While having constantly developed for five years,China's wind power meets its bottleneck of further development in fast-growing areas due to the insufficient market accommodation.In contrast,the Central China and ...While having constantly developed for five years,China's wind power meets its bottleneck of further development in fast-growing areas due to the insufficient market accommodation.In contrast,the Central China and the East China have experienced the shortage of coal,oil and natural gas for power generation in recent winters.Hence,how to handle the discrepancy between insufficient accommodation and short energy supply has become the focus of attention both domestically and abroad.Taking Jiuquan Wind Power Base as an example,the reverse distribution between the energy resources and the consumer market,the wind power accommodation and the energy transmission are analyzed;the necessity and feasibility of long-distance power transmission are also discussed,which presents a technical roadmap for the long-distance transmission of thermal and wind power in combination.展开更多
Pakistan is facing acute energy crises since last few years. Due to shortage of fuel oil and its sky touching prices, it seems very uneconomical to generate electricity from fuel oil. In order to generate cheap electr...Pakistan is facing acute energy crises since last few years. Due to shortage of fuel oil and its sky touching prices, it seems very uneconomical to generate electricity from fuel oil. In order to generate cheap electricity we have to rely on renewable energy resources. To address these challenges, wind power generation is among the popular options in the world which is now being considered in Pakistan as well. However unremitting change in wind speed from calm to stormy introduces real challenges. Storing wind energy in batteries during the periods of low demand seems an expensive option, especially when dealing with large scale power generation. Due to incessantly varying nature of wind speed, it is not feasible to rely only on wind power for cheap power production. Also, it is not thriftily possible to construct separate transmission line. However if we integrate wind power with hydro power, we can utilize the maximum possible transmission capacity. Existing hydro power station operating in that area or pumped storage scheme can be used. This paper is an attempt to analyze coordination of wind generation with hydro power in those areas of Pakistan where both wind and hydro power sources exist. In this paper, different issues have been analyzed taking case study of Dargai. This paper is first attempt in Pakistan about integration of wind and hydro power to draw some general conclusions and to point out some areas in which further research can be done.展开更多
The 10-GW-class Jiuquan Wind Power Base in Gansu Province is to get its Phase I Project completed soon, and will further expand and become the world largest wind power base in the future. Whether electricity from the ...The 10-GW-class Jiuquan Wind Power Base in Gansu Province is to get its Phase I Project completed soon, and will further expand and become the world largest wind power base in the future. Whether electricity from the wind power base can be delivered on such a large scale becomes the focus of attention of the world. This paper analyzes four challenges facing the wind power base, including transmission capability, peak regulation and frequency modulation, capacity balance and generation accommodation, as well as system stability.展开更多
The wind power generation is increasing in many countries as a result of decreasing technology costs, active government policies for renewable energy sources, environmental concerns, etc.. This paper investigates the ...The wind power generation is increasing in many countries as a result of decreasing technology costs, active government policies for renewable energy sources, environmental concerns, etc.. This paper investigates the impact of wind power generation on ATC (available transmission capacity) calculation. In order to determine the maximum incremental MW transfer possible between two parts of a power system without violating any specified limits, ATCs are calculated. When calculating ATC values, it is necessary to assume production and consumption pattern in power system. Production of wind power depends on the wind speed, which is a random variable and it is impossible to forecast exactly the production of wind power that is needed for the ATCs calculation. In order to investigate influence of the stochastic wind power production on the ATCs value, computer model of Croatian electric power system is made in Power World Simulator. ATCs are calculated for southern part of Croatian power system in which besides wind power, hydro power plants are only type of power generation. Available wind speed measurements are used as input data for wind power production. The results of the ATC calculation for different scenario of wind power production and location in the Southern Croatian power system are presented and discussed in the paper.展开更多
The commencement of China–Pakistan Economic Corridor has led to the appreciation of Pakistan’s economic outlook from 5.4%to 5.8%by the World Bank.The upgraded outlook is a welcome sign but it is still trivial,essent...The commencement of China–Pakistan Economic Corridor has led to the appreciation of Pakistan’s economic outlook from 5.4%to 5.8%by the World Bank.The upgraded outlook is a welcome sign but it is still trivial,essentially attributable to the electric power crisis,which approximately trims 2%of Pakistan’s economic growth annually.Almost 60%of the CPEC(China–Pakistan Economic Corridor)funds are directed at Pakistan’s energy sector,hence,demanding careful attention of both researchers and policy analysts alike.The study is based upon a meta-analytic review of literature concerning CPEC and Pakistan’s energy sector.The results of the study demonstrate that CPEC is an easing agent for Pakistan’s energy crisis(82.30%).The results also highlight points of concern,including inadequate planning(47%),dilapidated electricity distribution system causing losses(64.7%),and an unsustainable energy mix(64.7%).The study further validates the findings via Spearman’s Rho-Correlation.The rρvalue for the possible“resolution of Pakistan’s energy crisis”is 0.5426 achieving a significance level of 98%and a corresponding p-value of 0.0252.The significant negative rρvalue attained is−0.4894 which establishes the fact that lack of planning can hinder the energy crisis resolution.展开更多
For offshore hydraulic drive wind turbines,the problems of unsatisfactory speed control and low efficiency at low wind speeds are targeted.A low-speed high-torque radial piston pump is designed to replace the traditio...For offshore hydraulic drive wind turbines,the problems of unsatisfactory speed control and low efficiency at low wind speeds are targeted.A low-speed high-torque radial piston pump is designed to replace the traditional fixed pump with a particular focus on its low-speed performance.The pump is characterized by small internal leakage at low wind speeds and high volumetric efficiency,which is beneficial to improve the power generation efficiency of the system.A new linear control method based on the PID algorithm and feedforward compensation was proposed to obtain the constant speed output control of variable motor at low wind speed.With the model for wind turbine and fixed pump-variable motor main drive system,the system was simulated and experimentally proved to verify the feasibility and anti-interference performance of the system control method at low wind speeds.A promising outcome was obtained on the response characteristics of system power and efficiency at low wind speeds.This can be a powerful technical support for the normal ustility of hydraulic drive wind turbines.展开更多
文摘While having constantly developed for five years,China's wind power meets its bottleneck of further development in fast-growing areas due to the insufficient market accommodation.In contrast,the Central China and the East China have experienced the shortage of coal,oil and natural gas for power generation in recent winters.Hence,how to handle the discrepancy between insufficient accommodation and short energy supply has become the focus of attention both domestically and abroad.Taking Jiuquan Wind Power Base as an example,the reverse distribution between the energy resources and the consumer market,the wind power accommodation and the energy transmission are analyzed;the necessity and feasibility of long-distance power transmission are also discussed,which presents a technical roadmap for the long-distance transmission of thermal and wind power in combination.
