In order to study the residual stress distribution law of welded joints of arch ribs of large-span steel pipe concrete arch bridges,numerical simulation of temperature,stress and strain fields based on ABAQUS for weld...In order to study the residual stress distribution law of welded joints of arch ribs of large-span steel pipe concrete arch bridges,numerical simulation of temperature,stress and strain fields based on ABAQUS for welded joints of arch-ribbed steel tubes using 7-,8-and 9-layer welds is carried out and its accuracy is demonstrated.The steel pipe welding temperature changes,residual stress distribution,different processes residual stress changes in the law,the prediction of post-weld residual stress distribution and deformation are studied in this paper.The results show that the temperature field values and test results are more consistent with the accuracy of numerical simulation of welding,the welding process is mainly in the form of heat transfer;Residual high stresses are predominantly distributed in the Fusion zone(FZ)and Heat-affected zone(HAZ),with residual stress levels tending to decrease from the center of the weld along the axial path,the maximum stress appears in the FZ and HAZ junction;The number of welding layers has an effect on the residual stress distribution,the number of welding layers increases,the residual stress tends to decrease,while the FZ and HAZ high stress area range shrinks;Increasing the number of plies will increase the amount of residual distortion.展开更多
A huge number of old arch bridges located in rural regions are at the peak of maintenance.The health monitoring technology of the long-span bridge is hardly applicable to the small-span bridge,owing to the absence of ...A huge number of old arch bridges located in rural regions are at the peak of maintenance.The health monitoring technology of the long-span bridge is hardly applicable to the small-span bridge,owing to the absence of technical resources and sufficient funds in rural regions.There is an urgent need for an economical,fast,and accurate damage identification solution.The authors proposed a damage identification system of an old arch bridge implemented with amachine learning algorithm,which took the vehicle-induced response as the excitation.A damage index was defined based on wavelet packet theory,and a machine learning sample database collecting the denoised response was constructed.Through comparing three machine learning algorithms:Back-Propagation Neural Network(BPNN),Support Vector Machine(SVM),and Random Forest(R.F.),the R.F.damage identification model were found to have a better recognition ability.Finally,the Particle Swarm Optimization(PSO)algorithm was used to optimize the number of subtrees and split features of the R.F.model.The PSO optimized R.F.model was capable of the identification of different damage levels of old arch bridges with sensitive damage index.The proposed framework is practical and promising for the old bridge’s structural damage identification in rural regions.展开更多
The paper summarizes the four different construction schemes based on engineering cases for the arch rib construction of continuous beam-arch composite bridges for high-speed railways.These methods include in-situ ass...The paper summarizes the four different construction schemes based on engineering cases for the arch rib construction of continuous beam-arch composite bridges for high-speed railways.These methods include in-situ assembly,segmental lifting,incremental launching and longitudinal moving,and vertical rotation.The temporary structural designs,process methods,and technological equipment for each construction scheme are described in detail.The advantages and disadvantages of each scheme and its application scope under various conditions are analyzed,and opinions and suggestions for guiding the application of each scheme are proposed.The comparison and selection analyses show that the four arch rib construction schemes have certain applicability under different conditions such as bridge site status,bridge span,and construction environment.With the continuous increase of bridge span and progress of construction technological equipment,the arch rib construction technology is developing towards the overall erection direction.This leads to more obvious technical advantages of the segmental lifting method,incremental launching and longitudinal moving method,and vertical rotation method.Therefore,it is necessary to select the best construction scheme according to the construction status and technical conditions during application.展开更多
In order to study the mechanical performance of a new type of cable-stayed beam-arch combination bridge, the results of field static and dynamic load tests are comparatively analyzed with numerical results based on th...In order to study the mechanical performance of a new type of cable-stayed beam-arch combination bridge, the results of field static and dynamic load tests are comparatively analyzed with numerical results based on the Jingyi bridge straddling the Daxi River in Yixing. First, the test scheme, tasks, the corresponding measure method, as well as the relevant codes are described. Secondly, two sets of three- dimensional finite element models are established. One is Ansys which uses the solid element and the other is Midas which adopts the beam element. Finally, the experimental and analytical results are comparatively analyzed, and they show an agreement with each other. The results show that the bridge possesses adequate load-carrying capacity under all static load cases, but the capacity of dissipating external input energy is insufficient due to the relatively smaller damping ratio. The study results can provide a reference for further study and optimization of this type of bridge. Calibrated finite-element models that reflect the real conditions can be used as a baseline for future maintenance of the bridge.展开更多
By taking Youxi Village which was the typical village with wooden arched bridges in East Fujian for example, it had discussed landforms, geology, soil, climate and vegetation in natural environment which could be perc...By taking Youxi Village which was the typical village with wooden arched bridges in East Fujian for example, it had discussed landforms, geology, soil, climate and vegetation in natural environment which could be perceived and village's cultural and historical background. Based on relevant research results in academic field, it had studied the relationship between wooden arched bridges and villages' environment in East Fujian, and further analyzed the relation of wooden arched bridges as traditional architectural heritages with village's living condition and history. On this basis, it had analyzed imaginability of natural environment of Youxi Village from the aspects of village's site and stream's trend, and imaginability of cultural environment by taking Wenming Bridge, Liren Bridge and Zhangkeng Bridge for example. It was considered that wooden arched bridge was the consolidation of natural environment and had been the recognizable image at villages of East Fujian, manifesting heavy cultural characteristic.展开更多
