The construction process control of large-scale projects is one of the difficulties and keys in the owner’s project management. Based on generalization process index, this paper proposes an approach to construction p...The construction process control of large-scale projects is one of the difficulties and keys in the owner’s project management. Based on generalization process index, this paper proposes an approach to construction project process control. The paper elaborates on the concept and calculation of generalization process index, which, on analysis, possesses Markov property. Monthly generalization process index is regarded as a state of Markov chain, and the transition between different states is realized by computer simulation. According to the Markov process forecasting model and by means of MATLAB program, the project process forecast is realized, and the completion probability in contract period is obtained. From practical instances, it is concluded that this approach has good applicability and operability and that the obtained results can reflect the degree of project risks.展开更多
in recent years, as the project of our country is increasing, investment growth, put forward new challenges to investment in construction projects. Research from the research status of investment in construction, the ...in recent years, as the project of our country is increasing, investment growth, put forward new challenges to investment in construction projects. Research from the research status of investment in construction, the implementation process in accordance with the construction project, followed by analysis of the construction project investment the currently existing problems, and puts forward the implementation of the project the whole process as the main line, to scientific decision-making, rational design, bidding, construction control standard and completion of review strategies as the core.展开更多
As a flagship project of Sino-Indonesia cooperation within the framework of“the Belt and Road”Initiative(BRI),Jakarta-Bandung High Speed Railway(Jakarta-Bandung HSR)is the first overseas high speed railway entirely ...As a flagship project of Sino-Indonesia cooperation within the framework of“the Belt and Road”Initiative(BRI),Jakarta-Bandung High Speed Railway(Jakarta-Bandung HSR)is the first overseas high speed railway entirely implementing China's high speed railway technology with all systems,elements and industrial chain.It marks the success of extensive consultation,joint contribution and shared benefits between China and region states to achieve modernization.By studying the Jakarta-Bandung HSR project,this paper concludes the innovations and successful practices in“going global”of China's railway industry in terms of project organization,engineering construction,railway equipment,operation management,risk prevention and control,etc.Meanwhile,focusing on one of the eight major steps to support high-quality Belt and Road cooperation proposed by President Xi Jinping—building a multidimensional“the Belt and Road”connectivity network,this paper puts forward the specific outlook for China's high speed railway to“go global”and jointly build“the Belt and Road”Initiative from two perspectives of international railway engineering and international scientific and technological cooperation.展开更多
The general construction procedure of the steel middle pylon is briefly introduced. The alignment control of the pylon is carried out during the whole process of the construction. The control concept is extended to th...The general construction procedure of the steel middle pylon is briefly introduced. The alignment control of the pylon is carried out during the whole process of the construction. The control concept is extended to the manufacture stage. The manufacturing alignment error is strictly controlled in the segments precast process in factory, and the error is recognized and predicted precisely during the installation stage. The adjusting joints are employed to amend the accumulated error, which ensure that the steel pylon alignment could satisfy the precision requirements after installation.展开更多
Project cost can control the input in construction project and improve economic benefits of construction enterprises,so it is an important section of construction engineering.Reasonable control and management of proje...Project cost can control the input in construction project and improve economic benefits of construction enterprises,so it is an important section of construction engineering.Reasonable control and management of project cost is the principle that building units must obey in the whole process of project,particularly in the construction stage,so it is extremely important to control and manage the project cost.This paper first analyzed possible causes for the unreasonable cost of construction projects,and put forward pertinent strategies for the control and management of construction project cost.展开更多
