents in agricultural water conservancy engineering.Therefore,this paper deeply analyzes the problems and reasons faced by professional cognitive education,and proposes specific educational strategies for several key aspects such as enrollment promotion,freshman enrollment education,construction of teacher team,combination of scientific research and teaching,and strengthening professional cognition through competition activities.It aims to provide reference for improving the quality of professional cognitive education and exploring effective ways.展开更多
For the evaluation of construction quality and the verification of the design of water conservancy and hydropower engineering projects, and especially for the control of dam safety operation behavior, safety monitorin...For the evaluation of construction quality and the verification of the design of water conservancy and hydropower engineering projects, and especially for the control of dam safety operation behavior, safety monitoring sensors are employed in a majority of engineering projects. These sensors are used to monitor the project during the dam construction and operation periods, and play an important role in reservoir safety operation and producing benefits. With the changing of operating environments and run-time of projects, there are some factors affecting the operation and management of projects, such as a certain amount of damaged sensors and instability of the measured data. Therefore, it is urgent to evaluate existing safety monitoring sensors in water conservancy and hydropower engineering projects. However, there are neither standards nor evaluation guidelines at present. Based on engineering practice, this study examined some key techniques for the evaluation of safety monitoring sensors, including the evaluation process of the safety monitoring system, on-site detection methods of two typical pieces of equipment, the differential resistor sensor and vibrating wire sensor, the on-site detection methods of communication cable faults, and a validity test of the sensor measured data. These key techniques were applied in the Xiaolangdi Water Control Project and Xiaoxi Hydropower Project. The results show that the measured data of a majority of sensors are reliable and reasonable, and can reasonably reflect the structural change behavior in the project operating process, indicating that the availabilities of the safety monitoring sensors of the two projects are high展开更多
With the continuous development of society and economy in China, the number of water conserv ancy & hydropower engineering in China increases unceasingly and China s water conserv ancy industry also enters into th...With the continuous development of society and economy in China, the number of water conserv ancy & hydropower engineering in China increases unceasingly and China s water conserv ancy industry also enters into the stage of rapid development. The construction of water conserv ancy & hydropower engineering promotes social and economic development, so in order to safeguard the benefits of the engineering, cost management shall be done well, which is also an important channel for companies engaging in water conservancy & hydropower engineering to obtain economic benefits. Based on this the paper firstly investigates the problems in water conserv ancy & hydropower engineering cost management and then brings up relevant solutions.展开更多
This paper put forward the structure and construction process of three-dimensional visualization of hydroelectric construction system model based on GIS and 3D visualization platform. The paper first describes the 3D ...This paper put forward the structure and construction process of three-dimensional visualization of hydroelectric construction system model based on GIS and 3D visualization platform. The paper first describes the 3D visualization based on GIS, then discusses the method of constructing 3D visual digital model, and then introduces the terrain digital technology, feature modeling technology. Finally, the technical route shows that this method has good practicability.展开更多
There are many problems and deficiencies in traditional bank protection methods,which cause certain damage to the ecological environment of river channels.Recently,the issues of river management,improving bank protect...There are many problems and deficiencies in traditional bank protection methods,which cause certain damage to the ecological environment of river channels.Recently,the issues of river management,improving bank protection technology,formulating reasonable construction measures,and ensuring the smooth and efficient implementation of construction have been receiving increasing attention.展开更多