Theoretical study on and safeguarding of cultural landscape heritage has been put on the agenda of heritage protection in Zhejiang and Fujian provinces.The safeguarding of timber-framed arch bridge heritage in the pas...Theoretical study on and safeguarding of cultural landscape heritage has been put on the agenda of heritage protection in Zhejiang and Fujian provinces.The safeguarding of timber-framed arch bridge heritage in the past 5 decades could be classified into 3 stages,and heritage protection in all 3 stages was closely related to original meaning of "landscape",which proved that timber-framed arch bridge heritage had profound inside information,and the safeguarding of timber-framed arch bridge from the perspective of cultural landscape heritage was worth further study.Safeguarding of timber-framed arch bridge cultural landscape heritage focused on integrated conservation,but not protection of individual bridges.Integrated conservation of world heritage is to maintain and restore the integrated environment landscape of the heritage,thus protection of timber-framed arch bridge heritage is not only to explore its architectural craftsmanship,but also to lay a foundation for the dynamic succession of such craftsmanship as intangible cultural heritage.Value of the existing timber-framed arch bridges as historic building heritage was discussed,and it was proposed that ultimate objectives of the safeguarding could be realized step by step from 3 layers.展开更多
Considering arch rib, lateral brace, suspender, girder, pier and track position, the model for the interaction between long-span tied arch continuous bridge and multiple tracks was established by using steel-concrete ...Considering arch rib, lateral brace, suspender, girder, pier and track position, the model for the interaction between long-span tied arch continuous bridge and multiple tracks was established by using steel-concrete composite section beam element to simulate concrete-filled steel tube(CFST) arch rib, using the beam element with rigid arm to simulate the prestressed concrete girder and using nonlinear bar element to simulate longitudinal constraint between track and bridge. Taking a(77+3×156.8+77) m tied arch continuous bridge with four tracks on the Harbin-Qiqihar Passenger Dedicated Line as an example, the arrangement of continuously welded rail(CWR) was explored. The longitudinal force in CWR on the tied arch continuous bridge, the pier top horizontal force and torque due to the unbalance load case, were analyzed under the action of temperature, vertical live load, train braking and wind load.Studies show that, it can significantly reduce track displacement to set the track expansion devices at main span arch springing on both sides; the track stress due to arch temperature variation can reach 40.8 MPa; the track stress, pier top horizontal force and torque are related to the number of loaded tracks and train running direction, and the bending force applied to unloaded track is close to the loaded track, while the braking force applied to unloaded track is 1/4 to 1/2 of the loaded track; the longitudinal force of track due to the wind load is up to 12.4 MPa, which should be considered.展开更多
In the 1990s, several major earthquakes occurred throughout the world, with a common observation that near fault ground motion (NFGM) characteristics had a distinct impact on causing damage to civil engineering stru...In the 1990s, several major earthquakes occurred throughout the world, with a common observation that near fault ground motion (NFGM) characteristics had a distinct impact on causing damage to civil engineering structures that could not be predicted by using far field ground motions. Since then, seismic responses of structures under NFGMs have been extensively examined, with most of the studies focusing on structures with relatively short fundamental periods, where the traveling wave effect does not need to be considered. However, for long span bridges, especially arch bridges, the traveling wave (only time delay considered) effect may be very distinct and is therefore important. In this paper, the results from a case study on the seismic response of a steel arch bridge under selected NFGMs is presented by considering the traveling wave effect with variable apparent velocities. The effects of fling step and long period pulses of NFGMs on the seismic responses of the arch bridge are also discussed.展开更多
X-style arch bridge on high-speed railways(HSR)is one kind of complicated long-span structure,and the track-bridge interaction is essential to ensure the safety and smoothness of HSR.Taking an X-style steel-box arch b...X-style arch bridge on high-speed railways(HSR)is one kind of complicated long-span structure,and the track-bridge interaction is essential to ensure the safety and smoothness of HSR.Taking an X-style steel-box arch bridge with a main span of450 m on HSR under construction for example,a new integrative mechanic model of rail-stringer-cross beam-suspenderpier-foundation coupling system was established,adopting the nonlinear spring element simulating the longitudinal resistance between track and bridge.The transmission law of continuous welded rail(CWR)on the X-style arch bridge was researched,and comparative study was carried out to discuss the influence of several sensitive factors,such as the temperature load case,the longitudinal resistance model,the scheme of longitudinal restraint conditions,the introverted inclination of arch rib,the stiffness of pier and abutment and the location of the rail expansion device.Calculating results indicate that the longitudinal resistance has a significant impact upon the longitudinal forces of CWR on this kind of bridge,while the arch rib’s inclination has little effect.Besides,temperature variation of arch ribs and suspenders should be taken into account in the calculation.Selecting the restraint system without longitudinally-fixed bearing and setting the rail expansion devices on both ends are more reasonable.展开更多
Cantilever casting concrete arch bridge using form traveller has a broad application prospect.However,it is difficult to obtain reasonable initial cable force in construction stage.In this study,stress balance and inf...Cantilever casting concrete arch bridge using form traveller has a broad application prospect.However,it is difficult to obtain reasonable initial cable force in construction stage.In this study,stress balance and influence matrix methods were developed to determine the initial cable force of cantilever casting concrete arch bridge.The stress balance equation and influence matrix of arch rib critical section were established,and the buckle cable force range was determined by the allowable stress of arch rib critical section.Then a group of buckle cable forces were selected and substituted into the stress balance equation,and the reasonable initial buckle cable force was determined through iteration.Based on the principle of force balance,the initial anchor cable force was determined.In an engineering application example,it is shown that the stress balance and influence matrix methods for the determination of initial cable force are feasible and reliable.The initial cable forces of arch rib segments only need to be adjusted once in the corresponding construction process,which improves the working efficiency and reduces the construction risk.It is found that the methods have great advantages for determining initial cable force in cantilever casting construction process of concrete arch bridge.展开更多
