SEC is not only one of the largest enterprise groups in China that engaged in designing and manufacturing of power generating equipment, but also is noted for designing and manufacturing power transmission and distrib...SEC is not only one of the largest enterprise groups in China that engaged in designing and manufacturing of power generating equipment, but also is noted for designing and manufacturing power transmission and distribution equipment. Shanghai Power Transmission and Distribution Equipment Corporation is a subsidiary of SEC. It consists of key enterprises, including Shanghai Hua Tong Switchgear Works, Shanghai Relay Plant,Shanghai Instrument Transformer Works, Shang-展开更多
The limitations of the conventional master-slavesplitting(MSS)method,which is commonly applied to power flow and optimal power flow in integrated transmission and distribution(I-T&D)networks,are first analyzed.Con...The limitations of the conventional master-slavesplitting(MSS)method,which is commonly applied to power flow and optimal power flow in integrated transmission and distribution(I-T&D)networks,are first analyzed.Considering that the MSS method suffers from a slow convergence rate or even divergence under some circumstances,a least-squares-based iterative(LSI)method is proposed.Compared with the MSS method,the LSI method modifies the iterative variables in each iteration by solving a least-squares problem with the information in previous iterations.A practical implementation and a parameter tuning strategy for the LSI method are discussed.Furthermore,a LSI-PF method is proposed to solve I-T&D power flow and a LSIheterogeneous decomposition(LSI-HGD)method is proposed to solve optimal power flow.Numerical experiments demonstrate that the proposed LSI-PF and LSI-HGD methods can achieve the same accuracy as the benchmark methods.Meanwhile,these LSI methods,with appropriate settings,significantly enhance the convergence and efficiency of conventional methods.Also,in some cases,where conventional methods diverge,these LSI methods can still converge.展开更多
To satisfy the requirements of accurate operationalrisk assessment of integrated transmission and distribution networks (I-T&D), an integrated operational risk assessment (IORA) algorithm is proposed. Specific cas...To satisfy the requirements of accurate operationalrisk assessment of integrated transmission and distribution networks (I-T&D), an integrated operational risk assessment (IORA) algorithm is proposed. Specific cases demonstrate thatan I-ORA is necessary because it provides accurate handlingof the coupling between transmission and distribution networks,accurate analysis of power supply mode (PSM) changes ofimportant users and helps to improve security and stability ofpower grid operations. Two key technical requirements in theI-ORA algorithm are realized, i.e., integrated topology analysisand integrated power flow calculation. Under a certain contingency, integrated topology analysis is used to assess the risksof substation power cuts, network split and PSM changes ofimportant users, while the integrated power flow calculation,based on the self-adaptive Levenburg-Marquard method andNewton method, can be implemented to assess risks of heavyload/overload and voltage deviation. In addition, the graphicsprocessing unit is used to parallelly process some computationintensive steps. Numerical experiments show that the proposedI-ORA algorithm can realize accurate assessment for the entireI-T&D. In addition, the efficiency and convergence are satisfying,indicating the proposed I-ORA algorithm can significantly benefitreal practice in the coordination operation of I-T&D in the future.展开更多
In order to improve the safety management of urban gas transmission and distribution system, failure mode and effects analysis (FMEA) was used to construct the reliability analysis system of the pipeline network. To...In order to improve the safety management of urban gas transmission and distribution system, failure mode and effects analysis (FMEA) was used to construct the reliability analysis system of the pipeline network. To solve the problem of subjectivity and uncertainty of the multi-expert decision making, the correlation operator was introduced into the calculation of the risk priority number (RPN). Using FMEA along with weight analysis and expert investigation approach, the FMEA evaluation table was given, including five failure modes, risk priority numbers, failure causes and effects, as well as corrective actions. The results show that correlation operator can directly process the linguistic terms and quantify the priority of the risks.展开更多
The electrical parameters of H_(2)/Ar plasma in a cylindrical inductive discharge with an expansion region are investigated by a Langmuir probe,where Ar fractions range from 0%to 100%.The influence of gas composition ...The electrical parameters of H_(2)/Ar plasma in a cylindrical inductive discharge with an expansion region are investigated by a Langmuir probe,where Ar fractions range from 0%to 100%.The influence of gas composition and pressure on electron density,the effective electron temperature and the electron energy probability functions(EEPFs)at different spatial positions are present.In driver region,with the introduction of a small amount of Ar at 0.3 Pa,there is a rapid increase in electron density accompanied by a decrease in the effective electron temperature.Additionally,the shape of the EEPF transitions from a three-temperature distribution to a bi-Maxwellian distribution due to an increase in electron-electron collision.However,this phenomenon resulting from the changes in gas composition vanishes at 5 Pa due to the prior depletion of energetic electrons caused by the increase in pressure during hydrogen discharge.The EEPFs for the total energy in expansion region is coincident to these in the driver region at 0.3 Pa,as do the patterns of electron density variation between these two regions for differing Ar fractions.At 5 Pa,as the discharge transitions from H_(2)to Ar,the EEPFs evolved from a bi-Maxwellian distribution with pronounced low energy electrons to a Maxwellian distribution in expansion region.This evolve may be attributed to a reduction in molecular vibrational excitation reactions of electrons during transport and the transition from localized electron dynamics in hydrogen discharge to non-localized electron dynamics in argon discharge.In order to validate the experimental results,we use the COMSOL simulation software to calculate electrical parameters under the same conditions.The evolution and spatial distribution of the electrical parameters of the simulation results agree well with the trend of the experimental results.展开更多