In the ISO9000"input-output"process model,the concept of process quality is difficult to get the correct interpretation. From the"white box"theory of process,this paper puts forward the scientific ...In the ISO9000"input-output"process model,the concept of process quality is difficult to get the correct interpretation. From the"white box"theory of process,this paper puts forward the scientific meaning of the concept of process quality and the process quality model by taking the basic operating unit of 6M1E in the railway construction project for example. The basic operating unit system consists of technological natural process,operation process and management process;the process quality of the basic operating unit system depends on the interrelation and interaction among those three sub-processes,and also subjects to the impact of the external disturbance input factors. Finally,the cast-in-situ prestressed concrete continuous box girder construction process is utilized to elaborate the specific application of this theory in the quality management of the railway construction project.展开更多
A new approach for assessing and optimizing software project process based on software risk control presented, which evaluates and optimizes software project process from the view of controlling the software project r...A new approach for assessing and optimizing software project process based on software risk control presented, which evaluates and optimizes software project process from the view of controlling the software project risks. A model for optimizing software risk control is given, a discrete optimization algorithm based on dynamic programruing is proposed and an example of using above method to solve a problem is also included in this paper. By improving the old passive post-project control into an active effective preaction, this new method can greatly promote the possibility of success of software projects.展开更多
To treat the relationship between project construction and ecological environment and effectively prevent new soil erosion during the construction, according to the project layout, soil erosion distribution as well as...To treat the relationship between project construction and ecological environment and effectively prevent new soil erosion during the construction, according to the project layout, soil erosion distribution as well as natural and socio-economic conditions, the control measures of newly increased soil erosion along the project were carried out based on site survey and analysis of relevant information. In addition, adhering to the prin- ciple of partition prevention and treatment, some guiding prevention and control measures of the natural zone passed by the project and soil erosion control district were determined, which provided scientific references and technical support for the rational layout of water and soil conservation and ecological restoration measures in Dina 2 gas field.展开更多
Nowadays, construction projects became more complex, where the responsibility of construction manager is to control and plan the project resources in a professional way to handover the project in terms of time, cost, ...Nowadays, construction projects became more complex, where the responsibility of construction manager is to control and plan the project resources in a professional way to handover the project in terms of time, cost, and quality. The aim of this study is to analyze the affect of the long experience of the construction manager on project success; it aims to identify the capability skills that the construction manager should have to complete the project on time. The fmding of this study is to help in understanding the factors that influence the project success through the long experience of the construction manager.展开更多
Construction project management as an important branch of management science has its own characteristics; it was known as an important aspect of project management in the 21 st century. Construction companies now face...Construction project management as an important branch of management science has its own characteristics; it was known as an important aspect of project management in the 21 st century. Construction companies now face a more complex competitive environment and more powerful competitors. In order to compete for the market and living space, Enterprises should be in a strategic height, cultivate long- term competitive advantage. Cost management is a new tool to enhance the competitiveness of enterprises, Popularization and application of Construction project management to the scientific development of the project management made the following three aspects urgent requirement. First. establish a scientific system for the construction project management. Construction Project Management knowledge system is the foundation and needs for Construction Project Management scientific and professional.展开更多
Since the reform and opening up,Chinese economy has developed rapidly.Industrial and civil construction projects have made significant progress.That said,it is of great significance to further strengthen the construct...Since the reform and opening up,Chinese economy has developed rapidly.Industrial and civil construction projects have made significant progress.That said,it is of great significance to further strengthen the construction management of industrial and civil construction projects for the longterm development of construction industry in China.In terms of reality,one of the common problems in the current industrial and civil construction is wall cracks,which will have an important impact on the appearance of the building and the overall construction quality.Therefore,it is necessary to analyze the reasons and put forward corresponding measures on it.That is how we can continuously improve the construction quality in civil and industrial construction projects,thereby achieving the enhancement of building safety and stability.展开更多