This paper attempts to explore potential benefits of form in a deck-type reinforced concrete(RC) arch bridge in connection with its overall seismic behavior and performance. Through a detailed three-dimensional fini...This paper attempts to explore potential benefits of form in a deck-type reinforced concrete(RC) arch bridge in connection with its overall seismic behavior and performance. Through a detailed three-dimensional finite element modeling and analysis of an actual existing deck-type RC arch bridge, some useful quantitative information have been derived that may serve for a better understanding of the seismic behavior of such arch bridges. A series of the nonlinear dynamic analyses has been carried out under the action of seven different time histories of ground motion scaled to the AASHTO 2012 response spectrum. The concept of demand to capacity ratios has been employed to provide an initial estimation of the seismic performance of the bridge members. As a consequence of the structural form, a particular type of irregularity is introduced due to variable heights of columns transferring the deck loads to the main arch. Hence, a particular attention has been paid to the internal force/moment distributions within the short, medium, and long columns as well as along the main arch. A study of the effects of the vertical component of ground motion has demonstrated the need for the inclusion of these effects in the analysis of such bridges.展开更多
This paper presents the first of a series of case studies on the seismic design of long span bridges (cable-stayed bridges, suspension bridges and arch bridges) under a cooperative research project on seismic behavi...This paper presents the first of a series of case studies on the seismic design of long span bridges (cable-stayed bridges, suspension bridges and arch bridges) under a cooperative research project on seismic behavior and design of highway bridges between the State Key Laboratory for Disaster Reduction in Civil Engineering, Tongji University and the Multidisciplinary Center for Earthquake Engineering Research, University at Buffalo. The objective of this series of case studies is to examine the differences and similarities on the seismic design practice of long span bridges in China and the U.S., to identify research needs and to develop design guidelines beneficial to bridge engineers in both countries. Unlike short to medium span bridges, long span bridges are not included in most seismic design specifications, mainly because they are location dependent and structurally unique. In this paper, an available model of a steel tied half through arch bridge with a main span of 550m in China is discussed. Analysis is focused on comparisons of the seismic responses due to different ground motions. Seismic design criteria and seismic performance requirements for long span bridges in both countries were first introduced and compared, and then three near field earthquake records with large vertical components were selected as the excitations to examine the seismic behavior and seismic vulnerability of the bridge. Results show that (1) the selected near field ground motions cause larger responses to key components (critical sections) of the bridge (such as arch rib ends) with a maximum increase of more than twice those caused by the site specific ground motions; (2) piers, longitudinal girders and arch crowns are more vulnerable to vertical motions, especially their axial forces; and (3) large vertical components of near field ground motions may not significantly affect the bridge's internal forces provided that their peak acceleration spectra ordinates only appear at periods of less than 0.2s. However, they may have more influence on the longitudinal displacements of sliding bearings due to their large displacement spectra ordinates at the fundamental period of the bridge.展开更多
A convenient approach is proposed for analyzing the ultimate load carrying capacity of concrete filled steel tubular (CFST) arch bridge with stiffening girders. A fiber model beam element is specially used to simulate...A convenient approach is proposed for analyzing the ultimate load carrying capacity of concrete filled steel tubular (CFST) arch bridge with stiffening girders. A fiber model beam element is specially used to simulate the stiffening girder and CFST arch rib. The geometric nonlinearity, material nonlinearity, influence of the construction process and the contribution of prestressing reinforcement are all taken into consideration. The accuracy of this method is validated by comparing its results with experimental results. Finally, the ultimate strength of an abnormal CFST arch bridge with stiffening girders is investigated and the effect of construction method is discussed. It is concluded that the construction process has little effect on the ultimate strength of the bridge.展开更多
In the past 20 years, great progress has been achieved in China in the construction of concrete-filled steel tube (CFST) arch bridges and concrete arch bridges with a CFST skeleton. The span of these bridges has bee...In the past 20 years, great progress has been achieved in China in the construction of concrete-filled steel tube (CFST) arch bridges and concrete arch bridges with a CFST skeleton. The span of these bridges has been increasing rapidly, which is rare in the history of bridge development. The large-scale construction of expressways and high-speed railways demands the development of long-span arch bridges, and advances in design and construction techniques have made it possible to construct such bridges. In the present study, the current status, development, and major innovative technologies of CFST arch bridges and concrete arch bridges with a CFST skeleton in China are elaborated. This paper covers the key con- struction technologies of CFST arch bridges, such as the design, manufacture, and installation of steel tube arch trusses, the preparation and pouring of in-tube concrete, and the construction of the world's longest CFST arch bridge-the First Hejiang Yangtze River Bridge. The main construction technologies of rein- forced concrete arch bridges are also presented, which include cable-stayed fastening-hanging cantilever assembly, adjusting the load by means of stay cables, surrounding the concrete for arch rib pouring, and so forth. In addition, the construction of two CFST skeleton concrete arch bridges-the Guangxi Yongning Yong River Bridge and the Yunnan-Guangxi Railway Nanpan River Bridge--is discussed. CFST arch bridges in China have already gained a world-leading position; with the continuous innovation of key technologies, China will become the new leader in promoting the development of arch bridges.展开更多
A review of the current status and progress of steel arch bridges in China is presented in this paper. The existing steel arch bridges in China were analyzed in terms of steel material, span, structure type, main arch...A review of the current status and progress of steel arch bridges in China is presented in this paper. The existing steel arch bridges in China were analyzed in terms of steel material, span, structure type, main arch rib form and construction method. The comparison with CFST arch bridges and RC arch bridges is also conducted. It is shown that steel arch bridge has gain rapid development in China since 2000, characterized by long main spans. As for the span, most of the steel arch bridges have a span less than 250 m, while when the span exceeds 350 m, steel arch bridges are strongly competitive against CFST or RC arch bridges. Over 80% of the bridges are through and half-through bridge types, and the arch ribs are hingeless structures. The rise-to-span ratios of the arches are mainly between 1:4 and 1: 5. Most of the arches use solid box ribs, and a small portion of arches use truss ribs in which box sections are mostly adopted for the truss members. The cantilever method and scaffolding method are the two main construction methods used, but some other construction methods have also been developed.展开更多