As the integration of distributed generations(DGs)transforms the traditional distribution network into the active distribution network,voltage stability assessments(VSA)of transmission grid and distribution grid are n...As the integration of distributed generations(DGs)transforms the traditional distribution network into the active distribution network,voltage stability assessments(VSA)of transmission grid and distribution grid are not suitable to be studied separately.This paper presents a distributed continuation power flow method for VSA of global transmission and distribution grid.Two different parameterization schemes are adopted to guarantee the coherence of load growth in transmission and distribution grids.In the correction step,the boundary bus voltage,load parameter and equivalent power are communicated between the transmission and distribution control centers to realize the distributed computation of load margin.The optimal multiplier technique is used to improve the convergence of the proposed method.The three-phase unbalanced characteristic of distribution networks and the reactive capability limits of DGs are considered.Simulation results on two integrated transmission and distribution test systems show that the proposed method is effective.展开更多
The reform on electricity pricing mechanism is a critical problem in power market construction in China, and is in mutual supplementation and promotion with the latter. In particular, the pricing mechanism for electri...The reform on electricity pricing mechanism is a critical problem in power market construction in China, and is in mutual supplementation and promotion with the latter. In particular, the pricing mechanism for electricity fed into network and that for electricity transmission and distribution as well as the relationship between coal and electricity prices, etc. have to be studied in depth. This paper presents several solutions and suggestions to these problems.展开更多
The National Development and Reform Commission beefed up its efforts to promote the work of electricity price reform in 2004. It took measures in aspects of easing price contradictions, tentatively implementing discri...The National Development and Reform Commission beefed up its efforts to promote the work of electricity price reform in 2004. It took measures in aspects of easing price contradictions, tentatively implementing discriminated price and time-of-use price and issuing a policy on the linkage of coal and electricity prices and price administration. In 2005 the basic thinking of the Commission's electricity price reform is to actively advance the pilot work of price reform,carry out the reform of transmission and distribution price, enlarge the scope of pilot work of large consumer's direct purchase, simplify sales price structure and bring about the linkage of coal and electricity prices.展开更多
The State Council issued the Scheme for Reforming Electricity Pricing System m the second half of year 2003. It touches upon separating price of plant from that of network, sales price to network, transmission and dis...The State Council issued the Scheme for Reforming Electricity Pricing System m the second half of year 2003. It touches upon separating price of plant from that of network, sales price to network, transmission and distribution price, sales price and system principles in regard to electricity tariff mainly.展开更多
The paper outlines the Yangtze Three Gorges water conservancy complex. It describes the power transmission and distribution equipment in the Three Gorges LeftBank Hydropower Station, especially large high-voltage dist...The paper outlines the Yangtze Three Gorges water conservancy complex. It describes the power transmission and distribution equipment in the Three Gorges LeftBank Hydropower Station, especially large high-voltage distribution devices. It elaborates the measures for suppressing GIS over-voltage and the tests on VFTO, besides technical measures to ensure safety and stability of power system in the station. It also makes some analyses and summaries about the problems encountered in operation of the equipment.展开更多
The general availability growth models for large scale complicated repairable system such as electric generating units, power station auxiliaries, and transmission and distribution installations are presented. The cal...The general availability growth models for large scale complicated repairable system such as electric generating units, power station auxiliaries, and transmission and distribution installations are presented. The calculation formulas for the maintenance coefficient, mathematical expressions for general availability growth models, ways for estimating, and fitting on checking the parameters of the model are introduced. Availability growth models for electric generating units, power station auxiliaries, and transmission and distribution installations are given together with verification examples for availability growth models of 320–1000 MW nuclear power units and 1000 MW thermal power units, 200–1000 MW power station auxiliaries, and 220–500 kV transmission and distribution installations. The verification results for operation availability data show that the maintenance coefficients for electric generating units, power station auxiliaries, transmission and distribution installations conform to the power function, and general availability growth models conform to rules of availability growth tendency of power equipment.展开更多
文摘SEC is not only one of the largest enterprise groups in China that engaged in designing and manufacturing of power generating equipment, but also is noted for designing and manufacturing power transmission and distribution equipment. Shanghai Power Transmission and Distribution Equipment Corporation is a subsidiary of SEC. It consists of key enterprises, including Shanghai Hua Tong Switchgear Works, Shanghai Relay Plant,Shanghai Instrument Transformer Works, Shang-
基金supported by the National Natural Science Foundation of China(52077193).