In the 21st century, especially after the accession to WTO, Construction project bidding price formation mechanism is the main characteristics of the market price of the Construction project is divided in a unified, u...In the 21st century, especially after the accession to WTO, Construction project bidding price formation mechanism is the main characteristics of the market price of the Construction project is divided in a unified, uniform measurement unit, unified in terms of engineering and consumption of fixed rules on the basis of the implementation of market, competition fees.The first to be carried out not only the financial decision-making, corporate contractors in accordance with the different ways, according to market conditions, its technology, economic strength, through the financial decision-making self-quotation. Second, it is necessary to exercise effective control, both the Construction project bidding price by the form of the contract price is fixed.By design, material procurement, construction management on the implementation of bidding for the effective control of prices.展开更多
Urbanization has led to the rapid development of the construction industry.However,this has also led to higher requirements for the construction engineering management.Other than the quality monitoring of engineering ...Urbanization has led to the rapid development of the construction industry.However,this has also led to higher requirements for the construction engineering management.Other than the quality monitoring of engineering construction,the energy-saving properties of the building should also be considered.Therefore,a scientific management approach should be adopted to improve green building management.This paper primarily examines the importance of quality management in green building construction,along with the factors influencing it.It also identifies the quality issues present in current green building construction.Finally,it proposes measures for quality management in the green building construction process to facilitate the industry’s healthy development.展开更多
One of the most important tasks of security is the quality of the project substation substation construction project management, construction project management, including project bidding and engineering, electrical e...One of the most important tasks of security is the quality of the project substation substation construction project management, construction project management, including project bidding and engineering, electrical engineering and civil construction, engineering, quality control, safety management and supervision costs control, on-site supervision over the links, these links chain, indivisible, so long as a part of the management problems, will lead the entire construction project management effectiveness be affected, so it must be every link control and management work done, in order to guarantee the quality of the entire substation, in order to make security of supply substations, electrical safety and vital interests of users are protected. In this paper, the author details the three aspects substation construction management of the project, namely the concept of substation engineering, project management and construction safety, through these three aspects, the author analyzes the construction project management substation existing problems, To solve these problems and issues proposed some measures and construction process that need attention. It launched separately from the design, schedule, quality and other aspects of security and research, and in the course of the study stressed the importance of coordination between elements of construction and construction sectors as well as cooperation between the construction, explains the importance of the project cost control.展开更多
The compaction quality of the subgrade is directly related to the service life of the road. Effective control of the subgrade construction process is the key to ensuring the compaction quality of the subgrade. Therefo...The compaction quality of the subgrade is directly related to the service life of the road. Effective control of the subgrade construction process is the key to ensuring the compaction quality of the subgrade. Therefore, real-time, comprehensive, rapid and accurate prediction of construction compaction quality through informatization detection method is an important guarantee for speeding up construction progress and ensuring subgrade compaction quality. Based on the function of the system, this paper puts forward the principle of system development and the development mode used in system development, and displays the development system in real-time to achieve the whole process control of subgrade construction quality.展开更多
The purpose of Engineering Procurement Construction(EPC)general contracting project schedule management is to ensure that the project meets its deadlines,and it plays a critical role in contract performance.In compari...The purpose of Engineering Procurement Construction(EPC)general contracting project schedule management is to ensure that the project meets its deadlines,and it plays a critical role in contract performance.In comparison to the domestic general contracting model,project management and coordination are more complex for the general contractor of international EPC projects.As a result,scientific project schedule process control is critical to effectively ensuring project duration,saving project costs,improving project management level,and project quality,and ensuring that the project achieves the promised advantages for both the contractor and the owner.Through the research and analysis of the status of the schedule management of the Indonesia B Project Phase II cement project,corresponding optimization measures are proposed for the project schedule process control.展开更多