Data were collected from Three-north Region, Middle and upper reaches region of Yangtze River and Coastal region. By analysis of factors influencing soil erosion, the longitude, latitude, annual precipitation, and the...Data were collected from Three-north Region, Middle and upper reaches region of Yangtze River and Coastal region. By analysis of factors influencing soil erosion, the longitude, latitude, annual precipitation, and the slope degree were selected as regional independent variables and canopy density and stock litter were selected as independent variables, and integral diffusing models were established for evaluation of the benefit of soil and water conservation of forest. By solving the parameters of models using the package of STATISTICA, the Power function between independent variables and dependent variables was set up. The soil conservation amount of forest and economic values were estimated using the contrast method for the ecological forestry engineering of the above three areas.展开更多
The Shandong Water Conservancy Engineering Machinery General Factory is a specialized factory for the production of engineering machinery, approvcd by the Ministry of Water Resources. It was one of the first specializ...The Shandong Water Conservancy Engineering Machinery General Factory is a specialized factory for the production of engineering machinery, approvcd by the Ministry of Water Resources. It was one of the first specialized factories for the production of wheel loaders. Wheel loaders have been produced by the factory for about 20 years, and it has formed the Wild Ox brand 13 ton small and medium-sized loader series. These products sell well展开更多
At present,China’s social and economic development is faster and faster.At the same time,people pay more and more attention to the construction concept of energy and water conservation.We can see the popularization a...At present,China’s social and economic development is faster and faster.At the same time,people pay more and more attention to the construction concept of energy and water conservation.We can see the popularization and development of the concept of energy saving and water saving in every major field of our country,the same is true in the construction field.In order to effectively protect the ecological environment and maximize the use of limited resources,the energysaving and water-saving technology of the building,as well as water supply and drainage technology should be actively used.Based on this,this paper first analyzes the application significance of water supplydrainage and energy-water conservation technology in the construction field,analyzes the current situation of water supply and drainage in China,and proposes the application of water supply-drainage and energy-water conservation technology of the building for reference.展开更多
Reasonable site selection, blocking to meet design standards, interception and drainage and other protective measures are the basic conditions for not causing disaster in slag disposal site. A hydropower station is lo...Reasonable site selection, blocking to meet design standards, interception and drainage and other protective measures are the basic conditions for not causing disaster in slag disposal site. A hydropower station is located in mountainous area, the amount of slag abandoned is large, the grade of slag disposal field is high, and the site selection is difficult. On the basis of in Situ deformation monitoring, the slope stability of slag disposal site is calculated by Swedish arc method through the analysis of the scale, grade, site selection, surrounding environment, cut and discharge, blocking and protection design standards of slag disposal site. Under normal and abnormal operating conditions, the slope stability of slag disposal site meets the requirements of the code, and the results of in Situ deformation monitoring verify the calculation results of slope stability of slag disposal site by Swedish circular arc method.展开更多
为了解决水利水电项目建设中任务量大、专业技能多、操作难度高、环境干扰严重的问题,往往要进行多次论证和优化工程步骤,保证施工质量。采用BIM(Building Information Modeling)+GIS(Geographic Information System)技术对水利建筑模...为了解决水利水电项目建设中任务量大、专业技能多、操作难度高、环境干扰严重的问题,往往要进行多次论证和优化工程步骤,保证施工质量。采用BIM(Building Information Modeling)+GIS(Geographic Information System)技术对水利建筑模型进行优化,并对建筑进行外观设计,为模型的搭建提供坚实基础。结果表明,在水利水电项目建设过程中,以BIM+GIS技术模型为基础可快速模拟待查找的工程进度,有利于管控工程资金和监督工程实施进度,可以大幅度提升水利项目的信息化程度。展开更多
基金Supported by Key Project of the"14 th Five-year"Plan for Education Science in Heilongjiang Province in 2022(GJB1422016).
文摘The construction of new agricultural science requires the use of modern scientific and technological means to transform and enhance current agricultural related majors.The agricultural water conservancy engineering major,with its inherent disciplinary advantages,plays an indispensable and important role in the construction of new agricultural science.In recent years,the lack of professional cognitive education has gradually become a significant problem in the training of talents in agricultural water conservancy engineering.Therefore,this paper deeply analyzes the problems and reasons faced by professional cognitive education,and proposes specific educational strategies for several key aspects such as enrollment promotion,freshman enrollment education,construction of teacher team,combination of scientific research and teaching,and strengthening professional cognition through competition activities.It aims to provide reference for improving the quality of professional cognitive education and exploring effective ways.
