A new nonlinear transverse-torsional coupled model with backlash and bearing clearance was proposed for planetary gear set. Meanwhile, sun gear and planet's eccentricity errors, static transmission error, and time...A new nonlinear transverse-torsional coupled model with backlash and bearing clearance was proposed for planetary gear set. Meanwhile, sun gear and planet's eccentricity errors, static transmission error, and time-varying meshing stiffness were taken into consideration. The differential governing equations of motion were solved by employing variable step-size Rung-Kutta numerical integration method. The behavior of dynamic load sharing characteristics affected by the system parameters including input rate, sun gear's supporting stiffness and eccentricity error, planet's eccentricity error, sun gear's bearing clearance, backlashes of sun-planet and planet-ring meshes were investigated qualitatively and systematically. Some theoretical results are summarized at last which extend the current understanding of the dynamic load sharing behavior of planet gear train, enrich the related literature and provide references for the design of planetary gear train.展开更多
Piled embankments,which offer many advantages,are increasingly popular in construction of high-speed railways in China.Although the performance of piled embankment under static loading is well-known,the behavior under...Piled embankments,which offer many advantages,are increasingly popular in construction of high-speed railways in China.Although the performance of piled embankment under static loading is well-known,the behavior under the dynamic train load of a high-speed railway is not yet understood.In light of this,a heavily instrumented piled embankment model was set up,and a model test was carried out,in which a servo-hydraulic actuator outputting M-shaped waves was adopted to simulate the process of a running train.Earth pressure,settlement,strain in the geogrid and pile and excess pore water pressure were measured.The results show that the soil arching height under the dynamic train load of a high-speed railway is shorter than under static loading.The growth trend for accumulated settlement slowed down after long-term vibration although there was still a tendency for it to increase.Accumulated geogrid strain has an increasing tendency after long-term vibration.The closer the embankment edge,the greater the geogrid strain over the subsoil.Strains in the pile were smaller under dynamic train loads,and their distribution was different from that under static loading.At the same elevation,excess pore water pressure under the track slab was greater than that under the embankment shoulder.展开更多
The magnitude of dynamic load produced by high-speed trains depends on many factors,of which train speed is the most critical one.However,it is quite difficult to determine the effect of train speed on dynamic load us...The magnitude of dynamic load produced by high-speed trains depends on many factors,of which train speed is the most critical one.However,it is quite difficult to determine the effect of train speed on dynamic load using the theoretical methods due to the complexity of the interaction between vehicle and track-subgrade.Thus large-scale model test has gradually become an important approach for studying dynamic responses of ballastless track-subgrade of high-speed railway.In this study,a full-scale model of ballastless track-subgrade was constructed in accordance with the design and construction standards for Shanghai-Nanjing intercity high-speed railway line firstly.Then,the dynamic strain of slab and the dynamic earth pressure of subgrade were measured by conducting single wheel axle excitation test.In addition,the relationship between the dynamic load magnification factor(DLF) and the train speed was obtained.Finally,the DLF of track-subgrade under different train speeds was proposed,similar to that given by German Railway Standard.展开更多
In this paper, bridge alignment control with considering dynamic train loads was experimentally and theoretically investigated.Analytical process of bridge dynamics and the self-adaptive Kalman filter bridge alignment...In this paper, bridge alignment control with considering dynamic train loads was experimentally and theoretically investigated.Analytical process of bridge dynamics and the self-adaptive Kalman filter bridge alignment control method with considering the dynamic train loads were briefly introduced. The static measurement, the dynamic test, the field alignment measurement as well as the finite element analysis(FEA) of the second longest rail transit cable-stayed bridge in the world were carried out.Based on the results, the train dynamic load effect on the bridge alignment was obtained quantitatively. Subsequently, alignment control of the rail transit bridge with considering this effect using a self-adaptive Kalman filter method was analyzed. The results show that:(a) the dynamic train loads have effects on alignment control of the bridge and therefore cannot be neglected;(b) the self-adaptive Kalman filter method is applicable and reliable for alignment control of bridges during construction. The analytical method and whole process contribute to develop a related specification and further engineering applications.展开更多
基金Project(51105194)supported by the National Natural Science Foundation of ChinaProject(20113218110017)supported by the Doctoral Program Foundation of Institutions of Higher Education of China+2 种基金Project supported by the Priority Academic Program Development of Jiangsu Higher Education Institutions,ChinaProject(CXZZ11_0199)supported by the Funding of Jiangsu Innovation Program for Graduate Education,ChinaProjects(NZ2013303,NZ2014201)supported by the Fundamental Research Funds for the Central Universities,China
文摘A new nonlinear transverse-torsional coupled model with backlash and bearing clearance was proposed for planetary gear set. Meanwhile, sun gear and planet's eccentricity errors, static transmission error, and time-varying meshing stiffness were taken into consideration. The differential governing equations of motion were solved by employing variable step-size Rung-Kutta numerical integration method. The behavior of dynamic load sharing characteristics affected by the system parameters including input rate, sun gear's supporting stiffness and eccentricity error, planet's eccentricity error, sun gear's bearing clearance, backlashes of sun-planet and planet-ring meshes were investigated qualitatively and systematically. Some theoretical results are summarized at last which extend the current understanding of the dynamic load sharing behavior of planet gear train, enrich the related literature and provide references for the design of planetary gear train.