The comprehensive improvement strategy of intra-county environment pollution in the city and countryside was searched.By the research method which combined the microscopic view,the macroscopic view with the dynamic pe...The comprehensive improvement strategy of intra-county environment pollution in the city and countryside was searched.By the research method which combined the microscopic view,the macroscopic view with the dynamic perspective,the seriousness of rural water quality,soil and atmospheric pollution in Xiangxiang,Xiangtan and the surrounding areas in Shaoshan irrigated area was revealed.The control measure which was 'four-dimensional pollution in the city and countryside'—— low-carbon-high-value agriculture and the technology innovation was proposed.The low-carbon-high-value technology innovation industrialization demonstration in three parts which included the pre-production,mid-production and post-production deep-processing of cultivation and breeding industry in the ecological cyclic agricultural garden in Shaoshan irrigated area was the driving force.We tried to propel the low-carbon ecological cultivation and breeding industry which included the paddy rice,grass,tree,medicinal herbs and pig,cow,chick,duck,fish.We wanted to relieve the structural unbalance of previous cultivation and breeding industry,'cheap grain hurting the farmers' and the short-leg problem of social-economic-ecological benefit.The results showed that the low-carbon-high-value agricultural system was a poly-generation technology system which promoted the multi-level and grading utilization,saved the energy,reduced the consumption and cleaned the production based on the ecology.展开更多
OBJECTIVE: To evaluate the effectiveness and safety of filiform needle acupuncture for poststroke depression, and to compare acupuncture with the therapeutic efficacy of antidepressant drugs. DATA RETRIEVAL: We retr...OBJECTIVE: To evaluate the effectiveness and safety of filiform needle acupuncture for poststroke depression, and to compare acupuncture with the therapeutic efficacy of antidepressant drugs. DATA RETRIEVAL: We retrieved data from the Chinese National Knowledge Infrastructure (1979-2012), Wanfang (1980-2012), VIP (1989-2012), Chinese Biomedical Literature (1975- 2012), PubMed (1966-2012), Ovid Lww (-2012), and Cochrane Library (-2012) Database using the internet. SELECTION CRITERIA: Randomized controlled trials on filiform needle acupuncture versus antidepressant drugs for treatment of poststroke depression were included. Moreover, the in- cluded articles scored at least 4 points on the Jadad scale. Exclusion criteria: other acupuncture therapies as treatment group, not stroke-induced depression patients, score 〈 4 points, non-ran- domized controlled trials, or animal trials. MAIN OUTCOME MEASURES: These were the Hamilton Depression Scale scores, clinical ef- fective rate, Self-Rating Depression Scale scores, Side Effect Rating Scale scores, and incidence of adverse reaction and events. RESULTS: A total of 17 randomized controlled clinical trials were included. Meta-analysis results displayed that after 4 weeks of treatment, clinical effective rate was better in patients treated with fill- form needle acupuncture than those treated with simple antidepressant drugs [relative risk = 1.11, 95% confidence interval (C/): 1.03-1.21, P = 0.01]. At 6 weeks, clinical effective rate was similar between filiform needle acupuncture and antidepressant drug groups. At 2 weeks after filiform needle acupuncture, Hamilton Depression Scale (17 items) scores were lower than in the antide- pressant drug group (mean difference = -2.34, 95%CI: -3.46 to -1.22, P 〈 0.000,1). At 4 weeks, Hamilton Depression Scale (24 items) scores were similar between filiform needle acupuncture and antidepressant drug groups. Self-Rating Depression Scale scores were lower in filiform needle acupuncture group than in the antidepressant drug group. Side Effect Rating Scale was used in only two articles, and no meta-analysis was conducted. Safety evaluation of the 17 arti- cles showed that gastrointestinal tract reactions such as nausea and vomiting were very common in the antidepressant drug group. Incidence of adverse reaction and events was very low in the filiform needle acupuncture group. CONCLUSION: Early filiform needle acupuncture for poststroke depression can perfectly con- trol depression. Filiform needle acupuncture is safe and reliable. Therapeutic effects of filiform needle acupuncture were better than those of antidepressant drugs.展开更多
