We first discuss the relationship between the optimal track maintenance scheduling model and an efficient detection method for abnormal track irregularities given by the longitudinal level irregularity displaceme...We first discuss the relationship between the optimal track maintenance scheduling model and an efficient detection method for abnormal track irregularities given by the longitudinal level irregularity displacement (LLID). The results of applying the cluster analysis technique to the sampling data showed that maintenance operation is required for approximately 10% of the total lots, and these lots were further classified into three groups according to the degree of maintenance need. To analyze the background factors for detecting abnormal LLID lots, a principal component analysis was performed;the results showed that the first principal component represents LLIDs from the viewpoints of the rail structure, equipment, and operating conditions. Binomial and ordinal logit regression models (LRMs) were used to quantitatively investigate the determinants of abnormal LLIDs. Binomial LRM was used to characterize the abnormal LLIDs, whereas ordinal LRM was used to distinguish the degree of influence of factors that are considered to have a significant impact on LLIDs.展开更多
Stiffness is one of the basic performance parameters for railway track. The efficient and accurate stiffness measurement has been considered as the foundation for further development of railway engineering, and theref...Stiffness is one of the basic performance parameters for railway track. The efficient and accurate stiffness measurement has been considered as the foundation for further development of railway engineering, and therefore has great theoretical and practical significance. Based on a summary of the connotation and measurement of track stiffness, the state of the art of measurement methods for track stiffness was analyzed systematically. The standstill measurement of track stiffness can be performed with the traditional jack-loading method, impact hammer method, FWD (falling weight deflectometer) method, and track loading vehicle method. Although these methods can be adopted in stiffness measurement for a section of railway track, they are not desirable owning to small range and low efficiency. In the recent 20 years, researchers have proposed many methods like unbalancedloading laser displacement method, deflection basin deformation rate method, and eccentricity excitation method to continuously measure track stiffness; however, these methods have drawbacks like poor accuracy, low speed, and insufficient data analysis. In this work, the merits and demerits of these methods were summarized, and optimization suggestions were presented. Based on the wave transmission mechanism and principle of vibration energy harvesting, an overall conception on continuous measurement of stiffness and long-term stiffness monitoring for special sections was proposed.展开更多
The volume of rail traffic was increased by 5 % from 2006 to 2010, in Sweden, due to increased goods and passenger traffic. This increased traffic, in turn, has led to a more rapid degradation of the railway track, wh...The volume of rail traffic was increased by 5 % from 2006 to 2010, in Sweden, due to increased goods and passenger traffic. This increased traffic, in turn, has led to a more rapid degradation of the railway track, which has resulted in higher maintenance costs. In general, degradation affects comfort, safety, and track quality, as well as, reliability, availability, speed, and overall railway performance. This case study investigated the needs of railway stakeholders responsible for analysing the track state and what information is necessary to make good maintenance decisions. The goal is to improve the railway track per- formance by ensuring increased availability, reliability, and safety, along with a decreased maintenance cost. Inter- views of eight experts were undertaken to learn of general areas in need of improvement, and a quantitative analysis of condition monitoring data was conducted to find more specific information. The results show that by implement- ing a long-term maintenance strategy and by conducting preventive maintenance actions maintenance costs would be reduced. In addition to that, problems with measured data, missing data, and incorrect location data resulted in increased and unnecessary maintenance tasks. The conclusions show that proactive solutions are needed to reach the desired goals of improved safety, improved availability, and improved reliability. This also includes thedevelopment of a visualisation tool and a life cycle cost model for maintenance strategies.展开更多
文摘We first discuss the relationship between the optimal track maintenance scheduling model and an efficient detection method for abnormal track irregularities given by the longitudinal level irregularity displacement (LLID). The results of applying the cluster analysis technique to the sampling data showed that maintenance operation is required for approximately 10% of the total lots, and these lots were further classified into three groups according to the degree of maintenance need. To analyze the background factors for detecting abnormal LLID lots, a principal component analysis was performed;the results showed that the first principal component represents LLIDs from the viewpoints of the rail structure, equipment, and operating conditions. Binomial and ordinal logit regression models (LRMs) were used to quantitatively investigate the determinants of abnormal LLIDs. Binomial LRM was used to characterize the abnormal LLIDs, whereas ordinal LRM was used to distinguish the degree of influence of factors that are considered to have a significant impact on LLIDs.
基金supported by the project (51425804) of the National Science Fund for Distinguished Young Scholars of Chinathe National Natural Science Foundation of China (NSFC) under grants U1234201, U1334203, and 51378439
文摘Stiffness is one of the basic performance parameters for railway track. The efficient and accurate stiffness measurement has been considered as the foundation for further development of railway engineering, and therefore has great theoretical and practical significance. Based on a summary of the connotation and measurement of track stiffness, the state of the art of measurement methods for track stiffness was analyzed systematically. The standstill measurement of track stiffness can be performed with the traditional jack-loading method, impact hammer method, FWD (falling weight deflectometer) method, and track loading vehicle method. Although these methods can be adopted in stiffness measurement for a section of railway track, they are not desirable owning to small range and low efficiency. In the recent 20 years, researchers have proposed many methods like unbalancedloading laser displacement method, deflection basin deformation rate method, and eccentricity excitation method to continuously measure track stiffness; however, these methods have drawbacks like poor accuracy, low speed, and insufficient data analysis. In this work, the merits and demerits of these methods were summarized, and optimization suggestions were presented. Based on the wave transmission mechanism and principle of vibration energy harvesting, an overall conception on continuous measurement of stiffness and long-term stiffness monitoring for special sections was proposed.
文摘The volume of rail traffic was increased by 5 % from 2006 to 2010, in Sweden, due to increased goods and passenger traffic. This increased traffic, in turn, has led to a more rapid degradation of the railway track, which has resulted in higher maintenance costs. In general, degradation affects comfort, safety, and track quality, as well as, reliability, availability, speed, and overall railway performance. This case study investigated the needs of railway stakeholders responsible for analysing the track state and what information is necessary to make good maintenance decisions. The goal is to improve the railway track per- formance by ensuring increased availability, reliability, and safety, along with a decreased maintenance cost. Inter- views of eight experts were undertaken to learn of general areas in need of improvement, and a quantitative analysis of condition monitoring data was conducted to find more specific information. The results show that by implement- ing a long-term maintenance strategy and by conducting preventive maintenance actions maintenance costs would be reduced. In addition to that, problems with measured data, missing data, and incorrect location data resulted in increased and unnecessary maintenance tasks. The conclusions show that proactive solutions are needed to reach the desired goals of improved safety, improved availability, and improved reliability. This also includes thedevelopment of a visualisation tool and a life cycle cost model for maintenance strategies.