Beipanjiang Bridge is a long-span concrete arch bridges with stiffened skeleton(CABSS)in China.It has a fixed end arch with the span of 445 m and the rise of 100 m.To evaluate the rationality of the construction seque...Beipanjiang Bridge is a long-span concrete arch bridges with stiffened skeleton(CABSS)in China.It has a fixed end arch with the span of 445 m and the rise of 100 m.To evaluate the rationality of the construction sequence and the time-dependent behavior of CABSS,an experimental study of a model bridge was explored.But the measured displacement and stress ratios of arch rib between prototype and model bridge did not subject to linear similarity relation when the time-dependent behavior was considered.So,the three-dimensional finite element models were established,and verified by the measured data.Then,the displacements and stresses of the prototype and model were compared with each other,when the elastic analysis or coupling of temperature and shrinkage,creep effect was considered.Furthermore,a parametric study was studied.The results showed that when the temperature,shrinkage and creep effect of concrete are considered,the finite element analysis results of prototype and model agree well with the measured results.The displacement and stress ratios of prototype and model bridge in construction and bridge completed stage do not present the geometric similarity ratio 7.5 and 1.0,respectively.They are also much influenced by concrete predicting model and variation of temperature.展开更多
On the basis of investigating wooden arch gallery bridges in China,perspectives of researchers studying wooden arch gallery bridges in northeast Fujian Province were reviewed,and the innovativeness of researches from ...On the basis of investigating wooden arch gallery bridges in China,perspectives of researchers studying wooden arch gallery bridges in northeast Fujian Province were reviewed,and the innovativeness of researches from the perspectives of cultural geography and significance of wooden arch gallery bridge for the locals’behaviors was proposed.Youxi Village in Qinyang Town,Shouning County,known as the Village of Gallery Bridge,was taken for example to analyze physical,spiritual and social properties of its wooden arch gallery bridge spaces.Wooden arch gallery bridge is an effective boundary point of settlement space,constituting natural ecological spaces and man-made physical spaces of rural settlements.And as a type of building space,wooden arch gallery bridge expands settlement spaces,contributes to settlement cultures,and enriches spiritual connotations of regional cultures.In northeast Fujian,wooden arch gallery bridge is an important social space for the locals’daily life by carrying on living,production and spiritual functions.展开更多
Cultures of folk beliefs in east Fujian Province were introduced and folk beliefs in the local area summarized as ancestor worship,female immortal worship,Taoist secular gods worship,nature worship and local sage wors...Cultures of folk beliefs in east Fujian Province were introduced and folk beliefs in the local area summarized as ancestor worship,female immortal worship,Taoist secular gods worship,nature worship and local sage worship.Distribution of wooden arch bridges in east Fujian was introduced,major functions of the wooden arch bridges summarized as traffic hub,repairing village environment,creating rural areas with a favorable Fengshui environment,and also god temple.Folk beliefs embodied in wooden arch bridges were classified and responsibilities of the gods and immortals introduced.It was summarized that wooden arch bridges in east Fujian were embodied with diversified folk beliefs,most of the gods and immortals were believed to be responsible for practical aspects of the locals' life,many gods and immortals were worshipped together,which shows the inclusiveness of folk beliefs in the local area,and contributes to main connotations and regional features of local folk belief cultures.展开更多
To numerically evaluate the reinforcement effect on dynamic characteristics of a concrete-filled steel tube arch bridge with vibration problems,a 12-degree-of-freedom sprung-mass dynamic vehicle model and a 3D finite ...To numerically evaluate the reinforcement effect on dynamic characteristics of a concrete-filled steel tube arch bridge with vibration problems,a 12-degree-of-freedom sprung-mass dynamic vehicle model and a 3D finite element bridge model were established.Then,the coupled equations of vehicle-bridge interaction were derived and a computer program was developed using the FORTRAN language.This program can accurately simulate vehicle-bridge coupled vibration considering the bumping effect and road surface irregularity during motion of the vehicle.The simulated results were compared with those of relevant literatures to verify the correctness of the self-developed program.Then,three reinforcement schemes for the bridge(Addition of longitudinal beams,Reinforcement of bridge decks,and Replacement of suspenders)were proposed and numerically simulated,and the vibration reduction effects of the three schemes were evaluated based on the numerical results to find effective ones.It is confirmed that the reinforcement scheme of Addition of longitudinal beams shows the most significant vibration reduction effect.It is recommended in the engineering practice that the combination of the reinforcement schemes of Addition of longitudinal beams and Replacement of bridge deck can be used to solve the excessive vibration problem.展开更多
Purpose–Under different ground motion excitation modes,the spatial coupling effect of seismic response for the arch bridge with thrust,seismic weak parts and the internal force components of the control section of ma...Purpose–Under different ground motion excitation modes,the spatial coupling effect of seismic response for the arch bridge with thrust,seismic weak parts and the internal force components of the control section of main arch ribs are analyzed.Design/methodology/approach–Taking a 490 m deck type railway steel truss arch bridge as the background,the dynamic calculation model of the whole bridge was established by SAP2000 software.The seismic response analyses under one-,two-and three-dimension(1D,2D and 3D)uniform ground motion excitations were carried out.Findings–For the steel truss arch bridge composed of multiple arch ribs,any single direction ground motion excitation will cause large axial force in the chord of arch rib.The axial force caused by transverse and vertical ground motion excitation in the chord of arch crown area is 1.4–3.6 times of the corresponding axial force under longitudinal seismic excitation.The in-plane bending moment caused by the lower chord at the vault is 4.2–5.5 times of the corresponding bending moment under the longitudinal seismic excitation.For the bottom chord of arch rib,the arch foot is the weak part of earthquake resistance,but for the upper chord of arch rib,the arch foot,arch crown and the intersection of column and upper chord can all be the potential earthquake-resistant weak parts.The normal stress of the bottom chord of the arch rib under multidimensional excitation is mainly caused by the axial force,but the normal stress of the upper chord of the arch rib is caused by the axial force,in-plane and out of plane bending moment.Originality/value–The research provides specific suggestions for ground motion excitation mode and also provides reference information for the earthquake-resistant weak part and seismic design of long-span deck type railway steel truss arch bridges.展开更多
基金Sponsored by the National Natural Science Foundation of China(Grant No.52268048)the Guangxi Key Technology Research and Development Program(Grant No.GUI-KEAB23026101)the Guangxi Science and Technology Major Special Project(Grant No.GUI-KEAA22068066).