In order to recover the strip pillar coal resources, reduce the amount of gangue mountain and realize remediation of the goaf environment in the old mining area, the raw gangue filling mining technology was proposed. ...In order to recover the strip pillar coal resources, reduce the amount of gangue mountain and realize remediation of the goaf environment in the old mining area, the raw gangue filling mining technology was proposed. According to the previous practical experience, the feasibility of the implementation of raw gangue filling mining technology in the coal-pressed area was analyzed. Through the filling gangue compaction test, the deformation under different loading stages was obtained. Further, a reasonable prediction of the deformation beyond the experimental limited loading load was made based on the experimental results. Through the deformation source analysis of the whole process of gangue filling, the key factors for controlling deformation before, during, and after filling were determined. Additionally, the proportion of deformation during different stages was quantified. Considering the protection of surface buildings, mining fullness of the working face and mining technology, the production parameters of 1209 and 1210 filling working faces were preliminarily determined. Through numerical simulation, the rationality of mining scheme was verified. Based on the practice of 1209 working face and the key factors to control the deformation of gangue filling, the mining system and process in 1210 working face were optimized. According to the measured surface rock movement, raw gangue filling mining technology can meet the requirements of surface building protection level. Especially, this paper provides a method to quantitatively calculate the equivalent mining height (EMH) of raw gangue filling and its mining deformation, which has reference significance for old mining areas.展开更多
文摘The construction process control of large-scale projects is one of the difficulties and keys in the owner’s project management. Based on generalization process index, this paper proposes an approach to construction project process control. The paper elaborates on the concept and calculation of generalization process index, which, on analysis, possesses Markov property. Monthly generalization process index is regarded as a state of Markov chain, and the transition between different states is realized by computer simulation. According to the Markov process forecasting model and by means of MATLAB program, the project process forecast is realized, and the completion probability in contract period is obtained. From practical instances, it is concluded that this approach has good applicability and operability and that the obtained results can reflect the degree of project risks.
文摘in recent years, as the project of our country is increasing, investment growth, put forward new challenges to investment in construction projects. Research from the research status of investment in construction, the implementation process in accordance with the construction project, followed by analysis of the construction project investment the currently existing problems, and puts forward the implementation of the project the whole process as the main line, to scientific decision-making, rational design, bidding, construction control standard and completion of review strategies as the core.
文摘As a flagship project of Sino-Indonesia cooperation within the framework of“the Belt and Road”Initiative(BRI),Jakarta-Bandung High Speed Railway(Jakarta-Bandung HSR)is the first overseas high speed railway entirely implementing China's high speed railway technology with all systems,elements and industrial chain.It marks the success of extensive consultation,joint contribution and shared benefits between China and region states to achieve modernization.By studying the Jakarta-Bandung HSR project,this paper concludes the innovations and successful practices in“going global”of China's railway industry in terms of project organization,engineering construction,railway equipment,operation management,risk prevention and control,etc.Meanwhile,focusing on one of the eight major steps to support high-quality Belt and Road cooperation proposed by President Xi Jinping—building a multidimensional“the Belt and Road”connectivity network,this paper puts forward the specific outlook for China's high speed railway to“go global”and jointly build“the Belt and Road”Initiative from two perspectives of international railway engineering and international scientific and technological cooperation.
基金National Science and Technology Support Program of China ( No. 2009BAG15B02) Key Pro-grams for Science and Technology Development of Chinese Transportation Industry( No. 2008-353-332-180)
文摘The general construction procedure of the steel middle pylon is briefly introduced. The alignment control of the pylon is carried out during the whole process of the construction. The control concept is extended to the manufacture stage. The manufacturing alignment error is strictly controlled in the segments precast process in factory, and the error is recognized and predicted precisely during the installation stage. The adjusting joints are employed to amend the accumulated error, which ensure that the steel pylon alignment could satisfy the precision requirements after installation.
文摘Project cost can control the input in construction project and improve economic benefits of construction enterprises,so it is an important section of construction engineering.Reasonable control and management of project cost is the principle that building units must obey in the whole process of project,particularly in the construction stage,so it is extremely important to control and manage the project cost.This paper first analyzed possible causes for the unreasonable cost of construction projects,and put forward pertinent strategies for the control and management of construction project cost.