文摘The limitations of the conventional master-slavesplitting(MSS)method,which is commonly applied to power flow and optimal power flow in integrated transmission and distribution(I-T&D)networks,are first analyzed.Considering that the MSS method suffers from a slow convergence rate or even divergence under some circumstances,a least-squares-based iterative(LSI)method is proposed.Compared with the MSS method,the LSI method modifies the iterative variables in each iteration by solving a least-squares problem with the information in previous iterations.A practical implementation and a parameter tuning strategy for the LSI method are discussed.Furthermore,a LSI-PF method is proposed to solve I-T&D power flow and a LSIheterogeneous decomposition(LSI-HGD)method is proposed to solve optimal power flow.Numerical experiments demonstrate that the proposed LSI-PF and LSI-HGD methods can achieve the same accuracy as the benchmark methods.Meanwhile,these LSI methods,with appropriate settings,significantly enhance the convergence and efficiency of conventional methods.Also,in some cases,where conventional methods diverge,these LSI methods can still converge.
基金the State Grid Zhejiang Electric Power Co.,Ltd.(Science and Technology Project under Grant 5211JH180081:Research on security evaluation and control technology of smart platform based on dispatch cloud.)。
文摘To satisfy the requirements of accurate operationalrisk assessment of integrated transmission and distribution networks (I-T&D), an integrated operational risk assessment (IORA) algorithm is proposed. Specific cases demonstrate thatan I-ORA is necessary because it provides accurate handlingof the coupling between transmission and distribution networks,accurate analysis of power supply mode (PSM) changes ofimportant users and helps to improve security and stability ofpower grid operations. Two key technical requirements in theI-ORA algorithm are realized, i.e., integrated topology analysisand integrated power flow calculation. Under a certain contingency, integrated topology analysis is used to assess the risksof substation power cuts, network split and PSM changes ofimportant users, while the integrated power flow calculation,based on the self-adaptive Levenburg-Marquard method andNewton method, can be implemented to assess risks of heavyload/overload and voltage deviation. In addition, the graphicsprocessing unit is used to parallelly process some computationintensive steps. Numerical experiments show that the proposedI-ORA algorithm can realize accurate assessment for the entireI-T&D. In addition, the efficiency and convergence are satisfying,indicating the proposed I-ORA algorithm can significantly benefitreal practice in the coordination operation of I-T&D in the future.
文摘In order to improve the safety management of urban gas transmission and distribution system, failure mode and effects analysis (FMEA) was used to construct the reliability analysis system of the pipeline network. To solve the problem of subjectivity and uncertainty of the multi-expert decision making, the correlation operator was introduced into the calculation of the risk priority number (RPN). Using FMEA along with weight analysis and expert investigation approach, the FMEA evaluation table was given, including five failure modes, risk priority numbers, failure causes and effects, as well as corrective actions. The results show that correlation operator can directly process the linguistic terms and quantify the priority of the risks.
基金supported by the National Natural Science Foundation of China(Grant Nos.11935005 and 12075049)the National Key Research and Development Program of China(Grant No.2017YFE0300106).