文摘In order to study the residual stress distribution law of welded joints of arch ribs of large-span steel pipe concrete arch bridges,numerical simulation of temperature,stress and strain fields based on ABAQUS for welded joints of arch-ribbed steel tubes using 7-,8-and 9-layer welds is carried out and its accuracy is demonstrated.The steel pipe welding temperature changes,residual stress distribution,different processes residual stress changes in the law,the prediction of post-weld residual stress distribution and deformation are studied in this paper.The results show that the temperature field values and test results are more consistent with the accuracy of numerical simulation of welding,the welding process is mainly in the form of heat transfer;Residual high stresses are predominantly distributed in the Fusion zone(FZ)and Heat-affected zone(HAZ),with residual stress levels tending to decrease from the center of the weld along the axial path,the maximum stress appears in the FZ and HAZ junction;The number of welding layers has an effect on the residual stress distribution,the number of welding layers increases,the residual stress tends to decrease,while the FZ and HAZ high stress area range shrinks;Increasing the number of plies will increase the amount of residual distortion.
基金supported by the Elite Scholar Program of Northwest A&F University (Grant No.Z111022001)the Research Fund of Department of Transport of Shannxi Province (Grant No.22-23K)the Student Innovation and Entrepreneurship Training Program of China (Project Nos.S202110712555 and S202110712534).
文摘A huge number of old arch bridges located in rural regions are at the peak of maintenance.The health monitoring technology of the long-span bridge is hardly applicable to the small-span bridge,owing to the absence of technical resources and sufficient funds in rural regions.There is an urgent need for an economical,fast,and accurate damage identification solution.The authors proposed a damage identification system of an old arch bridge implemented with amachine learning algorithm,which took the vehicle-induced response as the excitation.A damage index was defined based on wavelet packet theory,and a machine learning sample database collecting the denoised response was constructed.Through comparing three machine learning algorithms:Back-Propagation Neural Network(BPNN),Support Vector Machine(SVM),and Random Forest(R.F.),the R.F.damage identification model were found to have a better recognition ability.Finally,the Particle Swarm Optimization(PSO)algorithm was used to optimize the number of subtrees and split features of the R.F.model.The PSO optimized R.F.model was capable of the identification of different damage levels of old arch bridges with sensitive damage index.The proposed framework is practical and promising for the old bridge’s structural damage identification in rural regions.
文摘The paper summarizes the four different construction schemes based on engineering cases for the arch rib construction of continuous beam-arch composite bridges for high-speed railways.These methods include in-situ assembly,segmental lifting,incremental launching and longitudinal moving,and vertical rotation.The temporary structural designs,process methods,and technological equipment for each construction scheme are described in detail.The advantages and disadvantages of each scheme and its application scope under various conditions are analyzed,and opinions and suggestions for guiding the application of each scheme are proposed.The comparison and selection analyses show that the four arch rib construction schemes have certain applicability under different conditions such as bridge site status,bridge span,and construction environment.With the continuous increase of bridge span and progress of construction technological equipment,the arch rib construction technology is developing towards the overall erection direction.This leads to more obvious technical advantages of the segmental lifting method,incremental launching and longitudinal moving method,and vertical rotation method.Therefore,it is necessary to select the best construction scheme according to the construction status and technical conditions during application.
文摘In order to study the mechanical performance of a new type of cable-stayed beam-arch combination bridge, the results of field static and dynamic load tests are comparatively analyzed with numerical results based on the Jingyi bridge straddling the Daxi River in Yixing. First, the test scheme, tasks, the corresponding measure method, as well as the relevant codes are described. Secondly, two sets of three- dimensional finite element models are established. One is Ansys which uses the solid element and the other is Midas which adopts the beam element. Finally, the experimental and analytical results are comparatively analyzed, and they show an agreement with each other. The results show that the bridge possesses adequate load-carrying capacity under all static load cases, but the capacity of dissipating external input energy is insufficient due to the relatively smaller damping ratio. The study results can provide a reference for further study and optimization of this type of bridge. Calibrated finite-element models that reflect the real conditions can be used as a baseline for future maintenance of the bridge.
基金Supported by the subject of " Professor Cultivation Engineering" of Ningde Teachers College of 2010 (2010J002)the special subject of " Cultural Research of East Fujian" in 2011 (2011HW05)A Class Subject of Fujian Department Education (JA11300S)~~
文摘By taking Youxi Village which was the typical village with wooden arched bridges in East Fujian for example, it had discussed landforms, geology, soil, climate and vegetation in natural environment which could be perceived and village's cultural and historical background. Based on relevant research results in academic field, it had studied the relationship between wooden arched bridges and villages' environment in East Fujian, and further analyzed the relation of wooden arched bridges as traditional architectural heritages with village's living condition and history. On this basis, it had analyzed imaginability of natural environment of Youxi Village from the aspects of village's site and stream's trend, and imaginability of cultural environment by taking Wenming Bridge, Liren Bridge and Zhangkeng Bridge for example. It was considered that wooden arched bridge was the consolidation of natural environment and had been the recognizable image at villages of East Fujian, manifesting heavy cultural characteristic.