基金Key Subject of Ministry of Railway Technology Research and Development Program(No.2011G010-D)Central University Funds for Basic Research(No.SWJTU12ZT12)
文摘In the ISO9000"input-output"process model,the concept of process quality is difficult to get the correct interpretation. From the"white box"theory of process,this paper puts forward the scientific meaning of the concept of process quality and the process quality model by taking the basic operating unit of 6M1E in the railway construction project for example. The basic operating unit system consists of technological natural process,operation process and management process;the process quality of the basic operating unit system depends on the interrelation and interaction among those three sub-processes,and also subjects to the impact of the external disturbance input factors. Finally,the cast-in-situ prestressed concrete continuous box girder construction process is utilized to elaborate the specific application of this theory in the quality management of the railway construction project.
基金Supported bythe Plan of New Technology Projectsin China National Packaging Corporation2005 (05ZBJA011)the Na-tional Natural Science Foundation of China (60373062) National Sci-ence Foundation of Hunan Province(04JJ3052)
文摘A new approach for assessing and optimizing software project process based on software risk control presented, which evaluates and optimizes software project process from the view of controlling the software project risks. A model for optimizing software risk control is given, a discrete optimization algorithm based on dynamic programruing is proposed and an example of using above method to solve a problem is also included in this paper. By improving the old passive post-project control into an active effective preaction, this new method can greatly promote the possibility of success of software projects.
文摘To treat the relationship between project construction and ecological environment and effectively prevent new soil erosion during the construction, according to the project layout, soil erosion distribution as well as natural and socio-economic conditions, the control measures of newly increased soil erosion along the project were carried out based on site survey and analysis of relevant information. In addition, adhering to the prin- ciple of partition prevention and treatment, some guiding prevention and control measures of the natural zone passed by the project and soil erosion control district were determined, which provided scientific references and technical support for the rational layout of water and soil conservation and ecological restoration measures in Dina 2 gas field.
文摘Nowadays, construction projects became more complex, where the responsibility of construction manager is to control and plan the project resources in a professional way to handover the project in terms of time, cost, and quality. The aim of this study is to analyze the affect of the long experience of the construction manager on project success; it aims to identify the capability skills that the construction manager should have to complete the project on time. The fmding of this study is to help in understanding the factors that influence the project success through the long experience of the construction manager.
文摘Construction project management as an important branch of management science has its own characteristics; it was known as an important aspect of project management in the 21 st century. Construction companies now face a more complex competitive environment and more powerful competitors. In order to compete for the market and living space, Enterprises should be in a strategic height, cultivate long- term competitive advantage. Cost management is a new tool to enhance the competitiveness of enterprises, Popularization and application of Construction project management to the scientific development of the project management made the following three aspects urgent requirement. First. establish a scientific system for the construction project management. Construction Project Management knowledge system is the foundation and needs for Construction Project Management scientific and professional.
文摘Since the reform and opening up,Chinese economy has developed rapidly.Industrial and civil construction projects have made significant progress.That said,it is of great significance to further strengthen the construction management of industrial and civil construction projects for the longterm development of construction industry in China.In terms of reality,one of the common problems in the current industrial and civil construction is wall cracks,which will have an important impact on the appearance of the building and the overall construction quality.Therefore,it is necessary to analyze the reasons and put forward corresponding measures on it.That is how we can continuously improve the construction quality in civil and industrial construction projects,thereby achieving the enhancement of building safety and stability.
文摘In the 21st century, especially after the accession to WTO, Construction project bidding price formation mechanism is the main characteristics of the market price of the Construction project is divided in a unified, uniform measurement unit, unified in terms of engineering and consumption of fixed rules on the basis of the implementation of market, competition fees.The first to be carried out not only the financial decision-making, corporate contractors in accordance with the different ways, according to market conditions, its technology, economic strength, through the financial decision-making self-quotation. Second, it is necessary to exercise effective control, both the Construction project bidding price by the form of the contract price is fixed.By design, material procurement, construction management on the implementation of bidding for the effective control of prices.