基金National Natural Science Foundation of China under Grant Nos.51622803,51378177 and 51420105013the 111 Project under Grant No.B13024
文摘Piled embankments,which offer many advantages,are increasingly popular in construction of high-speed railways in China.Although the performance of piled embankment under static loading is well-known,the behavior under the dynamic train load of a high-speed railway is not yet understood.In light of this,a heavily instrumented piled embankment model was set up,and a model test was carried out,in which a servo-hydraulic actuator outputting M-shaped waves was adopted to simulate the process of a running train.Earth pressure,settlement,strain in the geogrid and pile and excess pore water pressure were measured.The results show that the soil arching height under the dynamic train load of a high-speed railway is shorter than under static loading.The growth trend for accumulated settlement slowed down after long-term vibration although there was still a tendency for it to increase.Accumulated geogrid strain has an increasing tendency after long-term vibration.The closer the embankment edge,the greater the geogrid strain over the subsoil.Strains in the pile were smaller under dynamic train loads,and their distribution was different from that under static loading.At the same elevation,excess pore water pressure under the track slab was greater than that under the embankment shoulder.
基金the National Natural Science Foundation of China(51225804,U1234204,51222803,51178418)for the financial supports
文摘The magnitude of dynamic load produced by high-speed trains depends on many factors,of which train speed is the most critical one.However,it is quite difficult to determine the effect of train speed on dynamic load using the theoretical methods due to the complexity of the interaction between vehicle and track-subgrade.Thus large-scale model test has gradually become an important approach for studying dynamic responses of ballastless track-subgrade of high-speed railway.In this study,a full-scale model of ballastless track-subgrade was constructed in accordance with the design and construction standards for Shanghai-Nanjing intercity high-speed railway line firstly.Then,the dynamic strain of slab and the dynamic earth pressure of subgrade were measured by conducting single wheel axle excitation test.In addition,the relationship between the dynamic load magnification factor(DLF) and the train speed was obtained.Finally,the DLF of track-subgrade under different train speeds was proposed,similar to that given by German Railway Standard.
基金supported by the State Key Laboratory Breeding Base of Mountain Bridge and Tunnel Engineering(Chongqing Jiaotong University)fund(Grant No.CQSLBF-Y16-16)the Engineering Research Center of Bridge Structure and Material in the Mountainous Area Fund(Grant No.QLGCZX-JJ2015-6)+4 种基金the National Natural Science Foundation of China(Grant No.51408087)the Construction Technology Project of Ministry of Transport(Grant No.2015318814190)the Key Project of Foundation and Frontier Research of Chongqing(Grant No.cstc2015jcyjBX0022)the Application Foundation Research Project of Ministry of transport(Grant No.2013319814180)the "Xiaoping Science and Technology Innovation Team" fund for Chinese college students
文摘In this paper, bridge alignment control with considering dynamic train loads was experimentally and theoretically investigated.Analytical process of bridge dynamics and the self-adaptive Kalman filter bridge alignment control method with considering the dynamic train loads were briefly introduced. The static measurement, the dynamic test, the field alignment measurement as well as the finite element analysis(FEA) of the second longest rail transit cable-stayed bridge in the world were carried out.Based on the results, the train dynamic load effect on the bridge alignment was obtained quantitatively. Subsequently, alignment control of the rail transit bridge with considering this effect using a self-adaptive Kalman filter method was analyzed. The results show that:(a) the dynamic train loads have effects on alignment control of the bridge and therefore cannot be neglected;(b) the self-adaptive Kalman filter method is applicable and reliable for alignment control of bridges during construction. The analytical method and whole process contribute to develop a related specification and further engineering applications.