文摘Theoretical study on and safeguarding of cultural landscape heritage has been put on the agenda of heritage protection in Zhejiang and Fujian provinces.The safeguarding of timber-framed arch bridge heritage in the past 5 decades could be classified into 3 stages,and heritage protection in all 3 stages was closely related to original meaning of "landscape",which proved that timber-framed arch bridge heritage had profound inside information,and the safeguarding of timber-framed arch bridge from the perspective of cultural landscape heritage was worth further study.Safeguarding of timber-framed arch bridge cultural landscape heritage focused on integrated conservation,but not protection of individual bridges.Integrated conservation of world heritage is to maintain and restore the integrated environment landscape of the heritage,thus protection of timber-framed arch bridge heritage is not only to explore its architectural craftsmanship,but also to lay a foundation for the dynamic succession of such craftsmanship as intangible cultural heritage.Value of the existing timber-framed arch bridges as historic building heritage was discussed,and it was proposed that ultimate objectives of the safeguarding could be realized step by step from 3 layers.
基金Project(51378503)supported by the National Natural Science Foundation of ChinaProject(2014M552158)supported by China Postdoctoral Science Foundation
文摘Considering arch rib, lateral brace, suspender, girder, pier and track position, the model for the interaction between long-span tied arch continuous bridge and multiple tracks was established by using steel-concrete composite section beam element to simulate concrete-filled steel tube(CFST) arch rib, using the beam element with rigid arm to simulate the prestressed concrete girder and using nonlinear bar element to simulate longitudinal constraint between track and bridge. Taking a(77+3×156.8+77) m tied arch continuous bridge with four tracks on the Harbin-Qiqihar Passenger Dedicated Line as an example, the arrangement of continuously welded rail(CWR) was explored. The longitudinal force in CWR on the tied arch continuous bridge, the pier top horizontal force and torque due to the unbalance load case, were analyzed under the action of temperature, vertical live load, train braking and wind load.Studies show that, it can significantly reduce track displacement to set the track expansion devices at main span arch springing on both sides; the track stress due to arch temperature variation can reach 40.8 MPa; the track stress, pier top horizontal force and torque are related to the number of loaded tracks and train running direction, and the bending force applied to unloaded track is close to the loaded track, while the braking force applied to unloaded track is 1/4 to 1/2 of the loaded track; the longitudinal force of track due to the wind load is up to 12.4 MPa, which should be considered.
基金Federal Highway Administration(FHWA) Under Grant No.DTFH41-98900094
文摘In the 1990s, several major earthquakes occurred throughout the world, with a common observation that near fault ground motion (NFGM) characteristics had a distinct impact on causing damage to civil engineering structures that could not be predicted by using far field ground motions. Since then, seismic responses of structures under NFGMs have been extensively examined, with most of the studies focusing on structures with relatively short fundamental periods, where the traveling wave effect does not need to be considered. However, for long span bridges, especially arch bridges, the traveling wave (only time delay considered) effect may be very distinct and is therefore important. In this paper, the results from a case study on the seismic response of a steel arch bridge under selected NFGMs is presented by considering the traveling wave effect with variable apparent velocities. The effects of fling step and long period pulses of NFGMs on the seismic responses of the arch bridge are also discussed.
基金Projects(51378503,51178471) supported by the National Natural Science Foundation of China
文摘X-style arch bridge on high-speed railways(HSR)is one kind of complicated long-span structure,and the track-bridge interaction is essential to ensure the safety and smoothness of HSR.Taking an X-style steel-box arch bridge with a main span of450 m on HSR under construction for example,a new integrative mechanic model of rail-stringer-cross beam-suspenderpier-foundation coupling system was established,adopting the nonlinear spring element simulating the longitudinal resistance between track and bridge.The transmission law of continuous welded rail(CWR)on the X-style arch bridge was researched,and comparative study was carried out to discuss the influence of several sensitive factors,such as the temperature load case,the longitudinal resistance model,the scheme of longitudinal restraint conditions,the introverted inclination of arch rib,the stiffness of pier and abutment and the location of the rail expansion device.Calculating results indicate that the longitudinal resistance has a significant impact upon the longitudinal forces of CWR on this kind of bridge,while the arch rib’s inclination has little effect.Besides,temperature variation of arch ribs and suspenders should be taken into account in the calculation.Selecting the restraint system without longitudinally-fixed bearing and setting the rail expansion devices on both ends are more reasonable.
基金Projects(51478049,51778068)supported by the National Natural Science Foundation of ChinaProject(14JJ2075,2019JJ40301)supported by the Hunan Natural Science Foundation of China+1 种基金Project(17A010)supported by the Scientific Research Fund of Hunan Provincial Education Department of ChinaProject(2017GK4034)supported by the Major Technological Achievements Transformation Program of Hunan Strategic Emerging Industries of China
文摘Cantilever casting concrete arch bridge using form traveller has a broad application prospect.However,it is difficult to obtain reasonable initial cable force in construction stage.In this study,stress balance and influence matrix methods were developed to determine the initial cable force of cantilever casting concrete arch bridge.The stress balance equation and influence matrix of arch rib critical section were established,and the buckle cable force range was determined by the allowable stress of arch rib critical section.Then a group of buckle cable forces were selected and substituted into the stress balance equation,and the reasonable initial buckle cable force was determined through iteration.Based on the principle of force balance,the initial anchor cable force was determined.In an engineering application example,it is shown that the stress balance and influence matrix methods for the determination of initial cable force are feasible and reliable.The initial cable forces of arch rib segments only need to be adjusted once in the corresponding construction process,which improves the working efficiency and reduces the construction risk.It is found that the methods have great advantages for determining initial cable force in cantilever casting construction process of concrete arch bridge.