文摘Urbanization has led to the rapid development of the construction industry.However,this has also led to higher requirements for the construction engineering management.Other than the quality monitoring of engineering construction,the energy-saving properties of the building should also be considered.Therefore,a scientific management approach should be adopted to improve green building management.This paper primarily examines the importance of quality management in green building construction,along with the factors influencing it.It also identifies the quality issues present in current green building construction.Finally,it proposes measures for quality management in the green building construction process to facilitate the industry’s healthy development.
文摘One of the most important tasks of security is the quality of the project substation substation construction project management, construction project management, including project bidding and engineering, electrical engineering and civil construction, engineering, quality control, safety management and supervision costs control, on-site supervision over the links, these links chain, indivisible, so long as a part of the management problems, will lead the entire construction project management effectiveness be affected, so it must be every link control and management work done, in order to guarantee the quality of the entire substation, in order to make security of supply substations, electrical safety and vital interests of users are protected. In this paper, the author details the three aspects substation construction management of the project, namely the concept of substation engineering, project management and construction safety, through these three aspects, the author analyzes the construction project management substation existing problems, To solve these problems and issues proposed some measures and construction process that need attention. It launched separately from the design, schedule, quality and other aspects of security and research, and in the course of the study stressed the importance of coordination between elements of construction and construction sectors as well as cooperation between the construction, explains the importance of the project cost control.
文摘The compaction quality of the subgrade is directly related to the service life of the road. Effective control of the subgrade construction process is the key to ensuring the compaction quality of the subgrade. Therefore, real-time, comprehensive, rapid and accurate prediction of construction compaction quality through informatization detection method is an important guarantee for speeding up construction progress and ensuring subgrade compaction quality. Based on the function of the system, this paper puts forward the principle of system development and the development mode used in system development, and displays the development system in real-time to achieve the whole process control of subgrade construction quality.
文摘The purpose of Engineering Procurement Construction(EPC)general contracting project schedule management is to ensure that the project meets its deadlines,and it plays a critical role in contract performance.In comparison to the domestic general contracting model,project management and coordination are more complex for the general contractor of international EPC projects.As a result,scientific project schedule process control is critical to effectively ensuring project duration,saving project costs,improving project management level,and project quality,and ensuring that the project achieves the promised advantages for both the contractor and the owner.Through the research and analysis of the status of the schedule management of the Indonesia B Project Phase II cement project,corresponding optimization measures are proposed for the project schedule process control.
基金Supported by " Research on The Control Technology of Subtropical Agriculture Pollution System" Special Project of National Environment Protection Public Welfare Industry Science Research "Research on The Construction Strategy of Ecological Civilization" Development Plan Research Project of State Development and Reform Commission+1 种基金Xiangxiang " High-output and Efficient Cultivation of High Quality Rice and Processing Technology Industrialization Demonstration " in The Plan Test Site of National Science and Technology Enriching People and Developing County Special Project Action" Xiangxiang Middle and Long-term Development Plan of Modern Agriculture" of Subtropical Agriculture Ecology Institute in Chinese Academy of Science
文摘The comprehensive improvement strategy of intra-county environment pollution in the city and countryside was searched.By the research method which combined the microscopic view,the macroscopic view with the dynamic perspective,the seriousness of rural water quality,soil and atmospheric pollution in Xiangxiang,Xiangtan and the surrounding areas in Shaoshan irrigated area was revealed.The control measure which was 'four-dimensional pollution in the city and countryside'—— low-carbon-high-value agriculture and the technology innovation was proposed.The low-carbon-high-value technology innovation industrialization demonstration in three parts which included the pre-production,mid-production and post-production deep-processing of cultivation and breeding industry in the ecological cyclic agricultural garden in Shaoshan irrigated area was the driving force.We tried to propel the low-carbon ecological cultivation and breeding industry which included the paddy rice,grass,tree,medicinal herbs and pig,cow,chick,duck,fish.We wanted to relieve the structural unbalance of previous cultivation and breeding industry,'cheap grain hurting the farmers' and the short-leg problem of social-economic-ecological benefit.The results showed that the low-carbon-high-value agricultural system was a poly-generation technology system which promoted the multi-level and grading utilization,saved the energy,reduced the consumption and cleaned the production based on the ecology.