文摘Pakistan is facing acute energy crises since last few years. Due to shortage of fuel oil and its sky touching prices, it seems very uneconomical to generate electricity from fuel oil. In order to generate cheap electricity we have to rely on renewable energy resources. To address these challenges, wind power generation is among the popular options in the world which is now being considered in Pakistan as well. However unremitting change in wind speed from calm to stormy introduces real challenges. Storing wind energy in batteries during the periods of low demand seems an expensive option, especially when dealing with large scale power generation. Due to incessantly varying nature of wind speed, it is not feasible to rely only on wind power for cheap power production. Also, it is not thriftily possible to construct separate transmission line. However if we integrate wind power with hydro power, we can utilize the maximum possible transmission capacity. Existing hydro power station operating in that area or pumped storage scheme can be used. This paper is an attempt to analyze coordination of wind generation with hydro power in those areas of Pakistan where both wind and hydro power sources exist. In this paper, different issues have been analyzed taking case study of Dargai. This paper is first attempt in Pakistan about integration of wind and hydro power to draw some general conclusions and to point out some areas in which further research can be done.
文摘The 10-GW-class Jiuquan Wind Power Base in Gansu Province is to get its Phase I Project completed soon, and will further expand and become the world largest wind power base in the future. Whether electricity from the wind power base can be delivered on such a large scale becomes the focus of attention of the world. This paper analyzes four challenges facing the wind power base, including transmission capability, peak regulation and frequency modulation, capacity balance and generation accommodation, as well as system stability.
文摘The wind power generation is increasing in many countries as a result of decreasing technology costs, active government policies for renewable energy sources, environmental concerns, etc.. This paper investigates the impact of wind power generation on ATC (available transmission capacity) calculation. In order to determine the maximum incremental MW transfer possible between two parts of a power system without violating any specified limits, ATCs are calculated. When calculating ATC values, it is necessary to assume production and consumption pattern in power system. Production of wind power depends on the wind speed, which is a random variable and it is impossible to forecast exactly the production of wind power that is needed for the ATCs calculation. In order to investigate influence of the stochastic wind power production on the ATCs value, computer model of Croatian electric power system is made in Power World Simulator. ATCs are calculated for southern part of Croatian power system in which besides wind power, hydro power plants are only type of power generation. Available wind speed measurements are used as input data for wind power production. The results of the ATC calculation for different scenario of wind power production and location in the Southern Croatian power system are presented and discussed in the paper.
文摘The commencement of China–Pakistan Economic Corridor has led to the appreciation of Pakistan’s economic outlook from 5.4%to 5.8%by the World Bank.The upgraded outlook is a welcome sign but it is still trivial,essentially attributable to the electric power crisis,which approximately trims 2%of Pakistan’s economic growth annually.Almost 60%of the CPEC(China–Pakistan Economic Corridor)funds are directed at Pakistan’s energy sector,hence,demanding careful attention of both researchers and policy analysts alike.The study is based upon a meta-analytic review of literature concerning CPEC and Pakistan’s energy sector.The results of the study demonstrate that CPEC is an easing agent for Pakistan’s energy crisis(82.30%).The results also highlight points of concern,including inadequate planning(47%),dilapidated electricity distribution system causing losses(64.7%),and an unsustainable energy mix(64.7%).The study further validates the findings via Spearman’s Rho-Correlation.The rρvalue for the possible“resolution of Pakistan’s energy crisis”is 0.5426 achieving a significance level of 98%and a corresponding p-value of 0.0252.The significant negative rρvalue attained is−0.4894 which establishes the fact that lack of planning can hinder the energy crisis resolution.
基金supported by Chongqing Natural Science Foundation(cstc2019jcyj⁃msxm2000),Chongqing University of Science and Technology Graduate Science and Technology Innovation Project(JXXY201901)。
文摘For offshore hydraulic drive wind turbines,the problems of unsatisfactory speed control and low efficiency at low wind speeds are targeted.A low-speed high-torque radial piston pump is designed to replace the traditional fixed pump with a particular focus on its low-speed performance.The pump is characterized by small internal leakage at low wind speeds and high volumetric efficiency,which is beneficial to improve the power generation efficiency of the system.A new linear control method based on the PID algorithm and feedforward compensation was proposed to obtain the constant speed output control of variable motor at low wind speed.With the model for wind turbine and fixed pump-variable motor main drive system,the system was simulated and experimentally proved to verify the feasibility and anti-interference performance of the system control method at low wind speeds.A promising outcome was obtained on the response characteristics of system power and efficiency at low wind speeds.This can be a powerful technical support for the normal ustility of hydraulic drive wind turbines.