文摘This paper attempts to explore potential benefits of form in a deck-type reinforced concrete(RC) arch bridge in connection with its overall seismic behavior and performance. Through a detailed three-dimensional finite element modeling and analysis of an actual existing deck-type RC arch bridge, some useful quantitative information have been derived that may serve for a better understanding of the seismic behavior of such arch bridges. A series of the nonlinear dynamic analyses has been carried out under the action of seven different time histories of ground motion scaled to the AASHTO 2012 response spectrum. The concept of demand to capacity ratios has been employed to provide an initial estimation of the seismic performance of the bridge members. As a consequence of the structural form, a particular type of irregularity is introduced due to variable heights of columns transferring the deck loads to the main arch. Hence, a particular attention has been paid to the internal force/moment distributions within the short, medium, and long columns as well as along the main arch. A study of the effects of the vertical component of ground motion has demonstrated the need for the inclusion of these effects in the analysis of such bridges.
文摘This paper presents the first of a series of case studies on the seismic design of long span bridges (cable-stayed bridges, suspension bridges and arch bridges) under a cooperative research project on seismic behavior and design of highway bridges between the State Key Laboratory for Disaster Reduction in Civil Engineering, Tongji University and the Multidisciplinary Center for Earthquake Engineering Research, University at Buffalo. The objective of this series of case studies is to examine the differences and similarities on the seismic design practice of long span bridges in China and the U.S., to identify research needs and to develop design guidelines beneficial to bridge engineers in both countries. Unlike short to medium span bridges, long span bridges are not included in most seismic design specifications, mainly because they are location dependent and structurally unique. In this paper, an available model of a steel tied half through arch bridge with a main span of 550m in China is discussed. Analysis is focused on comparisons of the seismic responses due to different ground motions. Seismic design criteria and seismic performance requirements for long span bridges in both countries were first introduced and compared, and then three near field earthquake records with large vertical components were selected as the excitations to examine the seismic behavior and seismic vulnerability of the bridge. Results show that (1) the selected near field ground motions cause larger responses to key components (critical sections) of the bridge (such as arch rib ends) with a maximum increase of more than twice those caused by the site specific ground motions; (2) piers, longitudinal girders and arch crowns are more vulnerable to vertical motions, especially their axial forces; and (3) large vertical components of near field ground motions may not significantly affect the bridge's internal forces provided that their peak acceleration spectra ordinates only appear at periods of less than 0.2s. However, they may have more influence on the longitudinal displacements of sliding bearings due to their large displacement spectra ordinates at the fundamental period of the bridge.
文摘A convenient approach is proposed for analyzing the ultimate load carrying capacity of concrete filled steel tubular (CFST) arch bridge with stiffening girders. A fiber model beam element is specially used to simulate the stiffening girder and CFST arch rib. The geometric nonlinearity, material nonlinearity, influence of the construction process and the contribution of prestressing reinforcement are all taken into consideration. The accuracy of this method is validated by comparing its results with experimental results. Finally, the ultimate strength of an abnormal CFST arch bridge with stiffening girders is investigated and the effect of construction method is discussed. It is concluded that the construction process has little effect on the ultimate strength of the bridge.
文摘In the past 20 years, great progress has been achieved in China in the construction of concrete-filled steel tube (CFST) arch bridges and concrete arch bridges with a CFST skeleton. The span of these bridges has been increasing rapidly, which is rare in the history of bridge development. The large-scale construction of expressways and high-speed railways demands the development of long-span arch bridges, and advances in design and construction techniques have made it possible to construct such bridges. In the present study, the current status, development, and major innovative technologies of CFST arch bridges and concrete arch bridges with a CFST skeleton in China are elaborated. This paper covers the key con- struction technologies of CFST arch bridges, such as the design, manufacture, and installation of steel tube arch trusses, the preparation and pouring of in-tube concrete, and the construction of the world's longest CFST arch bridge-the First Hejiang Yangtze River Bridge. The main construction technologies of rein- forced concrete arch bridges are also presented, which include cable-stayed fastening-hanging cantilever assembly, adjusting the load by means of stay cables, surrounding the concrete for arch rib pouring, and so forth. In addition, the construction of two CFST skeleton concrete arch bridges-the Guangxi Yongning Yong River Bridge and the Yunnan-Guangxi Railway Nanpan River Bridge--is discussed. CFST arch bridges in China have already gained a world-leading position; with the continuous innovation of key technologies, China will become the new leader in promoting the development of arch bridges.
文摘A review of the current status and progress of steel arch bridges in China is presented in this paper. The existing steel arch bridges in China were analyzed in terms of steel material, span, structure type, main arch rib form and construction method. The comparison with CFST arch bridges and RC arch bridges is also conducted. It is shown that steel arch bridge has gain rapid development in China since 2000, characterized by long main spans. As for the span, most of the steel arch bridges have a span less than 250 m, while when the span exceeds 350 m, steel arch bridges are strongly competitive against CFST or RC arch bridges. Over 80% of the bridges are through and half-through bridge types, and the arch ribs are hingeless structures. The rise-to-span ratios of the arches are mainly between 1:4 and 1: 5. Most of the arches use solid box ribs, and a small portion of arches use truss ribs in which box sections are mostly adopted for the truss members. The cantilever method and scaffolding method are the two main construction methods used, but some other construction methods have also been developed.