文摘The electrical parameters of H_(2)/Ar plasma in a cylindrical inductive discharge with an expansion region are investigated by a Langmuir probe,where Ar fractions range from 0%to 100%.The influence of gas composition and pressure on electron density,the effective electron temperature and the electron energy probability functions(EEPFs)at different spatial positions are present.In driver region,with the introduction of a small amount of Ar at 0.3 Pa,there is a rapid increase in electron density accompanied by a decrease in the effective electron temperature.Additionally,the shape of the EEPF transitions from a three-temperature distribution to a bi-Maxwellian distribution due to an increase in electron-electron collision.However,this phenomenon resulting from the changes in gas composition vanishes at 5 Pa due to the prior depletion of energetic electrons caused by the increase in pressure during hydrogen discharge.The EEPFs for the total energy in expansion region is coincident to these in the driver region at 0.3 Pa,as do the patterns of electron density variation between these two regions for differing Ar fractions.At 5 Pa,as the discharge transitions from H_(2)to Ar,the EEPFs evolved from a bi-Maxwellian distribution with pronounced low energy electrons to a Maxwellian distribution in expansion region.This evolve may be attributed to a reduction in molecular vibrational excitation reactions of electrons during transport and the transition from localized electron dynamics in hydrogen discharge to non-localized electron dynamics in argon discharge.In order to validate the experimental results,we use the COMSOL simulation software to calculate electrical parameters under the same conditions.The evolution and spatial distribution of the electrical parameters of the simulation results agree well with the trend of the experimental results.
基金This work is supported by National Natural Science Foundation of China(No.51077042,No.51577049)Special Foundation of The doctoral program of Higher Education(No.20120094110008).
文摘As the integration of distributed generations(DGs)transforms the traditional distribution network into the active distribution network,voltage stability assessments(VSA)of transmission grid and distribution grid are not suitable to be studied separately.This paper presents a distributed continuation power flow method for VSA of global transmission and distribution grid.Two different parameterization schemes are adopted to guarantee the coherence of load growth in transmission and distribution grids.In the correction step,the boundary bus voltage,load parameter and equivalent power are communicated between the transmission and distribution control centers to realize the distributed computation of load margin.The optimal multiplier technique is used to improve the convergence of the proposed method.The three-phase unbalanced characteristic of distribution networks and the reactive capability limits of DGs are considered.Simulation results on two integrated transmission and distribution test systems show that the proposed method is effective.
文摘The reform on electricity pricing mechanism is a critical problem in power market construction in China, and is in mutual supplementation and promotion with the latter. In particular, the pricing mechanism for electricity fed into network and that for electricity transmission and distribution as well as the relationship between coal and electricity prices, etc. have to be studied in depth. This paper presents several solutions and suggestions to these problems.
文摘The National Development and Reform Commission beefed up its efforts to promote the work of electricity price reform in 2004. It took measures in aspects of easing price contradictions, tentatively implementing discriminated price and time-of-use price and issuing a policy on the linkage of coal and electricity prices and price administration. In 2005 the basic thinking of the Commission's electricity price reform is to actively advance the pilot work of price reform,carry out the reform of transmission and distribution price, enlarge the scope of pilot work of large consumer's direct purchase, simplify sales price structure and bring about the linkage of coal and electricity prices.
文摘The State Council issued the Scheme for Reforming Electricity Pricing System m the second half of year 2003. It touches upon separating price of plant from that of network, sales price to network, transmission and distribution price, sales price and system principles in regard to electricity tariff mainly.
文摘The paper outlines the Yangtze Three Gorges water conservancy complex. It describes the power transmission and distribution equipment in the Three Gorges LeftBank Hydropower Station, especially large high-voltage distribution devices. It elaborates the measures for suppressing GIS over-voltage and the tests on VFTO, besides technical measures to ensure safety and stability of power system in the station. It also makes some analyses and summaries about the problems encountered in operation of the equipment.
文摘The general availability growth models for large scale complicated repairable system such as electric generating units, power station auxiliaries, and transmission and distribution installations are presented. The calculation formulas for the maintenance coefficient, mathematical expressions for general availability growth models, ways for estimating, and fitting on checking the parameters of the model are introduced. Availability growth models for electric generating units, power station auxiliaries, and transmission and distribution installations are given together with verification examples for availability growth models of 320–1000 MW nuclear power units and 1000 MW thermal power units, 200–1000 MW power station auxiliaries, and 220–500 kV transmission and distribution installations. The verification results for operation availability data show that the maintenance coefficients for electric generating units, power station auxiliaries, transmission and distribution installations conform to the power function, and general availability growth models conform to rules of availability growth tendency of power equipment.