Both Ecosystem-based Adaptation (EbA) and Payment for Ecosystem Services (PES) have a wide range of strategies that include different economic instruments for nature conservation. Although the generation and maintenan...Both Ecosystem-based Adaptation (EbA) and Payment for Ecosystem Services (PES) have a wide range of strategies that include different economic instruments for nature conservation. Although the generation and maintenance of payment for hydrologic ecosystem services (Water-PES) is expanding in Brazil, there are difficulties in the implementation of projects. Due to the complexity and non-linearity of the hydrological processes, also affecting both EbA and Water-PES goals, monitoring quali-quantitative aspects of streams have been here addressed as a useful management tool. This study presents the Hydrological Monitoring Plan (HMP) of the Water Producer/PCJ project, operating between 2009-2014, in order to: 1) evaluate the impact of project actions under water quali-quantitative aspects;and 2) promote the incorporation of HMP’s elements in water resources management. HMP of the Water Producer/PCJ project has been implemented following the conditions for efficiency (baseline, long-term scale compatible with the actions of the project, in the experimental and reference watersheds). In addition, HMP is being implemented from upstream to downstream in catchments with areas ranging from 17 to 130 km<sup>2</sup>. This proposal favors the quantification and valuation of hydrologic services that could be assessed by ecohydrologic monitoring and modeling. Thus, we look forward to the consolidation of the Brazilian information system of water resources, the reduction of modeling uncertainties and integrated assessment of the consequences of land-use/land-cover change that strongly impact goals of EbA and Water-PES initiatives.展开更多
European Community policy concerning water is placing increasing demands on the acquisition of information about the quality of aquatic environments. The cost of this information has led to a reflection on the rationa...European Community policy concerning water is placing increasing demands on the acquisition of information about the quality of aquatic environments. The cost of this information has led to a reflection on the rationalization of monitoring networks and, therefore, on the economic value of information produced by these networks. The aim of this article is to contribute to this reflection. To do so, we used the Bayesian framework to define the value of additional information in relation to the following three parameters: initial assumptions (prior probabilities) on the states of nature, costs linked to a poor decision (error costs) and accuracy of additional information. We then analyzed the impact of these parameters on this value, particularly the combined role of prior probabilities and error costs that increased or decreased the value of information depending on the initial uncertainty level. We then illustrated the results using a case study of a stream in the Bas-Rhin department in France.展开更多
文摘Both Ecosystem-based Adaptation (EbA) and Payment for Ecosystem Services (PES) have a wide range of strategies that include different economic instruments for nature conservation. Although the generation and maintenance of payment for hydrologic ecosystem services (Water-PES) is expanding in Brazil, there are difficulties in the implementation of projects. Due to the complexity and non-linearity of the hydrological processes, also affecting both EbA and Water-PES goals, monitoring quali-quantitative aspects of streams have been here addressed as a useful management tool. This study presents the Hydrological Monitoring Plan (HMP) of the Water Producer/PCJ project, operating between 2009-2014, in order to: 1) evaluate the impact of project actions under water quali-quantitative aspects;and 2) promote the incorporation of HMP’s elements in water resources management. HMP of the Water Producer/PCJ project has been implemented following the conditions for efficiency (baseline, long-term scale compatible with the actions of the project, in the experimental and reference watersheds). In addition, HMP is being implemented from upstream to downstream in catchments with areas ranging from 17 to 130 km<sup>2</sup>. This proposal favors the quantification and valuation of hydrologic services that could be assessed by ecohydrologic monitoring and modeling. Thus, we look forward to the consolidation of the Brazilian information system of water resources, the reduction of modeling uncertainties and integrated assessment of the consequences of land-use/land-cover change that strongly impact goals of EbA and Water-PES initiatives.
文摘European Community policy concerning water is placing increasing demands on the acquisition of information about the quality of aquatic environments. The cost of this information has led to a reflection on the rationalization of monitoring networks and, therefore, on the economic value of information produced by these networks. The aim of this article is to contribute to this reflection. To do so, we used the Bayesian framework to define the value of additional information in relation to the following three parameters: initial assumptions (prior probabilities) on the states of nature, costs linked to a poor decision (error costs) and accuracy of additional information. We then analyzed the impact of these parameters on this value, particularly the combined role of prior probabilities and error costs that increased or decreased the value of information depending on the initial uncertainty level. We then illustrated the results using a case study of a stream in the Bas-Rhin department in France.