基金Projects(20-JKKJ-17,18-JKKJ-05)supported by the Shanxi Communications Holding Group Co.,Ltd.,ChinaProject(41907239)supported by the National Natural Science Foundation of China+1 种基金Project(2020M670698)supported by the China Postdoctoral Science FoundationProject(2019L0295)supported by the Scientific and Technological Innovation Programs of Higher Education Institutions in Shanxi,China。
文摘Beipanjiang Bridge is a long-span concrete arch bridges with stiffened skeleton(CABSS)in China.It has a fixed end arch with the span of 445 m and the rise of 100 m.To evaluate the rationality of the construction sequence and the time-dependent behavior of CABSS,an experimental study of a model bridge was explored.But the measured displacement and stress ratios of arch rib between prototype and model bridge did not subject to linear similarity relation when the time-dependent behavior was considered.So,the three-dimensional finite element models were established,and verified by the measured data.Then,the displacements and stresses of the prototype and model were compared with each other,when the elastic analysis or coupling of temperature and shrinkage,creep effect was considered.Furthermore,a parametric study was studied.The results showed that when the temperature,shrinkage and creep effect of concrete are considered,the finite element analysis results of prototype and model agree well with the measured results.The displacement and stress ratios of prototype and model bridge in construction and bridge completed stage do not present the geometric similarity ratio 7.5 and 1.0,respectively.They are also much influenced by concrete predicting model and variation of temperature.
基金Sponsored by social science research program of Fujian Provincial Department of Education(JA11300S)Special program of "East Fujian Culture Research"(2011HW05)Key project of Ningde Normal University(2010J002)
文摘On the basis of investigating wooden arch gallery bridges in China,perspectives of researchers studying wooden arch gallery bridges in northeast Fujian Province were reviewed,and the innovativeness of researches from the perspectives of cultural geography and significance of wooden arch gallery bridge for the locals’behaviors was proposed.Youxi Village in Qinyang Town,Shouning County,known as the Village of Gallery Bridge,was taken for example to analyze physical,spiritual and social properties of its wooden arch gallery bridge spaces.Wooden arch gallery bridge is an effective boundary point of settlement space,constituting natural ecological spaces and man-made physical spaces of rural settlements.And as a type of building space,wooden arch gallery bridge expands settlement spaces,contributes to settlement cultures,and enriches spiritual connotations of regional cultures.In northeast Fujian,wooden arch gallery bridge is an important social space for the locals’daily life by carrying on living,production and spiritual functions.
基金Supported by Class-A Social Science Research Program of Fujian Department of Education (JA11300S)2011 Special Program of "Research on East Fujian Cultures" (2011HW05)2010 Key Program of Ningde Normal University (2010J002)
文摘Cultures of folk beliefs in east Fujian Province were introduced and folk beliefs in the local area summarized as ancestor worship,female immortal worship,Taoist secular gods worship,nature worship and local sage worship.Distribution of wooden arch bridges in east Fujian was introduced,major functions of the wooden arch bridges summarized as traffic hub,repairing village environment,creating rural areas with a favorable Fengshui environment,and also god temple.Folk beliefs embodied in wooden arch bridges were classified and responsibilities of the gods and immortals introduced.It was summarized that wooden arch bridges in east Fujian were embodied with diversified folk beliefs,most of the gods and immortals were believed to be responsible for practical aspects of the locals' life,many gods and immortals were worshipped together,which shows the inclusiveness of folk beliefs in the local area,and contributes to main connotations and regional features of local folk belief cultures.
基金This work is supported by the Natural Science Foundation Projects of Liaoning Province(2019-ZD-0145).
文摘To numerically evaluate the reinforcement effect on dynamic characteristics of a concrete-filled steel tube arch bridge with vibration problems,a 12-degree-of-freedom sprung-mass dynamic vehicle model and a 3D finite element bridge model were established.Then,the coupled equations of vehicle-bridge interaction were derived and a computer program was developed using the FORTRAN language.This program can accurately simulate vehicle-bridge coupled vibration considering the bumping effect and road surface irregularity during motion of the vehicle.The simulated results were compared with those of relevant literatures to verify the correctness of the self-developed program.Then,three reinforcement schemes for the bridge(Addition of longitudinal beams,Reinforcement of bridge decks,and Replacement of suspenders)were proposed and numerically simulated,and the vibration reduction effects of the three schemes were evaluated based on the numerical results to find effective ones.It is confirmed that the reinforcement scheme of Addition of longitudinal beams shows the most significant vibration reduction effect.It is recommended in the engineering practice that the combination of the reinforcement schemes of Addition of longitudinal beams and Replacement of bridge deck can be used to solve the excessive vibration problem.
基金supported by the National Natural Science Foundation of China(Grant No.51768037)“Foundation of A Hundred Youth Talents Training Program of Lanzhou Jiaotong University.”。
文摘Purpose–Under different ground motion excitation modes,the spatial coupling effect of seismic response for the arch bridge with thrust,seismic weak parts and the internal force components of the control section of main arch ribs are analyzed.Design/methodology/approach–Taking a 490 m deck type railway steel truss arch bridge as the background,the dynamic calculation model of the whole bridge was established by SAP2000 software.The seismic response analyses under one-,two-and three-dimension(1D,2D and 3D)uniform ground motion excitations were carried out.Findings–For the steel truss arch bridge composed of multiple arch ribs,any single direction ground motion excitation will cause large axial force in the chord of arch rib.The axial force caused by transverse and vertical ground motion excitation in the chord of arch crown area is 1.4–3.6 times of the corresponding axial force under longitudinal seismic excitation.The in-plane bending moment caused by the lower chord at the vault is 4.2–5.5 times of the corresponding bending moment under the longitudinal seismic excitation.For the bottom chord of arch rib,the arch foot is the weak part of earthquake resistance,but for the upper chord of arch rib,the arch foot,arch crown and the intersection of column and upper chord can all be the potential earthquake-resistant weak parts.The normal stress of the bottom chord of the arch rib under multidimensional excitation is mainly caused by the axial force,but the normal stress of the upper chord of the arch rib is caused by the axial force,in-plane and out of plane bending moment.Originality/value–The research provides specific suggestions for ground motion excitation mode and also provides reference information for the earthquake-resistant weak part and seismic design of long-span deck type railway steel truss arch bridges.