基金supported by the Guangdong Provincial"211 Engineering"Stage-III Key Disciplines Construction Project in China,No.Yue 2009431
文摘OBJECTIVE: To evaluate the effectiveness and safety of filiform needle acupuncture for poststroke depression, and to compare acupuncture with the therapeutic efficacy of antidepressant drugs. DATA RETRIEVAL: We retrieved data from the Chinese National Knowledge Infrastructure (1979-2012), Wanfang (1980-2012), VIP (1989-2012), Chinese Biomedical Literature (1975- 2012), PubMed (1966-2012), Ovid Lww (-2012), and Cochrane Library (-2012) Database using the internet. SELECTION CRITERIA: Randomized controlled trials on filiform needle acupuncture versus antidepressant drugs for treatment of poststroke depression were included. Moreover, the in- cluded articles scored at least 4 points on the Jadad scale. Exclusion criteria: other acupuncture therapies as treatment group, not stroke-induced depression patients, score 〈 4 points, non-ran- domized controlled trials, or animal trials. MAIN OUTCOME MEASURES: These were the Hamilton Depression Scale scores, clinical ef- fective rate, Self-Rating Depression Scale scores, Side Effect Rating Scale scores, and incidence of adverse reaction and events. RESULTS: A total of 17 randomized controlled clinical trials were included. Meta-analysis results displayed that after 4 weeks of treatment, clinical effective rate was better in patients treated with fill- form needle acupuncture than those treated with simple antidepressant drugs [relative risk = 1.11, 95% confidence interval (C/): 1.03-1.21, P = 0.01]. At 6 weeks, clinical effective rate was similar between filiform needle acupuncture and antidepressant drug groups. At 2 weeks after filiform needle acupuncture, Hamilton Depression Scale (17 items) scores were lower than in the antide- pressant drug group (mean difference = -2.34, 95%CI: -3.46 to -1.22, P 〈 0.000,1). At 4 weeks, Hamilton Depression Scale (24 items) scores were similar between filiform needle acupuncture and antidepressant drug groups. Self-Rating Depression Scale scores were lower in filiform needle acupuncture group than in the antidepressant drug group. Side Effect Rating Scale was used in only two articles, and no meta-analysis was conducted. Safety evaluation of the 17 arti- cles showed that gastrointestinal tract reactions such as nausea and vomiting were very common in the antidepressant drug group. Incidence of adverse reaction and events was very low in the filiform needle acupuncture group. CONCLUSION: Early filiform needle acupuncture for poststroke depression can perfectly con- trol depression. Filiform needle acupuncture is safe and reliable. Therapeutic effects of filiform needle acupuncture were better than those of antidepressant drugs.
文摘In order to recover the strip pillar coal resources, reduce the amount of gangue mountain and realize remediation of the goaf environment in the old mining area, the raw gangue filling mining technology was proposed. According to the previous practical experience, the feasibility of the implementation of raw gangue filling mining technology in the coal-pressed area was analyzed. Through the filling gangue compaction test, the deformation under different loading stages was obtained. Further, a reasonable prediction of the deformation beyond the experimental limited loading load was made based on the experimental results. Through the deformation source analysis of the whole process of gangue filling, the key factors for controlling deformation before, during, and after filling were determined. Additionally, the proportion of deformation during different stages was quantified. Considering the protection of surface buildings, mining fullness of the working face and mining technology, the production parameters of 1209 and 1210 filling working faces were preliminarily determined. Through numerical simulation, the rationality of mining scheme was verified. Based on the practice of 1209 working face and the key factors to control the deformation of gangue filling, the mining system and process in 1210 working face were optimized. According to the measured surface rock movement, raw gangue filling mining technology can meet the requirements of surface building protection level. Especially, this paper provides a method to quantitatively calculate the equivalent mining height (EMH) of raw gangue filling and its mining deformation, which has reference significance for old mining areas.