基金supported by the National Natural Science Foundation of China(Grants No.51179108and50909066)the Key Research Foundation of Nanjing Hydraulic Research Institute(Grant No.Y711007)
文摘For the evaluation of construction quality and the verification of the design of water conservancy and hydropower engineering projects, and especially for the control of dam safety operation behavior, safety monitoring sensors are employed in a majority of engineering projects. These sensors are used to monitor the project during the dam construction and operation periods, and play an important role in reservoir safety operation and producing benefits. With the changing of operating environments and run-time of projects, there are some factors affecting the operation and management of projects, such as a certain amount of damaged sensors and instability of the measured data. Therefore, it is urgent to evaluate existing safety monitoring sensors in water conservancy and hydropower engineering projects. However, there are neither standards nor evaluation guidelines at present. Based on engineering practice, this study examined some key techniques for the evaluation of safety monitoring sensors, including the evaluation process of the safety monitoring system, on-site detection methods of two typical pieces of equipment, the differential resistor sensor and vibrating wire sensor, the on-site detection methods of communication cable faults, and a validity test of the sensor measured data. These key techniques were applied in the Xiaolangdi Water Control Project and Xiaoxi Hydropower Project. The results show that the measured data of a majority of sensors are reliable and reasonable, and can reasonably reflect the structural change behavior in the project operating process, indicating that the availabilities of the safety monitoring sensors of the two projects are high
文摘With the continuous development of society and economy in China, the number of water conserv ancy & hydropower engineering in China increases unceasingly and China s water conserv ancy industry also enters into the stage of rapid development. The construction of water conserv ancy & hydropower engineering promotes social and economic development, so in order to safeguard the benefits of the engineering, cost management shall be done well, which is also an important channel for companies engaging in water conservancy & hydropower engineering to obtain economic benefits. Based on this the paper firstly investigates the problems in water conserv ancy & hydropower engineering cost management and then brings up relevant solutions.
文摘This paper put forward the structure and construction process of three-dimensional visualization of hydroelectric construction system model based on GIS and 3D visualization platform. The paper first describes the 3D visualization based on GIS, then discusses the method of constructing 3D visual digital model, and then introduces the terrain digital technology, feature modeling technology. Finally, the technical route shows that this method has good practicability.
文摘There are many problems and deficiencies in traditional bank protection methods,which cause certain damage to the ecological environment of river channels.Recently,the issues of river management,improving bank protection technology,formulating reasonable construction measures,and ensuring the smooth and efficient implementation of construction have been receiving increasing attention.
文摘Data were collected from Three-north Region, Middle and upper reaches region of Yangtze River and Coastal region. By analysis of factors influencing soil erosion, the longitude, latitude, annual precipitation, and the slope degree were selected as regional independent variables and canopy density and stock litter were selected as independent variables, and integral diffusing models were established for evaluation of the benefit of soil and water conservation of forest. By solving the parameters of models using the package of STATISTICA, the Power function between independent variables and dependent variables was set up. The soil conservation amount of forest and economic values were estimated using the contrast method for the ecological forestry engineering of the above three areas.
文摘The Shandong Water Conservancy Engineering Machinery General Factory is a specialized factory for the production of engineering machinery, approvcd by the Ministry of Water Resources. It was one of the first specialized factories for the production of wheel loaders. Wheel loaders have been produced by the factory for about 20 years, and it has formed the Wild Ox brand 13 ton small and medium-sized loader series. These products sell well
文摘At present,China’s social and economic development is faster and faster.At the same time,people pay more and more attention to the construction concept of energy and water conservation.We can see the popularization and development of the concept of energy saving and water saving in every major field of our country,the same is true in the construction field.In order to effectively protect the ecological environment and maximize the use of limited resources,the energysaving and water-saving technology of the building,as well as water supply and drainage technology should be actively used.Based on this,this paper first analyzes the application significance of water supplydrainage and energy-water conservation technology in the construction field,analyzes the current situation of water supply and drainage in China,and proposes the application of water supply-drainage and energy-water conservation technology of the building for reference.
文摘Reasonable site selection, blocking to meet design standards, interception and drainage and other protective measures are the basic conditions for not causing disaster in slag disposal site. A hydropower station is located in mountainous area, the amount of slag abandoned is large, the grade of slag disposal field is high, and the site selection is difficult. On the basis of in Situ deformation monitoring, the slope stability of slag disposal site is calculated by Swedish arc method through the analysis of the scale, grade, site selection, surrounding environment, cut and discharge, blocking and protection design standards of slag disposal site. Under normal and abnormal operating conditions, the slope stability of slag disposal site meets the requirements of the code, and the results of in Situ deformation monitoring verify the calculation results of slope stability of slag disposal site by Swedish circular arc method.
文摘为了解决水利水电项目建设中任务量大、专业技能多、操作难度高、环境干扰严重的问题,往往要进行多次论证和优化工程步骤,保证施工质量。采用BIM(Building Information Modeling)+GIS(Geographic Information System)技术对水利建筑模型进行优化,并对建筑进行外观设计,为模型的搭建提供坚实基础。结果表明,在水利水电项目建设过程中,以BIM+GIS技术模型为基础可快速模拟待查找的工程进度,有利于管控工程资金和监督工程实施进度,可以大幅度提升水利项目的信息化程度。